{{#Wiki_filter:March 29, 2007LICENSEE:PSEG NUCLEAR, LLCFACILITY:HOPE CREEK GENERATING STATION
{{#Wiki_filter:March 29, 2007 LICENSEE:       PSEG NUCLEAR, LLC FACILITY:       HOPE CREEK GENERATING STATION


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF MARCH 2, 2007, MEETING WITH PSEG NUCLEAR, LLC, ON AN APPLICATION FOR EXTENDED POWER UPRATE FOR HOPE CREEK GENERATING STATION REGARDING STEAM DRYER MARGIN (TAC NO. MD 3002)On March, 2, 2007, a Category 1 public meeting was held between the Nuclear RegulatoryCommission (NRC) and representatives of PSEG Nuclear, LLC (PSEG, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss technical aspects of the licensee's application for an extended power uprate (EPU) at the Hope Creek Generating Station dated September 18, 2006 (Agencywide Documents and Management System (ADAMS) Accession No. ML062680451). contains the meeting agenda, Enclosure 2 is a list of meeting attendees, and  is the licensee's presentation.The licensee presented information detailing steam dryer margin statistics relating to the EPUlicense amendment request (LAR) (see attached licensee presentation). The information discussed at the meeting was intended to be an overview of information provided in an LAR supplement (Accession No. ML070680314), dated February 28, 2007. The supplement discusses additional benchmarking to establish scale model test (SMT) flow rates more representative of mean steam flow speeds at current licensed thermal power (CLTP) and EPU conditions, modeling of additional steam dryer weld reinforcements that were made before initial plant operation but were not previously included in the finite element model used to predict stress levels for EPU operation, and monitoring reactor pressure vessel steam dome to confirm the absence of a significant pressure pulsation frequency peak at 80 Hz. The licensee discussed the validation of in-plant data and the steam dryer power ascension test plan during the meeting. The NRC staff asked how often the NRC will be notified before each power set point is reached during power ascension. The licensee stated that a specific notificationschedule has not yet been developed.The NRC staff was interested in how the Mach number used in scale mode testing for both the1/5th and 1/8th scales, including uncertainty, was measured, calculated, and validated. The licensee said these questions could be addressed in a formal NRC request for additional information (RAI). Other topics discussed during the meeting, which will be addressed through RAIs, included how low-frequency pressure loading is monitored, how loading on the steam dryer due to vibration at the re-circulation pump bypass frequency is monitored, bias and uncertainty involved in the Strain Gage measurement, Acoustic Circuit Model (ACM) analysis and Finite Element analysis, and how the conservative factor was derived based on the pressure loads on the dryer resulting from the ACM analyses.  -2-During the meeting, the licensee committed to provide the following documents for staff review:  - Report on reactor pressure vessel dome dynamic pressure data recently collected byPSEG (Structural Integrity Report).    - Stress report based on new in-plant strain gage data at CLTP with all gages working.
OF MARCH 2, 2007, MEETING WITH PSEG NUCLEAR, LLC, ON AN APPLICATION FOR EXTENDED POWER UPRATE FOR HOPE CREEK GENERATING STATION REGARDING STEAM DRYER MARGIN (TAC NO. MD 3002)
PSEG representatives stated that the Hope Creek EPU schedule is on-track. The licensee iscurrently working on responses to RAIs from the NRC staff.There were no members of the general public in attendance. However, a few representativesof other licensees participated in the meeting who had previous proprietaty agreements with the vendor. Public Meeting Feedback forms were not received.
On March, 2, 2007, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of PSEG Nuclear, LLC (PSEG, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss technical aspects of the licensees application for an extended power uprate (EPU) at the Hope Creek Generating Station dated September 18, 2006 (Agencywide Documents and Management System (ADAMS) Accession No. ML062680451). contains the meeting agenda, Enclosure 2 is a list of meeting attendees, and  is the licensees presentation.
The licensee presented information detailing steam dryer margin statistics relating to the EPU license amendment request (LAR) (see attached licensee presentation). The information discussed at the meeting was intended to be an overview of information provided in an LAR supplement (Accession No. ML070680314), dated February 28, 2007. The supplement discusses additional benchmarking to establish scale model test (SMT) flow rates more representative of mean steam flow speeds at current licensed thermal power (CLTP) and EPU conditions, modeling of additional steam dryer weld reinforcements that were made before initial plant operation but were not previously included in the finite element model used to predict stress levels for EPU operation, and monitoring reactor pressure vessel steam dome to confirm the absence of a significant pressure pulsation frequency peak at 80 Hz. The licensee discussed the validation of in-plant data and the steam dryer power ascension test plan during the meeting. The NRC staff asked how often the NRC will be notified before each power set point is reached during power ascension. The licensee stated that a specific notification schedule has not yet been developed.
The NRC staff was interested in how the Mach number used in scale mode testing for both the 1/5th and 1/8th scales, including uncertainty, was measured, calculated, and validated. The licensee said these questions could be addressed in a formal NRC request for additional information (RAI). Other topics discussed during the meeting, which will be addressed through RAIs, included how low-frequency pressure loading is monitored, how loading on the steam dryer due to vibration at the re-circulation pump bypass frequency is monitored, bias and uncertainty involved in the Strain Gage measurement, Acoustic Circuit Model (ACM) analysis and Finite Element analysis, and how the conservative factor was derived based on the pressure loads on the dryer resulting from the ACM analyses.


During the meeting, the licensee committed to provide the following documents for staff review:
-      Report on reactor pressure vessel dome dynamic pressure data recently collected by PSEG (Structural Integrity Report).
-      Stress report based on new in-plant strain gage data at CLTP with all gages working.
PSEG representatives stated that the Hope Creek EPU schedule is on-track. The licensee is currently working on responses to RAIs from the NRC staff.
There were no members of the general public in attendance. However, a few representatives of other licensees participated in the meeting who had previous proprietaty agreements with the vendor. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1388, or jjs@nrc.gov].
Please direct any inquiries to me at 301-415-1388, or jjs@nrc.gov].
  /ra/James J. Shea, Project ManagerPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-354
                                      /ra/
James J. Shea, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354


==Enclosures:==
==Enclosures:==
: 1. Meeting Agenda
: 1. Meeting Agenda
: 2. List of Attendees
: 2. List of Attendees
: 3. Meeting Presentationcc w/encls: See next page -2-During the meeting, the licensee committed to provide the following documents for staff review:  - Report on reactor pressure vessel dome dynamic pressure data recently collected byPSEG (Structural Integrity Report).    - Stress report based on new in-plant strain gage data at CLTP with all gages working.
: 3. Meeting Presentation cc w/encls: See next page
PSEG representatives stated that the Hope Creek EPU schedule is on-track. The licensee iscurrently working on responses to RAIs from the NRC staff.There were no members of the general public in attendance. However, a few representativesof other licensees participated in the meeting who had previous proprietaty agreements with the vendor. Public Meeting Feedback forms were not received.


During the meeting, the licensee committed to provide the following documents for staff review:
-      Report on reactor pressure vessel dome dynamic pressure data recently collected by PSEG (Structural Integrity Report).
-      Stress report based on new in-plant strain gage data at CLTP with all gages working.
PSEG representatives stated that the Hope Creek EPU schedule is on-track. The licensee is currently working on responses to RAIs from the NRC staff.
There were no members of the general public in attendance. However, a few representatives of other licensees participated in the meeting who had previous proprietaty agreements with the vendor. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1388, or jjs@nrc.gov].
Please direct any inquiries to me at 301-415-1388, or jjs@nrc.gov].
  /ra/James J. Shea, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-354
                                      /ra/
James J. Shea, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354


==Enclosures:==
==Enclosures:==
: 1. Meeting Agenda
: 1. Meeting Agenda
: 2. List of Attendees
: 2. List of Attendees
: 3. Meeting Presentationcc w/encls: See next page DistributionPUBLICBranch ReadingRidsNrrDorlLpl1-2RidsNrrPMJSheaRidsNrrLAEWhittRidsOgcRp RidsAcrsAcnwMailCenterRidsNrrOdJRaval, NRR RidsNrrLASLittleRidsNrrDORLRidsRgn1MailCenter JHoch, NRRHChernoff, NRRTAlexion, NRR PHearn, NRRTScarbrough, NRRAFerkile, OIG EBrown, NRRJWu, NRRSMiotla, OIGADAMS ACCESSION NO.: Meeting Summary - ML070800430     Presentation - ML070920025 Package No.: ML070930464OFFICEDORL/LPL1-2DORL/LPL1-2:LADORL/LPL1-2:PMDORL/LPL1-2:BCNAMEJHochSLittleJSheaHChernoffDATE03/29/0703/29/0703/29/0703/29/07OFFICIAL RECORD COPY Hope Creek Generating Station cc:
: 3. Meeting Presentation cc w/encls: See next page Distribution PUBLIC                                Branch Reading              RidsNrrDorlLpl1-2 RidsNrrPMJShea                        RidsNrrLAEWhitt              RidsOgcRp RidsAcrsAcnwMailCenter                RidsNrrOd                    JRaval, NRR RidsNrrLASLittle                      RidsNrrDORL                  RidsRgn1MailCenter JHoch, NRR                            HChernoff, NRR              TAlexion, NRR PHearn, NRR                            TScarbrough, NRR            AFerkile, OIG EBrown, NRR                            JWu, NRR                    SMiotla, OIG ADAMS ACCESSION NO.: Meeting Summary - ML070800430 Presentation - ML070920025 Package No.: ML070930464 OFFICE    DORL/LPL1-2          DORL/LPL1-2:LA        DORL/LPL1-2:PM      DORL/LPL1-2:BC NAME      JHoch                SLittle              JShea                HChernoff DATE      03/29/07              03/29/07              03/29/07            03/29/07 OFFICIAL RECORD COPY
Mr. Michael P. GallagherVice President - Eng/Tech Support PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ  08038Mr. Michael BrothersVice President - Nuclear Assessments PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ  08038Mr. George P. BarnesSite Vice President - Hope Creek PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ 08038Mr. George H. GellrichPlant Support Manager PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ 08038Mr. Michael J. MassaroPlant Manager - Hope Creek PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ 08038Ms. Christina L. PerinoDirector - Regulatory Assurance PSEG Nuclear - N21 P.O. Box 236 Hancocks Bridge, NJ  08038Jeffrie J. Keenan, EsquirePSEG Nuclear - N21 P.O. Box 236 Hancocks Bridge, NJ  08038Ms. R. A. KankusJoint Owner Affairs Exelon Generation Company, LLC Nuclear Group Headquarters KSA1-E 200 Exelon Way Kennett Square, PA  19348Lower Alloways Creek Townshipc/o Mary O. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ  08038Dr. Jill Lipoti, Asst. DirectorRadiation Protection Programs NJ Department of Environmental Protection and Energy


CN 415 Trenton, NJ 08625-0415Brian BeamBoard of Public Utilities 2 Gateway Center, Tenth Floor Newark, NJ 07102Regional Administrator, Region IU.S. Nuclear Regulatory Commission
Hope Creek Generating Station cc:
Mr. Michael P. Gallagher            Jeffrie J. Keenan, Esquire Vice President - Eng/Tech Support    PSEG Nuclear - N21 PSEG Nuclear                        P.O. Box 236 P.O. Box 236                        Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Ms. R. A. Kankus Mr. Michael Brothers                Joint Owner Affairs Vice President - Nuclear Assessments Exelon Generation Company, LLC PSEG Nuclear                        Nuclear Group Headquarters KSA1-E P.O. Box 236                        200 Exelon Way Hancocks Bridge, NJ 08038            Kennett Square, PA 19348 Mr. George P. Barnes                Lower Alloways Creek Township Site Vice President - Hope Creek    c/o Mary O. Henderson, Clerk PSEG Nuclear                        Municipal Building, P.O. Box 157 P.O. Box 236                        Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Mr. George H. Gellrich              Radiation Protection Programs Plant Support Manager                NJ Department of Environmental PSEG Nuclear                          Protection and Energy P.O. Box 236                        CN 415 Hancocks Bridge, NJ 08038            Trenton, NJ 08625-0415 Mr. Michael J. Massaro              Brian Beam Plant Manager - Hope Creek          Board of Public Utilities PSEG Nuclear                        2 Gateway Center, Tenth Floor P.O. Box 236                        Newark, NJ 07102 Hancocks Bridge, NJ 08038 Regional Administrator, Region I Ms. Christina L. Perino              U.S. Nuclear Regulatory Commission Director - Regulatory Assurance      475 Allendale Road PSEG Nuclear - N21                  King of Prussia, PA 19406 P.O. Box 236 Hancocks Bridge, NJ 08038            Senior Resident Inspector Hope Creek Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ 08038


475 Allendale Road King of Prussia, PA  19406Senior Resident InspectorHope Creek Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ  08038 MEETING AGENDAMARCH 2, 2007WORKING-LEVEL MEETING TO DISCUSSEXTENDED POWER UPRATEHOPE CREEK GENERATING STATIONPSEG NUCLEAR LLCDOCKET NO. 50-354ScheduleDiscussion Topics10:00 a.m. - 10:15 a.m.Introductory Remarks/Introductions 10:15 a.m. - 11:30 a.m.Steam Dryer Integrity (proprietary information may be discussed)11:30 a.m. - 12:00 NoonSteam dryer monitoring during proposed uprate power ascensionEnclosure 1 ATTENDANCE FOR PUBLIC MEETING WITH EXELON, MARCH 2, 2007NAMEORGANIZATIONJames SheaNRR Joseph HochNRR Harold ChernoffNRR Tom AlexionNRR John WuNRR Thomas ScarbroughNRR Peter HearnNRR Eva BrownNRR Andrea FerkileOIG Sherri MiotlaOIG Larry CurranPSEG Nuclear Harold TrenkaPSEG Nuclear Paul DavisonPSEG Nuclear Shelly KuglerPSEG Nuclear Paul DukePSEG Nuclear Pam CowanExelon/PSEG Services Agreement David LangleyTVA Rick CutsingerTVA Alan BilaninContinuum Dynamics Inc Keven BrowningPPL, SusquehannaEnclosure 2 MEETING PRESENTATIONMARCH 2, 2007HOPE CREEK GENERATING STATONSTEAM DRYER MARGINEnclosure 3}}
MEETING AGENDA MARCH 2, 2007 WORKING-LEVEL MEETING TO DISCUSS EXTENDED POWER UPRATE HOPE CREEK GENERATING STATION PSEG NUCLEAR LLC DOCKET NO. 50-354 Schedule                  Discussion Topics 10:00 a.m. - 10:15 a.m. Introductory Remarks/Introductions 10:15 a.m. - 11:30 a.m. Steam Dryer Integrity (proprietary information may be discussed) 11:30 a.m. - 12:00 Noon  Steam dryer monitoring during proposed uprate power ascension Enclosure 1
 
ATTENDANCE FOR PUBLIC MEETING WITH EXELON, MARCH 2, 2007 NAME                        ORGANIZATION James Shea                  NRR Joseph Hoch                  NRR Harold Chernoff              NRR Tom Alexion                  NRR John Wu                      NRR Thomas Scarbrough            NRR Peter Hearn                  NRR Eva Brown                    NRR Andrea Ferkile              OIG Sherri Miotla                OIG Larry Curran                PSEG Nuclear Harold Trenka                PSEG Nuclear Paul Davison                PSEG Nuclear Shelly Kugler                PSEG Nuclear Paul Duke                    PSEG Nuclear Pam Cowan                    Exelon/PSEG Services Agreement David Langley                TVA Rick Cutsinger              TVA Alan Bilanin                Continuum Dynamics Inc Keven Browning              PPL, Susquehanna Enclosure 2
 
MEETING PRESENTATION MARCH 2, 2007 HOPE CREEK GENERATING STATON STEAM DRYER MARGIN Enclosure 3}}

Latest revision as of 09:11, 23 November 2019

Summary of March 2, 2007, Meeting with PSEG Nuclear, LLC, on an Application for Extended Power Uprate for Hope Creek Generating Station Regarding Steam Dryer Margin
ML070800430
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/29/2007
From: James Shea
NRC/NRR/ADRO/DORL/LPLI-2
To:
Hoch, Joseph NRR/DORL 415-3635
Shared Package
ML070930464 List:
References
TAC MD3002
Download: ML070800430 (7)


Text

March 29, 2007 LICENSEE: PSEG NUCLEAR, LLC FACILITY: HOPE CREEK GENERATING STATION

SUBJECT:

SUMMARY

OF MARCH 2, 2007, MEETING WITH PSEG NUCLEAR, LLC, ON AN APPLICATION FOR EXTENDED POWER UPRATE FOR HOPE CREEK GENERATING STATION REGARDING STEAM DRYER MARGIN (TAC NO. MD 3002)

On March, 2, 2007, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of PSEG Nuclear, LLC (PSEG, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss technical aspects of the licensees application for an extended power uprate (EPU) at the Hope Creek Generating Station dated September 18, 2006 (Agencywide Documents and Management System (ADAMS) Accession No. ML062680451). contains the meeting agenda, Enclosure 2 is a list of meeting attendees, and is the licensees presentation.

The licensee presented information detailing steam dryer margin statistics relating to the EPU license amendment request (LAR) (see attached licensee presentation). The information discussed at the meeting was intended to be an overview of information provided in an LAR supplement (Accession No. ML070680314), dated February 28, 2007. The supplement discusses additional benchmarking to establish scale model test (SMT) flow rates more representative of mean steam flow speeds at current licensed thermal power (CLTP) and EPU conditions, modeling of additional steam dryer weld reinforcements that were made before initial plant operation but were not previously included in the finite element model used to predict stress levels for EPU operation, and monitoring reactor pressure vessel steam dome to confirm the absence of a significant pressure pulsation frequency peak at 80 Hz. The licensee discussed the validation of in-plant data and the steam dryer power ascension test plan during the meeting. The NRC staff asked how often the NRC will be notified before each power set point is reached during power ascension. The licensee stated that a specific notification schedule has not yet been developed.

The NRC staff was interested in how the Mach number used in scale mode testing for both the 1/5th and 1/8th scales, including uncertainty, was measured, calculated, and validated. The licensee said these questions could be addressed in a formal NRC request for additional information (RAI). Other topics discussed during the meeting, which will be addressed through RAIs, included how low-frequency pressure loading is monitored, how loading on the steam dryer due to vibration at the re-circulation pump bypass frequency is monitored, bias and uncertainty involved in the Strain Gage measurement, Acoustic Circuit Model (ACM) analysis and Finite Element analysis, and how the conservative factor was derived based on the pressure loads on the dryer resulting from the ACM analyses.

During the meeting, the licensee committed to provide the following documents for staff review:

- Report on reactor pressure vessel dome dynamic pressure data recently collected by PSEG (Structural Integrity Report).

- Stress report based on new in-plant strain gage data at CLTP with all gages working.

PSEG representatives stated that the Hope Creek EPU schedule is on-track. The licensee is currently working on responses to RAIs from the NRC staff.

There were no members of the general public in attendance. However, a few representatives of other licensees participated in the meeting who had previous proprietaty agreements with the vendor. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1388, or jjs@nrc.gov].

/ra/

James J. Shea, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354

Enclosures:

1. Meeting Agenda
2. List of Attendees
3. Meeting Presentation cc w/encls: See next page

During the meeting, the licensee committed to provide the following documents for staff review:

- Report on reactor pressure vessel dome dynamic pressure data recently collected by PSEG (Structural Integrity Report).

- Stress report based on new in-plant strain gage data at CLTP with all gages working.

PSEG representatives stated that the Hope Creek EPU schedule is on-track. The licensee is currently working on responses to RAIs from the NRC staff.

There were no members of the general public in attendance. However, a few representatives of other licensees participated in the meeting who had previous proprietaty agreements with the vendor. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1388, or jjs@nrc.gov].

/ra/

James J. Shea, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354

Enclosures:

1. Meeting Agenda
2. List of Attendees
3. Meeting Presentation cc w/encls: See next page Distribution PUBLIC Branch Reading RidsNrrDorlLpl1-2 RidsNrrPMJShea RidsNrrLAEWhitt RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrOd JRaval, NRR RidsNrrLASLittle RidsNrrDORL RidsRgn1MailCenter JHoch, NRR HChernoff, NRR TAlexion, NRR PHearn, NRR TScarbrough, NRR AFerkile, OIG EBrown, NRR JWu, NRR SMiotla, OIG ADAMS ACCESSION NO.: Meeting Summary - ML070800430 Presentation - ML070920025 Package No.: ML070930464 OFFICE DORL/LPL1-2 DORL/LPL1-2:LA DORL/LPL1-2:PM DORL/LPL1-2:BC NAME JHoch SLittle JShea HChernoff DATE 03/29/07 03/29/07 03/29/07 03/29/07 OFFICIAL RECORD COPY

Hope Creek Generating Station cc:

Mr. Michael P. Gallagher Jeffrie J. Keenan, Esquire Vice President - Eng/Tech Support PSEG Nuclear - N21 PSEG Nuclear P.O. Box 236 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Ms. R. A. Kankus Mr. Michael Brothers Joint Owner Affairs Vice President - Nuclear Assessments Exelon Generation Company, LLC PSEG Nuclear Nuclear Group Headquarters KSA1-E P.O. Box 236 200 Exelon Way Hancocks Bridge, NJ 08038 Kennett Square, PA 19348 Mr. George P. Barnes Lower Alloways Creek Township Site Vice President - Hope Creek c/o Mary O. Henderson, Clerk PSEG Nuclear Municipal Building, P.O. Box 157 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Mr. George H. Gellrich Radiation Protection Programs Plant Support Manager NJ Department of Environmental PSEG Nuclear Protection and Energy P.O. Box 236 CN 415 Hancocks Bridge, NJ 08038 Trenton, NJ 08625-0415 Mr. Michael J. Massaro Brian Beam Plant Manager - Hope Creek Board of Public Utilities PSEG Nuclear 2 Gateway Center, Tenth Floor P.O. Box 236 Newark, NJ 07102 Hancocks Bridge, NJ 08038 Regional Administrator, Region I Ms. Christina L. Perino U.S. Nuclear Regulatory Commission Director - Regulatory Assurance 475 Allendale Road PSEG Nuclear - N21 King of Prussia, PA 19406 P.O. Box 236 Hancocks Bridge, NJ 08038 Senior Resident Inspector Hope Creek Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ 08038

MEETING AGENDA MARCH 2, 2007 WORKING-LEVEL MEETING TO DISCUSS EXTENDED POWER UPRATE HOPE CREEK GENERATING STATION PSEG NUCLEAR LLC DOCKET NO. 50-354 Schedule Discussion Topics 10:00 a.m. - 10:15 a.m. Introductory Remarks/Introductions 10:15 a.m. - 11:30 a.m. Steam Dryer Integrity (proprietary information may be discussed) 11:30 a.m. - 12:00 Noon Steam dryer monitoring during proposed uprate power ascension Enclosure 1

ATTENDANCE FOR PUBLIC MEETING WITH EXELON, MARCH 2, 2007 NAME ORGANIZATION James Shea NRR Joseph Hoch NRR Harold Chernoff NRR Tom Alexion NRR John Wu NRR Thomas Scarbrough NRR Peter Hearn NRR Eva Brown NRR Andrea Ferkile OIG Sherri Miotla OIG Larry Curran PSEG Nuclear Harold Trenka PSEG Nuclear Paul Davison PSEG Nuclear Shelly Kugler PSEG Nuclear Paul Duke PSEG Nuclear Pam Cowan Exelon/PSEG Services Agreement David Langley TVA Rick Cutsinger TVA Alan Bilanin Continuum Dynamics Inc Keven Browning PPL, Susquehanna Enclosure 2

MEETING PRESENTATION MARCH 2, 2007 HOPE CREEK GENERATING STATON STEAM DRYER MARGIN Enclosure 3