ML17341B618: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REGULATORY FORMATION DISTRIBUTION SY.M ('RIDS)ACCESSION NBR:8302070305 DOC~DATE: 83/02/03 NOTARIZED:
{{#Wiki_filter:REGULATORY   FORMATION DISTRIBUTION SY       .M                 ('RIDS)
NO FACIL:50-250 Turkey Point<<Pl anti Uni.t 3i F1 or ida Power and Light C 50"251 Turkey Point Planti'Unit 4r Florida Power and Light-C AUTH BYNAME AUTHOR AFFILIATION UHRIGER~ED Florida'Power&Light Co,'REC IP, NAME RECIPIENT AFFILIATION EISENHUTiDBG+
ACCESSION NBR:8302070305         DOC ~ DATE: 83/02/03   NOTARIZED:                   NO                   DOCKET FACIL:50-250 Turkey Point <<Pl anti Uni.t 3i F1 or ida Power and Light                         C           05000250 50"251 Turkey Point Planti 'Unit 4r Florida Power and Light BYNAME                                                                                -C           05000251 AUTH                 AUTHOR AFFILIATION UHRIGER ~ ED         Florida 'Power & Light Co,
Division of Licensing DOCKET 05000250 05000251
    'REC IP, NAME         RECIPIENT AFFILIATION EISENHUTiDBG+         Division of Licensing


==SUBJECT:==
==SUBJECT:==
Advises that ar rangements made for consul'tant to.perform new analysisper NUREG-07.4A~Rev 1~Generic Ltr 82"'26'"Pressure Vessel Natl.Fracture Toughnessr." to confirm previous conclusions re.shelf energy, Results expected by Aug 1983'ISTRIBUTION CODE: ADIOS COPIES RECEIVED:LTR A ENCL 7 SIZE:.TITLE: OR Submittal:
Advises that ar rangements made for consul'tant to .perform new analysisper NUREG-07.4A~Rev 1~Generic Ltr 82"'26'"Pressure Vessel Natl .Fracture Toughnessr." to confirm previous conclusions re .shelf energy, Results expected by Aug 1983 TITLE:    OR CODE:
USI A"12 Component Support Fracture Toughness'OTES:
Submittal:
RECIPIENT ID CODE/NAME NRR ORB1 BC 01 INTERNAl.;
ADIOS COPIES RECEIVED:LTR A ENCL USI A"12 Component Support Fracture 7                  SIZE:.  'ISTRIBUTION Toughness'OTES:
NRR RANDALL NRR/DE DIR NRR/DL DIR NR GP G 04 COPIES LTTR ENCL 7 7 1 1 1 1 1 1 0 1 1 RECIPIENT ID'CODE/NAME NRR SELLERSgC NRR/DE/MTEB 08 NRR/DL/ORAB 10 NRR/DST/GIB 07 RGN2'COPIES LTTR ENCL EXTERNAL: ACRS NRC PDR NTI'S 12 02 6 6 1 1 1 1 LPDR NSIC 03 05'-TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 26  
RECIPIENT         COPIES            RECIPIENT                      'COPIES ID CODE/NAME      LTTR ENCL      ID 'CODE/NAME         LTTR ENCL NRR ORB1   BC   01     7      7 INTERNAl.;     NRR RANDALL           1      1    NRR SELLERSgC NRR/DE DIR             1     1     NRR/DE/MTEB 08 NRR/DL DIR            1            NRR/DL/ORAB 10 NR          GP        1      0    NRR/DST/GIB 07 G            04    1      1    RGN2 EXTERNAL: ACRS                 12    6      6    LPDR            03 NRC PDR         02    1      1    NSIC            05 NTI'S                 1     1
)a 1 1))I)h leap$l f''i."'.:.l I'Il (~hf.'?f e)a',;')hf'll',ai
'-TOTAL NUMBER OF COPIES       REQUIRED: LTTR     27   ENCL   26
.,~g If)'lit))i'''')(')ff''h)'w'f>>hf)C''':II(j:')h)fry'3 rI t+I/I')')))f<<'
'0,'l,~l f)f lf,h)'i);r~Pq,'S'.
C>'>'i,'h)I'I~;f" t r'h~i''cw~oayaaaaacmsemI))I+
~'mac''e~)'"1')=I,'0;Il 6 0',"flan')i>W 9)h.=1:);,,", f'ha",',,'g Ia>>4,'g'(~j g/)y', I If I llf I f)lr'foal; I
.BOX 14000, JUNO BEACH, FL 3340B Q Ilz 0 r FLORIDA POWER 8(LIGHT COMPANY February 3, 1983 L-83-55 Office of Nuclear Reactor Regulation Attention:
Nr,.Darrell G.Eisenhut, Director Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555


==Dear Nr.Eisenhut:==
                                                                                                    )a 1                                                                                                                leap 1                                                                                      ))
Re: Turkey Point Units 3&4 Docket No.50-250&50-251 NUREG-0744 Rev.1: (Generic Letter 82-26)Pressure Vessel Material Fracture Tou hness Generic Letter 82-26 outlines an acceptable method of fracture mecnanics analysis which is to be performed to demonstrate the existence of adequate margin when the fracture toughness requirements of Appendix G to 10 CFR 50 are not met.The Generic Letter further requires that this analysis be submitted at least 3 years prior to the date fracture toughness levels are predicted to no longer satisfy these requirements.
I'Il I    )h
In previous correspondence (L-76-363, dated 10/19/76;L-77-113, dated 4/11/77;L-77-292, dated 9/14/77;L-77-326, dated 10/21/77)and meetings with your staff, we demonstrated that although the shelf energy of Turkey Point Unit 4's surveillance capsule"T" did not meet Section V.B of Appendix G to 10 CFR 50, the unit could continue to be safely operated.This conclusion was demonstrated by fatigue, accident and fracture analyses, as well as an in-depth look at the Turkey Point Unit 3 and 4 surveillance program.In addition to these actions, we have now arranged for a consultant to perform a new analysis, in accordance with Generic Letter 82-26, which we anticipate will confirm our previous conclusions.
                                    'h e
The results of this work is tentatively scheduled to be ccmplete by the end of August 1983.We will submit the report to you following in-house review, approximately eight weeks later.Very truly yours, Robert E.Uhrig Vice President Advanced Systems&Technology REU'/JEN/JS cc: V(r.James P.O'Reil ly, Region II ter.Harold F.Rei s, Esquire P NS-L I-83-056 8302070305 830203 PDR AMCK 05000250 P PDR ol<PEOPLE...SERVING PEOPLE 0 li}}
l i."
f
                                                                                                              '.: .l                    (~hf  .'? f                  a'
                                                                                                                                                                          )
                                                ,;')hf'll',ai    .,~g          If)'lit  )                      i'' '    '
                                                                                                                                    )(')    ff'
                                                                                ''':II( j:')
                                                                                                  )
                                                                                                                                                              'h)'w'f>>
                                                                    )C
                                                                                                                    '0,'l, hf h )fry      '
3  rI t +I/I')')))f<<'                                ~l f)  f  lf,h )'i)
                                                ;r~Pq,'S'.                  '>'i,'h )I'I ~
C>
cw~oayaaaaacmsemI))I+
                ~) '"1')=
                          ;f
                            ~" t r' I,'0;Il 6 mac 0',"flan
                                                  ')i>W
                                                          'e 9      )h.=1:);,,
                                                                                    ~
i f'ha",',,        '
g  Ia>>      4,    '        g
( ~j g
                                                        /)    y      ',    I  If f)lr'foal; I  llf I
I
 
                                                                  . BOX 14000, JUNO BEACH, FL 3340B 0
Q Ilz r
FLORIDA POWER    8( LIGHT COMPANY February 3, 1983 L-83-55 Office of Nuclear Reactor Regulation Attention: Nr,. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555
 
==Dear Nr. Eisenhut:==
 
Re:   Turkey Point Units 3 & 4 Docket No. 50-250 & 50-251 NUREG-0744 Rev . 1:     (Generic Letter 82-26)
Pressure Vessel Material Fracture Tou hness Generic Letter 82-26 outlines an acceptable method of fracture mecnanics analysis which is to be performed to demonstrate the existence of adequate margin when the fracture toughness requirements of Appendix G to 10 CFR 50 are not met. The Generic Letter further requires that this analysis be submitted at least 3 years prior to the date fracture toughness levels are predicted to no longer satisfy these requirements.
In previous correspondence (L-76-363, dated 10/19/76; L-77-113, dated 4/11/77; L-77-292, dated 9/14/77; L-77-326, dated 10/21/77) and meetings with your staff, we demonstrated that although the shelf energy of Turkey Point Unit 4's surveillance capsule "T" did not meet Section V. B of Appendix G to 10 CFR 50, the unit could continue to be safely operated. This conclusion was demonstrated by fatigue, accident and fracture analyses, as well as an in-depth look at the Turkey Point Unit 3 and 4 surveillance program.
In addition to these actions, we have now arranged for a consultant to perform a new analysis, in accordance with Generic Letter 82-26, which we anticipate will confirm our previous conclusions. The results of this work is tentatively scheduled to be ccmplete by the end of August 1983. We will submit the report to you following in-house review, approximately eight weeks later.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems   & Technology REU'/JEN/JS ol<
cc:   V(r. James P. O'Reil ly, Region II ter. Harold F. Rei s, Esquire P NS-L I-83-056 8302070305 830203 PDR AMCK 05000250 P                                                                       PEOPLE... SERVING PEOPLE PDR
 
0 li}}

Latest revision as of 23:47, 3 February 2020

Advises That Arrangements Made for Consultant to Perform New Analysis Per NUREG-0744,Rev 1,Generic Ltr 82-26, Pressure Vessel Matl Fracture Toughness, to Confirm Previous Conclusions Re Shelf Energy.Results Expected by Aug 1983
ML17341B618
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/03/1983
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-12, REF-GTECI-EQ, RTR-NUREG-0744, RTR-NUREG-744, TASK-A-12, TASK-OR 820803, GL-82-26, L-83-55, NUDOCS 8302070305
Download: ML17341B618 (4)


Text

REGULATORY FORMATION DISTRIBUTION SY .M ('RIDS)

ACCESSION NBR:8302070305 DOC ~ DATE: 83/02/03 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point <<Pl anti Uni.t 3i F1 or ida Power and Light C 05000250 50"251 Turkey Point Planti 'Unit 4r Florida Power and Light BYNAME -C 05000251 AUTH AUTHOR AFFILIATION UHRIGER ~ ED Florida 'Power & Light Co,

'REC IP, NAME RECIPIENT AFFILIATION EISENHUTiDBG+ Division of Licensing

SUBJECT:

Advises that ar rangements made for consul'tant to .perform new analysisper NUREG-07.4A~Rev 1~Generic Ltr 82"'26'"Pressure Vessel Natl .Fracture Toughnessr." to confirm previous conclusions re .shelf energy, Results expected by Aug 1983 TITLE: OR CODE:

Submittal:

ADIOS COPIES RECEIVED:LTR A ENCL USI A"12 Component Support Fracture 7 SIZE:. 'ISTRIBUTION Toughness'OTES:

RECIPIENT COPIES RECIPIENT 'COPIES ID CODE/NAME LTTR ENCL ID 'CODE/NAME LTTR ENCL NRR ORB1 BC 01 7 7 INTERNAl.; NRR RANDALL 1 1 NRR SELLERSgC NRR/DE DIR 1 1 NRR/DE/MTEB 08 NRR/DL DIR 1 NRR/DL/ORAB 10 NR GP 1 0 NRR/DST/GIB 07 G 04 1 1 RGN2 EXTERNAL: ACRS 12 6 6 LPDR 03 NRC PDR 02 1 1 NSIC 05 NTI'S 1 1

'-TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 26

)a 1 leap 1 ))

I'Il I )h

'h e

l i."

f

'.: .l (~hf .'? f a'

)

,;')hf'll',ai .,~g If)'lit ) i ' '

)(') ff'

:II( j:')

)

'h)'w'f>>

)C

'0,'l, hf h )fry '

3 rI t +I/I')')))f<<' ~l f) f lf,h )'i)

r~Pq,'S'. '>'i,'h )I'I ~

C>

cw~oayaaaaacmsemI))I+

~) '"1')=

f

~" t r' I,'0;Il 6 mac 0',"flan

')i>W

'e 9 )h.=1:);,,

~

i f'ha",',, '

g Ia>> 4, ' g

( ~j g

/) y ', I If f)lr'foal; I llf I

I

. BOX 14000, JUNO BEACH, FL 3340B 0

Q Ilz r

FLORIDA POWER 8( LIGHT COMPANY February 3, 1983 L-83-55 Office of Nuclear Reactor Regulation Attention: Nr,. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Nr. Eisenhut:

Re: Turkey Point Units 3 & 4 Docket No. 50-250 & 50-251 NUREG-0744 Rev . 1: (Generic Letter 82-26)

Pressure Vessel Material Fracture Tou hness Generic Letter 82-26 outlines an acceptable method of fracture mecnanics analysis which is to be performed to demonstrate the existence of adequate margin when the fracture toughness requirements of Appendix G to 10 CFR 50 are not met. The Generic Letter further requires that this analysis be submitted at least 3 years prior to the date fracture toughness levels are predicted to no longer satisfy these requirements.

In previous correspondence (L-76-363, dated 10/19/76; L-77-113, dated 4/11/77; L-77-292, dated 9/14/77; L-77-326, dated 10/21/77) and meetings with your staff, we demonstrated that although the shelf energy of Turkey Point Unit 4's surveillance capsule "T" did not meet Section V. B of Appendix G to 10 CFR 50, the unit could continue to be safely operated. This conclusion was demonstrated by fatigue, accident and fracture analyses, as well as an in-depth look at the Turkey Point Unit 3 and 4 surveillance program.

In addition to these actions, we have now arranged for a consultant to perform a new analysis, in accordance with Generic Letter 82-26, which we anticipate will confirm our previous conclusions. The results of this work is tentatively scheduled to be ccmplete by the end of August 1983. We will submit the report to you following in-house review, approximately eight weeks later.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems & Technology REU'/JEN/JS ol<

cc: V(r. James P. O'Reil ly, Region II ter. Harold F. Rei s, Esquire P NS-L I-83-056 8302070305 830203 PDR AMCK 05000250 P PEOPLE... SERVING PEOPLE PDR

0 li