L-77-292, Transmitting Summary Technical Report on the Results of Reactor Vessel Integrity Analyses

From kanterella
(Redirected from L-77-292)
Jump to navigation Jump to search
Transmitting Summary Technical Report on the Results of Reactor Vessel Integrity Analyses
ML18227D405
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/14/1977
From: Robert E. Uhrig
Florida Power & Light Co
To: Case E
Office of Nuclear Reactor Regulation
References
L-77-292
Download: ML18227D405 (4)


Text

NRC~sas-$ S5 DOCKET NUMBER i

'2.7S)

FILE NUMBER NRC DISTRIBUTION FoR PART 60 DOCKET MATERIAL TO FROM: DATE OF DOCUMENT Mr. E; Case FPL 9-14-77 Miaad,, Fla. 33101 DATE R'CCEIV ED ABETTER RLE>> 10-14 Z7 Uhrig'NPUT CINOTORIZED PROP FORM NUMBER OF COPIES RECEIVED PfjPRIGINAL jgJNCLASSIFIED Q COPY

'ESCRIPTION ENCLOSURE I Ltr trans the following: 1P Reactor Vessel Integrity Analyses.... ~..... 2 inches Turkey Pt. Units 3 & 4 DHL 10 7 FOR ACTION/INFORMATION ~RHNMFSTA:

ASSIGNED AD V>> MOORE LTR BRANCH CHIEF MANAGER. PROJECT KQQQEK:

ASSISTANT.; L'ICENSING ASSXSTANT:

B>> HARLESS INTERNAL0 RI BUTIQN STFMS TY PIANT SYSTEMS SXTE SAFETY &

TSO TEDESCO ENVIRON ANALYSIS BENAROYA DENTON & MOLAR IPPOL'XTO EKIIRO TECH ERNST OPERA G'EACTORS GB 0 GAMMILL 2 SITE ANALYSXS VOLLMER BUNCH J>> COLLWS EXTERNAL OISTRIBVTION CONTROL NVMBER NSIC J 772870305 IV J HANCHETT I CYS ACRS SENT CA GO

'0 g

MPH BLF NP>

KEbUCi077 FLORIDA POWER & LIGHT COMPANY September 14, 1977 L-77-292 Mr. Edson Case, Acting Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr'. Case:

Re: Turkey Point Units 3 & 4 Docket Nos. 50-250 and 50-251 Reactor Vessel Surveillance Ca Power G Light Company hereby submits fifteen (15) copies sules'lorida of a summary technical report on the results of Turkey Point reactor vessel integrity analyses. The analyses were performed in accordance with 10 CFR 50, Appendix G, Section V.B.

The present report series updates previously submitted analyses for Turkey Point Units 3 and 4. The series includes an ASME III Appendix G Analysis, a fatigue crack growth evaluation, and a fracture mechanics evaluation of the pressure vessel subjected to postulated accident conditions.

April 7, 1977, a meeting was held with staff members from On Operating Reactors Branch-g3. At that meeting the weld metal surveillance data for the Turkey Point Unit 3 it was shown that reactor vessel represents not only the core midplane circumferential welds in Unit 3, but in Unit, 4 as well. Data supporting this con-clusion has been submitted to the Division of Operating Reactors.

Based on the results of the April 7 meeting and the results of the present report series, the Turkey Point Units 3 and 4 reactor vessels are in full compliance with 10 CFR 50, Appendix G.

Very truly yours, Robert E. Uhrig Vice President REU/MAS/cpc Attachments cc: Mr. James P. O'Reilly, Region II Robert Lowenstein, Esquire 772S70305 PFOPLE SERVING PcQPLE

'4%333H 73,'..',"[g )',",(](~