L-76-363, Forwards Reactor Vessel Matl Surveillance & Fracture Mechanics Evaluations for Turkey Point Units 3 & 4 Nuclear Power Plants, Per 10CFR50,App H & Reg Guide 10.1.Rept Includes Capsule T Analysis & Accident Analysis

From kanterella
(Redirected from L-76-363)
Jump to navigation Jump to search
Forwards Reactor Vessel Matl Surveillance & Fracture Mechanics Evaluations for Turkey Point Units 3 & 4 Nuclear Power Plants, Per 10CFR50,App H & Reg Guide 10.1.Rept Includes Capsule T Analysis & Accident Analysis
ML20215E178
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/19/1976
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Rusche B
Office of Nuclear Reactor Regulation
Shared Package
ML20215E175 List:
References
FOIA-87-286, RTR-REGGD-10.001 10932, L-76-363, NUDOCS 8706190279
Download: ML20215E178 (1)


Text

P O 80x 013100 Yl AYL F L 3." ?

W \' t...

O Go FLORIDA POW ER & LIGHT COMP A'.v e* '

/ f7 -

October 19, 1976

- v ."* L Mr. Benard C. Rusche, Di , tor Office of Nuclear Reacto qulatio , 4 6 pp' q U. S. Nuclear Regulatory Washington, D. C. 20555

,gg p i

Dear Mr. Rusche- OC 29 ;07,

x p u, ,, 0 Re: Turkey Point Units 3 & 4 Docket Nos. 50-250 and 50-251 s

(('N ,

Reactor Vessel Surveillance Capsules ,

Florida Power & Light Company hereby submits fifteen (15) copies of a summary technical report on the results of Turkey Point reactor vessel surveillance capsule fracture toughness tests.

The report is being submitted in accordance with 10CFR Part 50, Appendix H (Reactor Vessel Material Surveillance Program Requirements) and Regulatory Guide i0.1 (Compilation of Report-ing Requirements for Persons Subject to NRC Regulations). -

The present report includes the Capsule T Analysis, Accident Analysis, Fracture Analysis and resultant Heatup/Cooldown Curves for Unit 3. It also contains the Capsule T Analysis and resultant Heatup/Cooldown Curves for Unit 4. Additional reports are being prepared by our NSSS vendor to summarize the Fatigue Analysis for Unit 3 and the Fatigue Analysis, Accident Analysis, and Fracture Analysis for Unit 4. When we have received and completed our review of these additional reports, they will be forwarded to your office.

i The Heatup/Cooldown Curves for both Units were previously submitted to your staff in our letter L-76-199 dated May 21, 1976 (Proposed Amendlaent to Facility Operating Licenses DPR-31 and DPR-41) .  ;

Very truly yours, DY Robert E. Uhrig Vice President s

REC / MAS: mew Enclosures cc: Jack R. Newman, Esq.

N

\ -

8706190279 B70616

$SU -286 PDR_

l PEOPLE- . SERVING PEOPLE