IR 05000456/2010502: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{Adams|number = ML100990411}} | {{Adams | ||
| number = ML100990411 | |||
| issue date = 04/08/2010 | |||
| title = IR 05000456-10-502, 05000457-10-502, on 03/22/2010 - 03/26/2010, Braidwood Station, Units 1 and 2, Baseline Emergency Preparedness Biennial Exercise Inspection | |||
| author name = Peterson H | |||
| author affiliation = NRC/RGN-III/DRS/OB | |||
| addressee name = Pardee C G | |||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | |||
| docket = 05000456, 05000457 | |||
| license number = NPF-072, NPF-077 | |||
| contact person = | |||
| document report number = IR-10-502 | |||
| document type = Inspection Report, Letter | |||
| page count = 11 | |||
}} | |||
{{IR-Nav| site = 05000456 | year = 2010 | report number = 502 }} | {{IR-Nav| site = 05000456 | year = 2010 | report number = 502 }} | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 8, 2010 Mr. Charles Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear | ||
4300 Winfield Road Warrenville IL 60555 | |||
SUBJECT: BRAIDWOOD STATION, UNITS 1 AND 2 BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000456/2010502(DRS); 05000457/2010502(DRS) | SUBJECT: BRAIDWOOD STATION, UNITS 1 AND 2 | ||
BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000456/2010502(DRS); 05000457/2010502(DRS) | |||
==Dear Mr. Pardee:== | ==Dear Mr. Pardee:== | ||
On March 26, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Braidwood Station, Units 1 and 2. The enclosed report documents the inspection results, which were discussed on March 26, 2010, with Mr. A. Shahkarami and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no NRC-identified and no self-revealed findings of very low safety significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | On March 26, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Braidwood Station, Units 1 and 2. The enclosed report documents the inspection results, which were discussed on March 26, 2010, with Mr. A. Shahkarami and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed | ||
personnel. Based on the results of this inspection, no NRC-identified and no self-revealed findings of very low safety significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely,/RA/ | Sincerely,/RA/ | ||
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 | Hironori Peterson, Chief Operations Branch | ||
Division of Reactor Safety Docket Nos. 50-456; 50-457 | |||
License Nos. NPF-72; NPF-77 | |||
===Enclosure:=== | ===Enclosure:=== | ||
Line 21: | Line 42: | ||
===w/Attachment:=== | ===w/Attachment:=== | ||
Supplemental Information cc w/encl: Distribution via ListServ U. S. NUCLEAR REGULATORY COMMISSION REGION III Docket Nos: 50-456; 50-457 License Nos: NPF-72; NPF-77 Report No: 05000456/2010502(DRS) and 05000457/2010502(DRS) Licensee: Exelon Generation Company, LLC Facility: Braidwood Station, Units 1 and 2 Location: Braceville, Illinois Dates: March 22 through 26, 2010 Inspectors: Robert Jickling, Senior Emergency Preparedness Inspector Regina Russell, Emergency Preparedness Inspector Raymond Walton, Senior Operations Engineer Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure Enclosure | Supplemental Information cc w/encl: Distribution via ListServ | ||
U. S. NUCLEAR REGULATORY COMMISSION REGION III Docket Nos: 50-456; 50-457 License Nos: NPF-72; NPF-77 Report No: 05000456/2010502(DRS) and 05000457/2010502(DRS) Licensee: Exelon Generation Company, LLC Facility: | |||
Braidwood Station, Units 1 and 2 Location: Braceville, Illinois Dates: March 22 through 26, 2010 Inspectors: Robert Jickling, Senior Emergency Preparedness Inspector Regina Russell, Emergency Preparedness Inspector Raymond Walton, Senior Operations Engineer | |||
Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure Enclosure | |||
=SUMMARY OF FINDINGS= | =SUMMARY OF FINDINGS= | ||
Line 27: | Line 53: | ||
===A. NRC-Identified=== | ===A. NRC-Identified=== | ||
and Self-Revealed Findings | and Self-Revealed Findings | ||
===Cornerstone: Emergency Preparedness=== | ===Cornerstone: Emergency Preparedness=== | ||
No findings of significance were identified. | No findings of significance were identified. | ||
===B. Licensee-Identified Violations=== | ===B. Licensee-Identified Violations=== | ||
No violations of significance were identified. | No violations of significance were identified. | ||
Line 50: | Line 78: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings of significance were identified. | No findings of significance were identified. | ||
==OTHER ACTIVITIES== | ==OTHER ACTIVITIES== | ||
Line 70: | Line 98: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings of significance were identified. | No findings of significance were identified. | ||
5.3 Alert and Notification System | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Line 77: | Line 107: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings of significance were identified. | No findings of significance were identified. | ||
{{a|4OA6}} | {{a|4OA6}} | ||
==4OA6 Management Meetings== | ==4OA6 Management Meetings== | ||
===.1 Exit Meeting Summary On March 26, 2010, the inspectors presented the inspection results to Mr. A. Shahkirami, and other members of the licensee staff. | ===.1 Exit Meeting Summary=== | ||
The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary. ATTACHMENT: | |||
On March 26, 2010, the inspectors presented the inspection results to Mr. A. Shahkirami, and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary. ATTACHMENT: | |||
=SUPPLEMENTAL INFORMATION= | =SUPPLEMENTAL INFORMATION= | ||
==KEY POINTS OF CONTACT== | ==KEY POINTS OF CONTACT== | ||
Licensee | Licensee | ||
: [[contact::A. Shahkarami]], Site Vice President | : [[contact::A. Shahkarami]], Site Vice President | ||
Line 98: | Line 131: | ||
: [[contact::S. McKinney]], Emergency Preparedness Coordinator | : [[contact::S. McKinney]], Emergency Preparedness Coordinator | ||
: [[contact::M. Smith]], Engineering Manager | : [[contact::M. Smith]], Engineering Manager | ||
: [[contact::W. Waznis]], Nuclear Oversight Nuclear Regulatory Commission | : [[contact::W. Waznis]], Nuclear Oversight | ||
Nuclear Regulatory Commission | |||
: [[contact::N. Shah]], Acting Senior Resident Inspector | : [[contact::N. Shah]], Acting Senior Resident Inspector | ||
: [[contact::A. Garmoe]], Resident Inspector | : [[contact::A. Garmoe]], Resident Inspector | ||
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | ==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | ||
Opened, Closed, and Discussed None | |||
===Opened, Closed, and Discussed=== | |||
None | |||
2 | 2 | ||
Line 108: | Line 145: | ||
The following is a list of documents reviewed during the inspection. | The following is a list of documents reviewed during the inspection. | ||
: Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. | : Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. | ||
: Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. 1EP1 Exercise Evaluation | : Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | ||
==1EP1 Exercise Evaluation== | |||
: EP-AA-1001; Radiological Emergency Plan Annex for Braidwood; Revision 22 | : EP-AA-1001; Radiological Emergency Plan Annex for Braidwood; Revision 22 | ||
: EP-AA-112-100; Control Room Operations; Revision 9 | : EP-AA-112-100; Control Room Operations; Revision 9 | ||
: EP-AA-112-200; TSC Activation and Operation; Revision 7 | : EP-AA-112-200; TSC Activation and Operation; Revision 7 | ||
: AR 01047918; Exercise: | : AR 01047918; Exercise: | ||
: OSC Operator Dispatched without Briefing or Tracking; March 25, 2010 | : OSC Operator Dispatched without Briefing or Tracking; | ||
: March 25, 2010 | |||
: AR 01047913; Exercise: | : AR 01047913; Exercise: | ||
: TSC Dose Ass't Used Incorrect Conditions; March 25, 2010 | : TSC Dose Ass't Used Incorrect Conditions; March 25, 2010 | ||
: AR 01047898; Exercise: | : AR 01047898; Exercise: | ||
: Initial Dose Ass't Air Sample Analysis Incorrect; March 25, 2010 | : Initial Dose Ass't Air Sample Analysis Incorrect; | ||
: March 25, 2010 | |||
: AR 01047890; Exercise: | : AR 01047890; Exercise: | ||
: TSC Core Damage Ass't Objective Failure; March 25, 2010 | : TSC Core Damage Ass't Objective Failure; March 25, 2010 | ||
Line 125: | Line 166: | ||
: NOS Identified TSC Habitability Problems; March 25, 2010 4OA1 Performance Indicator Verification | : NOS Identified TSC Habitability Problems; March 25, 2010 4OA1 Performance Indicator Verification | ||
: LS-AA-2110; Monthly Data Elements for NRC ERO Drill Participation; September - December 2009 | : LS-AA-2110; Monthly Data Elements for NRC ERO Drill Participation; September - December 2009 | ||
: LS-AA-2120; Monthly Data Elements for NRC ERO Drill/Exercise Performance; July - December 2009 | : LS-AA-2120; Monthly Data Elements for NRC ERO Drill/Exercise Performance; | ||
: LS-AA-2130; Monthly Data Elements for NRC Alert and Notification System Reliability; July - December 2009 Braidwood Monthly Siren Availability Report Records; July - December 2009 | : July - December 2009 | ||
: LS-AA-2130; Monthly Data Elements for NRC Alert and Notification System Reliability; | |||
: July - December 2009 Braidwood Monthly Siren Availability Report Records; July - December 2009 | |||
==LIST OF ACRONYMS== | ==LIST OF ACRONYMS== | ||
: [[USED]] [[]] | : [[USED]] [[]] | ||
: [[ADAMS]] [[Agency-wide Documents Access and Management System]] | : [[ADAMS]] [[Agency-wide Documents Access and Management System]] | ||
: [[ANS]] [[Alert and Notification System]] | : [[ANS]] [[Alert and Notification System]] | ||
CFR Code of Federal Regulations | : [[CFR]] [[Code of Federal Regulations]] | ||
CR Condition Report | : [[CR]] [[Condition Report]] | ||
CRS Control Room Simulator | : [[CRS]] [[Control Room Simulator]] | ||
: [[EOF]] [[Emergency Operations Facility]] | : [[EOF]] [[Emergency Operations Facility]] | ||
: [[EP]] [[Emergency Preparedness]] | : [[EP]] [[Emergency Preparedness]] | ||
: [[ERO]] [[Emergency Response Organization IMC Inspection Manual Chapter]] | : [[ERO]] [[Emergency Response Organization]] | ||
: [[IMC]] [[Inspection Manual Chapter]] | |||
: [[IP]] [[Inspection Procedure]] | : [[IP]] [[Inspection Procedure]] | ||
KI Potassium | |||
Iodide | |||
: [[NEI]] [[Nuclear Energy Institute]] | : [[NEI]] [[Nuclear Energy Institute]] | ||
: [[NRC]] [[]] | : [[NRC]] [[]] | ||
: [[U.]] [[S. Nuclear Regulatory Commission]] | : [[U.]] [[S. Nuclear Regulatory Commission]] | ||
OSC Operations Support Center | : [[OSC]] [[Operations Support Center]] | ||
: [[PAR]] [[Protective Action Recommendation]] | : [[PAR]] [[Protective Action Recommendation]] | ||
PARS Publicly Available Records | |||
PI Performance | |||
Indicator | |||
: [[SDP]] [[Significance Determination Process]] | : [[SDP]] [[Significance Determination Process]] | ||
: [[TI]] [[Temporary Instruction | : [[TI]] [[Temporary Instruction TSC Technical Support Center]] | ||
: [[C.]] [[Pardee -2-]] | : [[C.]] [[Pardee -2-]] | ||
NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, /RA/ | |||
RA/ | Hironori Peterson, Chief | ||
Hironori Peterson, Chief Operations Branch | Operations Branch | ||
Division of Reactor Safety | |||
License Nos. | Division of Reactor Safety | ||
Docket Nos. 50-456; 50-457 | |||
License Nos. NPF-72; NPF-77 Enclosure: Inspection Report 05000456/2010502; 05000457/2010502 w/Attachment: Supplemental Information cc w/encl: Distribution via ListServ | |||
: [[DISTRI]] [[BUTION]] | |||
: RidsNrrDorlLpl3-2 Resource | |||
Susan Bagley | |||
RidsNrrPMBraidwood Resource | |||
RidsNrrDirsIrib Resource | |||
Cynthia Pederson | |||
Steven Orth Jared Heck | |||
Allan Barker | |||
: [[DRPIII]] [[]] | |||
DRSIII Carole Ariano | |||
Linda Linn | |||
Patricia Buckley | |||
Tammy Tomczak | |||
ROPreports Resource | |||
: [[DOCUME]] [[NT NAME: G:\DRS\Work in Progress\BRA 2010]] | |||
: [[502 DRS]] [[]] | |||
OL.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive | |||
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy | |||
: [[OFFICE]] [[]] | |||
: [[RIII]] [[]] | |||
: [[RIII]] [[]] | |||
NAME RJickling:co | |||
HPeterson | |||
DATE 04/08/2010 | |||
04/08/2010 | |||
: [[OFFICI]] [[AL]] | |||
: [[RECORD]] [[]] | |||
: [[COPY]] [[]] | |||
}} | }} |
Revision as of 11:35, 23 August 2018
ML100990411 | |
Person / Time | |
---|---|
Site: | Braidwood ![]() |
Issue date: | 04/08/2010 |
From: | Hironori Peterson Operations Branch III |
To: | Pardee C G Exelon Generation Co, Exelon Nuclear |
References | |
IR-10-502 | |
Download: ML100990411 (11) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 8, 2010 Mr. Charles Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear
4300 Winfield Road Warrenville IL 60555
SUBJECT: BRAIDWOOD STATION, UNITS 1 AND 2
BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000456/2010502(DRS); 05000457/2010502(DRS)
Dear Mr. Pardee:
On March 26, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Braidwood Station, Units 1 and 2. The enclosed report documents the inspection results, which were discussed on March 26, 2010, with Mr. A. Shahkarami and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel. Based on the results of this inspection, no NRC-identified and no self-revealed findings of very low safety significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/
Hironori Peterson, Chief Operations Branch
Division of Reactor Safety Docket Nos. 50-456; 50-457
Enclosure:
Inspection Report 05000456/2010502; 05000457/2010502
w/Attachment:
Supplemental Information cc w/encl: Distribution via ListServ
U. S. NUCLEAR REGULATORY COMMISSION REGION III Docket Nos: 50-456; 50-457 License Nos: NPF-72; NPF-77 Report No: 05000456/2010502(DRS) and 05000457/2010502(DRS) Licensee: Exelon Generation Company, LLC Facility:
Braidwood Station, Units 1 and 2 Location: Braceville, Illinois Dates: March 22 through 26, 2010 Inspectors: Robert Jickling, Senior Emergency Preparedness Inspector Regina Russell, Emergency Preparedness Inspector Raymond Walton, Senior Operations Engineer
Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure Enclosure
SUMMARY OF FINDINGS
IR 05000456/2010502, 05000457/2010502; 03/22/2010 - 03/26/2010; Braidwood Station, Units 1 and 2; Baseline Emergency Preparedness Biennial Exercise Inspection. This report covers a one week period of announced baseline inspection by two regional inspectors and one operations engineer. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.
A. NRC-Identified
and Self-Revealed Findings
Cornerstone: Emergency Preparedness
No findings of significance were identified.
B. Licensee-Identified Violations
No violations of significance were identified.
REPORT DETAILS
REACTOR SAFETY
Cornerstone:
1EP1 Exercise Evaluation
.1 Exercise Evaluation
a. Inspection Scope
The inspectors reviewed the March 24, 2010, biennial emergency preparedness exercise's objectives and scenario to ensure that the exercise would acceptably test major elements of the licensee's emergency plan and to verify that the exercise's simulated problems provided an acceptable framework to support demonstration of the licensee's capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2008, 2009, and 2010, to verify that those drills' scenarios were sufficiently different from the scenario used in the March 24, 2010, exercise. The inspectors evaluated the licensee's exercise performance, focusing on the risk significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities: Control Room Simulator (CRS); Technical Support Center (TSC); and Emergency Operations Facility (EOF). The inspectors also assessed the licensee's recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensee's emergency plan. The inspectors attended post-exercise critiques in the CRS, TSC, and EOF to evaluate the licensee's initial self-assessment of its exercise performance. The inspectors later met with the licensee's lead exercise evaluators and managers to obtain the licensee's findings and assessments of its exercise participants' performances. These self-assessments were then compared with the inspectors' independent observations and assessments to assess the licensee's ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report. This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01-05.
b. Findings
No findings of significance were identified.
OTHER ACTIVITIES
4OA1 Performance Indicator (PI) Verification
.1 Drill/Exercise Performance
a. Inspection Scope
The inspectors sampled licensee submittals for the Drill/Exercise Performance PI for the period from the third quarter 2009 through fourth quarter 2009. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, were used. The inspectors reviewed the licensee's records associated with the performance indicator to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report. This inspection constituted one drill/exercise performance sample as defined in IP 71151-05.
b. Findings
No findings of significance were identified.
.2 Emergency Response Organization Drill Participation
a. Inspection Scope
The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the third quarter 2009 through fourth quarter 2009. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, were used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; performance during the 2009 exercises and drills; and revisions of the roster of personnel assigned to key emergency response organization positions. Documents reviewed are listed in the Attachment to this report. This inspection constituted one ERO drill participation sample as defined in IP 71151-05.
b. Findings
No findings of significance were identified.
5.3 Alert and Notification System
a. Inspection Scope
The inspectors sampled licensee submittals for the Alert and Notification System (ANS) PI for the period from the third quarter 2009 through fourth quarter 2009. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, were used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. Documents reviewed are listed in the Attachment to this report. This inspection constituted one alert and notification system sample as defined in IP 71151-05.
b. Findings
No findings of significance were identified.
4OA6 Management Meetings
.1 Exit Meeting Summary
On March 26, 2010, the inspectors presented the inspection results to Mr. A. Shahkirami, and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary. ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- A. Shahkarami, Site Vice President
- K. Appel, Corporate Emergency Preparedness Manager
- S. Butler, Emergency Preparedness Manager
- P. Daly, Radiation Protection Manager
- R. Gaston, Regulatory Assurance Manager
- J. Lizalek, Nuclear Oversight
- M. Marchionda, Operations Director
- T. Mattson, NRC Coordinator
- T. McCool, Operations Manager
- S. McKinney, Emergency Preparedness Coordinator
- M. Smith, Engineering Manager
- W. Waznis, Nuclear Oversight
Nuclear Regulatory Commission
- N. Shah, Acting Senior Resident Inspector
- A. Garmoe, Resident Inspector
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None
2
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection.
- Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort.
- Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
1EP1 Exercise Evaluation
- EP-AA-1001; Radiological Emergency Plan Annex for Braidwood; Revision 22
- EP-AA-112-100; Control Room Operations; Revision 9
- EP-AA-112-200; TSC Activation and Operation; Revision 7
- AR 01047918; Exercise:
- OSC Operator Dispatched without Briefing or Tracking;
- March 25, 2010
- AR 01047913; Exercise:
- TSC Dose Ass't Used Incorrect Conditions; March 25, 2010
- AR 01047898; Exercise:
- Initial Dose Ass't Air Sample Analysis Incorrect;
- March 25, 2010
- AR 01047890; Exercise:
- TSC Core Damage Ass't Objective Failure; March 25, 2010
- AR 01047653; Exercise:
- NOS Identified OSC Team Briefing Problems; March 25, 2010
- AR 01047638; Exercise:
- NOS Identified TSC Habitability Problems; March 25, 2010 4OA1 Performance Indicator Verification
- LS-AA-2110; Monthly Data Elements for NRC ERO Drill Participation; September - December 2009
- LS-AA-2120; Monthly Data Elements for NRC ERO Drill/Exercise Performance;
- July - December 2009
- LS-AA-2130; Monthly Data Elements for NRC Alert and Notification System Reliability;
- July - December 2009 Braidwood Monthly Siren Availability Report Records; July - December 2009
LIST OF ACRONYMS
- USED [[]]
KI Potassium
Iodide
- NRC [[]]
PARS Publicly Available Records
PI Performance
Indicator
NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, /RA/
Hironori Peterson, Chief
Operations Branch
Division of Reactor Safety
Docket Nos. 50-456; 50-457
License Nos. NPF-72; NPF-77 Enclosure: Inspection Report 05000456/2010502; 05000457/2010502 w/Attachment: Supplemental Information cc w/encl: Distribution via ListServ
- RidsNrrDorlLpl3-2 Resource
Susan Bagley
RidsNrrPMBraidwood Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
- DRPIII [[]]
DRSIII Carole Ariano
Patricia Buckley
ROPreports Resource
- 502 DRS [[]]
OL.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
- OFFICE [[]]
- RIII [[]]
- RIII [[]]
NAME RJickling:co
HPeterson
DATE 04/08/2010
04/08/2010
- RECORD [[]]
- COPY [[]]