ML12193A086: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:U~lD= C2.2Z Rý22 £June 27, 2012 SVPLTR: #12-0038 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washigon, oC 20555 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating LManse Nos. DPR-19 and MPR26 Nuclear Docket Nos. l0M237 anm 50-249
==Subject:==
2011 Regulatory Commitment Change Summary Report Please find enclosed the 2011 Commitment Change Summary for Dresden Nuclear Power Station. Revisions to docketed regulatory orriwere processed using Nuclear Energy Institute's (NEI) 99-04, Revision 0, 'Guidelines for Managing NRC Commitment Changes', dated July1 999.Should you have any questions concerning this summary, please contact Mr. Mal Dodd, Regulatory Assurance Manager at 815-416-2800.
Respectfully.
Daviii. Czufln Site Vice President Dresden Nuclear Power Station
==Enclosure:==
Attachment A: Dresden Nuclear Power Station Commitment Change Summary for 2011 cc: NRC Regional Administrator, Region III NRC Senior Resident Inspector, Dresden Nuclear Power Station Attachment A Dresden Nuclear Power Station Commitment Change Summary for 2011 Commitment Date of Original Original Commitment Revised Commitment Basis For Revision Revision Commitment Document Tracking No. Revision 11-01 1/10/2011 NTS Item This is not a regulatory DRP 6200-08 will be deleted and The previously annotated commitment did not 2373159611500 commitment it was a corrective Dresden will utilize the guidance meet the LS-AA-1 10, commitment and DRP 6200-08, action out of a root cause report. provided in corporate procedure management procedure guidelines as either Radiation RP-AA-460, High and Locked a regulatory or non-regulatory commitment.
Protection High Radiation Area Controls.Guidelines for Revise DRP 6200-08 to include a RP-AA-460 provides adequate Work in the requirement to properly post and procedural guidance and the Reactor Cavity control the cavity when the drywell previously annotated commitment head is lifted, did not meet the LS-AA- 110, commitment management procedure guidelines as either a regulatory or non-regulatory commitment.
11-02 09/15/2011 DTP-44 Noted in NRC Inspection report 94- Delete DTP-44 -Monitoring and Unit 1 fuel pool has been emptied of all Monitoring and 01 stating that Commonwealth Trending of Unit 1 Spent Fuel nuclear material and drained of all water, Trending of Unit 1 Edison had established baseline Pool making DTP-44 obsolete.Spent Fuel Pool values with regards to the environmental sampling programs and intended to maintain communications with appropriate levels of staffs within the NRC and IDNS. The correspondence does not say sampling would terminate.}}

Revision as of 00:04, 2 August 2018

Dresden, Units 2 & 3, Transmittal of 2011 Regulatory Commitment Change Summary Report
ML12193A086
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 06/27/2012
From: Czufin D M
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SVPLTR 12-0038
Download: ML12193A086 (2)


Text

U~lD= C2.2Z Rý22 £June 27, 2012 SVPLTR: #12-0038 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washigon, oC 20555 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating LManse Nos. DPR-19 and MPR26 Nuclear Docket Nos. l0M237 anm 50-249

Subject:

2011 Regulatory Commitment Change Summary Report Please find enclosed the 2011 Commitment Change Summary for Dresden Nuclear Power Station. Revisions to docketed regulatory orriwere processed using Nuclear Energy Institute's (NEI) 99-04, Revision 0, 'Guidelines for Managing NRC Commitment Changes', dated July1 999.Should you have any questions concerning this summary, please contact Mr. Mal Dodd, Regulatory Assurance Manager at 815-416-2800.

Respectfully.

Daviii. Czufln Site Vice President Dresden Nuclear Power Station

Enclosure:

Attachment A: Dresden Nuclear Power Station Commitment Change Summary for 2011 cc: NRC Regional Administrator, Region III NRC Senior Resident Inspector, Dresden Nuclear Power Station Attachment A Dresden Nuclear Power Station Commitment Change Summary for 2011 Commitment Date of Original Original Commitment Revised Commitment Basis For Revision Revision Commitment Document Tracking No. Revision 11-01 1/10/2011 NTS Item This is not a regulatory DRP 6200-08 will be deleted and The previously annotated commitment did not 2373159611500 commitment it was a corrective Dresden will utilize the guidance meet the LS-AA-1 10, commitment and DRP 6200-08, action out of a root cause report. provided in corporate procedure management procedure guidelines as either Radiation RP-AA-460, High and Locked a regulatory or non-regulatory commitment.

Protection High Radiation Area Controls.Guidelines for Revise DRP 6200-08 to include a RP-AA-460 provides adequate Work in the requirement to properly post and procedural guidance and the Reactor Cavity control the cavity when the drywell previously annotated commitment head is lifted, did not meet the LS-AA- 110, commitment management procedure guidelines as either a regulatory or non-regulatory commitment.

11-02 09/15/2011 DTP-44 Noted in NRC Inspection report 94- Delete DTP-44 -Monitoring and Unit 1 fuel pool has been emptied of all Monitoring and 01 stating that Commonwealth Trending of Unit 1 Spent Fuel nuclear material and drained of all water, Trending of Unit 1 Edison had established baseline Pool making DTP-44 obsolete.Spent Fuel Pool values with regards to the environmental sampling programs and intended to maintain communications with appropriate levels of staffs within the NRC and IDNS. The correspondence does not say sampling would terminate.