Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal 1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 7 of 13
ML13126A187
Person / Time
Site: Dresden 
Issue date: 03/28/2013
From: Ali E
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
References
RS-12-167, RS-13-067 12Q0108.30-R-002, Rev. 2
Download: ML13126A187 (64)


Text

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5203-----..P30 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

DIESEL GENERATOR/ Fuel Oil Transfer Pump Project:

Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora-qe

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Minor crack in grout pad judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-396

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5203-----P30 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

DIESEL GENERATOR/ Fuel Oil Transfer Pump Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Small transfer pump anchored by four 3/8" cast-in-place anchors.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 7/31/2012 Evaluated by:

James Griffith Date:

9/30/2012 Michael Wodarcyk 9/30/2012 C-397

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5203----P30 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

DIESEL GENERATOR/ Fuel Oil Transfer Pump zu1Lut,ii-uresoen-i 1.5 C-398

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: E1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5203 ------

P30 Equipment Class:

(5) Horizontal Pumps C-399

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: EY1 N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5203---P30 Equipment Class:

(5) Horizontal Pumps I

C-400

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

D03-5203----P30 (5) Horizontal Pumps D03-503 P3 C-401

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: F-N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5203----P30 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

DIESEL GENERATOR/ Fuel Oil Transfer Pump C-402

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status:

Y-K N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5746-A---H15 Equipment Class:

(10) Air Handlers Equipment

Description:

LPCI/ LPCI Emergency Room Air Cooler Project:

Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoracqe

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

Yes of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Abandoned anchor hole located at least 2 anchor diameters away from one rod support in accordance with station procedures. Judged to be acceptable.

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Minor shrinkage cracks in underside of ceiling slab judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-403

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5746-A----H15 Equipment Class:

(10) Air Handlers Equipment

Description:

LPCI/ LPCI Emergency Room Air Cooler Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

Cooler secured to wall. Thus, there are no relative flexibility concerns between cooler and associated piping.

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Air cooler is hung from the ceiling with six 1/2" diameter rod hangers (3 on each side).

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/1/2012 Evaluated by:

ýr ' V" James Griffith Date:

9/30/2012 Michael Wodarcyk 9/30/2012 C-404

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: [Y71 N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5746-A ---- H15 Equipment Class:

(10) Air Handlers Equipment

Description:

LPCI/ LPCI Emergency Room Air Cooler C-405

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status:

Y-E N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

D03-5746-A-HI 5 (10) Air Handlers C-406

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: [Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5746-A--H15 Equipment Class:

(10) Air Handlers C-407

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5746-A---H15 Equipment Class:

(10) Air Handlers C-408

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

D03-5746-A--HI 5 (10) Air Handlers C-409

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 14 Status: FY N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5747----H15 Equipment Class:

(10) Air Handlers Equipment

Description:

HPCI/ HPCI Emergency Air Cooler Project:

Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora-qe

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Minor shrinkage cracks in ceiling judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-410

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 14 Status: T N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5747-----H15 Equipment Class:

(10) Air Handlers EauiDment

Description:

HPCI/ HPCI EmerQencv Air Cooler Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Potential interaction between cooler and channel support of HVAC duct judged to be non-damaging and acceptable.

Insulated pipe for cooler touching duct judged to be acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Air cooler is hung from the ceiling with sixl/2" diameter rod hangers (3 on each side).

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/3/2012 See U3 HPCI Room area walk-by for further information.

Evaluated by:

APO James Griffith Date:

9/30/2012 Michael Wodarcyk 9/30/2012 C-411

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 14 Status: [-Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5747---H15 Equipment Class:

(10) Air Handlers Equipment

Description:

HPCI/ HPCI Emergency Air Cooler Photos 201 C-412

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 14 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

D03-5747---H1 5 (10) Air Handlers C-413

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 14 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5747----H15 Equipment Class:

(10) Air Handlers icy Air C-414

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 14 Status: r-ý N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5747---H15 Equipment Class:

(10) Air Handlers C-415

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 14 Status: [-ý N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5747---H15 Equipment Class:

(10) Air Handlers C-416

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 14 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5747 ------

H15 Equipment Class:

(10) Air Handlers C-417

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 14 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5747---H115 Equipment Class:

(10) Air Handlers C-418

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 10 of 14 Status: r-ý N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

D03-5747---H 15 (10) Air Handlers C-419

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 11 of 14 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5747---H15 Equipment Class:

(10) Air Handlers inment Descriintion HPCI/ HPCI Emera C-420

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 12 of 14 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5747----.H15 Equipment Class:

(10) Air Handlers C-421

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 13 of 14 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5747---H15 Equipment Class:

(10) Air Handlers C-422

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 14 of 14 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-5747.-----H15 Equipment Class:

(10) Air Handlers Eauioment Descriotion:

HPCI/ HPCI Emeraencv Air Cooler C-423

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-6601 ------

G05 Equipment Class:

(17) Engine-Generators Equipment

Description:

DIESEL GENERATOR/ Diesel Engine Driven Generator Status: F N U Project:

Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Minor shrinkage cracks in floor judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-424

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Seismic Walkdown Checklist (SWC)

Status: EY-N U Equipment ID No.:

D03-6601 ------

G05 Equipment Class:

(17) Engine-Generators Eauiiment

Description:

DIESEL GENERATOR/ Diesel Enqine Driven Generator Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Adjacent masonry wall is safety-related.

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Anchored by 14 cast-in-place 1.25" diameter bolts.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 7/31/2012 Evaluated by:

James Griffith Date:

9/30/2012 Michael Wodarcyk 9/30/2012 C-425

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: [-* N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-6601---G05 Equipment Class:

(17) Engine-Generators Equipment

Description:

DIESEL GENERATOR/ Diesel Engine Driven Generator C-426

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-6601---G05 Equipment Class:

(17) Engine-Generators I

C-427

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: [YII] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-6601 ---- G05 Equipment Class:

(17) Engine-Generators I

C-428

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-6601 ---- G05 Equipment Class:

(17) Engine-Generators C-429

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-6601 ---

G05 Equipment Class:

(17) Engine-Generators I

C-430

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 9 Status:

V N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-67341--S35 Equipment Class:

(3) Medium Voltage Switchgear Equipment

Description:

4160V AC/ Switchgear 34-1 Project:

Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 545.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SVVEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora-qe

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-431

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 9 Status: LY-1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-67341 -S---

S35 Equipment Class:

(3) Medium Voltage Switchgear Equipment

Description:

4160V AC/ Switchgear 34-1 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead roof structure well-supported and judged to be acceptable.

Overhead light fixtures are judged to be acceptable.

Masonry wall at east end of switchgear is safety-related.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Anchored by small base plates welded to switchgear and anchored by 3/8" concrete expansion anchors.

Switchgear braced back to wall.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/2/2012 Evaluated by:

James Griffith Date:

9/30/2012 Michael Wodarcyk 9/30/2012 C-432

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 9 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-67341---S35 Equipment Class:

(3) Medium Voltage Switchgear Equipment

Description:

4160V AC/ Switchgear 34-1 Photos C-433

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 9 Status: [-* N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-67341---S35 Equipment Class:

(3) Medium Voltage Switchgear 34-1 C-434

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 9 Status: Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

D03-67341 --- S35 (3) Medium Voltage Switchgear 34-1 C-435

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 9 Status: E[ý N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-67341---S35 Equipment Class:

(3) Medium Voltage Switchgear 34-1 C-436

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 9 Status: E-I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-67341---$35 Equipment Class:

(3) Medium Voltage Switchgear Equipment

Description:

4160V AC/ Switchgear 34-1 C-437

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 9 Status: [Z N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-67341---S35 Equipment Class:

(3) Medium Voltage Switchgear C-438

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 9 Status:

Y--] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-67341 --

S35 Equipment Class:

(3) Medium Voltage Switchgear 34-1 C-439

Dresden Generating Station Unit 3 12QO108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 8 Status: [T N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7338 -S----

S35 Equipment Class:

(2) Low Voltage Switchgear Equipment

Description:

480V AC/ Switchgear 38 Project:

Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 570.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas. Additional space is Drovided at the end of this checklist for documentina other comments.

Anchoraaqe

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-440

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 8 Status: FYZ N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7338-S35 Equipment Class:

(2) Low Voltage Switchgear Eauir~ment Descriotion:

480V ACI Switchciear 38 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

IR 1396562:

UNPINNED SWITCHGEAR HOISTS During Fukushima seismic walkdowns, two movable trolley hoists mounted on top of SWGR 38 and one movable trolley hoist mounted on top of SWGR 39 were found unrestrained against horizontal movement due to the restraining pin for each hoist not being installed while each hoist was in the stored position. The switchgears are located at U3, N-47, EL. 570.

Unit supervisor and shift manager were informed of the condition and station personnel installed the pins for the trolley hoists. Therefore, hoists are judged acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixture judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/2/2012 C-441

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 8 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7338-----.35 Equipment Class:

(2) Low Voltage Switchgear Equipment

Description:

480V AC/ Switchgear 38 Evaluated by:

James Griffith Date:

10/24/2012 C/

Michael Wodarcyk 10/24/2012 C-442

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 8 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7338 --.... S35 Equipment Class:

(2) Low Voltage Switchgear 38 20120802-Dresden-3 038 C-443

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 8 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7338-...-S35 Equipment Class:

(2) Low Voltage Switchgear C-444

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 8 Status: EY N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7338 -S----

S35 Equipment Class:

(2) Low Voltage Switchgear 38 C-445

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 8 Status:

Y-1 N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7338 --.... S35 Equipment Class:

(2) Low Voltage Switchgear 38 C-446

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 8 Status: EZII N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7338 --.... S35 Equipment Class:

(2) Low Voltage Switchgear C-447

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7338 ------

T10 Equipment Class:

(4) Transformers Eauipment

Description:

480V AC/ Transformer 38, Feed to Switchgear 38 Project:

Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 570.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-448

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: FT] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7338----T1O Equipment Class:

(4) Transformers Eauipment

Description:

480V AC/ Transformer 38, Feed to Switchgear 38 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/2/2012 Transformer has been replaced since SQUG walkdown.

Evaluated by:

4 -A James Griffith Date:

9/30/2012 Michael Wodarcyk 9/30/2012 C-449

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: r N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7338----TI0 Equipment Class:

(4) Transformers Equipment

Description:

480V AC/ Transformer 38, Feed to Switchgear 38 201 C-450

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: FY N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7338----T1O Equipment Class:

(4) Transformers r

C-451

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7338----T1O Equipment Class:

(4) Transformers r

C-452

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7339 ------

S35 Equipment Class:

(2) Low Voltage Switchgear Eauipment

Description:

480V AC/ 480V Switchqear 39 Project:

Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 570.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-453

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7339 -S----

S35 Equipment Class:

(2) Low Voltage Switchgear Equipment

Description:

480V AC/ 480V Switchgear 39 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Bottom of eastern-most door at back of switchbear is bent out slightly. Door is adequately latched and judged to be acceptable.

IR 1396562:

UNPINNED SWITCHGEAR HOISTS During Fukushima seismic walkdowns, two movable trolley hoists mounted on top of SWGR 38 and one movable trolley hoist mounted on top of SWGR 39 were found unrestrained against horizontal movement due to the restraining pin for each hoist not being installed while each hoist was in the stored position. The switchgears are located at U3, N-47, EL. 570.

Unit supervisor and shift manager were informed of the condition and station personnel installed the pins for the trolley hoists. Therefore, hoists are judged acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

Yes Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

C-454

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7339----S35 Equipment Class:

(2) Low Voltage Switchgear EquiDment

Description:

480V AC/ 480V Switchgear 39 Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/2/2012 Evaluated by:

4e James Griffith Date:

9/30/2012 Michael Wodarcyk 9/30/2012 Photos C-455

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: FYI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7339---S35 Equipment Class:

(2) Low Voltage Switchgear C-456

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7339-----.35 Equipment Class:

(2) Low Voltage Switchgear C-457

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7339-----.35 Equipment Class:

(2) Low Voltage Switchgear

==

Description:==

480V AC/ 480V C-458

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: FYI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-7339-----.35 Equipment Class:

(2) Low Voltage Switchgear C-459