12Q0106.30-R-002, Rev. 2, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 3, Part 9 of 11
ML12348A263
Person / Time
Site: Dresden Constellation icon.png
Issue date: 11/15/2012
From: Delaney M
Exelon Generation Co, Stevenson & Associates
To:
Office of Nuclear Reactor Regulation
References
RS-12-167 12Q0106.30-R-002, Rev 2
Download: ML12348A263 (70)


Text

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 8 Status: V N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250-----

B04 Equipment Class: (15) Batteries on Racks..Equipment

==

Description:==

250V DC/ Battery #3, Feed to TB MCC #3 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 551.00 ft, ALL Manufacturer/Model:

Instructions for Completing .Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided -at the end of this checklist for documenting other comments.Anchoraae 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Minor shrinkage cracks in floor judged acceptable.
5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes Yes Yes Yes C-521 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 8 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250-----

B04 Equipment Class: (15) Batteries on Racks EauiDment DescriDtion:

250V DC/ Battery #3, Feed to TB MCC #3 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures, duct, and trolley hoist and beam judged acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Trolley stops prevent trolley contact with jumper cable.Comments SEWS Anchorage Notes: Each post leg is thru-bolted to an angle iron clip which is anchored by one or two 1/2" wedge expansion anchor to the concrete floor.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: A James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-522 Dresden Generating Station Unit 3 1200108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 8 Status: r-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250-----

B04 Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

250V DC/ Battery #3, Feed to TB MCC #3 Photos C-523 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 8 Status: [I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250---B04 Equipment Class: (15) Batteries on Racks F C-524 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 8 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250---B04 Equipment Class: (15) Batteries on Racks ,imAft Decrinfiann 250V DC/ Ratterv $3- Ft C-525 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 8 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250---B04 Equipment Class: (15) Batteries on Racks F C-526 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 8 Status: YI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-83250----B04 (15) Batteries on Racks FE 20120731-Dresden-3 071 C-527 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 8 Status: F-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250----B04 Equipment Class: (15) Batteries on Racks F C-528 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-9802A-A21-B11 Equipment Class: (14) Distribution Panels Equipment

==

Description:==

24/48V DC/ Breaker to Battery Charger #3A (+)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 538.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracks in floor judged to be acceptable.

5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-529 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: ET] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-9802A-A21-B11 Equipment Class: (14) Distribution Panels Equipment

==

Description:==

24/48V DC/ Breaker to Battery Charger #3A (+)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

Adjacent masonry wall is safety-related.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?

IR 1394946: Panel 3A 48/24 VDC with doors that do not latch Panel 3A 48/24 VDC was found partially latched. Only one of three latches were engaged (the door was out of plane with the rest of the item).Communication from the shift manager informed Engineering that Operations personnel had secured the latches on 7/30/2012 at approximately 17:55 hours.Therefore.

door is not a seismic concern.Yes Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: P James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-530 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: Y-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-9802A-A21-B11 Equipment Class: (14) Distribution Panels Equipment

==

Description:==

24/48V DC/ Breaker to Battery Charger #3A (+)C-531 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-9802A-A21-BI1 Equipment Class: (14) Distribution Panels EaUiDment DescriDtion:

24/48V DC/ Breaker to Battery Charaer #3A C-532 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet I of 9 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-9802-A


P06 Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

24/48V DC/ Distribution Panel #3A Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 538.00 ft, ALL.Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes Minor shrinkage cracks in floor judged to be acceptable.
5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-533 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 9 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-9802-A


P06 Equipment Class: (1) Motor Control Centers EauiDment DescriDtion:

24/48V DC/ Distribution Panel #3A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Light fixtures judged to be acceptable.

Emergency light fixture No. 329 is adequately restrained.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found -no adverse seismic conditions that could adversely affect the safety functions of the equipment?

IR 1394946: Panel 3A 48/24 VDC with doors that do not latch Panel 3A 48/24 VDC was found partially latched. Only one of three latches were engaged (the door was out of plane with the rest of the item).Communication from the shift manager informed Engineering that Operations personnel had secured the latches on 7/30/2012 at approximately 17.'55 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br />.Therefore, door is not a seismic concern.Yes Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/30/2012 Evaluated by: A James Griffith Date: 9/30/2012 Michael Wodarc k 9/30/2012 C-534 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 9 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-9802-A--P06 Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

24/48V DC/ Distribution Panel #3A Photos C-535 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 9 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-9802-A


P06 (1) Motor Control Centers C-536 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 9 Status: EYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-9802-A


P06 Equipment Class: (1) Motor Control Centers n Pai C-537 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 9 Status: 7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-9802-A


P06 Equipment Class: (1) Motor Control Centers 20120730-Dresden-3 168 20120730-Dresden-3 169 C-538 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 9 Status: rII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-9802-A----P06 Equipment Class: (1) Motor Control Centers C-539 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 9 Status: E N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-9802-A


P06 Eauipment Class: (1) Motor Control Centers I I 20120730-Dresden-3 176 C-540 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 9 Status: E[I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-9802-A--P06 Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

24/48V DC/ Distribution Panel #3A C-541 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauipment

==

Description:==

CONTROL PANEL/ Unit 3 Diesel Generator Control Panel Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchora-qe

1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Control panel mounted to Diesel Generator skid.5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes Yes C-542 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauipment

==

Description:==

CONTROL PANEL/ Unit 3 Diesel Generator Control Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead gallery well-supported.

Adjacent masonry wall is safety-related.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Panel welded to the base of the skid and braced at the top to the expansion water tank that is supported by the Diesel Skid.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: '1 ' James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-543 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL Unit 3 Diesel Generator Control Panel Photos C-544 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Ir C-545 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-546 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: ETI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL Unit 3 Neutral Grounding Cabinet Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?No Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracks in floor judged to be acceptable.
5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-547 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment DescriDtion:

CONTROL PANEL Unit 3 Neutral Groundinci Cabinet Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Emergency fight No. 313 is judged to be adequately restrained.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-548 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL Unit 3 Neutral Grounding Cabinet Photos 201 C-549 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-550 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: Y[I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: inmant Ifl~aqnt~n-D03-NGC (20) Instrumentation and Control Panels and Cabinets CONTROL PANEL Unit 3 It C-551 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-552 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 D Area Walk-By Checklists (AWCs)Table D-1 provides the building, elevation, and location of each area as well as a list of SWEL items associated with each area, and page numbers of each Area Walk-By Checklist.

D-1 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Table D-1. Summary of Area Walk-By Checklists AWC- BLDG ELEV DESCRIPTION COMPONENT ID PAGE U3-xx D03-0903-0003 1 --- 534 Control Room D03-0903-0015 D- 5 D03-0923-0005

& -0005A D03-0903-0028 2 Turbine 517.5 Aux. Electric Equipment D03-0903-0039 D- 7 D03-2203-0070A D03-8300--3---B05 D03-83250-3---B05 3 Turbine 538 Battery Charger Room D03-9802A-A21-B11 D- 12 D03-9802-A


P06 4 Turbine 538 D03-8300--3A--BO5 D- 15 5 Turbine 551 Battery Room D03-8300--BC--B04 D- 21___________________________D03-83250----B04 6 Turbine 538 D03-7838-2


M05 D- 24 7 Turbine 528.25 U3 DG Fuel Oil Day D03-5202 ------ T05 D- 30 Tank Room D03-2253-001 0 D03-2253-0021 D03-4600-B


T05 U3 Diesel Generator D0-6-B-T5 8 Turbine 517.5 D03-5203 ------ P30 D- 33 Room D03-6601 ------ G05 D03-DGCP D03-NGC 9 Turbine 534 D03-7839-2----M05 D- 39 10 Turbine 495 D03-1501-0044AP30 D- 43 D03-0302-0019AV27 D03-0305-0010-0031-0125-Al 0 D03-0305-0010-0031-0126-VO5 D03-0305-0010-0031-0127-VO5 11 Reactor 517.5 West CRD/HCU Bank D03-0305-0010-0031-H20 D- 47 D03-0305-0030-0043-0125-Al 0 D03-0305-0030-0043-0126-VO5 D03-0305-0030-0043-0127-VO5 D03-0305-0030-0043-H20 D03-2203-0008 Table D-1 Page 1 of 3 D-2 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 AWC- BLDG ELEV DESCRIPTION COMPONENT ID PAGE U3-xx D03-0302-0082B-LT D03-0302-0082E-LT D03-0305-0046-0031-0125-Al 0 D03-0305-0046-0031-0126-VO5 D03-0305-0046-0031-0127-VO5 12 Reactor 517.5 East CRD/HCU Bank D03-0305-0046-0031-H20 D- 53 D03-0305-0058-0023-0125-Al 0 D03-0305-0058-0023-0126-VO5 D03-0305-0058-0023-0127-VO5 D03-0305-0058-0023-H20 D03-1501-0021AV20 13 Reactor 504.5 U2/3 DG Room Near D00-DGCP 0- 59 13_ Reactor 504.5Local Control Panels _________D-_59 14 Cribhouse 490.67 D03-3903 ------ P30 D- 66 15 Reactor 476.5 Torus D03-1501-0021AV20 D- 77 16 Reactor 517.5 D03-7838-1-1--P06 D- 79 D03-1501-0003AV20 17 Reactor 476.5 SE Corner Room Gallery D03-1501-0032AV20 D- 84 D03-1503-A


H15 D03-5746-A


H15 SE Corner Room D03-1502-A


P30 Basement D03-1599-0013AV26 D03-2301-0003-V20 D03-2302 ------ P30 D03-2301-0006-V20 003-2301 -0035-V20 19 Reactor 476.5 HPCI Room .03-2301-00357-P0 D- 104 D03-2301-0057-P30 D03-2320-GSCE-F05 D03-2380 ------ PSH D03-5747 -HIS.. H15 D03-7338 ------ S35 D03-7338 -T 10 20 Reactor 570 D03-7339 ------ S35 D- 110 D03-8303A -M... M05 D03-8303B


M05 D03-83125

.---- P06 21 Reactor 570 D03-1601-0024-VO5 D- 115 22 Reactor 545.5 D03-2253-0084 D- 117 D03-67341 -S 35 23 Reactor 545.5 D03-2203-0006 D- 123 Table D-1 Page 2 of 3 D-3 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 AWC- BLDG ELEV DESCRIPTION COMPONENT ID PAGE U3-xx 24 Reactor 570 Fuel Pool Cooling Room D03-1601-0023-V05 D- 131 D00-2223-01 09 25 Reactor 504.5 U2/3 DG Room (Unit 2 DOO-ACP D- 134 area walk-by) DOO-NGC 26 Reactor 517.5 Shutdown Cooling Pump D03-1001-0002AV20 D- 136 Room 27 Reactor 517.5 TIP Room D03-0409-A


T05 D- 139 D03-1 541-...A-FE 28 Reactor 476.5 Torus D03-1541--

D- 141 D03-1601-0057-V20 29 Turbine 517.5 U2 RFP Room (Unit 2 DOO-2350-C


LS D- 146 area walk-by)30 Reactor 570 RWCU Demin Valve D03-1601-0063-V05 D- 149 Room Ventilation Room (Unit 2 DOO-5741-0048BV72 31 Turbine 534 Ventiatio Roy D00-9400-0102-R15 D- 151 area walk-by) DOO-9400-0104BF05 32 Turbine 538 (Unit 2 area walk-by) D03-2203-0073A D- 153 33 Reactor 476.5 Torus D03-1001-0005AV20 D- 157 Table D-1 Page 3 of 3 D-4 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: [F] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-01 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Yes 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Yes 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Yes 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Light fixtures judged to be acceptable.

5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Yes Yes 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes 7. Does it appearthat the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Yes D-5 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: Ij[ N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-01 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Yes Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/30/12 For photographs, see SWCs for D03-0903-0003, -0015, D03-0923-0005, and -0005A.Evaluated by: James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 Photos D-6 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-02 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Temporary light fixture tethered with cord and with redundant supports to permanent light fixtures and judged to be acceptable.

D-7 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: FYI N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-02 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?IR 1395481: PANEL 902-28 WITH DOORS THAT DO NOTLATCH While performing NRC required NTTF (near term task force) seismic walkdowns, Panel 903-28 was found unlatched per IR 01394831.

The FIN Team performed a corrective remedial repair of cabinet door 903-28 and then checked the Unit 2 side, Panel 902-28 (located in the front part of the Aux Electric room at elevation 517"6"). Panel 902-28 was found in the same condition as U3; namely, the opening device is a push button operated without a handle that requires a key to engage the latches. The FIN Team performed remedial repairs on cabinet door 902-28 in addition to 903-28 on 07/30/12.Operations was unsuccessful in finding a key for the U2 in addition to the U3 doors.This IR was generated to document unsecured latches for Unit 2 Panel 902-28.As an interim measure, the doors have been secured (taped shut) to prevent movement during a seismic event. In addition, a satisfactory "tug test" on the secured doors was performed by two SQUG-qualified engineers.

This interim solution is judged to be acceptable and has been accepted by Operations (Shift Manager).IR 1395498: DATA AQUISITION CABINET 1 & 2 DOOR DO NOT LATCH While performing NRC required NTTF (near term task force) seismic walkdowns, Panels 903-28 and 902-28 were found unlatched per IRs 01394831 & 01395481 respectively.

An extent of condition walkdown was performed in the Aux Electric room at elevation 51 7"-6"to see if there are other unsecured panel latches. The "Data Aquisition Cabinet #1 & #2" doors were found in similar conditions as those above; namely, the opening device is a button without a handle that requires a key to engage the latches. There are no other panels/cabinets in the Aux Electric room besides those identified above that have the key operated latches.This IR was generated to document unsecured latches for Data Aquisition Cabinets #1 & #2. These panels are not safety related and since they are by themselves, they have no spatial seismic interaction issues with other cabinets in the Aux Electric room. Therefore, they are judged to not be a seismic interaction concern.Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/30/12 D-8 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: 1 N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-02 Evaluated by: " James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 Photos D-9 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: FY] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-02 D-1 0 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: r-1 N U Area Walk-By Checklist (AWC)D-1 1 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: E N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-03 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Light fixtures judged to be acceptable.

5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?Room heater and associated piping judged to be adequately supported.
6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

D-1 2 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-03 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/30/12 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 D-13 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: F N U Area Walk-By Checklist (AWC)D-14 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-04 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?Threaded fire pipe is well-supported and judged to be acceptable.
6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?Gas bottle is well-restrained and judged to be acceptable.
7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

D-1 5 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: I N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-04 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Evaluated by: AI James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 D-1 6 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: Y N U Area Walk-By Checklist (AWC)D-1 7 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: F-ý N U Area Walk-By Checklist (AWC)D-18 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: N U Area Walk-By Checklist (AWC)20'D-19 Dresden Generating Station Unit 3 1200108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: FI- N U Area Walk-By Checklist (AWC)D-20 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: LT N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-05 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Yes 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Yes 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?Yes 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Yes 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Yes 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Yes D-21 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: r N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-05 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: , James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 D-22 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: Y N U Area Walk-By Checklist (AWC)D-23 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: F N U Area Walk-By Checklist (AWC)Location (Bidg, Elev, Room/Area):

AWC-U3-06 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Duct hanger rods near trays judged acceptable.

5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?Threaded fire pipe is well-supported and judged to be acceptable.
6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Scaffold adequately restrained to wall and ceiling. Carts chocked; distance between carts and equipment adequate.D-24 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: Yj N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-06 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: r James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 Photos D-25 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: ELI N U Area Walk-By Checklist (AWC)D-26 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: N U Area Walk-By Checklist (AWC)D-27 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: [T] N U Area Walk-By Checklist (AWC)D-28 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: Y N U Area Walk-By Checklist (AWC)D-29 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: [- N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-07 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Some pipes close together; judged acceptable due to flexibility of the pipes.5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?Threaded fire piping is well-supported and judged to be acceptable.

6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

D-30 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: T1 N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-07 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 Photos D-31 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: E-D N U Area Walk-By Checklist (AWC)D-32 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet I of 6 Status: Tj N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-08 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Small separation between pipes in various locations.

Pipes are robust and/or flexible and are judged acceptable.

5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?Threaded fire pipe is well-supported and judged to be acceptable.
6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?Oil leakage rags; judged acceptable due to small amount of material.7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

D-33 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: F-1 N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-U3-08 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: James Griffith Date: 9/30/2012 01 0Michael Wodarcyk 9/30/2012 D-34 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: Liii N U Area Walk-By Checklist (AWC)D-35 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: Y N U Area Walk-By Checklist (AWC)D-36 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: [I N U Area Walk-By Checklist (AWC)D-37 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: [1 N U Area Walk-By Checklist (AWC)D-38