Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal 1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 9 of 13
ML13126A189
Person / Time
Site: Dresden Constellation icon.png
Issue date: 03/28/2013
From: Ali E
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
References
RS-12-167, RS-13-067 12Q0108.30-R-002, Rev. 2
Download: ML13126A189 (41)


Text

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: F]

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83125 -----

P06 Equipment Class:

(1) Motor Control Centers Equipment

Description:

125V DC/ RB 125V DC Distribution Panel #3 Project:

Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 570.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraae

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-512

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83125 -----

P06 Equipment Class:

(1) Motor Control Centers Eauipment Descriotion:

125V DC/ RB 125V DC Distribution Panel #3 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

MCC stitch welded to edge angle embedded in concrete.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/2/2012 Evaluated by:

James Griffith Date:

9/30/2012 Michael Wodarcyk 9/30/2012 C-513

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

EauiDment DescriDtion:

D03-83125---P06 (1) Motor Control Centers 125V DC/ RB 125V DC Distribution Panel #3 Photos C-514

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83250-3---B05 Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

250V DC/ Battery Charger #3 Project:

Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 538.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Yes Minor shrinkage cracks in floor judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-515

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: [Yi1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83250-3---B05 Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

250V DC/ Battery Charger #3 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 7/30/2012 Evaluated by:

At*

James Griffith Date:

9/30/2012 Michael Wodarcyk 9/30/2012 C-516

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83250-3--B05 Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

250V DC/ Battery Charger #3 C-517

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83250-3--B05 Equipment Class:

(16) Battery Chargers and Inverters C-518

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83250-3---B05 Equipment Class:

(16) Battery Chargers and Inverters C-519

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: r-ý N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83250-3--B05 Equipment Class:

(16) Battery Chargers and Inverters Charaer #3 20120730-Dresden-3 209 C-520

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 8 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83250----B04 Equipment Class:

(15) Batteries on Racks Equipment

Description:

250V DC/ Battery #3, Feed to TB MCC #3 Project:

Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 551.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Minor shrinkage cracks in floor judged acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes C-521

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 8 Status: FY-N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83250---B04 Equipment Class:

(15) Batteries on Racks Equipment

Description:

250V DC/ Battery #3, Feed to TB MCC #3 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures, duct, and trolley hoist and beam judged acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Trolley stops prevent trolley contact with jumper cable.

Comments SEWS Anchorage Notes:

Each post leg is thru-bolted to an angle iron clip which is anchored by one or two 1/2" wedge expansion anchor to the concrete floor.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 7/31/2012 Evaluated by:

James Griffith Date:

9/30/2012 Michael Wodarcyk 9/30/2012 C-522

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 8 Status:

Y-1 N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83250---B04 Equipment Class:

(15) Batteries on Racks Eauilpment

Description:

250V DC/ Battery #3, Feed to TB MCC #3 C-523

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 8 Status: [-* N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83250---B04 Equipment Class:

(15) Batteries on Racks C-524

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 8 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83250---B04 Equipment Class:

(15) Batteries on Racks FE C-525

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 8 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83250---B04 Equipment Class:

(15) Batteries on Racks ipment

Description:

250V DC/ Battery #3, FE C-526

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 8 Status: r-IJ N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83250---B04 Equipment Class:

(15) Batteries on Racks C-527

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 8 Status: F-7 N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-83250-----.B04 Equipment Class:

(15) Batteries on Racks F

C-528

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: EZ] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-9802A-A21-B11 Equipment Class:

(14) Distribution Panels Equipment

Description:

24/48V DC/ Breaker to Battery Charger #3A (+)

Project:

Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 538.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Minor shrinkage cracks in floor judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-529

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-9802A-A21-B11 Equipment Class:

(14) Distribution Panels Equipment

Description:

24/48V DC/ Breaker to Battery Charger #3A (+)

Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable. Adjacent masonry wall is safety-related.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?

IR 1394946:

Panel 3A 48/24VDC with doors that do not latch Panel 3A 48/24VDC was found partially latched. Only one of three latches were engaged (the door was out of plane with the rest of the item).

Communication from the shift manager informed Engineering that Operations personnel had secured the latches on 7/30/2012 at approximately 17:55 hours.

Therefore, door is not a seismic concern.

Yes Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 7/31/2012 Evaluated by:

James Griffith Date:

9/30/2012 Michael Wodarcyk 9/30/2012 C-530

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: FY N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-9802A-A21-B11 Equipment Class:

(14) Distribution Panels Equipment Desciption:

24/48V DC/ Breaker to Battery Charger #3A (+)

Photos 20O C-531

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F'* N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

D03-9802A-A21-B131 (14) Distribution Panels to Battery Charger #3A (+)

C-532

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 9 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-9802-A ---- P06 Equipment Class:

(1) Motor Control Centers Equipment

Description:

24/48V DC/ Distribution Panel #3A Project:

Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 538.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Yes Minor shrinkage cracks in floor judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-533

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 9 Status: FYj] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-9802-A----P06 Equipment Class:

(1) Motor Control Centers Equipment

Description:

24/48V DC/ Distribution Panel #3A Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Light fixtures judged to be acceptable. Emergency light fixture No. 329 is adequately restrained.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?

IR 1394946:

Panel 3A 48/24VDC with doors that do not latch Panel 3A 48/24VDC was found partially latched. Only one of three latches were engaged (the door was out of plane with the rest of the item).

Communication from the shift manager informed Engineering that Operations personnel had secured the latches on 7/30/2012 at approximately 17:55 hours.

Therefore, door is not a seismic concem.

Yes Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 7/30/2012 Evaluated by:

James Griffith Date:

9/30/2012 Michael Wodarcyk 9/30/2012 C-534

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 9 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-9802-A--P06 Equipment Class: (1) Motor Control Centers Equipment

Description:

24/48V DC/ Distribution Panel #3A C-535

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 9 Status: F-7 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-9802-A---P06 Equipment Class:

(1) Motor Control Centers Enuinment Decrintinn:

24/48V DCI Di-tnhutinn Panel #3A m

C-536

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 9 Status:

Y-- N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

D03-9802-A ---- P06 (1) Motor Control Centers D390-A...I 0

C-537

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 9 Status: [*

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-9802-A---P06 Equipment Class:

(1) Motor Control Centers 1

20120730-Dresden-3 168 C-538

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 9 Status: FY-I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-9802-A---P06 Equipment Class:

(1) Motor Control Centers I

C-539

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 9 Status: EY N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-9802-A---P06 Equipment Class:

(1) Motor Control Centers C-540

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 9 Status: EZI! N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-9802-A--P06 Equipment Class:

(1) Motor Control Centers Equipment

Description:

24/48V DC/ Distributon Panel #3A C-541

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 5 Status:

Y-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-DGCP Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTROL PANEL/ Unit 3 Diesel Generator Control Panel Project:

Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Control panel mounted to Diesel Generator skid.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes Yes C-542

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-DGCP Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTROL PANEL Unit 3 Diesel Generator Control Panel Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead gallery well-supported. Adjacent masonry wall is safety-related.

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Panel welded to the base of the skid and braced at the top to the expansion water tank that is supported by the Diesel Skid.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 7/31/2012 Evaluated by:

James Griffith Date:

9/30/2012 Michael Wodarcyk 9/30/2012 C-543

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 5 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

Equipment

Description:

D03-DGCP (20) Instrumentation and Control Panels and Cabinets CONTROL PANEL/ Unit 3 Diesel Generator Control Panel C-544

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: FYl] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-DGCP Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Unit 3 C-545

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: FYI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-DGCP Equipment Class:

(20) Instrumentation and Control Panels and Cabinets C-546

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-NGC Equipment Class:

(20) Instrumentation and Control Panels and Cabinets EauiDment

Description:

CONTROL PANEL/ Unit 3 Neutral Grounding Cabinet Project:

Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Minor shrinkage cracks in floor judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-547

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-NGC Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTROL PANEL Unit 3 Neutral Grounding Cabinet Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Emergency light No. 313 is judged to be adequately restrained.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 7/31/2012 Evaluated by:

James Griffith Date:

9/30/2012 Michael Wodarcyk 9/30/2012 C-548

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-NGC Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTROL PANEL/ Unit 3 Neutral Grounding Cabinet Photos 201 C-549

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: [1 N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-NGC Equipment Class:

(20) Instrumentation and Control Panels and Cabinets C-550

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-NGC Equipment Class:

(20) Instrumentation and Control Panels and Cabinets C-551

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

D03-NGC Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Eauioment Descriotion:

CONTROL PANEL/ Unit 3 Neutral Groundina Cabinet C-552