Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: F]
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83125 -----
P06 Equipment Class:
(1) Motor Control Centers Equipment
Description:
125V DC/ RB 125V DC Distribution Panel #3 Project:
Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Reactor, 570.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraae
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
Yes
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-512
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83125 -----
P06 Equipment Class:
(1) Motor Control Centers Eauipment Descriotion:
125V DC/ RB 125V DC Distribution Panel #3 Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEWS Anchorage Notes:
MCC stitch welded to edge angle embedded in concrete.
Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/2/2012 Evaluated by:
James Griffith Date:
9/30/2012 Michael Wodarcyk 9/30/2012 C-513
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
EauiDment DescriDtion:
D03-83125---P06 (1) Motor Control Centers 125V DC/ RB 125V DC Distribution Panel #3 Photos C-514
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83250-3---B05 Equipment Class:
(16) Battery Chargers and Inverters Equipment
Description:
250V DC/ Battery Charger #3 Project:
Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Turbine, 538.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Yes Minor shrinkage cracks in floor judged to be acceptable.
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-515
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: [Yi1 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83250-3---B05 Equipment Class:
(16) Battery Chargers and Inverters Equipment
Description:
250V DC/ Battery Charger #3 Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead light fixtures judged to be acceptable.
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 7/30/2012 Evaluated by:
At*
James Griffith Date:
9/30/2012 Michael Wodarcyk 9/30/2012 C-516
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83250-3--B05 Equipment Class:
(16) Battery Chargers and Inverters Equipment
Description:
250V DC/ Battery Charger #3 C-517
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83250-3--B05 Equipment Class:
(16) Battery Chargers and Inverters C-518
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83250-3---B05 Equipment Class:
(16) Battery Chargers and Inverters C-519
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: r-ý N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83250-3--B05 Equipment Class:
(16) Battery Chargers and Inverters Charaer #3 20120730-Dresden-3 209 C-520
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 8 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83250----B04 Equipment Class:
(15) Batteries on Racks Equipment
Description:
250V DC/ Battery #3, Feed to TB MCC #3 Project:
Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Turbine, 551.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
Yes
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Minor shrinkage cracks in floor judged acceptable.
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes C-521
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 8 Status: FY-N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83250---B04 Equipment Class:
(15) Batteries on Racks Equipment
Description:
250V DC/ Battery #3, Feed to TB MCC #3 Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead light fixtures, duct, and trolley hoist and beam judged acceptable.
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Trolley stops prevent trolley contact with jumper cable.
Comments SEWS Anchorage Notes:
Each post leg is thru-bolted to an angle iron clip which is anchored by one or two 1/2" wedge expansion anchor to the concrete floor.
Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 7/31/2012 Evaluated by:
James Griffith Date:
9/30/2012 Michael Wodarcyk 9/30/2012 C-522
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 8 Status:
Y-1 N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83250---B04 Equipment Class:
(15) Batteries on Racks Eauilpment
Description:
250V DC/ Battery #3, Feed to TB MCC #3 C-523
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 8 Status: [-* N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83250---B04 Equipment Class:
(15) Batteries on Racks C-524
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 8 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83250---B04 Equipment Class:
(15) Batteries on Racks FE C-525
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 8 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83250---B04 Equipment Class:
(15) Batteries on Racks ipment
Description:
250V DC/ Battery #3, FE C-526
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 8 Status: r-IJ N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83250---B04 Equipment Class:
(15) Batteries on Racks C-527
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 8 Status: F-7 N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-83250-----.B04 Equipment Class:
(15) Batteries on Racks F
C-528
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: EZ] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-9802A-A21-B11 Equipment Class:
(14) Distribution Panels Equipment
Description:
24/48V DC/ Breaker to Battery Charger #3A (+)
Project:
Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Turbine, 538.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Minor shrinkage cracks in floor judged to be acceptable.
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-529
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-9802A-A21-B11 Equipment Class:
(14) Distribution Panels Equipment
Description:
24/48V DC/ Breaker to Battery Charger #3A (+)
Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead light fixtures judged to be acceptable. Adjacent masonry wall is safety-related.
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
IR 1394946:
Panel 3A 48/24VDC with doors that do not latch Panel 3A 48/24VDC was found partially latched. Only one of three latches were engaged (the door was out of plane with the rest of the item).
Communication from the shift manager informed Engineering that Operations personnel had secured the latches on 7/30/2012 at approximately 17:55 hours.
Therefore, door is not a seismic concern.
Yes Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 7/31/2012 Evaluated by:
James Griffith Date:
9/30/2012 Michael Wodarcyk 9/30/2012 C-530
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: FY N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-9802A-A21-B11 Equipment Class:
(14) Distribution Panels Equipment Desciption:
24/48V DC/ Breaker to Battery Charger #3A (+)
Photos 20O C-531
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F'* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
D03-9802A-A21-B131 (14) Distribution Panels to Battery Charger #3A (+)
C-532
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 9 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-9802-A ---- P06 Equipment Class:
(1) Motor Control Centers Equipment
Description:
24/48V DC/ Distribution Panel #3A Project:
Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Turbine, 538.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Yes Minor shrinkage cracks in floor judged to be acceptable.
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-533
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 9 Status: FYj] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-9802-A----P06 Equipment Class:
(1) Motor Control Centers Equipment
Description:
24/48V DC/ Distribution Panel #3A Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Light fixtures judged to be acceptable. Emergency light fixture No. 329 is adequately restrained.
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
IR 1394946:
Panel 3A 48/24VDC with doors that do not latch Panel 3A 48/24VDC was found partially latched. Only one of three latches were engaged (the door was out of plane with the rest of the item).
Communication from the shift manager informed Engineering that Operations personnel had secured the latches on 7/30/2012 at approximately 17:55 hours.
Therefore, door is not a seismic concem.
Yes Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 7/30/2012 Evaluated by:
James Griffith Date:
9/30/2012 Michael Wodarcyk 9/30/2012 C-534
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 9 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-9802-A--P06 Equipment Class: (1) Motor Control Centers Equipment
Description:
24/48V DC/ Distribution Panel #3A C-535
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 9 Status: F-7 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-9802-A---P06 Equipment Class:
(1) Motor Control Centers Enuinment Decrintinn:
24/48V DCI Di-tnhutinn Panel #3A m
C-536
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 9 Status:
Y-- N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
D03-9802-A ---- P06 (1) Motor Control Centers D390-A...I 0
C-537
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 9 Status: [*
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-9802-A---P06 Equipment Class:
(1) Motor Control Centers 1
20120730-Dresden-3 168 C-538
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 9 Status: FY-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-9802-A---P06 Equipment Class:
(1) Motor Control Centers I
C-539
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 9 Status: EY N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-9802-A---P06 Equipment Class:
(1) Motor Control Centers C-540
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 9 Status: EZI! N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-9802-A--P06 Equipment Class:
(1) Motor Control Centers Equipment
Description:
24/48V DC/ Distributon Panel #3A C-541
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 5 Status:
Y-] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-DGCP Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CONTROL PANEL/ Unit 3 Diesel Generator Control Panel Project:
Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Turbine, 517.50 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
Yes
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Control panel mounted to Diesel Generator skid.
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes Yes C-542
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-DGCP Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CONTROL PANEL Unit 3 Diesel Generator Control Panel Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead gallery well-supported. Adjacent masonry wall is safety-related.
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEWS Anchorage Notes:
Panel welded to the base of the skid and braced at the top to the expansion water tank that is supported by the Diesel Skid.
Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 7/31/2012 Evaluated by:
James Griffith Date:
9/30/2012 Michael Wodarcyk 9/30/2012 C-543
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 5 Status:
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
D03-DGCP (20) Instrumentation and Control Panels and Cabinets CONTROL PANEL/ Unit 3 Diesel Generator Control Panel C-544
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: FYl] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-DGCP Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Unit 3 C-545
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: FYI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-DGCP Equipment Class:
(20) Instrumentation and Control Panels and Cabinets C-546
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-NGC Equipment Class:
(20) Instrumentation and Control Panels and Cabinets EauiDment
Description:
CONTROL PANEL/ Unit 3 Neutral Grounding Cabinet Project:
Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Turbine, 517.50 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Minor shrinkage cracks in floor judged to be acceptable.
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-547
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-NGC Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CONTROL PANEL Unit 3 Neutral Grounding Cabinet Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Emergency light No. 313 is judged to be adequately restrained.
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 7/31/2012 Evaluated by:
James Griffith Date:
9/30/2012 Michael Wodarcyk 9/30/2012 C-548
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-NGC Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CONTROL PANEL/ Unit 3 Neutral Grounding Cabinet Photos 201 C-549
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: [1 N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-NGC Equipment Class:
(20) Instrumentation and Control Panels and Cabinets C-550
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-NGC Equipment Class:
(20) Instrumentation and Control Panels and Cabinets C-551
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
D03-NGC Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Eauioment Descriotion:
CONTROL PANEL/ Unit 3 Neutral Groundina Cabinet C-552