12Q0108.30-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 2, Part 6 of 7
ML12348A271
Person / Time
Site: Dresden Constellation icon.png
Issue date: 11/15/2012
From: Delaney M
Exelon Generation Co, Stevenson & Associates
To:
Office of Nuclear Reactor Regulation
References
RS-12-167 12Q0108.30-R-001, Rev 1
Download: ML12348A271 (102)


Text

12QO108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: [-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-83125


P06 Equipment Class: (1) Motor Control Centers Eauipment

==

Description:==

125V DC/ RB 125V DC Distribution Panel #2 Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 570.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Refer to SWC for D02-8302B-M05 for anchorage evaluation.

Yes C-340 12Q-108.30-R-OO1, Rev. 1 Correspondence No.: RS-1 2-1 67 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-83125


P06 Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

125V DC/ RB 125V DC Distribution Panel #2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures with open S-hooks. Situation mitigated by power cord and MCC top bracing and judged to be acceptable.

See IR 1390863.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Anchorage:

Distribution panel is at the end of the line-up which includes D02-8302B


M05. MCC stitch welded to edge angle embedded in concrete.Seismic Walkdown Team: D. Carter & J. Griffith -7/19/2012 Evaluated by: David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-341 12QO108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauipment

==

Description:==

D02-831 25- DC P06 (1) Motor Control Centers 125V DC/ RB 125V DC Distribution Panel #2 MG 0567 MG 0568 C-342 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-83125---P06 Equipment Class: (1) Motor Control Centers MG 0569 MU 5713 MG 0579 C-343 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D02-83125----P06 (1) Motor Control Centers 125V DC Distribution Panel #2-MU. UOUA C-344 12QO108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-83250-AOl-M05 Equipment Class: (14) Distribution Panels Eauipment

==

Description:==

250V DC/ Breaker to TB MCC #2 (ROB-Battery

  1. 2)Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 549.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?No Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-345 12Q0108.30-R-oo1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-83250-AO1-M05 Equipment' Class: (14) Distribution Panels Equipment

==

Description:==

250V DC/ Breaker to TB MCC #2 (ROB-Battery

  1. 2)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?

Safety related masonry wall.9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Portable eyewash moved to conformm to DAP.IR 1389735: During the NRC task force 2.3 seismic walk down, the team identified that there was a portable eyewash station near the U2 250V DC Distribution panels that was not secured and was in close proximity to safety related equipment.

The location did not meet the distance requirements of DAP 03-20, Restraint of Portable Equipment.

DAP 03-20 Step F.3 requires the following:

IF the item will be left unattended in an area requiring seismic restraint but its aspect ratio is less than or equal to 2, THEN it shall be stored greater than 24" from safety related equipment or seismically restrained.

The eyewash station was relocated to comply with station procedures.

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/16/2012 C-346 1200108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

D02-83250-AO1-MO5 (14) Distribution Panels 250V DC/ Breaker to TB MCC #2 (ROB-Battery

  1. 2)Evaluated by: David Carter Date: 10/2/2012 4r b James Griffith 10/2/2012 MG 0049 MG 0050 C-347 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-83250-AO1-MO5 Equipment Class: (14) Distribution Panels to TB MCC MG OU53 MU 0054 C-348 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-83250-Ao1 -M05 Equipment Class: (14) Distribution Panels ipment

Description:

250V DC/ Breaker to TE MCC #2 (ROB-Battery

  1. 2)MG 0055 C-349 12QO108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-83250

B04 Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

250V DC Battery #2 Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 549.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-350 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-83250


B04 Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

250V DC/ Battery #2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the.safety functions of the equipment?

Comments SEWS Anchorage Notes: Each post leg is thru-bolted to an angle iron clip which is anchored by at least one 1/2" wedge expansion anchor to the concrete floor (some intermediate post have 2 or 3 anchors).Seismic Walkdown Team: D. Carter & J. Griffith -7/16/2012 Evaluated by: Q-JAIQJ. David Carter Date: 10/2/2012ý. D James Griffith 10/2/2012 C-351 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-83250---B04 Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

250V DC/ Battery #2 Photos MG 0080 MG 0081 C-352 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: FY-i N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-9802A-A21-B11 Equipment Class: (14) Distribution Panels Equipment

==

Description:==

24/48V DC/ Breaker to Battery Charger #2A (+)Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 549.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes C-353 12Q-108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-9802A-A21-B11 Equipment Class: (14) Distribution Panels EauiDment DescriDtion:

24/48V DC/ Breaker to Battery Charuer #2A (+)8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/16/2012 No photographs were taken of this item.Evaluated by: Q,,4ck David Carter Date: 10/24/2012 James Griffith 10/24/2012 Photos C-354 12Qo108.30-R-O-1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-9802-A


P06 Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

24/48V DC/ Distribution Panel #2A Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 549.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects 7. Are soft tarqets free from impact by nearby equipment or structures?

Yes C-355 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-9802-A


P06 Equipment Class: (1) Motor Control Centers Eauipment

==

Description:==

24/48V DC/ Distribution Panel #2A 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could ,Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/16/2012 No photographs were taken of this item.Evaluated by: David Carter Date: 10/24/2012 James Griffith 10/24/2012 Photos C-356 12Q0108.30-R-501, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: IY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL/ Unit 2 Diesel Generator Control Panel Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Panel is attached to DIG skid. Not directly attached to concrete.5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes Yes C-357 1200108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: FYZ N U Seismic Walkdown Checklist (SWC)Equipment ID No.:, D02-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL/ Unit 2 Diesel Generator Control Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Station heating line 1.5-inch from panel and judged to be acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: (Panel welded to the base of the skid and braced at the top to the expansion water tank that is supported by the Diesel Skid.Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 Evaluated by: ,QJA'Z- David Carter Date: 10/2/2012* Ie. James Griffith 10/2/2012 C-358 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: jJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

D02-DGCP (20) Instrumentation and Control Panels and Cabinets CONTROL PANEL Unit 2 Diesel Generator Control Panel MG_0159 MG_0160 C-359 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: inmant fngar-rinfinn-D02-DGCP (20) Instrumentation and Control Panels and Cabinets I Unit 2 Diesel Generator Control Panel MG 0162 C-360 12Q-108.30-R-0O1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL/ Unit 2 Neutral Grounding Cabinet Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.

Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Cabinet is anchored with four angle clips. Each clip has one 5/8-inch wedge anchor.Yes C-361 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauioment DescriDtion:

CONTROL PANEL Unit 2 Neutral Groundina Cabinet Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Emergency light adequately restrained.

Large light fixture with lens secured by screws. Judged acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Relocated stored toolbox to adequate distance per DAP.Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 Evaluated by: POWQQk, David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-362 12Q0108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL Unit 2 Neutral Grounding Cabinet Photos MG 0165 MG 0166 C-363 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-NGC Equipment Class: (20) Instrumentation and Control Panels and CabinetsU1b7 MG 0168 MU ult5l C-364 i2-1O08.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 D Area Walk-By Checklists (AWCs)Table D-1 provides the building, elevation, and location of each area as well as a list of SWEL items associated with each area, and page numbers of each Area Walk-By Checklist.

D-1 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Table D-1. Summary of Area Walk-By Checklists AWC-xx BUILDING ELEVATION LOCATION COMPONENT ID PAGE D02-0902-0003 1 Control Room 534.00 D02-0902-0015 D- 5_ __ D02-0902-0036 2 Cribhouse 490.67 D02-3903 ------ P30 D- 7 D02-0302-0019AV27 D02-0305-0046-0023-0125-Al 0 D02-0305-0046-0023-0126-VO5 D02-0305-0046-0023-0127-VO5 3 Reactor 517.50 East HCU Bank D02-0305-0046-0023-H20D 9 D02-0305-0054-0039-0125-Al 0 D02-0305-0054-0039-0126-VO5 D02-0305-0054-0039-0127-VO5 D02-0305-0054-0039-H20 D02-1501-0021AV20 4 Rao 5FPC Heat D02-1601-0023-V05 D- 11 Exchanger Room D02-1601-0062-V05 SE Corner Room, D02-1501-0003AV20 5 Reactor 476.50 SE rery R , D02-1503-A


H15 D- 16 Gallery Level D254..H1 D02-5746-A


H15 D02-0302-01 57AV05 6 Reactor 476.50 Torus D02-0302-0157AV05 D- 18 D02-0302-0158AV05 7 Reactor 476.50 Torus D02-1001-0005AV20 D- 22 8 Reactor 476.50 Torus D02-1501-0038AV20 D- 24 9 Reactor 476.50 Torus D02-3702 ------V20 D- 26 10 Reactor 476.50 Torus D02-1501-0021AV20 D- 29 D02-1501-0058A-FT 11 Reactor 476.50 SE Corner Room D02-1502-A


P30 D- 31 Basement Level D02-1599-0013AV26 D02-2301-0003-V20 D02-2301-0006-V20 D02-2301-0035-V20 12 Reactor 476.50 HPCI Room D02-2301-0057-P30 D- 41 D02-2302 ------ P30 D02-2320-GSCE-F05 D02-5747 -HIS.. H15 13 Reactor 476.50 SW Corner Room, D02-2380 ------ PSH D- 48 Basement Level rU2/3 Diesel DOO-2223-0033 14__ Reactor_ 504.50 Generator Room DOO-2223-0041 D-_52 15 Reactor 517.50 D02-7828-1-1--P06 D- 54 16 Reactor 517.50 D02-7828-7


M05 D- 56 17 Reactor 517.50 D02-2202-0008 D- 58 18 Reactor 517.50 SDC Pump Room D02-1001-0002AV20 D- 61 Table D-1 Page 1 of 3 D-2 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 AWC-xx BUILDING ELEVATION LOCATION COMPONENT ID PAGE 19 Reactor 517.50 TIP Room D02-0302-0108A-LE D- 66 D02-0318-A


T05 D02-0305-0014-0027-0125-Al 0 D02-0305-0014-0027-0126-VO5 D02-0305-0014-0027-0127-VO5 D02-0305--0014-0027-H20 D02-0305-0030-0035-01 25-Al10 20 Reactor 517.50 West HCU Bank D02-0305-0030-0035-0126-V0 D- 69 D02-0305-0030-0035-0126-VO5 D02-0305-0030-0035-0127-V05 D02-0305-0030-0035-1-20 D02-0302-0082A-LS D02-0302-0109C-LT D02-2202-0006 21 Reactor 545.50 D02-2202-0006 D- 71 D02-2252-0084 D02-7328 -S---- S35 D02-7329 ------ S35 D02-7329-....T10 22 Reactor 570.00 East End D02-732A-M--

D- 78 D02-8302A


M05 D02-8302B


M05 D02-83125


P06 D02-1601-0024-VO5 D- 84 23 Reactor 570.00 D02-1601-0063-V05 24 Turbine 549.00 125VDC Battery D02-8300--BC--B04 D- 92 Room 25 Turbine 549.00 250VDC Battery D02-83250


B04 D- 94 Room D02-0902-0039 26 Turbine 517.50 Auxiliary Electric D02-0902-0041 D- 96 Equipment Room______________________________D02-2202-0070A 27 Turbine 495.00 D02-1501-0044AP30 D- 98 D02-2252-001 0 D02-2252-0021 U D02-4600-B


T05 28 Turbine 517.50 UDie l D02-5203 ------ P30 D- 100 Generator Room D260- O D02-6601 ------ G05 D02-DGCP D02-NGC 29 Turbine 517.50 U2 RFP Room DOO-2350-A-----.LS D- 102 30 Turbine 534.00 D02-6723 -S---- S35 D- 105 DOO-5741-0048AV72 31 Turbine 534.00 Ventilation Room DOO-9400-0101-F10 D- 107 DOO-9400-0104AF05 32 Turbine 538.00 D02-2202-0073A D- 109 Table D-1 Page 2 of 3 D-3 12QO108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 AWC-xx BUILDING ELEVATION LOCATION COMPONENT ID PAGE DOO-83250-0---B05 D02-8300--2A--B05 D02-8300--2----B05 33 Turbine 549.00 Outside Ba-ey D02-83125-2---P06 D- 114 D02-83250-AO1-M05 D02-9802A-A21-B11 D02-9802-A


P06 U2/3 DG Diesel 34 Reactor 517.50 Oil Day Tank DOO-5202 ------ T05 D- 116 Room I I Table D-1 Page 3 of 3 D-4 1200108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-01 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documentinq other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Yes Yes Yes 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Yes 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes Yes Yes 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Cart near Panel 902-5 should be moved per DAP. Wheels are chocked and aspect ratio is less than 2.IR 1389231: D-5 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-01 During the NRC task force 2.3 seismic walk down, the team identified that a cart staged for maintenance work in the main control room back panel did not meet the distance requirements of DAP 03-20, Restraint of Portable Equipment.

Discussed with Operations.

Scaffold is greater than 2 feet from front of Panel 902-36. Aspect ratio is less than 2. Scaffold is on carpet so sliding is limited. The scaffold is judged to be acceptable.

8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Masonry wall for HVAC chase near Panel 902-13. Wall has short horizontal spans, running bond and is "L" shaped. Judged to be acceptable.

Yes Comments Seismic Walkdown Team: D. Carter & J. Griffith -7116/2012 AWC 1 For photographs, see SWCs of components included in this area walk-by.Evaluated by: QJA/ak David Carter Date: 10/24/2012 James Griffith 10/24/2012 Photos D-6 12Q0108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-02 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

Minor spalling and slight pull-out on TBCCW pipe support. Judged to be acceptable.

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Surface rust on bottom of tray with routing point #402B1405B.

Judged to be acceptable.

4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Room heater 2-5755H close to support but judged to be acceptable.

5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?Fire piping well supported and adequate distance away from equipment.

Judged to be acceptable.

6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

D-7 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-02 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/16/2012 AWC 2 For photographs, see SWCs of components included in this area walk-by.Evaluated by: -JAIQ,-k David Carter Date: 10/24/2012 Ae James Griffith 10/24/2012 Photos D-8 12Q0108:30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-03 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Adjacent masonry wall is safety related.5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?Gas bottles in area adequately restrained.

7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Relocated Radiation Protection electronic dose sign to adequate distance in accordance with DAP.D-9 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-03 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/18/2012 AWC 3 For photographs, see SWCs of components included in this area walk-by.Evaluated by: PeJ/JOU-_

David Carter Date: 10/24/2012

< James Griffith 10/24/2012 Photos D-1 0 12Q0108.30-R-0o1, Rev. I Correspondence No.: RS-12-167 Sheet 1 of 5 Status: FYI N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-04 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?Slightly bent rod support for overhead tubing judged to be acceptable.
4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Existing water shields braced against overturning but unanchored.

Located in vicinity of abandoned equipment.

Will not interact with equipment in operation.

Judged to be acceptable.

5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

D-11 12Q0108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 2 of 5 Status: N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-04 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Masonry walls at south side of room are safety related.Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/19/2012 AWC 4 Evaluated by: -JA'k David Carter Date: 10/2/2012'e James Griffith 10/2/2012 Photos MG 0629 MG 0630 IVIG 0629 D-12 12Q0108 30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: F N U Area Walk-By Checklist (AWC)MG 0655 MG 0656 D-13 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: FJ N U Area Walk-By Checklist (AWC)MG 0661 MG 0663 MG 0661 D-14 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: N U Area Walk-By Checklist (AWC)MG 0668 MG 0669 D-15 12Q-108.30-R-O01, Rev. 1 Correspondence No.: RS-U2-167 Sheet 1 of 2 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-05 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Lights shifted out of position by scaffold.

Light supports still judged to be acceptable.

5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Scaffold around LPCI Room cooler adequately restrained.

D-16 12QOiO8.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-05 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 AWC 5 For photographs, see SWCs of components included in this area walk-by.Evaluated by: 9d/k David Carter Date: 10/24/2012 James Griffith 10/24/2012 Photos D-17 12Qo108.30-R-oo1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-06 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Yes 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

.Yes 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?Yes 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Well-supported tray near well-supported pipe judged to be acceptable.

Yes 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Yes 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Yes D-1 8 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-06 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffrth -7/20/2012 AWC 6 Evaluated by: David Carter Date: 10/2/2012 James Griffith 10/2/2012 Photos MG 0906 MG 0907 D-19 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: N U Area Walk-By Checklist (AWC)MG 0913 MG 0914 D-20 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F N U Area Walk-By Checklist (AWC)Location (Bldn. Elev. Room/AreaV:

AWC-06 MG 0915 MG 0917 D-21 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-07 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Yes 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Yes 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Yes Yes Yes 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Existing restrained permanent scaffold in area judged to be acceptable.

Yes D-22 12Q0108.30-R-0O1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: jj7 N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-07 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/20/2012 AWC 7 Evaluated by: QJ-- David Carter Date: 10/2/2012 6 e James Griffith 10/2/2012 MG_0934 MG_0935 D-23 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-08 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documentinq other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Yes 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Yes 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?Yes 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Yes 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Yes Yes Yes D-24 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-08 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/20/2012 AWC 8 Evaluated by: David Carter Date: 10/2/2012 James Griffith 10/2/2012 Photos MLi MU Ui5bI5 U UM/ U uMt$D-25 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-09 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Yes 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Yes 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?Yes 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Small bore, well supported pipe near rod hanger judged to be acceptable.

5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Yes Yes 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Yes D-26 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-09 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/20/2012 AWC 9 Evaluated by: David Carter Date: 10/2/2012 James Griffith 10/2/2012 Photos MG 0876 MG 0877 D-27 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: F N U Area Walk-By Checklist (AWC)Mr. 0R7R MG_0883 MG 0886 D-28 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: FYI N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-10 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Scaffold adequately restrained.

D-29 12Q-108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: r-Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-10 8. *Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/18/2012 AWC 10 For photographs, see SWCs of components included in this area walk-by.Evaluated by: QJAIfk David Carter Date: 10/24/2012 James Griffith 10/24/2012 Photos D-30 12Q-108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 10 Status: 7 N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-1 1 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documentinq other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Yes 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Yes 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?Yes 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Yes 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Yes 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes 7. Does it appear that the area is.free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Yes D-31 1200108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 10 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC- 11 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 AWC 11 Evaluated by: QJIAt David Carter Date: 10/2/2012 I James Griffith 10/2/2012 Photos II MG_0273 MG 0272 D-32 12Q0108.30-R-0O1, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 10 Status: -Y- N U Area Walk-By Checklist (AWC)MG_0274 MG 0276 D-33 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 10 Status: T N U Area Walk-By Checklist (AWC)MG_0277 MG 0278 D-34 12Q0108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 10 Status: LY7 N U Area Walk-By Checklist (AWC)MG_0287 MG 0279 D-35 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 6 of 10 Status: I-ý N U Area Walk-By Checklist (AWC)MG_0288 D-36 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 7 of 10 Status: FYI N U Area Walk-By Checklist (AWC)MG_0290 MG 0291 D-37 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 8 of 10 Status: 7 N U Area Walk-By Checklist (AWC)_w_ _-zPM- ý I -MtG 0298 MG 0299 MG 0298 MG 0299 D-38 12Q0108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 9 of 10 Status: F N U Area Walk-By Checklist (AWC)MG_0300 MG 0301 D-39 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 10 of 10 Status: [] N U Area Walk-By Checklist (AWC)MG_0303 MG 0304 D-40 12Q0108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-12 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?Threaded fire pipe well-supported.

Judged to be acceptable.

6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping .practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Ladder rack at back of room. Ladders positioned on the rack to prevent interaction with pump 2-2301-57.

Paperwork, tools, bags, etc. on floorjudged to be acceptable.

Relocated scaffold ladder leaning on pump to scaffold storage area.D-41 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: F-7 N U Area Walk-By Checklist (AWC)Location (Blda. Elev. Room/Area):

AWC-12 IR 1390584: The Fukushima Seismic walkdown team inspected the U2 HPCI room as part of the scope for area walk by inspections to satisfy the NRC request for information.

There is a ladder rack on the wall directly across from the doorway to the room. The ladder rack does not have any "ringers" on the ends of the rack that would keep the ladders on the rack during a seismic event. There were two ladders stored on the rack that needed to be shifted to one side to prevent the ladders from contacting seismically sensitive equipment in case of an event. There is currently no condition since the ladders have been repositioned.

8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Evidence of prior groundwater intrusions on walls. No seismic concern.Yes Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/19/2012 AWC 12 Evaluated by: ., David Carter Date: 10/2/2012 James Grffith 10/2/2012 Photos I 0_MG 0494 MG 0495 D-42 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: F N U Area Walk-By Checklist (AWC)MG 0500 MG_0502 D-43 1200108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: [7 N U Area Walk-By Checklist (AWC)MG 0509 MG 0510 D-44 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: r N U Area Walk-By Checklist (AWC)--MG 0515 MG 0516 MG 0515 D-45 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: F N U Area Walk-By Checklist (AWC)MG 0524 MG 0525 D-46 12Q0108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 7 of 7 Status: F N U Area Walk-By Checklist (AWC)MG_0530 MG_0531 D-47 12Q-108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 1 of 4 Status: F N U Area Walk-By Checklist (AWC)Location (Bld., Elev, Room/Area):

AWC-13 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Yes 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Yes 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?Yes 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Yes 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Threaded fire pipe well supported.

Judged acceptable.

Yes 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Yes D-48 12Q0108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-13 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/19/2012 AWC 13 Evaluated by: Q)JQ.k David Carter Date: 10/2/2012 Y James Griffith 10/2/2012U73I MUU(31 D-49 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: [Y N U Area Walk-By Checklist (AWC)MG 0743 MG 0744 D-50 12Q0108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F N U Area Walk-By Checklist (AWC)MG 0745 D-51 12Qo108.30-R-oO1, Rev. I Correspondence No.: RS-12-167 Sheet 1 of 2 Status: FY N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-14 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Yes 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?Yes Yes Yes 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Drain line well supported and judged to be acceptable.

Yes 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Yes D-52 12Q01 08.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: F-7 N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-14 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 AWC 14 Evaluated by: David Carter Date: 10/2/2012 James Griffith 10/2/2012 Phot G_0246 D-53 12QO108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-15 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Light fixtures near rugged cable trays on MCC 28-1 judged to be acceptable.

5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

D-54 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: F-J N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-15 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 AWC 15 Evaluated by: David Carter Date: 10/24/2012 James Griffith 10/24/2012

0211 D-55 1200108.30-R-001, Rev. 1 Correspondence No.
RS-12-167 Sheet 1 of 2 Status: FYI N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-16 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?Threaded pipe well supported and judged to be acceptable.
6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?Hydrogen tanks well restrained and judged to be acceptable.
7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

D-56 1200108.30-R-OO1,.Rev.

I Correspondence No.: RS-12-167 Sheet 2 of 2 Status: F-1 N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-16 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 AWC 16 Evaluated by: ,.JAJk David Carter Date: 10/2/2012 James Griffith 10/2/2012 Photos MG 0221 MG 0222 D-57 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: N U Area Walk-By Checklist (AWC)Location (Bldq, Elev, Room/Area):

AWC-17 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Yes 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Yes 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?Yes 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Yes 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Yes 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Ladder rack judged to be acceptable.

Yes D-58 12Q0108.30-R-0O1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: [-Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-17 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 AWC 17 Evaluated by: A'AIQJZ David Carter Date: 10/2/2012 4 James Griffith 10/2/2012.Photos MG 0229 MG 0230 D-59 1200108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: N U Area Walk-By Checklist (AWC)MG 0233 MG 0234 D-60 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-18 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?Minor surface corrosion at bottom cable tray joints judged to be acceptable.

4.. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Masonry wall is safety related. Valve operator near cable tray judged to be acceptable.

5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Tools, hoses, ladder judged to not be of concern. Stored scaffold material judged to be acceptable.

Erected scaffold adequately restrained.

D-61 12Q0108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 2 of 5 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-18 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/20/2012 AWC 18 Evaluated by: QiVd/k David Carter Date: 10/2/2012* James Griffith 10/2/2012 Photos MG 0831 MG 0832 MG 0833 MG 0835 D-62 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: TI- N U Area Walk-By Checklist (AWC)MG0842 MG0843 D-63 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: F N U Area Walk-By Checklist (AWC)MG MG 0849 MG 0848 MG 0849 D-64 12Q0108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 5 of 5 Status: F N U Area Walk-By Checklist (AWC)MG 0852 MG 0853 D-65 12Q0108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-19 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?

4-legged support frame has 4 anchors per leg. Leg nearest to SD V tank has 2 anchors with gap between nut and base plate. Based on configuration of support structure, judged to not be of concern.3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

TIP tube near tank instrument and tube on wall near anchorage judged to not be of concern.5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Scaffold in area adequately restrained.

D-66 12QO108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-19 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/19/2012 AWC 19 Evaluated by: 9-,Ad(" David Carter Date: 10/2/2012 Vol James Griffith 10/2/2012 Photos MG 0687 MG 0688 D-67 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: 7 N U Area Walk-By Checklist (AWC)MG 0689 D-68 12..108.30-R-O0i, Rev. 1 Correspondence No.: RS-12-167 Sheet I of 2 Status: FY] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-20 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?Threaded fire pipe is well supported and judged to be adequate.6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?Fire cabinet in area is secure. Gas bottles are propedy restrained.
7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

D-69 12Q-108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: F] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-20 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/18/2012 AWC 20 For photographs, see SWCs of components included in this area walk-by.Evaluated by: d;)2JIJQk-David Carter Date: 10/24/2012

< James Griffith 10/24/2012 Photos D-70 12Qo108.30-R-0O1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: F N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-21 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Yes 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Yes 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appears to be inside acceptable limits)?Yes 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Yes Yes Yes 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Breaker stored near Switchgear 24-1 not of concern because center-of-gravity is low.Yes D-71 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: F-1 N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

AWC-21 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Masonry wall at east end of Switchgear 24-1 is safety related.Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/19/2012 AWC 21 Evaluated by: Q-J'JC David Carter Date: 10/2/2012 James Griffith 10/2/2012 Photos MG 0771 MG 0772 D-72 12Q0108 30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: F N U Area Walk-By Checklist (AWC)(113 MU. U((4 MU U113 MU Utt4 D-73 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: F N U Area Walk-By Checklist (AWC)MG_0776 MG_0775 D-74 12Qo108.30-R-oo1, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: [-j N U Area Walk-By Checklist (AWC)MG_0777 MG 0779 MG_0780 D-75 12Q0108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 6 of 7 Status: F N U Area Walk-By Checklist (AWC)MG_0782 I MG 0783 MG_0784 D-76 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: F N U Area Walk-By Checklist (AWC)MG 0786 MG 0785 D-77