12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0318-A


T05 Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

CRD/ West Bank Scram Discharge Volume Tank Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-114 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0318-A


T05 Equipment Class: (21) Tanks and Heat Exchangers EauiDment

==

Description:==

CRD/ West Bank Scram Discharae Volume Tank Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?.Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/19/2012 Evaluated by: ,J.JQJ. David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-115 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauioment

==

Description:==

D02-0318-A--T05 (21) Tanks and Heat Exchangers CRD/ West Bank Scram Discharae Volume Tank Photos MG 0677 MG 0678 C-116 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0318-A--T05 Equipment Class: (21) Tanks and Heat Exchangers MG_0679 MG_0680 MG 0681 C-117 12Q-108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet I of 3 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0003 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANELS/ Control Panel 902-3 Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

N/A, 534.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

Viewed 5 of 8 anchors. Remaining anchors could not be viewed due to cabling and limitation on access. Anchors viewed matched documentation.

Thus it is reasonable to conclude that the anchors match plant documentation without further verification.

C-118 12Q.108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0003 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauioment

==

Description:==

CONTROL PANELS/ Control Panel 902-3 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Flourescent bulbs in cabinets judged acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Back of panel open. No other adverse seismic conditions.

Comments SEWS Notes on Anchorage:

Anchorage:

Panel is 10.5' wide (long) on inside (rear side) and front side. Anchored by 4 tabs in front and 4 on back. All anchored by welded friction clips (clips are welded to panel base channels).

Clips are bolted by a 3/4" concrete expansion anchors. Clips are 3/8" thick, 2" wide and about 5" long.Seismic Walkdown Team: D. Carter & J. Griffith -7/16/2012 Evaluated by: ,-&iQk- David Carter Date: 10/2/2012ý- James Griffith 10/2/2012 C-119 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

D02-0902-0003 (20) Instrumentation and Control Panels and Cabinets CONTROL PANELS/ Control Panel 902-3 MG 0022 MG 0023 -Copy C-120 12Q-108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0015 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANELS/ Control Panel 902-15 Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

N/A, 534.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

Observed 3 anchors at outside face (front of panel). Remaining anchors could not be viewed due to cabling and limitation on access. Anchors viewed matched documentation.

Thus, it is reasonable to conclude that the anchors match plant documentation without further verification.

C-121 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0015 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANELS/ Control Panel 902-15 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?

Fluorescent bulbs in cabinets.

Judged acceptable.

9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Back of panel open.Plastic wireways in base of cabinet twisted and broken; judged to be acceptable.

IR 1389213: The walkdown team identified a loose wireway in the 902-15 back panel in the main control room. The team notified the Unit 2 Supervisor.

The wireway was noted by the team as part of a pre-seismic baseline list. The wireway is not in danger of falling off during normal conditions but should be repaired replaced.Discussed with Operations.

Not an immediate concem.Comments SEWS Anchorage Notes: Anchorage:

Panel is 8' wide (long). Anchored by at least 4 tabs in front and 2 tabs on back which were visible during the walkdown.

Other tabs are covered by cables and not visible. All anchored by welded friction clips (clips are welded to panel base channels).

On one side, clip is bolted by a 3/4" concrete expansion anchor.On the other side, clip is welded to embedded steel. Clips are 3/8" thick, 2" wide, about 5" lonq for the bolted C-122 1200108.30-R-OO1, Rev. I Correspondence No.: RS-12-167 Sheet 3 of 4 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0015 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANELS/ Control Panel 902-15 clip and about 3" long for the welded clip.Seismic Walkdown Team: D. Carter & J. Griffith -7/16/2012 Evaluated by: ),Ala- David Carter Date: 10/2/2012ý- ' James Griffith 1012/2012 MU UU03 MU UU31 C-123 12QO108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D02-0902-0015 (20) Instrumentation and Control Panels and Cabinets MG 0032 MG 0033 C-124 12QO108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0036 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANELS/ Control Panel 902-36 Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

N/A, 534.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Viewed 3 of 6 anchors on exterior side of panel. Remaining anchors could not be viewed due to cabling and limitation on access. Anchors viewed matched documentation.

Thus it is reasonable to conclude that the anchors match plant documentation without further verification.

Yes C-125 12QO108.30-R-0O1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: r-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0036 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANELS/ Control Panel 902-36 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

IR 1389209: The walkdown team identified several loose bolts with missing nuts in the conduit clamps above the 902-36 back panel in the main control room. The team notified the Unit 2 Supervisor.

The 902-36 back panel enclosure top prevents the bolts from falling into that panel.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Fluorescent bulbs in cabinets judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions.
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Back of panel open. No other adverse seismic conditions.

Comments SEWS Anchorage Notes: Anchored by 3 tabs in front and 3 on back. All anchored by welded friction clips (clips are welded to panel base channels).

On one side, clip is bolted by a 3/4" concrete expansion anchor. On the other side, clip is welded to embedded steel. Clips are 3/8" thick, 2" wide, about 5" long for the bolted clip and 3" long for the welded clip.Seismic Walkdown Team: D. Carter & J. Griffith -7/16/2012 Evaluated by: ,QJ,0,JC-David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-126 12Q0108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 3 of 3 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0036 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANELS/ Control Panel 902-36 MG0026 M(J uuz7 C-127 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0039 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANELS/ Control Panel 902-39 Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-128 12-O108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0039 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANELS/ Control Panel 902-39 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

The bottom of one door is slightly flared out. Door is secure and judged to be acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

AIlf panel doors opened. No other adverse seismic conditions.

Comments SEWS Anchorage Notes: Anchored by 4 -3/8" concrete expansion anchors (oneanchor at or near each corner).Seismic Walkdown Team: D. Carter & J. Griffith -7/16/2012 Evaluated by: P-&I4- David Carter Date: 10/2/2012r James Griffith 10/2/2012 C-129 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: F1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0039 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANELS/ Control Panel 902-39 MG 0121 MG 0122 C-130 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: [-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0039 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Co MG 0125 MG 0126 C-131 12Q0108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0039 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANELS/ Control Panel 902-39 MG 0127 C-1 32 12Q0108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0041 Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment

==

Description:==

CONTROL PANELS/ Control Panel 902-41 Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-133 12Q0108.30-R-0O1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0041 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANELS/ Control Panel 902-41 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Emergency light is adequately restrained and judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Each leg (foot) is anchored by 2 -3/8" diameter CEAs. Panel is top braced back to R/C wall.Seismic Walkdown Team: D. Carter & J. Griffith -7/16/2012 Evaluated by: P4Jd0Q) J-. David Carter Date: 10/2/2012 b e James Griffith 10/2/2012 C-134 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: r-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0041 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANELS/ Control Panel 902-41 MG_0114 MUM 110 C-135 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0902-0041 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANELS/ Control Panel 902-41 MU 0116 MU 0117 C-136 I 2Q01 08.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

SHUTDOWN COOLING/ Shut Down Pumps Suction Line Valve Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-137 12Qo108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

SHUTDOWN COOLING/ Shut Down Pumps Suction Line Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Cable tray adjacent to valve operator.

No soft targets impacted; judged to be acceptable.

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/20/2012 Evaluated by: David Carter Date: 10/2/2012.VK James Griffith 10/2/2012 C-138 12QO108.30-R-0O1, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

SHUTDOWN COOLING/ Shut Down Pumps Suction Line Valve MUMU,5 MU UtUt C-139 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves MU UtszUUJU MU uts;ju C-140 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment

==

Description:==

SHUTDOWN COOLING/ Iniection Line Valve Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-141 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: 7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

SHUTDOWN COOLING/ Injection Line Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are.overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/20/2012 Evaluated by: ,.AIQJZ David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-142 1200108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: [YII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

D02-1001-0005AV20 (8) Motor-Operated and Solenoid-Operated Valves SHUTDOWN COOLING/ Injection Line Valve MU U927 M_( 092t C-143 12Q0108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

SHUTDOWN COOLING/ Injection Line Valve MG 0929 C-144 12Q0108.30-R-0O1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0003AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CCSW/ Heat Exchanqer Outlet Service Water Line Valve Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas.

Additional soace is orovided at the end of this checklist for documentina other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-145 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: J-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0003AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CCSW/ Heat Exchanger Outlet Service Water Line Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 Evaluated by: 9'.A/Qk David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-146 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: EouiDment Descriotion:

D02-1501-0003AV20 (8) Motor-Operated and Solenoid-Operated Valves CCSW/ Heat Exchanaer Outlet Service Water Line Valve f, JI I n'J tMI.MG 0296 MG 0297 C-147 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

LPCI/ LPCI Injection Line Valve Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes C-148 12Qo108.30-R-o01, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

LPCI/ LPCI Iniection Line Valve 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Light fixtures mounted with beam clamps oriented incorrectly (friction resisting dead load). Light fixture would not negatively affect valve below and is unable to sway far enough to hit East Bank CRD. Fixture is judged to be acceptable.

IR 1390318: Light fixture above 2-1501-21A valve supported by chain connected to a cantilevered channel via a beam clamp. The beam clamp appears to rely solely on the slip capacity of the beam clamp bolt to resist the dead load of the light fixture, which could be inadequate in a seismic event. Recommend replace the beam clamps connecting the light fixture chains to the unistrut supports with the appropriate spring-loaded nut and bolt assembly.

Not an immediate seismic concem. Identified during area walk-by inspection.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/18/2012 C-149 1200108.30-R-001, Rev. 1 Correspondence No. RS-12-167 Sheet 3 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eciuipment

==

Description:==

LPCI/ LPCI Injection Line Valve Evaluated by: V-JAIO4ý David Carter Date: 10/24/2012 James Griffith 10/24/2012 Photos C-150 12Q-108.30-R-oo1, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D02-1 501-0021AV20 D02-1501-0021AV20 (8) Moto Operated and Solenoid-Operated Valves IMG 0377 C-151 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves pment

Description:

LPCI/ LPCI Injection Line Valve IMG_0382 C-152 i2Q1018.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0038AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment DescriPtion:

LPCI/ SuDoression Chamber Sprav Line Valve Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-153 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0038AV20 Equipment Class:_ (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

LPCI/ Suppression Chamber Spray Line Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/20/2012 Evaluated by: David Carter Date: 10/2/2012 Vo' James Griffith 10/2/2012 C-1 54 12Q0108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

D02-1501-0038AV20 (8) Motor-Operated and Solenoid-Operated Valves LPCI/ Suppression Chamber Spray Line Valve Photos MU Mot MU MUb C-155 12Q-108.30-R-0o1, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0038AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauipment Descriotion:

LPCI/ Suooression Chamber Sorav Line Valve MG 0861 MG_0860 C-156 12Q-108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 10 Status: FY- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0044AP30 Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

CCSW/ CCSW Pump "A" Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 495.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Crack in floor coating at southwest comer of anchor. Verified to be crack in floor coating only by inserting 2 Minute Drill card. No affect on anchor capacity.5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-157 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 10 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0044AP30 Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

CCSW/ CCSW Pump "A" Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Pump bolted with six 7/8" Cast-in-place bolts (3 on each side), Seismic Walkdown Team: D. Carter & J. Griffith -7/18/2012 Evaluated by: David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-158 12Q0108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 10 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

D02-1 501 -0044AP30 (5) Horizontal Pumps CC SWI CCSW Pump "N'Photos I I MG 0456 MG 0458 C-159 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 10 Status: r-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D02-1 501-0044AP30 (5) Horizontal Pumps 5%,,4 MG 0461 MG 0462 MG 0461 C-160 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 10 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0044AP30 Equipment Class: (5) Horizontal Pumps"Al MG 0465 MG 0466 C-161 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 6 of 10 Status: -Y' N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0044AP30 Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

CCSW/ CCSW Pump "A" I MG 0469 MG 0470 C-162 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 7 of 10 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D02-1 501-0044AP30 (5) Horizontal Pumps MU 0473 MG 0474 C-163 1200108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 8 of 10 Status: F-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0044AP30 Equipment Class: (5) Horizontal Pumps"A" MG 0477 MG 0478 MG 0477 C-164 1200108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 9 of 10 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0044AP30 Equipment Class: (5) Horizontal Pumps MG_0481 Mr U4W2 C-165 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 10 of 10 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0044AP30 Equipment Class: (5) Horizontal Pumps EauiDment

==

Description:==

CCSW/ CCSW Pump "A" MG 0483 MG 0483 C-166 12Q0108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 1 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0058A-FT Equipment Class: (18) Instruments on Racks Equipment DescriDtion:

LPCI/ LPCI Header Flow Transmitter Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-167 12Q0108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0058A-FT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

LPCI/ LPCI Header Flow Transmitter Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Need bulbs removed from overhead light fixture.IR 1389874: Damaged lighting and support above instrument rack 2202-19A, one fluorescent light bulb in the fixture is broken with only a piece left in the socket and the other bulb appears to be loose enough to fall. This fagl could potentially affect the vibration sensitive equipment below. Station removed loose and.-broken bulbs. In addition, the support members for the lighting fixture appear to be bent at the channel fitting connection.

Although bent, the supports were judged to not pose a seismic interaction concern.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?I Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Mounted on rack 2202-19A.Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 C-168 12Q0108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: F-j N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0058A-FT Equipment Class: (18) Instruments on Racks EQuipment DescriDtion:

LPCI/ LPCI Header Flow Transmitter Evaluated by: IJA/O-1 David Carter Date: 10/2/2012 James Griffith 10/2/2012 Photos MG 0265 MG 0266 C-169 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D02-1 501-0058A-FT (18) Instruments on Racks MG_0267 MG 0268 MG 0268 C-170 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0058A-FT Equipment Class: (18) Instruments on Racks MG 0269 C-171 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: r-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1501-0058A-FT Equipment Class: (18) Instruments on Racks EauiDment DescriDtion:

LPCI/ LPCI Header Flow Transmitter MG_0271 C-1 72 12QO108.30-R-oo1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1502-A


P30 Equipment Class: (6) Vertical Pumps Equipment

==

Description:==

LPCI/ LPCI Injection Pump "A" Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor grout pad spalling.

Judged to be acceptable.

5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-173 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1502-A


P30 Equipment Class: (6) Vertical Pumps Eauipment

==

Description:==

LPCI/ LPCI Iniection Pump "A" Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: The pump is anchored with four 1" Cast-in-Place bolts. Pump is supported by two heavy duty saddles that are reinforced.

Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 Evaluated by: 9c-&IQk David Carter Date: 10/2/2012 b James Griffith 10/2/2012 C-1 74 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauipment

==

Description:==

002-1 502-A-P30 (6) Vertical Pumps LPCI/ LPCI Iniection Pump "A'MG 0282 MU. U215J MG 0282 MU UZU3 C-175 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1502-A---P30 Equipment Class: (6) Vertical Pumps MG 0284 MG 0286 C-1 76 12Qo108.30-R-01, Rev. I1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: Ei- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1503-A


H15 Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

LPCI/ LPCI Heat Exchanger Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes Yes Yes Yes C-177 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1503-A


H15 Equipment Class: (21) Tanks and Heat Exchangers EauiDment

==

Description:==

LPCI/ LPCI Heat Exchanaer Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Vertical heat exchanger is 60" in diameter and is supported at approximately 2/3 its height by a floor system composed of wide flange beams.Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 Evaluated by: David Carter Date: 10/2/2012 AK James Griffith 10/2/2012 C-178 12Q0108.30-R-001, Rev 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

D02-1503-A---H 15 (21) Tanks and Heat Exchangers LPCI/ LPCI Heat Exchanger Photos MG 0257 MG 0258 C-179 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D02-1503-A


H15 (21) Tanks and Heat Exchangers MG_0260 MG 0261 C-180 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1599-0013AV26 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

LPCI/ Suppression Pool Suction Line "A" Relief Valve Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findin-qs.

Additional space is provided at the end of this checklist for documentina other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-181 12Q-108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1599-0013AV26 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

LPCI/ Suppression Pool Suction Line "A" Relief Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment.

or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 Evaluated by: ,,J/Q--' David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-182 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

D02-1599-0013AV26 (7) Fluid-Operated Valves LPCI/ Suppression Pool Suction Line "A" Relief Valve MG 0262 MG 0263 C-183 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet I of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1601-0023-V05 Equipment Class: (7) Fluid-Operated Valves Eauipment

==

Description:==

PRESSURE SUPPRESSION/

Drywell Ventiliation Line Valve Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 570.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-184 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1601-0023-VO5 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

PRESSURE SUPPRESSION/

Drywell Ventiliation Line Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Small gap between bottom of adjacent 6-inch line and valve limit switch conduits.

Pipe is well supported, so situation is judged to be acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/19/2012 Evaluated by:

David Carter Date: 10/2/2012James Griffith 10/2/2012 C-185 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauipment

==

Description:==

002-1601 -0023-V05 (7) Fluid-Operated Valves PRESSURE SUPPRESSION/

Drywell Ventiliation Line Valve D02-1601-0023-V05 (7) Fluid-Operated Valves Photos MU5 U(44 MG 0645 MU UtA4 C-1 86 12Q0108.30-R-0O1, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: E7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1601-0023-V05 Equipment Class: (7) Fluid-Operated Valves MG 0648 MG 0650 C-187 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D02-1 601 -0023-VO5 (7) Fluid-Operated Valves MG 0651 MG 0652 C-188 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1601-0024-V05 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

PRESSURE SUPPRESSION/

Drywell and Torus Vent Valve Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 570.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the .anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-189 12Q0108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1601 0024-V05 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

PRESSURE SUPPRESSION/

Drvwell and Torus Vent Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/19/2012 See area walk-by (AWC 23) near valves D02-1601-0063-V05 and D02-1601-0024-V05 for further notes.Evaluated by: David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-190 12Q0108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

D02-1601-0024-VO5 (7) Fluid-Operated Valves PRESSURE SUPPRESSION/

Drywell and Torus Vent Valve MU UtbYJ Mu UM59 C-191 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1601-0024-V05 Equipment Class: (7) Fluid-Operated Valves RAE.; 111111 MG 0703 MG 0704 C-192 12Q0108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 5 of 5 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1601-0024-VO5 Equipment Class: (7) Fluid-Operated Valves MG_0705 MG 0706 C-193 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1601-0062-VO5 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

PRESSURE SUPPRESSION/

Drvwell Ventilation Line Valve Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 570.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments, Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-194 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: FjJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1601-0062-V05 Equipment Class: (7) Fluid-Operated Valves Eauipment

==

Description:==

PRESSURE SUPPRESSION/

Drvwell Ventilation Line Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/19/2012 Evaluated by: David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-195 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1601-0062-V05 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

PRESSURE SUPPRESSION/

Drywell Ventilation Line Valve MG 0639 MG 0640 C-196 12Q0108.30-R-00, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1601-0063-VO5 Equipment Class: (7) Fluid-Operated Valves EauiDment DescriDtion:

PRESSURE SUPPRESSION/

Containment to SBGT Line Valve Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 570.00 ft, ALL" Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-197 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-1601-0063-V05 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

PRESSURE SUPPRESSION/

Containment to SBGT Line Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Masonry walls are safety related.Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/20/2012 Evaluated by: ,e-JA10-k-David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-198 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauipment Descriotion:

D02-1601-0063-V05 (7) Fluid-Operated Valves PRESSURE SUPPRESSION/

Containment to SBGT Line Valve l"l .;- I I11ILA MG 0805 MG 0806 C-199 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: r-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D02-1 601 -0063-V05 (7) Fluid-Operated Valves MG_0808 MG 0510 C-200 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0006 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

INSTRUMENT RACKS/ Instrument Rack 2202-6 Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 545.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraae 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes Crack in vicinity of south rack leg is not structurally significant.

Enough distance from leg to not affect anchor, therefore judged to be acceptable.

5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-201 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0006 Equipment Class: (18) instruments on Racks EauiDment Descriiption:

INSTRUMENT RACKS/ Instrument Rack 2202-6 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Light adjacent to north side of rack judged to be adequately supported'

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Instrument rack 15' in length ( composed of 3 bays, each 5' long) 6'-9" in height and 18" in width. Each bay has two 1/4" expansion bolts at the base that take shear. The rack is braced to the wall behind it at the top at each end and at the center by a heavy duty structural frame.Seismic Walkdown Team: D. Carter & J. Griffith -7/19/2012 Evaluated by: David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-202 12Q.108.30-R-O1, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0006 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

INSTRUMENT RACKS/ Instrument Rack 2202-6 MG 0748 MG 0749 C-203 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: FJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0006 Equipment Class: (18) Instruments on Racks MG_0751 MUu( UU C-204 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: [T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0006 Equipment Class: (18) Instruments on Racks MG_0753 MG 0754 MG 0755 C-205 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0006 Equipment Class: (18) Instruments on Racks TRUMENT RACKS/ In MGU 758 MU U759 C-206 12Q0108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: rI- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0006 Equipment Class: (18) Instruments on Racks;I I-1 M(3_0760 MG 0761 C-207 12Q-108.30-R-oo1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: r7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0008 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

INSTRUMENT RACKS/ Instrument Rack 2202-8 Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes Yes Yes Yes C-208

.12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: FYII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0008 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

INSTRUMENT RACKS/ Instrument Rack 2202-8 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Emergency light 293 is restrained and judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchor Notes: Anchored by 10 -3/8" concrete expansion anchors and braced back to reinforced concrete wall by 8 large braces.Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 Evaluated by: P_&/,,ik David Carter Date: 10/2/2012 VO James Griffith 10/2/2012 C-209 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

D02-2202-0008 (18) Instruments on Racks INSTRUMENT RACKS/ Instrument Rack 2202-8 MG 0225 MG 0226 MG 0225 MG 0226 C-2 10 12Q0108.30-R-0Oi, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0008 Equipment Class: (18) Instruments on Racks/I MU 0227 MG_ 022 C-211 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0070A Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

INSTRUMENT RACKS/ Instrument Rack 2202-70A Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of.visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-212 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0070A Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

INSTRUMENT RACKS/ Instrument Rack 2202-70A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,.and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

All panel doors opened. No other adverse seismic conditions.

Top of cabinet is bolted to Cabinet 52B.Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/16/2012 Evaluated by: -David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-213 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Ecuipment

==

Description:==

D02-2202-0070A (18) Instruments on Racks INSTRUMENT RACKS/Instrument Rack 2202-70A Photos MG_0128 M(U U13U MG_0131 C-214 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: EY I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0070A Equipment Class: (18) Instruments on Racks"-I MG 0133 MG 0134 C-215 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0073A Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

INSTRUMENT RACKS/ Instrument Rack 2202-73A Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 538.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

Viewed 5 of 6 anchors. View of north side middle anchor obstructed by junction box attached to panel. Anchors viewed matched documentation.

Thus it is reasonable to conclude that the anchors match plant documentation without further verification.

C-216 12-0108.30-R-oo1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0073A Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

INSTRUMENT RACKS/ Instrument Rack 2202-73A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Adjacent fixed grating has gap at base of equipment.

Judged to be acceptable.

Comments SEWS Anchorage Notes: Panel 36Dx3OWx98H welded to steel base, 4Wx 36L 1/2" Plate. Steel base in turn anchored to R/C floor by six- 1/2" concrete expansion anchors, 3 on each side.Seismic Walkdown Team: D. Carter & J. Griffith -7/19/2012 Evaluated by: 0J0/4-k David Carter Date: 10/2/2012 o6 6 James Griffith 10/2/2012 C-217 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: -YI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0073A Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

INSTRUMENT RACKS/Instrument Rack 2202-73A Photos MG 0791 MG 0792 MG 0791 C-218 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: [Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0073A Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

INSTRUMENT RACKS/ Instrument Rack 2202-73A M(U _719 C-219 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: F-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2202-0073A Equipment Class: (18) Instruments on Racks MG 0797 MG 0798 MG 0797 MG 0798 C-220 12Q0108.30-R-0O1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: [-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2252-0010 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL/ DG Meterinq and Relay Cabinet Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas.

Additional soace is provided at the end of this checklist for documentina other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Cabinet is anchored with four angle clips. Each clip has one 5/8-inch wedge anchor, Yes C-221 12Q0108.30-R-0O1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2252-0010 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauioment Descriotion:

CONTROL PANEL DG Meterina and Relay Cabinet Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter and J. Griffith on 7/17/12 Evaluated by: ,Q-UOQ 4 k,* David Carter Date: 10/2/2012.V James Griffith 10/2/2012 C-222 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-2252-0010 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL DG Metering and Relay Cabinet IUI (, 111A4X MG 0149 C-223