Text

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: FT] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D00-ACP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL/ Unit 2/3 Auxiliary Control Panel Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 504.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-41 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-ACP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL/ Unit 2/3 Auxiliary Control Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Column mounted panel. Bolted to column with four 3/8" shell type expansion bolts (one in each corner)through a 1/2" shim plate.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 See U2/3 Diesel Generator Room area walk-by notes completed during U2 walkdown for further information.

C-42 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: [-7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauioment

==

Description:==

DOO-ACP (20) Instrumentation and Control Panels and Cabinets CONTROL PANEL Unit 2/3 Auxiliary Control Panel Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 Photos C-43 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-ACP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTRO C-44 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D00-ACP Equipment Class: (20) Instrumentation and Control Panels and Cabinets-w C-45 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: 7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL/ Unit 2/3 Diesel Generator Control Panel Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 504.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Panel is anchored to Diesel Generator skid.5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes Yes C-46 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D00-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL Unit 2/3 Diesel Generator Control Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Edge of panel door protrudes.

Door is adequately latched and judged to be acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Several tubes and conduits are in close proximity to one another. All are flexible and all have the same driver (Diesel Generator skid). Tubes and conduits are judged acceptable.

Comments SEWS Anchorage Notes: Panel welded to the base of the skid and braced at the top to the expansion water tank that is supported by the Diesel Skid.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 C-47 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

DOO-DGCP (20) Instrumentation and Control Panels and Cabinets CONTROL PANEL/ Unit 2/3 Diesel Generator Control Panel Photos C-48 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL/ Unit 2/3 Diesel Generator Control Panel-L 20120731-Dresden-3 4 20120731-Dresden-3 478 C-49 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: [- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets CONTROL F it~1 C-50 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-51 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: YI- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DO-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets pment

Description:

CONTROL PANEL/ Unit 2/3 Diesel Generator Control Panel 201 C-52 Dresden Generating Station Unit 3 12QO108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D00-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL/ Unit 2/3 Neutral Grounding Cabinet Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 504.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-53 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauioment Descriotion:

CONTROL PANEL/ Unit 2/3 Neutral Groundina Cabinet Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Cabinet restrained at top to column and Cabinet 2223-33 via 2 clips on each side. Judged to be acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Panel is welded to an embed with 3/16" thick fillets (the two in front are 1/2" long and the two in the rear are 3/4" and 1" in length) on in each corner of the panel.Evaluated by: " James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-54 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL Unit 2/3 Neutral Grounding Cabinet Photos C-55 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: i-7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D00-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL Unit 2/3 Neutral Grounding Cabinet 20120731-Dresden-3 464 C-56 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-57 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: l N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DO0-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL/ Unit 2/3 Neutral Grounding Cabinet C-58 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 11 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CRD/ Backup Scram Solenoid Valve Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-59 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 11 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CRD/ Backup Scram Solenoid Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 Missing support clamp on copper pipe near Valve 3-302-20B.

Condition judged to be acceptable based on totality of piping system support. See IR 1395804.See U3 West HCU Bank area walk-by for further notes.Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-60 Dresden Generating Station Unit 3 12QO108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 11 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CRD/ Backup Scram Solenoid Valve Photos-%77ý20" C-61 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 11 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-0302-0019AV27 (8) Motor-Operated and Solenoid-Operated Valves n Solen C-62 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 11 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-63 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 11 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves ramilSole C-64 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 11 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CRD/ Backup Scram Solenoid Valve M IL C-65 Dresden Generating Station Unit 3 12Q0108,30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 11 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CRD/ Backup Scram Solenoid Valve C-66 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 11 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves[1 00 C-67 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 10 of 11 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves pment

Description:

CRD/ Backup Scram Solenoid Valve C-68 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 11 of 11 Status: 7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-69 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: F-7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082B-LT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ East Bank SDV Tank Level Transmitter Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraae 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracks in wall judged to be acceptable.

5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-70 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082B-LT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ East Bank SDV Tank Level Transmitter Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 See U3 East HCU Bank area walk-by for further notes.Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-71 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: [-7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

D03-0302-0082B-LT (18) Instruments on Racks CRD/ East Bank SDV Tank Level Transmitter Photos 20120801-Dresden-3 129 C-72 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: EY7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082B-LT Equipment Class: (18) Instruments on Racks)V T C-73 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082B-LT Equipment Class: (18) Instruments on Racks T C-74 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082B-LT Equipment Class: (18) Instruments on Racks T'C-75 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082E-LT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ East Bank SDV Tank Level Transmitter Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracks in wall judged to be acceptable.

5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-76 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: 7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082E-LT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ East Bank SDV Tank Level Transmitter Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 See U3 East HCU Bank area walk-by for further notes.Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-77 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: E7I- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082E-LT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ East Bank SDV Tank Level Transmitter C-78 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082E-LT Equipment Class: (18) Instruments on Racks pment

Description:

CRD/ East Bank SDV Tank C-79 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082E-LT Equipment Class: (18) Instruments on Racks pment

Description:

CRD/ East Bank SDV Tank C-80 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082E-LT Equipment Class: (18) Instruments on Racks Bank SDV Tank I C-81 Dresden Generating Station Unit 3 12QO108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-0302-0082E-LT (18) Instruments on Racks V Tank C-82 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-0125-Al0 Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

CRD/ Insertion Accumulator, West Bank, Row 8, Position 15 (C-8)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage tree of potentially adverse seismic conditions?

The insertion accumulator is an in-line component that is adequately restrained to the CRD/HCU support frame.Yes C-83 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: 7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-0125-Al0 Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

CRD/ Insertion Accumulator, West Bank, Row 8, Position 15 (C-8)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 For photographs, see SWC for D03-0305-0010-0031-H20.

Evaluated by: James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 Photos C-84 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-0126-VO5 Equipment Class: (7) Fluid-Operated Valves CRD/ Accumulator Insertion Scram Valve, West Bank, Row 8, Position 15 (C-Equipment

==

Description:==

8)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraqe 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

The insertion scram valve is an in-line component with the operator adequately restrained to the CRD/HCU support frame.Yes C-85 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-0126-V05 Equipment Class: (7) Fluid-Operated Valves CRD/ Accumulator Insertion Scram Valve, West Bank, Row 8, Position 15 (C-Equipment

==

Description:==

8)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/12 For photographs, see SWC for D03-0305-0010-0031-H20.

Evaluated by: ..James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 Photos C-86 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-001 0-0031-01 27-VO5 Equipment Class: Equipment

==

Description:==

(7) Fluid-Operated Valves CRD/ Withdraw to Scram Discharge Volume Scram Valve, West Bank, Row 8, Position 15 (C-8)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

The discharge volume scram valve is an in-line component with the operator adequately restrained to the CRD/HCU support frame.Yes C-87 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-0127-VO5 Equipment Class: Eauipment DescriDtion:

(7) Fluid-Operated Valves CRD/ Withdraw to Scram Discharge Volume Scram Valve, West Bank, Row 8, Position 15 (C-8)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 For photographs, see SWC for D03-0305-0010-0031-H20.

Evaluated by: L I' James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 Photos C-88 Dresden Generating Station Unit 3 12QO108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-H20 Equipment Class: (0) Other Equipment

==

Description:==

CRD/ Hydraulic Control Unit, West Bank, Row 8, Position 15 (C-8)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraqe 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is shown on Drawings M-251, Rev. R, and M-258, Rev. J.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes C-89 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-H20 Equipment Class: (0) Other Equipment

==

Description:==

CRD/ Hydraulic Control Unit, West Bank, Row 8, Position 15 (C-8)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: £f- James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-90 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: I- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-H20 Equipment Class: (0) Other Equipment

==

Description:==

CRD/ Hydraulic Control Unit, West Bank, Row 8, Position 15 (C-8)Photos==tufrt1 14:01 20120731-Dresden-3 348 C-91 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-H20 Equipment Class: (0) Other 11 C-92 Dresden Generating Station Unit 3 12Q0108,30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: 1-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-H20 Equipment Class: (0) Other Il C-93 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-H20 Equipment Class: (0) Other m Degcnntin:

CRD/ Hv C-94 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-H20 Equipment Class: (0) Other Equipment Descnpetion:

CR0/ Hydraulic Control Unit, West Bank, Row 8, Position 15 (C-8)C-95 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0030-0043-0125-Al0 Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

CRD/ Insertion Accumulator, West Bank, Row 8, Position 4 (H-11)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchora-ae

1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

The insertion accumulator is an in-line component that is adequately restrained to the CRD/HCU support frame.Yes C-96 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0030-0043-0125-Al0 Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

CRD/ Insertion Accumulator, West Bank, Row 8, Position 4 (H-1 1)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 For photographs, see SWC for D03-0305-0030-0043-H20.

Evaluated by: James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 Photos C-97 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: [T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0030-0043-0126-VO5 Equipment Class: (7) Fluid-Operated Valves CRD/ Accumulator Insertion Scram Valve, West Bank, Row 8, Position 4 (H-Equipment

==

Description:==

11)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraae 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

The insertion scram valve is an in-line component with the operator adequately restrained to the CRD/HCU support frame.Yes C-98 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0030-0043-0126-V05 Equipment Class: (7) Fluid-Operated Valves CRD/ Accumulator Insertion Scram Valve, West Bank, Row 8, Position 4 (H-Equipment

==

Description:==

11)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 For photographs, see SWC for D03-0305-0030-0043-H20.

Evaluated by: James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 Photos C-99 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: FY- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0030-0043-0127-V05 Equipment Class: (7) Fluid-Operated Valves CRD/ Withdraw to Scram Discharge Volume Scram Valve, West Bank, Row 8, EauiDment

==

Description:==

Position 4 (H-11)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findingls.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

The discharge volume scram valve is an in-line component with the operator adequately restrained to the CRD/HCU support frame.Yes C-1 00 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0030-0043-0127-V05 Equipment Class: (7) Fluid-Operated Valves CRD/ Withdraw to Scram Discharge Volume Scram Valve, West Bank, Row 8, Eauirment

==

Description:==

Position 4 (H-1 1)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 For photographs, see SWC for D03-0305-0030-0043-H20.

Evaluated by: V ' James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 Photos C-101 Dresden Generating Station Unit 3 12Q010830-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: I-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0030-0043-H20 Equipment Class: (0) Other Equipment

==

Description:==

CRD/ Hydraulic Control Unit, West Bank, Row 8, Position 4 (H-1 1)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is shown on Drawings M-251, Rev. R, and M-258, Rev. J.6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-102 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0030-0043-H20 Equipment Class: (0) Other Equipment

==

Description:==

CRD/ Hydraulic Control Unit, West Bank, Row 8, Position 4 (H-11)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: ' James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-103 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: ] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0030-0043-H20 Equipment Class: (0) Other Equipment

==

Description:==

CRD/ Hydraulic Control Unit, West Bank, Row 8, Position 4 (H-11)20187IJ 14:10 zu-I zU t.5-1 -uresoen-,5 20120731-Dresden-3 366 C-104 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: E-7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0030-0043-H20 Equipment Class: (0) Other Il C-105 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0030-0043-H20 Equipment Class: (0) Other itrol M8IIOJN1 14:1)C-106 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: F-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0030-0043-H20 Equipment Class: (0) Other Equipment

==

Description:==

CRD/ Hydraulic Control Unit, West Bank, Row 8, Position 4 (H-11)C-107 Dresden Generating Station Unit 3 12QO108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0046-0031-0125-Al0 Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

CRD/ Insertion Accumulator, East Bank, Row 1, Position 16 (M-8)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.

Additional space is provided at the end of this checklist for documentinq other comments.Anchoraae 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

The insertion accumulator is an in-line component that is adequately restrained to the CRD/HCU support frame.Yes C-108 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0046-0031-0125-Al0 Equipment Class: (21) Tanks and Heat Exchangers Eauipment

==

Description:==

CRD/ Insertion Accumulator, East Bank, Row 1, Position 16 (M-8)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 For photographs, see SWC for D03-0305-0046-0031-H20.

Evaluated by: James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 Photos C-109 Dresden Generating Station Unit 3 12QO108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0046-0031-0126-V05 Equipment Class: (7) Fluid-Operated Valves CRD/ Accumulator Insertion Scram Valve, East Bank, Row 1, Position 16 (M-Eauipment Descriotion:

8)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

The insertion scram valve is an in-line component with the operator adequately restrained to the CRD/HCU support frame.Yes C-110 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0046-0031-0126-V05 Equipment Class: (7) Fluid-Operated Valves CRD/ Accumulator Insertion Scram Valve, East Bank, Row 1, Position 16 (M-Equipment

==

Description:==

8)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 For photographs, see SWC for D03-0305-0046-0031-H20.

Evaluated by: James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 Photos C-111 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0046-0031-0127-V05 Equipment Class: (7) Fluid-Operated Valves CRD/ Withdraw to Scram Discharge Volume Scram Valve, East Bank, Row 1, Equipment

==

Description:==

Position 16 (M-8)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

The discharge volume scram valve is an in-line component with the operator adequately restrained to the CRD/HCU support frame.Yes C-112 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0046-0031-0127-V05 Equipment Class: (7) Fluid-Operated Valves CRD/ Withdraw to Scram Discharge Volume Scram Valve, East Bank, Row 1, EQuipment

==

Description:==

Position 16 (M-8)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 For photographs, see SWC for D03-0305-0046-0031-H20.

Evaluated by: r' James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 Photos C-113 Dresden Generating Station Unit 3 12QO108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0046-0031-H20 Equipment Class: (0) Other Equipment

==

Description:==

CRD/ Hydraulic Control Unit, East Bank, Row 1, Position 16 (M-8)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is shown on Drawings M-251, Rev. R, and M-258, Rev. J.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes C-114 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: iT] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0046-0031-H20 Equipment Class: (0) Other Equipment

==

Description:==

CRD/ Hydraulic Control Unit, East Bank, Row 1, Position 16 (M-8)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: '" James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-115 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: [-7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0046-0031-H20 Equipment Class: (0) Other Equipment

==

Description:==

CRD/ Hydraulic Control Unit, East Bank, Row 1, Position 16 (M-8)zu1zut41-uresaen-i jis 20120731-Dresden-3 399 C-116 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0046-0031 -H20 Equipment Class: (0) Other Il C-117 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0046-0031-H20 Equipment Class: (0) Other itrol Unit, C-118