ML12348A267

From kanterella
Jump to navigation Jump to search
12Q0108.30-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 2, Part 2 of 7
ML12348A267
Person / Time
Site: Dresden Constellation icon.png
Issue date: 11/15/2012
From: Delaney M
Exelon Generation Co, Stevenson & Associates
To:
Office of Nuclear Reactor Regulation
References
RS-12-167 12Q0108.30-R-001, Rev 1
Download: ML12348A267 (106)


Text

12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 B Equipment Lists Appendix B contains the equipment lists that were developed during SWEL development.

Note that because no SWEL 2 or Rapid Drain-Down items existed for Dresden Generating Station Unit 2, there is no Base List 2, SWEL 2, or Rapid Drain-Down Equipment List.The following contents are found in Appendix B: SW EL Approval Signature Page ....................................................................

B-2 Table B-la, Base List la -Items Exclusive to Unit 2 .............................................

B-3 Table B-lb, Base List lb -Items Common to Units 2 and 3 .................................

B-38 Table B -2 , S W E L 1 .....................................................................................

B -42 B-1 Rev. I:Co~rrespondenceNo.,:-RS-1 2"-167: Stevenson

& Associaates.

S e i : " I : i R.: ..: ..: : : : : i*. ..s ,' * " : : i Seismic Walkdown Interim Rep:ort. Revision 0i P In Responseg:to NT.TF.Recommendation 2.3: Seismic ...D:resd:en Generating Station Unit:,2 07/13/2012a:

EquipmenthSeldeion Preparer daite: Ki.L.u9 7/131-2012:.

Equipment Selection Rev iewer -.0 a ae.ýStation Operatios Staff. Mmber .. date,.Refer to.Attiachment 3 fof synopsis of ttion opeations role and esponsibi~ty.

ýB-2 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Table B-la. Base List la -Items Exclusive to Unit 2 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-0028-1-1 Panel N/A REACTOR RECIRCULATION/

Recirc Pump A Discharge D02-0202-ValAV20 Nuclear Boiler System Reactor 515.5 DRYWELL D02-02021-0006AV20 REACTOR RECIRCULATION/

Recirc Pump Crosstie Nuclear Boiler System Reactor 476.5 Drywell Valve D02-0202-0007AV20 REACTOR RECIRCULATION/

Recirc Pump A Bypass Nuclear Boiler System Reactor 476.5 Drywell Valve REACTOR RECIRCULATION/

Recirc Crosstie Bypass D02-0202-0009AV20 Nuclear Boiler System Reactor 515.5 DRYWELL D02-0203-OOOIAV05 MAIN STEAM/ Isolation Valve Nuclear Boiler System Reactor 515.42 DRYWELL D02-0203-0001BV05 MAIN STEAM/ Isolation Valve Nuclear Boiler System Reactor 515.42 DRYWELL D02-0203-OO01CV05 MAIN STEAM/ Isolation Valve Nuclear Boiler System Reactor 515.42 DRYWELL D02-0203-0001DV05 MAIN STEAM/ Isolation Valve Nuclear Boiler System Reactor 515.42 DRYWELL D02-0203-0002AV05 MAIN STEAM/ Isolation Valve Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-0203-0002BV05 MAIN STEAM/ Isolation Valve Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-0203-0002CV05 MAIN STEAM/ Isolation Valve Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-0203-0002DV05 MAIN STEAM/ Isolation Valve Nuclear Boiler System Turbine. 517.5 X AREA G/41 D02-0203-0003A-PC ADS/ Target Rock Process Controller (ROB-203-3A)

Nuclear Boiler System Reactor 517.5 Drywell D02-0203-0003AV26 ADS/ Target Rock Valve Nuclear Boiler System Reactor 537 DRYWELL D02-0203-0003B-PC ADS! Electromatic Valve Process Controller!(ROB-Nuclear Boiler System Reactor 517.5 Drywell 203-31B)D02-0203-0003BV26 ADS/ Electromatic Relief Valve Nuclear Boiler System Reactor 537 DRYWELL ADS/ Electromatic Valve Process Controller (ROB-D02-0203-0003C-PC ADS! Nuclear Boiler System Reactor 517.5 Drywell 203-3C)______

__ ___D02-0203-0003CV26 ADS/ Electromatic Relief Valve Nuclear Boiler System Reactor 537 DRYWELL D02-0203-0003D-PC ADS! Electromatic Valve Process Controller (ROB- Nuclear Boiler System Reactor 517.5 Drywell 203-3D))D02-0203-0003DV26 ADS/ Electromatic Relief Valve Nuclear Boiler System Reactor 537 DRYWELL-02030003_PC ADS/ Electromatic Valve Process Controller (ROB-D02-0203-0003EPC Nuclear Boiler System Reactor 517.5 Drywell 203-3E)Table B-1 a Page 1 of 35 B-3 12QC10p.30nR-co 1, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-0203-0003EV26 ADS/ Electromatic Relief Valve Nuclear Boiler System Reactor 537 DRYWELL D02-0203-0004AV26 ADS/ Reactor Overpressure Relief Valve Nuclear Boiler System Reactor 537 DRYWELL D02-0203-0004BV26 ADS/ Reactor Overpressure Relief Valve Nuclear Boiler System Reactor 537 DRYWELL D02-0203-0004CV26 ADS/ Reactor Overpressure Relief Valve Nuclear Boiler System Reactor 537 DRYWELL D02-0203-0004DV26 ADS/ Reactor Overpressure Relief Valve Nuclear Boiler System Reactor 537 DRYWELL D02-0203-0004EV26 ADS/ Reactor Overpressure Relief Valve Nuclear Boiler System Reactor 537 DRYWELL D02-0203-0004FV26 ADS/ Reactor Overpressure Relief Valve Nuclear Boiler System Reactor 537 DRYWELL D02-0203-0004GV26 ADS/ Reactor Overpressure Relief Valve Nuclear Boiler System Reactor 537 DRYWELL D02-0203-0004HV26 ADS/ Reactor Overpressure Relief Valve Nuclear Boiler System Reactor 537 DRYWELL D02-0203-001A1V27 MAIN STEAM/ Isolation DC Solenoid Valve Nuclear Boiler System Reactor 515.42 DRYWELL D02-0203-001A2V27 MAIN STEAM/ Isolation AC Solenoid Valve Nuclear Boiler System Reactor 515.42 DRYWELL D02-0203-001B1V27 MAIN STEAM/ Isolation DC Solenoid Valve Nuclear Boiler System Reactor 515.42 DRYWELL D02-0203-001B2V27 MAIN STEAM/ Isolation AC Solenoid Valve Nuclear Boiler System Reactor 515.42 DRYWELL D02-0203-001C1V27 MAIN STEAM/ Isolation DC Solenoid Valve Nuclear Boiler System Reactor 515.42 DRYWELL D02-0203-001C2V27 MAIN STEAM/ Isolation AC Solenoid Valve Nuclear Boiler System Reactor 515.42 DRYWELL D02-0203-001D1V27 MAIN STEAM/ Isolation DC Solenoid Valve Nuclear Boiler System Reactor 515.42 DRYWELL D02-0203-001D2V27 MAIN STEAM/ Isolation AC Solenoid Valve Nuclear Boiler System Reactor 515.42 DRYWELL D02-0203-002A1V27 MAIN STEAM/ Isolation DC Solenoid Valve Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-0203-002A2V27 MAIN STEAM/ Isolation AC Solenoid Valve Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-0203-002B1V27 MAIN STEAM/ Isolation DC Solenoid Valve Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-0203-002B2V27 MAIN STEAM/ Isolation AC Solenoid Valve Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-0203-002C1V27 MAIN STEAM/ Isolation DC Solenoid Valve Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-0203-002C2V27 MAIN STEAM/ Isolation AC Solenoid Valve Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-0203-002DlV27 MAIN STEAM/ Isolation DC Solenoid Valve Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-0203-002D2V27 MAIN STEAM/ Isolation AC Solenoid Valve Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-0205-0024-V20 REACTOR RECIRCULATION!

Reactor Head Cooling Nuclear Boiler System Reactor 589 K-L/41 Line Valve D02-0220-0001-V20 MAIN STEAM/ Isolation Valve Line Drain Valve Nuclear Boiler System Reactor 517.5 Drywell D02-0220-0002-V20 MAIN STEAM/ Isolation Valve Line Drain Valve Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-220-044-V5 REACTOR RECIRCULATION Recirc Loop Sample Line Nuclear Boiler System Reactor 537 DRYWELL Valve D02-0220-0044-V27 REACTOR RECIRCULATION!

Recirc Loop Line Nuclear Boiler System Reactor 537 DRYWELL_Solenoid Valve Table B-i a Page 2 of 35 B-4 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-0220-0045-VO5 REACTOR RECIRCULATION/

Recirc Loop Sample Line Nuclear Boiler System Reactor 545.5 RWCU HX RM L/42 Valve REACTOR RECIRCULATION/

Recirc Loop Line D02-0220-0045-V27 SEnOi VE Nuclear Boiler System Reactor 545.5 RWCU HX RM L/42 Solenoid Valve D02-0220-0082AA10 MAIN STEAM/ Isolation Valve Accumulator Nuclear Boiler System Reactor 515.42 DRYWELL D02-0220-0082BA10 MAIN STEAM/ Isolation Valve Accumulator Nuclear Boiler System Reactor 515.42 DRYWELL D02-0220-OO82CA1O MAIN STEAM/ Isolation Valve Accumulator Nuclear Boiler System Reactor 515.42 DRYWELL D02-0220-0082DA10 MAIN STEAM/ Isolation Valve Accumulator Nuclear Boiler System Reactor 515.42 DRYWELL D02-0220-0083AAIO MAIN STEAM/ Isolation Valve Accumulator Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-0220-0083BA10 MAIN STEAM/ Isolation Valve Accumulator Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-0220-0083CA10 MAIN STEAM/ Isolation Valve Accumulator Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-0220-0083DA10 MAIN STEAM/ Isolation Valve Accumulator Nuclear Boiler System Turbine 517.5 X AREA G/41 D02-0261-OO01A-FE MAIN STEAM/ Injection Line Flow Element Nuclear Boiler System Reactor 517.5 Drywell D02-0261-OOO1B-FE MAIN STEAM/ Injection Line Flow Element Nuclear Boiler System Reactor 517.5 Drywell D02-0261-OOO1C-FE MAIN STEAM/ Injection Line Flow Element Nuclear Boiler System Reactor 517.5 Drywell D02-0261-OOO1D-FE MAIN STEAM/ Injection Line Flow Element Nuclear Boiler System Reactor 517.5 Drywell D02-0261-0014A-TE ADS/ Target Rock Temperature Element Nuclear Boiler System Reactor 517.5 Drywell D02-0261-0014B-TE ADS! Electromatic Relief Valve Temperature Nuclear Boiler System Reactor 517.5 Drywell Element D02-0261-0014C-TE ADS! Electromatic Relief Valve Temperature Nuclear Boiler System Reactor 517.5 Drywell Element D02-0261-0014D-TE ADS! Electromatic Relief Valve Temperature Nuclear Boiler System Reactor 517.5 Drywell Element D02-0261-0014E-TE ADS! Electromatic Relief Valve Temperature Nuclear Boiler System Reactor 517.5 Drywell Element D02-0261-0020--TR ADS/ Blowdown Lines Temperature Recorder Nuclear Boiler System Reactor 517.5 Drywell D02-0261-0037A-PS ADS/ Target Rock Pressure Switch Nuclear Boiler System Reactor 517.5 Drywell D02-0261-0037B-PS ADS/ Target Rock Pressure Switch Nuclear Boiler System Reactor 517.5 Drywell D02-0261-0037C-PS ADS/ Target Rock Pressure Switch Nuclear Boiler System Reactor 517.5 Drywell D02-0263-OO59ALIS REACTOR RECIRCULATION/

Level Indicating Switch Nuclear Boiler System Reactor 545.5 K/39-40 D02-0263-0059BLIS REACTOR RECIRCULATION/

Level Indicating Switch Nuclear Boiler System Reactor 545.5 L-M/41-42 Table B-i a Page 3 of 35 B-5 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-0263-0060A-PI REACTOR RECIRCULATION/

Pressure Indicator Nuclear Boiler System Reactor 545.5 K/39-40 D02-0263-0060B-PI REACTOR RECIRCULATION/

Pressure Indicator Nuclear Boiler System Reactor 545.5 L-M/41-42 D02-0263-0214BV15 REASTOR RECIRCULATION/

Instrument Line Valve Nuclear Boiler System Reactor 545.5 L-M/41-42 D02-0263-0215BV15 REACTOR RECIRCULATION/

Instrument Line Valve Nuclear Boiler System Reactor 545.5 L-M/41-42 D02-030-0030-00355-CRD/ Withdraw to Scram Discharge Volume Scram Control Rod Drive System Reactor 517.5 In Hydraulic CU 0127-V05 Valve, West Bank Row 8, Position 2 (H-9)D02-0302-0019AV27 CRD/ Backup Scram Solenoid Valve Control Rod Drive System Reactor 517.5 L/39 D02-0302-0019BV27 CRD/ Backup Scram Solenoid Valve Control Rod Drive System Reactor 517.5 L/39 D02-0302-0020AV27 CRD/ Scram Dump Solenoid Valve Control Rod Drive System Reactor 517.5 L/39 D02-0302-0020BV27 CRD/ Scram Dump Solenoid Valve Control Rod Drive System Reactor 517.5 L/39 D02-0302-0082A-LS CRD/ West Bank SDV Tank Level Switch Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0302-0082B-LS CRD/ West Bank SDV Tank Level Switch Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0302-0082C-LS CRD/ West Bank SDV Tank Level Switch Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0302-0082D-LS CRD/ West Bank SDV Tank Level Switch Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0302-0082G-LS CRD/ East Bank SDV Tank Level Switch Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0302-0082H-LS CRD/ East Bank SDV Tank Level Switch Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0302-0082J-LS CRD/ East Bank SDV Tank Level Switch Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0302-0082K-LS CRD/ East Bank SDV Tank Level Switch Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0302-0108A-LE CRD/ West Bank SDV Tank Level Element Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 Table B-la Page 4 of 35 B-6 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-0302-0108B-LE CRD/ West Bank SDV Tank Level Element Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0302-0108G-LE CRD/ East Bank SDV Tank Level Element Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0302-0108H-LE CRD/ East Bank SDV Tank Level Element Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0302-0109C-LT CRD/ West Bank SDV Tank Level Transmitter Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0302-0109D-LT CRD/ West Bank SDV Tank Level Transmitter Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0302-0109J-LT CRD/ East Bank SDV Tank Level Transmitter Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0302-0109K-LT CRD/ East Bank SDV Tank Level Transmitter Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0302-0157AV05 CRD/ West Bank Scram Discharge Volume Drain Control Rod Drive System Reactor 476.5 TORUS BAY 8 Valve D02-0302-0157AV27 CRD/ West Bank Scram Discharge Volume Drain Sol. Control Rod Drive System Reactor 476.5 TORUS BAY 8 Valve D02-0302-0157BV05 CRD/ East Bank Scram Discharge Volume Drain Valve Control Rod Drive System Reactor 476.5 TORUS BAY 3 D02-0302-0157BV27 CRD/ East Bank Scram Discharge Volume Drain Sol. Control Rod Drive System Reactor 476.5 TORUSBAY3____ ___ ___ ___ ___Valve_

_ _ _ _ _ _ _ _ _ _D02-0302-0158AV05 CRD/ West Bank Scram Discharge Volume Drain Control Rod Drive System Reactor 476.5 TORUS BAY 8 Valve D02-0302-0158AV27 CRD/ West Bank Scram Discharge Volume Drain Sol. Control Rod Drive System Reactor 476.5 TORUS BAY 8 Valve D02-0302-0158BV05 CRD/ East Bank Scram Discharge Volume Drain Valve Control Rod Drive System Reactor 476.5 TORUSBAY3 D02-0302-0158BV27 CRD/ East Bank Scram Discharge Volume Drain Sol. Control Rod Drive System Reactor 476.5 TORUS BAY 3 Valve D02-0302-O160AV05 CRD/ West Bank Scram Discharge Volume Vent Control Rod Drive System Reactor 517.5 DRY GALL K/43 Valve I I I Table B-la Page 5 of 35 B-7 12QO108.30-R-oo1, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-0302-0160AV27 CRD/ West Bank Scram Discharge Volume Vent Sol. Control Rod Drive System Reactor 517.5 DRY GALL K/43 Valve D02-0302-0160BV05 CRD/ East Bank Scram Discharge Volume Vent Valve Control Rod Drive System Reactor 545.5 L/39 D02-0302-0160BV27 CRD/ East Bank Scram Discharge Volume Vent Sol. Control Rod Drive System Reactor 545.5 L/39 Valve D02-0302-O161AV05 CRD/ West Bank Scram Discharge Volume Vent Control Rod Drive System Reactor 517.5 DRY GALL K/43 Valve D02-0302-0161AV27 CRD/ West Bank Scram Discharge Volume Vent Sol. Control Rod Drive System Reactor 517.5 DRY GALL K/43 Valve D02-0302-0161BV05 CRD/ East Bank Scram Discharge Volume Vent Valve Control Rod Drive System Reactor 545.5 L/39 D02-0302-0161BV27 CRD/ East Bank Scram Discharge Volume Vent Sol. Control Rod Drive System Reactor 545.5 L/39 Valve D02-0305-0014-0027-CRD/ Insertion Accumulator, West Bank, Row 8, Control Rod Drive System Reactor 517.5 In Hydraulic CU 0125-AlO Position 21 (D-7).D02-0305-0014-0027-CRD/ Accumulator Insertion Scram Valve, West Bank Control Rod Drive System Reactor 517.5 In Hydraulic CU 0126-VO5 Row 8, Position 21 (D-7)D02-0305-0014-0027-CRD/ Withdraw to Scram Discharge Volume Scram Control Rod Drive System Reactor 517.5 In Hydraulic CU 0127-VO5 Valve, West Bank Row 8, Position 21 (D-7)D02-0305--0014-0027-CRD/ Hydraulic Control Unit -West Bank, Row 8, Control Rod Drive System Reactor 517.5 i-K/38-39,43-44 H20 Position 21 (D-7)D02-0305-0030-0035-CRD/ Insertion Accumulator, West Bank, Row 8, Control Rod Drive System Reactor 517.5 In Hydraulic CU 0125-AlO Position 2 (H-9)D02-0305-0030-0035-CRD/ Accumulator Insertion Scram Valve, West Bank Control Rod Drive System Reactor 517.5 In Hydraulic CU 0126-VO5 Row 8, Position 2 (H-9)D02-0305-0030-0035-CRD/ Hydraulic Control Unit -West Bank, Row 8, Control Rod Drive System Reactor 517.5 i-K/38-39,43-44 H20 Position 2 (H-9)D02-0305-0046-0023-CRD/ Insertion Accumulator, East Bank, Row 1, Control Rod Drive System Reactor 517.5 In Hydraulic CU 0125-AlO Position17 (M-6) I D02-0305-0046-0023-CRD/ Accumulator Insertion Scram Valve, East Bank, Control Rod Drive System Reactor 517.5 In Hydraulic CU 0126-VO5 Row 1, Postion 17 (M-6)Table B-la Page 6 of 35 B-8 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-0305-0046-0023-CRD/ Withdraw to Scram Discharge Volume Scram Control Rod Drive System Reactor 517.5 In Hydraulic CU 0127-VO5 Valve, East Bank, Row 1, Postion 17 (M-6)D02-0305-0046-0023-CRD/ Hydraulic Control Unit -East Bank, Row 1, Control Rod Drive System Reactor 517.5 J-K/38-39,43-44 H20 Position 17 (M-6)D02-0305-0054-0039-CRD/ Insertion Accumulator, East Bank, Row 1, Control Rod Drive System Reactor 517.5 In Hydraulic CU 0125-Ai0 Position 8 (P-IO)D02-0305-0054-0039-CRD/ Accumulator Insertion Scram Valve, East Bank, Control Rod Drive System Reactor 517.5 In Hydraulic CU 0126-VOS Row 1, Postion 8 (P-iO)D02-0305-0054-0039-CRD/ Withdraw to Scram Discharge Volume Scram 012-VS aleEas Bnk Rw , Pston8 P.0)Control Rod Drive System Reactor 517.5 Iln Hydraulic CU 0127-V05 Valve, East Bank, Row 1, Postion 8 (P-10)D02-0305-0054-0039-CRD/ Hydraulic Control Unit -East Bank, Row 1, Control Rod Drive System Reactor 517.5 J-K/38-39,43-44 H20 Position 8 (P-iD)DO2-0305-O117-V27 CRD/ Pilot Solenoid For HCU Scram Valves Control Rod Drive System Reactor 517.5 In Hydraulic CU DO2-0305-O118-V27 CRD/ Pilot Solenoid For HCU Scram Valves Control Rod Drive System Reactor 517.5 In Hydraulic CU DO2-O305-0120-V15 CRD/ Hydraulic Control Unit Withdraw Valve Control Rod Drive System Reactor. 517.5 In Hydraulic CU DO2-O305-O121-V15 CRD/ Hydraulic Control Unit Insertion Valve Control Rod Drive System Reactor 517.5 In Hydraulic CU DO2-0305-O122-V15 CRD/ Hydraulic Control Unit Withdraw Valve Control Rod Drive System Reactor 517.5 In Hydraulic CU D02-0305-0123-V15 CRD/ Hydraulic Control Unit Insertion Valve Control Rod Drive System Reactor 517.5 In Hydraulic CU D02-0305-0128-AlO CRD/ Insertion Accumulator Control Rod Drive System Reactor 517.5 In Hydraulic CU DO2-0305-0129--LS CRD/ Insertion Accumulator Level Switch Control Rod Drive System Reactor 517.5 In Hydraulic CU DO2-O305-O130--PS CRD/ Insertion Accumulator Pressure Switch Control Rod Drive System Reactor 517.5 In Hydraulic CU D02-O305-0131--PI CRD/ Insertion Accumulator Pressure Indicator Control Rod Drive System Reactor 517.5 In Hydraulic CU Table B-la Page 7 of 35 B-9 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-0318-A


T05 CRD/ West Bank Scram Discharge Volume Tank Control Rod Drive System Reactor 517.5 J-L/43-44 D02-0318-B


T05 CRD/ East Bank Scram Discharge Volume Tank Control Rod Drive System Reactor 517.5 J-L/38-39 D02-0399-0524AV27 CRD/ Alternate Rod Insertion ATWS Solenoid Valve Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0399-0524BV27 CRD/ Alternate Rod Insertion ATWS Solenoid Valve Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0399-0548AV27 CRD/ Alternate Rod Insertion ATWS Solenoid Valve Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0399-0548BV27 CRD/ Alternate Rod Insertion ATWS Solenoid Valve Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0399-0549AV27 CRD/ Alternate Rod Insertion ATWS Solenoid Valve Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0399-0549BV27 CRD/ Alternate Rod Insertion ATWS Solenoid Valve Control Rod Drive System Reactor 517.5 J-L/38-39,43-44 D02-0645-A----FT MAIN STEAM/ Steam Flow Transmitter Reactor Level Control Reactor 545.5 K/39-40_____________________

~~~~~~System

______ ______ _________Reactor Level Control D02-0645-B


FT MAIN STEAM/ Steam Flow Transmitter Reactor 545.5 K/39-40 System Reactor Level Control D02-0645-C


FT MAIN STEAM/ Steam Flow Transmitter Reactor 545.5 K/39-40 System Reactor Level Control D02-0645-D


FT MAIN STEAM/ Steam Flow Transmitter Reactor 545.5 K/39-40 System D02-0750-OOOIA-RY NEUTRON MONITORING!

Source Range Monitor Neutron Monitoring Turbine 534 G-H/31-32 System D02-0750-OO1B-RY NEUTROM MONITORING!

Source Range Monitor Neutron Monitoring Turbine 534 G-H!31-32______________________

~~~~~~System______

__ ____ __________

D02-0750-O001C-RY NEUTRON MONITORING/

Source Range Monitor Neutron Monitoring Turbine 534 G-H/31-32 System D02-0750-OO01D-RY NEUTRON MONITORING/

Source Range Monitor Neutron Monitoring Turbine 534 G-H/31-32 I__ _System I D02-0902-0003 CONTROL PANELS! Control Panel 902-3 Control Room Panels N/A 534 C. RM PNL 902-3 Table B-i a Page 8 of 35 B-1 0 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-0902-0004 CONTROL PANELS/ Control Panel 902-4 Control Room Panels N/A 534 C. RM PNL 902-4 D02-0902-0005 CONTROL PANELS/ Control Panel 902-5 Control Room Panels N/A 534 C. RM PNL 902-5 D02-0902-0015 CONTROL PANELS/ Control Panel 902-15 Control Room Panels N/A 534 C. RM PL 902-15 D02-0902-0017 CONTROL PANELS/ Control Panel 902-17 Control Room Panels N/A 534 C. RM PL 902-17 D02-0902-0019 CONTROL PANELS/ Control Panel 902-19 Control Room Panels N/A 534 C. RM PL 902-19 D02-0902-0028 CONTROL PANELS/ Control Panel 902-28 Control Room Panels Turbine 517.5 AEER PNL 902-28 D02-0902-0032 CONTROL PANELS/ Control Panel 902-32 Control Room Panels Turbine 517.5 AEER PNL 902-32 D02-0902-0033 CONTROL PANELS/ Control Panel 902-33 Control Room Panels Turbine 517.5 AEER PNL 902-33 D02-0902-0036 CONTROL PANELS/ Control Panel 902-36 Control Room Panels N/A 534 C. RM PL 902-36 D02-0902-0037 CONTROL PANELS/ Control Panel 902-37 Control Room Panels N/A 534 C. RM PL 902-37 D02-0902-0039 CONTROL PANELS/ Control Panel 902-39 Control Room Panels Turbine 517.5 AEER PNL 902-39 D02-0902-0041 CONTROL PANELS/ Control Panel 902-41 Control Room Panels Turbine 517.5 AEER PNL 902-41 D02-0902-0046 CONTROL PANELS/ Control Panel 902-46 Control Room Panels Turbine 517.5 AEER PNL 902-46 D02-0902-0047 CONTROL PANELS/ Control Panel 902-47 Control Room Panels Turbine 517.5 AEER PNL 902-47 D02-0902-0061 CONTROL PANELS/ Control Panel 902-61 Control Room Panels Turbine 517.5 AEER PNL 902-61 D02-0902-0062 CONTROL PANELS/ Control Panel 902-62 Control Room Panels Turbine 549 B RM2 E/31 SHUTDOWN COOLING/ Shut Down Pumps Injection Shutdown Cooling Reactor 517 Drywell Line Valve Sud nClgRat 517_Drywel SHUTDOWN COOLING!/Shut Down Pumps Injection D02-1001-OO01BV20 Sine Valve Shutdown Cooling Reactor 517.5 Drywell Line Valve______

_ ____SHUTDOWN COOLING/ Shut Down Pumps Suction Shutdown Cooling Reactor 517.5 H-J/39-40 DO2-1001-0002AV20 Line Valve Suo CoiRet 51__H_394 D02-1001-0002BV20 SHUTDOWN COOLING Shut Down Pumps Suction Shutdown Cooling Reactor 517.5 H-J/39-40 Line Valve D02-1001-0002CV20 SHUTDOWN COOLING/ Shut Down Pumps Suction Shutdown Cooling Reactor 517.5 H-J/39-40 Line Valve Sud nClgRat 51.5_-_3-4 D02-1001-0005AV20 SHUTDOWN COOLING/ Injection Line Valve Shutdown Cooling Reactor 476.5 TORUS BAY J/38 D02-1001-0005BV20 SHUTDOWN COOLING/ Injection Line Valve Shutdown Cooling Reactor 476.5 K/38-39 REACTOR WATER CLEAN UP/ Pump Suction Bypass Reactor Water Cleanup Reactor 545.5 Drywell DO2-1201-OOO1AV20Oeco

4. rwl Line Valve System D02-1201-0001-V20 REACTOR WATER CLEAN UP/ Aux Pump Suction Line Reactor Water Cleanup Reactor 537 DRYWELL_Valve System I Table B-la Page 9 of 35 B-1I 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION REACTOR WATER CLEAN UP/ Pump Suction Bypass Reactor Water Cleanup Reactor 545.5 RWCU PIPWY J/42 D02-1202-O002-V20Reco
54. RWUPWYJ2 Line Valve System REACTOR WATER CLEAN UP/ Aux Pump Suction Line Reactor Water Cleanup D02-1202-OOO3-V20 V vSytmReactor 545.5 J-K/42-43___________ValIve System____

__ _____ _________Isolation Condenser D02-1301-0001-V20 ISOLATION CONDENSER/

Steam Line Isolation Valve Reactor 576.58 DRYWELL System Isolation Condenser D02-1301-0002-V20 ISOLATION CONDENSER/

Steam Line Isolation Valve Reactor 570 IC VLV RM L/40 System ISOLATION CONDENSER/

Steam Return Line Isolation Isolation Condenser DO2-1301-OOO3-V20 Vav ytmReactor 545.5 M!41 Valve System ISOLATION CONDENSER/

Steam Return Line Isolation Isolation Condenser Reactor 537 DRYWELL Valve System D02-1402-0003AV20 CORE SPRAY/ Pump Injection Line Valve Core Spray System Reactor 476.5 TORUS BSMT 1 D02-1402-0003BV20 CORE SPRAY/ Pump Injection Line Valve Core Spray System Reactor 476.5 TORUS BSMT 10 D02-1402-0004AV20 CORE SPRAY/ Pump Discharge Test Line Valve Core Spray System Reactor 476.5 L-M/39 D02-1402-0004BV20 CORE SPRAY/ Pump Discharge Test Line Valve Core Spray System Reactor 476.5 L-M/43 D02-1402-0024AV20 CORE SPRAY/ Pump Discharge Injection Line Valve Core Spray System Reactor 545.5 SHTC HX RM H/39 D02-1402-0024BV20 CORE SPRAY/ Pump Discharge Injection Line Valve Core Spray System Reactor 545.5 DRY GALL M/40 D02-1402-0025AV20 CORE SPRAY/ Pump Discharge Injection Line Valve Core Spray System Reactor 545.5 H-J/40-41 D02-1402-0025BV20 CORE SPRAY/ Pump Discharge Injection Line Valve Core Spray System Reactor 545.5 H-J/40-41 D02-1501-0003AV20 CCSW/ Heat Exchanger Outlet Service Water Line LPCI Reactor 476.5 SE C.RM M-N!38 Valve CCSW/ Heat Exchanger Outlet Service Water Line DO2-1501-OOO3BV20 VleLPCI Reactor 476.5 SW C.RM N!43 Valve D02-1501-OOO5AV20 LPCI/ Suppression Pool Suction Line "A" Valve LPCI Reactor 476.5 SE C.RM N/39 D02-1501-0005BV20 LPCI/ Suppression Pool Suction Line "B" Valve LPCI Reactor 476.5 SE C.RM N/39 D02-1501-OOO5CV20 LPCI/ Suppression Pool Suction Line "C" Valve LPCI Reactor 476.5 SW C.RM N/43 D02-1501-0005DV20 LPCI/ Suppression Pool Suction Line "D" Valve LPCI Reactor 476.5 SW C.RM N/43 D02-1501-0011AV20 LPCI/ LPCI Heat Exchanger Bypass Line Valve LPCI Reactor 476.5 SE C.RM M-N/38 D02-1501-0011BV20 LPCI/ LPCI Heat Exchanger Bypass Line Valve LPCI Reactor 476.5 SW C.RM M-N/43 D02-1501-0013AV20 LPCI/ LPCI Minimum Flow Bypass Line Valve LPCI Reactor 476.5 TORUS BAY 1 D02-1501-0013BV20 LPCI/ LPCI Minimum Flow Bypass Line Valve LPCI Reactor 476.5 TORUS BAY 11 D02-1501-0018AV20 LPCI/ Suppression Chamber Spray Line Valve LPCI Reactor 476.5 M/38-39 Table B-i a Page 10 of 35 B-1 2 12Qo108.30-R-eo1, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-1501-0018BV20 LPCI/ Suppression Chamber Spray Line Valve LPCI Reactor 476.5 M/43 D02-1501-0019AV20 LPCI/ Suppression Chamber Spray Line Valve LPCI Reactor 476.5 M/38-39 D02-1501-0019BV20 LPCI/ Suppression Chamber Spray Line Valve LPCI Reactor 476.5 M/43 D02-1501-0020AV20 LPCI/ Suppression Chamber Spray Line Valve LPCI Reactor 476.5 TORUS BAY 1 D02-1501-0020BV20 LPCI/ Suppression Chamber Spray Line Valve LPCI Reactor 476.5 TORUS BAY 11 D02-1501-0021AV20 LPCI/ LPCI Injection Line Valve LPCI Reactor 517.5 K/38-39 D02-1501-0021BV20 LPCI/ LPCI Injection Line Valve LPCI Reactor 517.5 K/44 D02-1501-0022AV20 LPCI/ LPCI Injection Line Valve LPCI Reactor 476.5 TORUS BAY 2 D02-1501-0022BV20 LPCI/ LPCI Injection Line Valve LPCI Reactor 476.5 TORUS BAY J/43 D02-1501-0027AV20 LPCI/ Drywell Spray Line Valve LPCI Reactor 517.5 L-M/40-41 D02-1501-0027BV20 LPCI/ Drywell Spray Line Valve LPCI Reactor 517.5 M/40-41 D02-1501-0028AV20 LPCI/ Drywell Spray Line Valve LPCI Reactor 517.5 L-M/40-41 D02-1501-0028BV20 LPCI/ Drywell Spray Line Valve LPCI Reactor 517.5 M/40-41 D02-1501-O03QBV15 LPCI/ Drywell Spray Line Drain Valve LPCI Reactor 517.5 M/40-41 D02-1501-0032AV20 LPCI/ LPCI Header Crosstie Line Valve LPCI Reactor 476.5 SE C.RM N/39 D02-1501-0032BV20 LPCI/ LPCI Header Crosstie Line Valve LPCI Reactor 476.5 SW C.RM N/43 D02-1501-0038AV20 LPCI/ Suppression Chamber Spray Line Valve LPCI Reactor 476.5 TORUS BAY 2 D02-1501-0038BV20 LPCI/ Suppression Chamber Spray Line Valve LPCI Reactor 476.5 TORUS BAY 10 D02-1501-0044AP30 CCSW/ CCSW Pump "A" LPCI Turbine 495 D/36 D02-1501-0044BP30 CCSW/ CCSW Pump "B" LPCI Turbine 495 VAULT RM D/38 D02-1501-0044CP30 CCSW/ CCSW Pump "C" LPCI Turbine 495 VAULT RM D/38 D02-1501-0044DP30 CCSW/ CCSW Pump "D" LPCI Turbine 495 D/39 D02-1501-0047A-PI LPCI/ LPCI Pump Suction Line "A" Pressure Indicator LPCI Reactor 476.5 SE C.RM N/39 D02-1501-0047B-PI LPCI/ LPCI Pump Suction Line "B" Pressure Indicator LPCI Reactor 476.5 SE C.RM N/39 D02-1501-0047C-PI LPCI/ LPCI Pump Suction Line "C" Pressure Indicator LPCI Reactor 476.5 SW C.RM N/43 D02-1501-0047D-PI LPCI/ LPCI Pump Suction Line "D" Pressure Indicator LPCI Reactor 476.5 SW C.RM N/43 D02-1501-0048A-PI LPCI/ LPCI Pump Discharge Line "A" Pressure LPCI Reactor 476.5 SE C.RM N/39 L _ _ _ _ _ Indicator I I I Table B-i a Page 11 of 35 B-1 3 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION LPCI/ LPCI Pump Discharge Line "B" Pressure D02-1501-0048B-PI In LPCI Reactor 476.5 SE C.RM N/39 Indicator LPCI/ LPCI Pump Discharge Line "C" Pressure D02-1501-0048C-PI In LPCI Reactor 476.5 SW C.RM N/43 Indicator D02-1501-0048D-PI LPCI/ LPCI Pump Discharge Line "D" Pressure LPCI Reactor 476.5 SW C.RM N/43 Indicator D02-1501-0051A-PS LPCI/ LPCI Header Pressure Switch High LPCI Reactor 476.5 M-N/38-39 D02-1501-OO51B-PS LPCI/ LPCI Header Pressure Switch High LPCI Reactor 476.5 N/44 D02-1501-O053AFSL LPCI/ LPCI Injection Line Flow Switch Low LPCI Reactor 476.5 K/38-39 D02-1501-0053BFSL LPCI/ LPCI Injection Line Flow Switch Low LPCI Reactor 476.5 K/44 D02-1501-0058A-FT LPCI/ LPCI Header Flow Transmitter LPCI Reactor 476.5 M-N/38-39 D02-1501-0058B-FT LPCI/ LPCI Header Flow Transmitter LPCI Reactor 476.5 N/44 D02-1501-0059A1PT CCSW/ CCSW Pump "A" Discharge Pressure LPCI Turbine 495 D/49 Transmitter D02-1501-0059A-PI CCSW/ CCSW Pump "A" Discharge Pressure Indicator LPCI Turbine 495 D/49 D02-1501-OOS9B31PT CCSW/ CCSW Pump "B" Discharge Pressure LPCI Turbine 495 D/50 Transmitter D02-1501-0059B-PI CCSW/ CCSW Pump "B" Discharge Pressure Indicator LPCI Turbine 495 D/50 DO2-1501-OO59C1IPT CCSW/ CCSW Pump "C" Discharge Pressure LPCI Turbine 495 D/50-51 Transmitter D02-1501-0059C-PI CCSW/ CCSW Pump "C" Discharge Pressure Indicator LPCI Turbine 495 D/50-51 CCSW/ CCSW Pump "D" Discharge Pressure D02-1501-O059D1PT LPCI Turbine 495 D/51-52 Transmitter D02-1501-0059D-PI CCSW/ CCSW Pump "D" Discharge Pressure Indicator LPCI Turbine 495 D/51-52 D02-1501-0092AFIS LPCI/ LPCI Header Flow Indicating Switch LPCI Reactor 476.5 M-N/38-39 D02-1501-0092BFIS LPCI/ LPCI Header Flow Indicating Switch LPCI Reactor 476.5 N/44 D02-1501-090A-PDS LPCI/ Heat Exchanger Differential Pressure Switch LPCI Reactor 476.5 SE C.RM M-N/38 D02-1501-090B-PDS LPCI/ Heat Exchanger Differential Pressure Switch LPCI Reactor 476.5 SW C.RM M-N/43 D02-1501-LDSH LPCI/ Lower Drywell Spray Header LPCI Reactor 515.5 DRYWELL Table B-la Page 12 of 35 B-14 12Qo108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-1501-SCSH LPCI/ Sippression Chamber Spray Header LPCI Reactor 476.5 INSIDE TORUS D02-1501-UDSH LPCI/ Upper Drywell Spray Header LPCI Reactor 537 DRYWELL D02-1502-A


P30 LPCI/ LPCI Injection Pump "A" LPCI Reactor 476.5 SE C.RM N/39 D02-1502-B


P30 LPCI/ LPCI Injection Pump "B" LPCI Reactor 476.5 SE C.RM N/39 D02-1502-C


P30 LPCI/ LPCI Injection Pump "C" LPCI Reactor 476.5 SW C.RM N/43 D02-1502-D


P30 LPCI/ LPCI Injection Pump "D" LPCI Reactor 476.5 SW C.RM N/43 D02-1503-A


H15 LPCI/ LPCI Heat Exchanger LPCI Reactor 476.5 SE C.RM M-N/38 D02-1503-B


H15 LPCI/ LPCI Heat Exchanger LPCI Reactor 476.5 SW C.RM M-N/43 D02-1540-OOO5--TR LPCI/ LPCI Heat Exchanger Temperature Recorder LPCI Reactor 476.5 SE-C.RM M-N/38 D02-1540-OOO6A-ZC LPCI/ Heat Exchanger Differential Pressure LPCI Reactor 476.5 SE C.RM M-N/38 Modulator D02-1540-0006B-ZC LPCI/ Heat Exchanger Differential Pressure LPCI Reactor 476.5 SW C.RM M-N/43 Modulator D02-1540-0007--FR LPCI/ LPCI Header Flow Recorder LPCI Reactor 476.5 M-N/38-39 D02-1540-003ADPIC LPCI/ Heat Exchanger Differential Pressure LPCI Reactor 476.5 SE C.RM M-N/38 Controller LPCI/ Heat Exchanger Differential Pressure D02-1540-OO3BDPIC LLPCI Reactor 476.5 SW C.RM M-N/43 Controller D02-1541 ----- A-FE CCSW/ CCSW Pump "A" and "B" Discharge Flow LPCI Reactor 476.5 M-N/38-39 Element CCSW/ CCSW Pump "C" and "D" Discharge Flow D02-1541 ----- B-FE Element LPCI Reactor 476.5 M-N/43-44 D02-1543-A


PDT LPCI/ Heat Exchanger Differential Pressure LPCI Reactor 476.5 SE C.RM M-N/38 Transmitter D02-1543-B


PDT LPCI/ Heat Exchanger Differential Pressure LPCI Reactor 476.5 SW C.RM M-N/43 Transmitter D02-1545 ----- A-TE CCSW/ CCSW Heat Exchanger Outlet Temperature LPCI Reactor 476.5 SE C.RM M-N/38 Element D02-1545 ----- B-TE CCSW/ CCSW Heat Exchanger Outlet Temperature LPCI Reactor 476.5 SW C.RM N/43 Element D02-1546-Al1----

TE LPCI/ LPCI Heat Exchanger Line Temperature LPCI Reactor 476.5 SE C.RM M-N/38 Element Table B-i a Page 13 of 35 B-1 5 12QO108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-1546-A


TE LPCI/ LPCI Heat Exchanger Line Temperature LPCI Reactor 476.5 SE C.M M-N/38 Element D02-1546-Bl1----

TE LPCI/ LPCI Heat Exchanger Line Temperature LPCI Reactor 476.5 SW C.RM M-N/43________________

Element_____________

_____ _________D02-1546-B-

.... TE LPCI/ LPCI Heat Exchanger Line Temperature LPCI Reactor 476.5 SW C.RM M-N/43 Element D02-1547-Al1----

TE LPCI/ Heat Exchanger Outlet Line Temperature LPCI Reactor 476.5 SE C.M M-N/38 D02-1547A-B TE LPCI/ Heat Exchanger Outlet Line Temperature LPCI Reactor 476.5 SE C.RM M-N/38 Element D02-1547-Bl1----

TE LPCI/ Heat Exchanger Outlet Line Temperature LPCI Reactor 476.5 SW C.M M-N/43 Element LPCI/ Heat Exchanger Outlet Line Temperature D02-1547-B


TE LPCI Reactor 476.5 SW C.RM M-N/43___ ___ __ ___ ___ __ Element__

_ _ _ _ _ _ _ _ _ _ ______ _ _____ _ _ _ _ _ _ _ _ _D02-1548-A


FE LPCI/ LPCI Header Flow Element LPCI Reactor 476.5 M-N/38-39 D02-1548-B F .... FE LPCI/ LPCI Header Flow Element LPCI Reactor 476.5 N/44 D02-1549-A


FT LPCI/ LPCI Header Flow Transmitter LPCI Reactor 476.5 M-N/38-39 D02-1549-B-FT LPCI/ LPCI Header Flow Transmitter LPCI Reactor 476.5 N/44 D02-1550-A


FE LPCI/ LPCI Injection Line Flow Element LPCI Reactor 476.5 K/38-39 D02-1550-B


FE LPCI/ LPCI Injection Line Flow Element LPCI Reactor 476.5 K/44 D02-1552-Al


T CCSW/ CCSW Heat Exchanger Inlet Temperature LPCI Reactor 476.5 SE CRM M-N/38 DO2-1550-A1.....

FE LPCI/Element jectininFlowElemetPIReator 46.5 K38-3 CCSW/ CCSW Heat Exchanger Inlet Temperature D02-1552-A-

.... TE Element LPCI Reactor 476.5 SE C.RM M-N/38 Element D02-1552-B


TE CCSW/ CCSW Heat Exchanger Inlet Temperature LPCI Reactor 476.5 SW CRM M-N/43 D02-1554-A-PS LPCI/ LPCI Pump Discharge Line "A" Pressure Switch LPCI Reactor 476.5 SE C.RM M/39 D02-1554-B-PS LPCI/ LPCI Pump Discharge Line "B" Pressure Switch LPCI Reactor 476.5 SE C.RM M/39 Table B-la Page 14 of 35 B-1 6 12QO108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-1554-C


PS LPCI/ LPCI Pump Discharge Line "C" Pressure Switch LPCI Reactor 476.5 SW C.RM N/43 D02-1554-D


PS LPCI/ LPCI Pump Discharge Line "D" Pressure Switch LPCI Reactor 476.5 SW C.RM N/43 D02-1554-E


PS LPCI/ LPCI Pump Discharge Line "A" Pressure Switch LPCI Reactor 476.5 SE C.RM M/39 D02-1554-F


PS LPCI/ LPCI Pump Discharge Line "B" Pressure Switch LPCI Reactor 476.5 SE C.RM M/39 D02-1554-H


PS LPCI/ LPCI Pump Discharge Line "C" Pressure Switch LPCI Reactor 476.5 SW C.RM N/43 D02-1554-J


PS LPCI/ LPCI Pump Discharge Line "D" Pressure Switch LPCI Reactor 476.5 SW C.RM N/43 LPCI/ Heat Exchanger Differential Pressure D02-1555-A


FY LPCI Reactor 476.5 SE C.RM M-N/38 Converter D02-1555-B


FY LPCI/ Heat Exchanger Differential Pressure LPCI Reactor 476.5 SW C.RM M-N/43 Converter D02-1556 ----- A-FT CCSW/ CCSW Pump "A" and "B" Discharge Flow LPCI Reactor 476.5 M-N/38-39 Transmitter D02-1556-...B-FT CCSW/ CCSW Pump "C" and "D" Discharge Flow LPCI Reactor 476.5 M-N/43-44 Transmitter

______CCSW/ CCSW Pump "C" and "D" Discharge Flow D02-1556 ----- C-FT TasitrLPCI Reactor 476.5 M-N/38-39 D02-1556----C-FT CCSW/ CCSW Pump "A" and "B" Discharge Flow -PIReactor 476.5 M-N/38-39 Transmitter CCSW/ CCSW Pump "C" and "D" Discharge Flow D02-1556 ----- D-FT TasitrLPCI Reactor 476.5 M-N/43-44 Transmitter


_ _ _ _____ _HeePsrwcL__at46___

D02-1557-A


PSL LPCI/ LPCI Header Pressure Switch Low LPCI Reactor 476.5 M-N/38-39 DO2-1557-B-....PSL LPCI/ LPCI Header Pressure Switch Low ILPCI Reactor 476.5 N/44 D02-1558 ----- A-FY CCSW/ CCSW Pump "A" and "B" Discharge Flow LPCI Reactor 476.5 M-N/38-39 Converter D02-1558 ----- B-FY CCSW/CCSW Pump "C" and "D" Discharge Flow.. LPCI Reactor 476.5 M-N/43-44 Converter D02-1558 ----- C-FY CCSW/ CCSW Pump "A" and "B" Discharge Flow LPCI Reactor 476.5 M-N/38-39 Converter I I Table B-la Page 15 of 35 B-17 12QO108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-1558---D-FY CCSW/ CCSW Pump "C" and "D" Discharge Flow D02-1558__....._D-FY CnetrLPCI Reactor 476.5 M-N/43-44 Converter D02-1559-A B---- FY LPCI/ LPCI Injection Line Flow Converter LPCI Reactor 476.5 K/38-39 D02-1559-B C---- FY LPCI/ LPCI Injection Line Flow Converter LPCI Reactor 476.5 K/44 D02-1559-C D---- FY LPCI/ LPCI Injection Line Flow Converter LPCI Reactor 476.5 K/38-39 D02-1559-D


FY LPCI/ LPCI Injection Line Flow Converter LPCI Reactor 476.5 K/44 D02-1560 ----- A-Fl CCSW/ CCSW Pump "A" and "B" Discharge Flow LPCI Reactor 476.5 M-N/38-39 Indicator CCSW/ CCSW Pump "C" and "D" Discharge Flow D02-1560-...B-Fl LPCI Reactor 476.5 M-N/43-44 Indicator D02-1561-A


FI LPCI/ LPCI Injection Line Flow Indicator LPCI Reactor 476.5 K/38-39 D02-1561-B


FI LPCI/ LPCI Injection Line Flow Indicator LPCI Reactor 476.5 K/44 D02-1562-A


FT LPCI/ LPCI Injection Line Flow Transmitter LPCI Reactor 476.5 K/38-39 D02-1562-B


FT LPCI/ LPCI Injection Line Flow Transmitter LPCI Reactor 476.5 K/44 D02-1562-C


FT LPCI/ LPCI Injection Line Flow Transmitter LPCI Reactor 476.5 K/38-39 D02-1562-D


FT LPCI/ LPCI Injection Line Flow Transmitter LPCI Reactor 476.5 K/44 D02-1599-0013AV26 LPCI/ Suppression Pool Suction Line "A" Relief Valve LPCI Reactor 476.5 SE C.RM N/39 D02-1599-0013BV26 LPCI/ Suppression Pool Suction Line "B" Relief Valve LPCI Reactor 476.5 SE C.RM N/39 D02-1599-0013CV26 LPCI/ Suppression Pool Suction Line "C" Relief Valve LPCI Reactor 476.5 SW C.RM N/43 D02-1599-0013DV26 LPCI/ Suppression Pool Suction Line "D" Relief Valve LPCI Reactor 476.5 SW C.RM N/43 D02-1601-0021-V05 PRESSURE SUPPRESSION/

Drywell Purge Line Valve Drywell Containment Reactor 476.5 TORUS BAY 8 D02-1601-0021-V27 PRESSURE SUPPRESSION!

Drywell Purge Line Drywell Containment Reactor 476.5 TORUS BAY 8 Solenoid Valve PRESSURE SUPPRESSION/

Drywell/Torus Purge Line Drywell Containment Reactor 476.5 TORUS BAY 8 D02-101-002-V05 Valve _____ ________D02-1601-0022-V27 PRESSURE SUPPRESSION!

Drywell/Torus Purge Drywell Containment Reactor 476.5 TORUS BAY 8 Solen. Valve Table B-i a Page 16 of 35 B-1 8 12QO108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-1601-0023-V05 PRESSURE SUPPRESSION/

Drywell Ventiliation Line Drywell Containment Reactor 570 FPC RM L/40-41 Valve D02-1601-0023-V27 PRESSURE SUPPRESSION!

Drywell Vent. Solenoid Drywell Containment Reactor 570 FPC RM L/40-41 Valve D02-1601-0024-VOS PRESSURE SUPPRESSION!

Drywell and Torus Vent Drywell Containment Reactor 570 J-K/42 Valve D02-1601-0024-V27 PRESSURE SUPPRESSION/

Drywell/Torus Solenoid Drywell Containment Reactor 570 i-K!42 Valve DrywellContainment Reactor 570__ -K/42 PRESSURE SUPPRESSION/

Drywell Purge Inerting D02-1601-0055-V05 PRe S S D Pg t Drywell Containment Reactor 476.5 TORUS BAY 8 Line Valve _UPEOryelrenr._ln D02-1601-0055-V27 PRESSURE SUPPRESSION!

Drywell Purge Inert. Solen. Drywell Containment Reactor 476.5 TORUS BAY 8 Valve D02-1601-0056-VOS PRESSURE SUPPRESSION!

Torus Purge and Inert Line Drywell Containment Reactor 476.5 TORUS BAY 10 Valve D02-1601-0056-V27 PRESSURE SUPPRESSION/

Torus Purge/Inert Drywell Containment Reactor 476.5 TORUS BAY 10 Solenoid Valve DyeCoan t Rco 47.5 TRUA__D02-1601-0057-V20 PRESSURE SUPPRESSION!

Drywell!Torus Nitr. Drywell Containment Reactor 476.5 TORUS BAY 9 Makeup Valve D02-1601-0058-VOS PRESSURE SUPPRESSION/

Torus Nitrogen Makeup Line Valve8-VO5Drywell Containment Reactor 476.5 TORUS BAY 10 Line Valve D02-1601-0058-V27 PRESSURE SUPPRESSION!

Torus Nitrogen Make. Drywell Containment Reactor 476.5 TORUS BAY 10 Solen. Valve D02-1601-0059-VOS PRESSURE SUPPRESSION!

Drywell Nitr. Makeup Line Drywell Containment Reactor 476.5 TORUS BAY 9 Valve D02-1601-0059-V27 PRESSURE SUPPRESSION!

Drywell Nitr. Makeup Drywell Containment Reactor 476.5 TORUS BAY 9 Solen. Valve D2-1601-60-V PRESSURE SUPPRESSION Torus Ventilation Line Drywell Containment Reactor 476.5 TORUS BAY 2 Valve D02-1601-0060-V27 PRESSURE SUPPRESSION/

Torus Vent. Solenoid Valve Drywell Containment Reactor 476.5 TORUS BAY 2 PRESSURE SUPPRESSION/

Torus Ventilation Line D02-1601-0061-VOS Drywell Containment Reactor 476.5 TORUS BAY 2 Valve I I I I Table B-la Page 17 of 35 B-1 9 1200108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-1601-0061-V27 PRESSURE SUPPRESSION/

Torus Vent. Solenoid Valve Drywell Containment Reactor 476.5 TORUS BAY 2 D2-1601-62-V5 PRESSURE SUPPRESSION Drywell Ventilation Line DrywellContainment Reactor 570 FPC RM L/40-41 Valve D02-1601-0062-V27 PRESSURE SUPPRESSION/

Drywell Vent. Solenoid Drywell Containment Reactor 570 FPC RM L/40-41 Valve D02-1601-0063-V05 PRESSURE SUPPRESSION!

Containment to SBGT Line Drywell Containment Reactor 570 RWCU DEMIN J/42 Valve D2-1601-63-V27 PRESSURE SUPPRESSION Containment to SBGT Drywell Containment, Reactor 570 RWCU DEMIN J/42 Solen. Valve RB EQUIPMENT DRAIN/ Drywell Equipment Drain Radwaste ! Spent Fuel DO2-2001-OOO5-V05 Reactor 476.5 TORUS BAY 4 Line Valve Pool RB EQUIPMENT DRAIN/ Drywell Equipment Solenoid Radwaste ! Spent Fuel DO2-2001-OOO5-V27 Reactor 476.5 TORUS BAY 4 Valve Pool RB EQUIPMENT DRAIN/ Drywell Equipment Drain Radwaste / Spent Fuel Reactor 476.5 TORUSBAY4 DO2-2001-OOO6-V05Reco 475 TOUBA4 Line Valve Pool RB EQUIPMENT DRAIN/ Drywell Equipment Solenoid Radwaste / Spent Fuel Reactor 476.5 TORUSBAY4 Valve Pool RB EQUIPMENT DRAIN/ Drywell Floor Drain Line Radwaste / Spent Fuel DO2-2001-OlO5-V05 Reactor 476.5 TORUS BAY 14 Valve Pool RB EQUIPMENT DRAIN/ Drywell Floor Drain Solenoid Radwaste / Spent Fuel DO2-2001-O1O5-V27 Reactor 476.5 TORUS BAY 14 Valve Pool RB EQUIPMENT DRAIN/ Drywell Floor Drain Line Radwaste / Spent Fuel DO2-2001-O1O6-V05 Reactor 476.5 TORUS BAY 14 Valve Pool RB EQUIPMENT DRAIN/ Drywell Floor Drain Solenoid Radwaste / Spent Fuel DO2-2001-O1O6-V27 Reactor 476.5 TORUS BAY 14 Valve Pool Local Panels & Racks D02-2202-0005 INSTRUMENT RACKS/ Instrument Rack 2202-5 (Radwas Reactor 545.5 E/39 (Radwaste)

Local Panels & Racks D02-2202-0006 INSTRUMENT RACKS/ Instrument Rack 2202-6 (Radwaste)

Reactor 545.5 M/41 Local Panels & Racks D02-2202-0007 INSTRUMENT RACKS/ Instrument Rack 2202-7 (Radwas Reactor 517.5 K/39 I(Radwaste)IIII Table B-la Page 18 of 35 B-20 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-2202-0008 INSTRUMENT RACKS/ Instrument Rack 2202-8 Local Panels & Racks Reactor 517.5 K/43 (Radwaste)

Local Panels & Racks D02-2202-0029 INSTRUMENT RACKS/ Instrument Rack 2202-29 Reactor 476.5 HP RM2 N/45-46 (Radwaste)

Local Panels & Racks D02-2202-0036 INSTRUMENT RACKS/ Instrument Rack 2202-36 Loadwantes Reactor 476.5 SW C.RM M/43 (Radwaste)

D02-2202-0070A INSTRUMENT RACKS/ Instrument Rack 2202-70A Local Panels & Racks Turbine 517.5 AEER 2202-70A (Radwaste)

Local Panels & Racks D02-2202-0070B INSTRUMENT RACKS/ Instrument Rack 2202-70B Loalwas Turbine 517.5 AEER 2202-70B____________________ (Radwaste)_

_ _ _ _ _ _ _ _Local Panels & Racks D02-2202-0073A INSTRUMENT RACKS/ Instrument Rack 2202-73A Reactor Turbine 538 H/35 (Radwaste)

D02-2202-0017 INSTRUMENT RACKS/ Instrument Rack 2202-7B Local Panels & Racks Turbine 517.5 DH3 5MP G-!3 (Radwaste)

D02-2252-0021 CONTROL PANEL! DG MexitateriongandRe Cabinet Local Panels & Racks Turbine 517.5 DG RM2 G-H!35 (Radwaste)

D02-2252-00210 CONTROL PANEL/ DG MExctteiongn ea Cabinet Local Panels & Racks Turbine 517.5 DG RM2 G-H/35 D02-2252-0033 Swing Relay Meter .ing Cabinet Local Panels & Racks N!A (Radwaste)

Local Panels & Racks D02-2252-0083 INSTRUMENT RACKS/ Instrument Rack 2252-83 (Radwaste)

Reactor 545.5 N!39 (Radwaste)

Local Panels & Racks D02-2252-0084 INSTRUMENT RACKS/ Instrument Rack 2252-84 Local Panels & Racks Reactor 545.5 N/42 (Radwaste)

D02-2300-LLAS-1 Gland Seal Condenser Hotwell Level Alarm Switch HPCI Reactor 476.5 D02-2300-LLAS-2 Gland Seal Condenser Hotwell Level Alarm Switch HPCI Reactor .476.5 D02-2301-0003-V20 H PCI/ Turbine Steam Line Valve HPCI Reactor 476.5 HP RM2 N/45 D02-2301-0004-V20 HPCI/ Turbine Steam Line Valve HPCI Reactor 576.58 DRYWELL D02-2301-0005-V20 HPCI/ Turbine Steam Line Valve HPCI Reactor 476.5 TORUS BAY 2 D02-2301-0006-V20 HPCI/ Condensate Tank Supply to HPCI Pump Valve HPCI Reactor 476.5 HP RM2 N/44 Table B-la Page 19 of 35 B-21 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-2301-0008-V20 HPCI/ HPCI Pump Injection Line Valve HPCI Turbine 517.5 X AREA G-H/41 D02-2301-0009-V20 HPCI/ HPCI Pump Injection Line Valve HPCI Reactor 476.5 HP RM2 N/44 D02-2301-O01O-V20 HPCI/ Condensate Storage Tank Return Line Valve HPCI Reactor 476.5 HP RM2 N/44 D02-2301-0014-V20 HPCI/ HPCI Pump Test Line Valve HPCI Reactor 476.5 HP RM2 N/44 D02-2301-0035-V20 HPCI/ Suppression Pool Suction Line Valve HPCI Reactor 476.5 HP RM2 N/44 D02-2301-0036-V20 HPCI/ Suppression Pool Suction Line Valve HPCI Reactor 476.5 SW C.RM N/43-44 D02-2301-0048-V20 HPCI/ HPCI Pump Condensate Return Line Valve HPCI Reactor 476.5 HP RM2 N/44-45 D02-2301-0049-V20 HPCI/ HPCI Pump Condensate Return Line Valve HPCI Reactor 476.5 HP RM2 N/44-45 D02-2301-0057-P30 HPCI/ HPCI Turbine Cooling Water Pump HPCI Reactor 476.5 HP RM2 N/44 D02-2301-CONDPP HPCI/ Condenser Hotwell Condensate Pump HPCI Reactor 476.5 HP RM2 N/45 D02-2301-PS4---PS HPCI/ Emergency Bearing Oil Pump Pressure Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2301 ------ T20 HPCI/ HPCI Turbine HPCI Reactor 476.5 HP RM2 N/45 D02-2302 ------ P30 HPCI/ HPCI Pump HPCI Reactor 476.5 HP RM2 N/45 D02-2320-GSCE-F05 HPCI/ Gland Seal Condenser Exhaust Fan HPCI Reactor 476.5 HP RM2 N/45-46 D02-2320-GSC--H15 HPCI/ Gland Seal Condenser HPCI Reactor 476.5 HP RM2 N/45-46 D02-2320-GSEF-F05 HPCI/ Gland Seal Condenser Exhaust Fan HPCI Reactor 476.5 HP RM2 N/45-46 D02-2340-0001-FIC HPCI/ HPCI Pump Discharge Line Flow Controller HPCI Reactor 476.5 HP RM2 N/44 D02-2340-0002--PI HPCI/ HPCI Pump Discharge Line Pressure Indicator HPCI Reactor 476.5 HP RM2 N/44 D02-2340-0004--PI HPCI/ Turbine Inlet Line Pressure Indicator HPCI Reactor 476.5 HP RM2 N/45 D02-2340-0005--PI HPCI/ Turbine Exhaust Line Pressure Indicator HPCI Reactor 476.5 TORUS BAY M/41 D02-2340-0007--PI HPCI/ HPCI Pump Suction Line Pressure Indicator HPCI Reactor 476.5 HP RM2 N/45 D02-2341-0003--TE HPCI/ Pump Injection Line Local Temperature HPCI Reactor 476.5 HP RM2 N/44 Element D02-2351-A


LS HPCI/ Torus Water Level Switch HPCI Reactor 476.5 SW C.RM M/43 D02-2351-B


LS HPCI/ Torus Water Level Switch HPCI Reactor 476.5 SW C.RM M/43 D02-2354 ------- FS HPCI/ HPCI Pump Discharge Line Flow Switch HPCI Reactor 476.5 HP RM2 N/44 D02-2356 ------- FE HPCI/ HPCI Pump Discharge Line Local Flow Element HPCI Reactor 476.5 HP RM2 N/44 D02-2357 ------- PI HPCI/ HPCI Pump Discharge Line Local Pressure HPCI Reactor 476.5 HP RM2 N/44 Indicator D02-2358 ------- FT HPCI/ HPCI Pump Discharge Line Flow Transmitter HPCI Reactor 476.5 HP RM2 N/44 Table B-i a Page 20 of 35 B-22 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-2359 ------- PT HPCI/ HPCI Pump Discharge Line Pressure HPCI Reactor 476.5 HP RM2 N/44 Transmitter D02-2360 ------- PS HPCI/ HPCI Pump Suction Line Pressure Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2363 ------- PI HPCI/ Turbine Inlet Line Pressure Indicator HPCI Reactor 476.5 HP RM2 N/45 D02-2364 ------- PT HPCI/ Turbine Inlet Line Pressure Transmitter HPCI Reactor 476.5 HP RM2 N/45 D02-2365 ------ LSH HPCI/ Turbine Steam Drain Line Level Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2366 ------- PT H PCI/ Turbine Exhaust Line Pressure Transmitter HPCI Reactor 476.5 TORUS BAY M/41 D02-2367 ------- PI HPCI/ Turbine Exhaust Line Local Pressure Indicator HPCI Reactor 476.5 TORUS BAY M/41 D02-2368-A


PS HPCI/ Turbine Exhaust Line Pressure Switch HPCI Reactor 476.5 TORUS BAY M/41 D02-2368-B


PS HPCI/ Turbine Exhaust Line Pressure Switch HPCI Reactor 476.5 TORUS BAY M/41 D02-2369 ------ LSH HPCI/ Turbine Exhaust Drain Line Level Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2370-A


TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2370-B


TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2370-C


TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2370-D


TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2371-A -TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2371-B


TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2371-C


TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2371-D


TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2372-A


TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2372-B


TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2372-C


TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2372-D


TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2373-A


TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2373-B


TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2373-C


TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2373-D


TS HPCI/ Steam Leak Detection Temperature Switch HPCI Reactor 476.5 HP RM2 N/45 D02-2380 ------ PSH HPCI/ HPCI Turbine Pressure Switch HPCI Reactor 476.5 HP RM2 N/44 D02-2381 ------- PI HPCI/ HPCI Pump Suction Line Pressure Indicator HPCl Reactor 476.5 HP RM2 N/45 D02-2382 ------- PT HPCI/ HPCI Pump Suction Line Pressure Transmitter HPCI Reactor 476.5 HP RM2 N/45 Table B-la Page 21 of 35 B-23 12Q0108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-2387 ------- TI HPCI/ Pump Discharge Line Local Temperature HPCI Reactor 476.5 HP RM2 N/44 Indicator D02-2399-79 HPCI Gland Seal Flow Regulating Valve HPCI Reactor 476.5 D02-3701-A


P30 RBCCW/ Cooling Water Pump Rx Bldg Closed Cooling Reactor 545.5 M/39-40 Water D02-3701-B


P30 RBCCW/ Cooling Water Pump Rx Bldg Closed Cooling Reactor 545.5 M/39-40 Water D02-3702-A


H15 RBCCW/ Cooling Water Heat Exchanger Rx Bldg Closed Cooling Reactor 545.5 M-N/38-39 Water D02-3702-B


H15 RBCCW/ Cooling Water Heat Exchanger Rx Bldg Closed Cooling Reactor 545.5 M-N/38-39 Water D02-3702 ------ V20 RBCCW/ Drywell Coolers Inlet Header Line Valve Rx Bldg Closed Cooling Reactor 545.5 L-M/40 Water D02-3703 ------ V20 RBCCW/ Drywell Coolers Outlet Header Line Valve Rx Bldg Closed Cooling Reactor 545.5 L/39 Water D02-3704 ------ V20 RBCCW/ Tie to Shutdown Heat Exchangers Line Rx Bldg Closed Cooling Reactor 545.5 J/39 Valve Water D02-3706 ------ V20 RBCCW/ Drywell Coolers Outlet Header Line Valve Rx Bldg Closed Cooling Reactor 545.5 Drywell Water D02-3901-A


P30 SERVICE WATER/ Service Water Cooling Pump Service Water System C. House 490.67 B-C/1-2 D02-3901-B


P30 SERVICE WATER/ Service Water Cooling Pump Service Water System C. House 490.67 B-C/2-3 D02-3902 ------ $22 SERVICE WATER/ Cooling Pump Strainer Service Water System C. House 490.67 A-B/3-4 SERVICE WATER! Diesel Generator Cooling Water D02-3903 ------ P30 Service Water System C. House 490.67 A-B/4 Pump SERVICE WATER!/DG Cooling Pump Discharge Flow DO2-3941-0898--FE E Service Water System Turbine 495 D/38-39 Element DIESEL GENERATOR/

Primary Gas Air Receiver Unit D02-4600-B


T05 1A2" Service Air System Turbine 528.25 DG RM2 G-H/35 DIESEL GENERATOR/

Primary Gas Air Receiver Unit 8.2S DG RM2 G-H!35 D02-4600-G

--- T05 DIESEL G Service Air System Turbine 528.25 DG RM2 G-H/35 Table B-i a Page 22 of 35 B-24 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-4600-H----TO5 DIESEL GENERATOR/

Primary Gas Air Receiver Unit Service Air System Turbine 528.25 DG RM2 G-H/35"B2" D02-4720 ------ V05 INSTRUMENT AIR/ Drywell Pneumatic Supply Valve Instrument Air System Reactor 517.5 DRY GALL J/43 D02-4720 ------ V27 INSTRUMENT AIR! Drywell Pneumatic Supply Instrument Air System Reactor 517.5 DRY GALL J/43 Solenoid Valve D02-4721 ------ V05 INSTRUMENT AIR/ Drywell Pneumatic Supply Valve Instrument Air System Reactor 517.5 DRY GALL J/43 D02-4721 ------ V27 INSTRUMENT AIR! Drywell Pneumatic Supply Instrument Air System Reactor 517.5 DRY GALL J/43 Solenoid Valve D2-4741-11-V27 INSTRUMENT AIR Drywell Pneumatic Supply Instrument Air System Reactor 517.5 DRY GALL J/43 Solenoid Valve INSTRUMENT AIR/ Drywell Pneumatic Supply D02-4741-0022-V27 Solenoid Valve Instrument Air System Reactor 517.5 DRY GALL J/43 D02-4798-A


A1O INSTRUMENT AIR/ Target Rock Accumulator Instrument Air System Reactor 537 DRYWELL D02-5201 ------ TO5 DIESEL GENERATOR/

Diesel Fuel Oil Storage Tank Diesel Oil System N/A 517.5 N/A D02-5202-T05 DIESEL GENERATOR!

Diesel Fuel Oil Storage Day Diesel Oil System Turbine 528.25 DG RM2 G-H!35 Tank D02-5203 ------ P30 DIESEL GENERATOR/

Fuel Oil Transfer Pump Diesel Oil System Turbine 517.5 DG RM2 G-H/35 D02-5700-0030AH15 CCSW/ CCSW Pump Cooler "A" Heating Boilers & Turbine 495 VAULT RM D/38 Ventilation System D02-5700-OO3OBH15 CCSW/ CCSW Pump Cooler "B" Heating Boilers & Turbine 495 VAULT RM D/38 Ventilation System D02-5700-0030CH15 CCSW/ CCSW Pump Cooler "C" Heating Boilers & Turbine 495 VAULT RM D/38 Ventilation System D02-5700-OO3ODH15 CCSW/ CCSW Pump Cooler "D" HeatingTurbine 495 VAULT RM D/38 Ventilation System Heating Boilers &D02-5734-A


F05 DRYWELL COOLING HVAC/ Drywell Cooler Blower Reactor 502.33 DRYWELL Ventilation System Heating Boilers &D02-5734-A


H15 DRYWELL COOLING HVAC/ Drywell Cooler Veatin SystemReactor 502.33 DRYWELL Ventilation System Heating Boilers &D02-5734-B


F05 DRYWELL COOLING HVAC/ Drywell Cooler Blower Veatin SystemReactor 502.33 DRYWELL Ventilation System Table B-i a Page 23 of 35 B-25 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION Heating Boilers &D02-5734-B


H15 DRYWELL COOLING HVAC/ Drywell Cooler Ventilatin SystemReactor 502.33 DRYWELL Ventilation System Heating Boilers &D02-5734-C


F05 DRYWELL COOLING HVAC/ Drywell Cooler Blower Ventilation System Reactor 502.33 DRYWELL Ventilation System D02-5734-C


H15 DRYWELL COOLING HVAC/Drywell Cooler Heating Boilers & Reactor 502.33 DRYWELL Ventilation System Heating Boilers &D02-5734-D


F05 DRYWELL COOLING HVAC/ Drywell Cooler Blower Reactor 502.33 DRYWELL Ventilation System Heating Boilers &Ventilation System:Heating Boilers &D02-5734-E


F05 DRYWELL COOLING HVAC/ Drywell Cooler Blower Reactor 502.33 DRYWELL Ventilation System Heating Boilers &D02-5734-E


H15 DRYWELL COOLING HVAC/ Drywell Cooler Ventilation System Reactor 502.33 DRYWELL Heating Boilers &D02-5734-F


F05 DRYWELL COOLING HVAC/ Drywell Cooler Blower Reactor 515.42 DRYWELL Ventilation System D02-5734-F


H15 DRYWELL COOLING HVAC/ Drywell Cooler Heating Boilers & Reactor 515.42 DRYWELL Ventilation System Heating Boilers &D02-5734-G


F05 DRYWELL COOLING HVAC/ Drywell Cooler Blower Veatin Syst Reactor 515.42 DRYWELL Ventilation System Heating Boilers &D02-5734-G


H15 DRYWELL COOLING HVAC/ Drywell Cooler Ventilation System Reactor 515.42 DRYWELL D02-5747 ------ H15 LPCI/ LPCI Emergency Ro Air Cooler Heating Boilers & Reactor 476.5 SE CRM2 N/45 Ventilation System Heating Boilers &DO2-5746-AB....H15 LPCI/ LPCI Emergency Room Air Cooler Vetlto ytmReactor 476.5 SW C.RM M/38 Ventilation System Heating Boilers &D02-5746-B

..Hi5 HPCI/ HPCI Emergency RomAir Cooler Vetlto ytmReactor 476.5 HP CRM2 N/45 Heating Boilers &D02-772-100-05 IESE GENRATR! Vntilatio Fa Inlt DaperVentilation System Trie 58 GH3 D02-5772-0101-D05 DIESEL GENERATOR/

Ventiliation Fan Outlet Damper Heating Boilers & Turbine 517.5 DG RM2 G-H/35 V e ntilatio n Syste m D G _ _ _ _ _ _ _ _ _Table B-i a Page 24 of 35 B-26 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION DIESEL GENERATOR/

Normal Ventiliation Duct Heating Boilers & Turbine 517.5 RFP RM G/35 D02-5772-0102-D05Trie 57.SF MG3 Damper Ventilation System iHeating Boilers &D02-5788-A


FOS DRYWELL COOLING HVAC/ Drywell Cooler Blower Veatin SystemReactor 502.33 Drywell ventilation System D02-5788-B


F05 DRYWELL COOLING HVAC/ Drywell Cooler Blower Heating Boilers & Reactor 502.33 Drywell Ventilation System D02-5788-C


F05 DRYWELL COOLING HVAC/ Drywell Cooler Blower Heating Boilers & Reactor 502.33 Drywell Ventilation System Heating Boilers &D02-5788-D


F05 DRYWELL COOLING HVAC/ Drywell Cooler Blower Veatin SystemReactor 502.33 Drywell Ventilation System D02-5788-E


F05 DRYWELL COOLING HVAC/ Drywell Cooler Blower Heating Boilers & Reactor 502.33 Drywell Ventilation System D02-5788-F


F05 DRYWELL COOLING HVAC/ Drywell Cooler Blower Heating Boilers & Reactor 515.5 Drywell Ventilation System Heating Boilers &D02-5788-G


F05 DRYWELL COOLING HVAC/ Drywell Cooler Blower Reactor 515.5 Drywell Ventilation System D02-5790-0003-D05 DIESEL GENERATOR/

Ventiliation Fan Solenoid Heating Boilers & Turbine 517.5 G-H/34-35 Ventilation System DIESEL GENERATOR/

Vent. Fan Damper Solenoid Heating Boilers & Turbine 538 G-H/35 DO2-5790-OOO3-V10Oubn 58 GH3 Operator Ventilation System DIESEL GENERATOR/

Room Vent. Fan Dampers Heating Boilers &DO2-5790--EP2-V27 SlniVavVetaioSyemTurbine 517.5 DG PNL 2252-47 Solenoid Valve Ventilation System D02-5790--EP3-V27 DIESEL GENERATOR/

Normal Vent. Damper Solenoid Heating Boilers & Turbine 517.5 DG PNL 2252-47 Valve Ventilation System D02-5790 ------ F1O DIESEL GENERATOR/

Room Ventilation Fan Heating Boilers & Turbine 517.5 DG RM2 G-H/35 Ventilation System D02-6601 ------ GOS DIESEL GENERATOR/

Diesel Engine Driven Generator Diesel Generator Turbine 517.5 DG RM2 G-H!35 D02-6665 ------ P30 DIESEL GENERATOR/

Fuel Oil Priming Pump Diesel Generator Turbine 517.5 G-H/34-35 D02-67231


S35 4160V AC/ Switchgear 23-1 4160 Volt Switchgear Reactor 545.5 M-N/39-40 D02-6723 ------ S35 4160V AC/ Switchgear 23 4160 Volt Switchgear Turbine 534 D-E/31-32 D02-67241


S35 4160V AC/ Switchgear 24-1 4160 Volt Switchgear Reactor 545.5 M-N/41-42 D02-6724 --.... S35 4160V AC/ Switchgear 24 4160 Volt Switchgear Turbine 534 D-E/31-32 Table B-I a Page 25 of 35 B-27 12Q0108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D2-7328-282BS35 AC Breaker to Transformer 28 (ROB- 480 Volt Switchgear Reactor 570 M-N/40-41 Switchgear 28)D02-7328-0282CS35 480V ACBreaker to Switchgear 29 (ROB-Switchgear 480 Volt Switchgear Reactor 570 M-N/40-41 D02-7328-0284CS35 48VA/B28) 480 Vt__Ra r7__D02-7328-0284AS35 480V AC/ Breaker to MCC 28-1 (ROB-Switchgear

28) 480 Volt Switchgear Reactor 570 M-N/40-41 D02-7328-0284BS35 480V AC/ Breaker to MCC 28-2 (ROB-Switchgear
28) 480 Volt Switchgear Reactor 570 M-N/40-41 D02-7328-0284D5S35 480V AC/ Breaker to MCC 28-3 (ROB-Switchgear
28) 480 Volt Switchgear Reactor 570 M-N/40-41 D02-7328-0285AS35 480V AC/ Breaker to MCC 28-7 (ROB-Switchgear
28) 480 Volt Switchgear Reactor 570 M-N/40-41 480V AC/ Breaker to Drywell Fan A (ROB-Switchgear 480 Volt Switchgear Reactor 570 M-N!40-41 D02-7328-O286AS3548VotStheaRetr 57 M-4-1 28)480V AC/ Breaker to Drywell Fan B (ROB-Switchgear 480 Volt Switchgear Reactor 570 M-N!40-41 D02-7328-O286BS35 28)otSicher Ratr 7 -/04 28)D02-7328-0286DS35 480V AC/ Breaker to Drywell Fan F (ROB-Switchgear 480 Volt Switchgear Reactor 570 M-N/40-41 28)D272-86S5 480V AC!/Breaker to Drywell Fan G (ROB-Switchgear 480 Volt Switchgear Reactor 570 M-N/40-41 28) ___________

_ _ _ _ _D02-7328 ------ C05 480V AC/ Switchgear 28 480 Volt Switchgear Reactor 570 M-N/40-41 D02-7328 ------ S35 480V AC/ Switchgear 28 480 Volt Switchgear Reactor 570 M-N/40-41 D02-7328-:


TIO 480V AC/ Transformer 28, Feed to Switchgear 28 480 Volt Switchgear Reactor 570 N/40 480V AC/ Breaker to Transformer 29 (ROB-D02-7329-0292BS35 480 Volt Switchgear Reactor 570 M-N/40-41 Switchgear

29) _____D02-7329-0292CS35 480V AC Breaker to Switchgear 28 (ROB-Switchgear 480 Volt Switchgear Reactor 570 M-N/40-41 29)D02-7329-0293BS35 480V AC/ Breaker to MCC 29-7 (ROB-Switchgear
29) 480 Volt Switchgear Reactor 570 M-N/40-41 D2-7329-293DS35C Breaker to MCC 29-2,4 (ROB-Switchgear 480 Volt Switchgear Reactor 570 M-N/40-41 29)D02-7329-0294CS35 480V AC/ Breaker to MCC 29-1 (ROB-Switchgear
29) 1480 Volt Switchgear Reactor 570 M-N/40-41 Table B-i a Page 26 of 35 B-28 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-7329-0294DS35 480V AC/ Breaker to MCC 29-8 (ROB-Switchgear
29) 480 Volt Switchgear Reactor 570 M-N/40-41 D2-7329-0296AS35 AC Breaker to Drywell Fan C (ROB-Switchgear 480 Volt Switchgear Reactor 570 M-N/40-41 29)D02-7329-0296BS35 480V AC! Breaker to Drywell Fan D (ROB-Switchgear 480 Volt Switchgear Reactor 570 M-N/40-41 29)480V AC/ Breaker to Drywell Fan E (ROB-Switchgear 480 Volt Switchgear Reactor 570 M-N!40-41 DO2-7329-O296CS3548Vot5iheaRecr 57 M-401 29)D02-7329-08-1-535 480V AC/ Breaker to CR Ventilation Panel (ROB-MCC 480 Volt Switchgear Turbine 517.5 D-E!33-34_________________

29-8)D02-7329-08-2-$35 480V AC! Breaker to CR Ventilation AFU (ROB-MCC 480 Volt Switchgear Turbine 517.5 D-E/33-34 29-8)D02-7329-08-3-S35 480V AC! Breaker to CR Ventilation AHU (ROB-MCC 480 Volt Switchgear Turbine 517.5 D-E/33-34 29-8)D02-7329-08-5-S35 480V AC! Breaker to CR Ventilation RCU (ROB-MCC 480 Volt Switchgear Turbine 517.5 D-E/33-34 29-8)D02-7329 ------ S35 480V AC/ Switchgear 29 480 Volt Switchgear Reactor 570 M-N/40-41 D02-7329 ------ T10 480V AC/ Transformer 29, Feed to Switchgear 29 480 Volt Switchgear Reactor 570 N/40 D02-7826-4


M05 480V AC/ MCC 26-4 480 Volt MCCS Turbine 549 D-E/32 D02-7828-01C2-S35 480V AC/ Breaker to Valve 1201-1 (ROB-MCC 28-1) 480 Volt MCCS Reactor 517.5 L-M/38 D02-7828-01C3-S35 480V AC! Breaker to Diesel Vent. Fan 2!3 (ROB-MCC 480 Volt MCCS Reactor 517.5 L-M/38 28-1)D02-7828-O1F1-S35 480V AC! Breaker to Transfer Pump 2!3 (ROB-MCC 480 Volt MCCS Reactor 517.5 L-M/38 28-1)D02-7828-01F3-S35 480V AC/ Breaker to LPCI Air Cooler (ROB-MCC 28-1) 480 Volt MCCS Reactor 517.5 L-M/38 480V AC/ Breaker to Valve 1402-24A (ROB-MCC 28-DO2-7828-01H 1-S35 1)480 Volt MCCS Reactor 517.S L-M/38 1)D02-7828-01H3-S35 480V AC/ Breaker to Valve 1501-3A (ROB-MCC 28-1) 480 Volt MCCS Reactor 517.5 L-M/38 D02-7828-01H4-S35 480V AC/ Breaker to Valve 1402-3A (ROB-MCC 28-1) 480 Volt MCCS Reactor 517.5 L-M!38 Table B-l a Page 27 of 35 B-29 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-7828-01J3-S35 480V AC/ Breaker to Valve 1301-4 (ROB-MCC 28-1) 480 Volt MCCS Reactor 517.5 L-M/38 D02-7828-01J4-S35 480V AC/ Breaker to Valve 1301-1 (ROB-MCC 28-1) 480 Volt MCCS Reactor 517.5 L-M/38 D02-7828-O1K1-S35 480V AC/ Breaker to Valve 1501-5A (ROB-MCC 28-1) 480 Volt MCCS Reactor 517.5 L-M/38 D02-7828-O1K2-S35 480V AC/ Breaker to Valve 1501-5B (ROB-MCC 28-1) 480 Volt MCCS Reactor 517.5 L-M/38 480V AC/ Breaker to Valve 1501-38A (ROB-MCC 28-D02-7828-01L1-S35

1) 480 Volt MCCS Reactor 517.5 L-M/38 1)480V AC/ Breaker to Valve 1501-20A (ROB-MCC 28-D02-7828-01L2-S35 480 Volt MCCS Reactor 517.5 L-M/38 1)480V AC/ Breaker to Valve 1501-32A (ROB-MCC 28-D02-7828-01M3-S35 480 Volt MCCS Reactor 517.5 L-M/38 1) _ _ _ _ _ _ _ _ _ _ _480V AC/ Breaker to Valve 1501-13A (ROB-MCC 28-DO2-7828-01N1-M35 480 Volt MCCS Reactor 517.5 L-M!38 480V AC/ Breaker to Valve 1501-ChA (ROB-MCC 28-D02-7828-01N2-S35
1) 480 Volt MCCS Reactor 517.5 L-M/38 480V AC/ Breaker to CCSW Cooler A, Fan 1 (ROB- 480 Volt MCCS Turbine 538 F-G!35-36 MCC 28-2) __________________

D02-7828-02D2-S35 480V AC! Breaker to 1Vat Cho .2a (ROB- 480 Volt MCCS Turbine 538 F-G/35-36 MCC 28-2)D02-7828-23-S35 AC Breaker to CCSW Cooler , Fan 2 (ROB- 480 Volt MCCS Turbine 538 F-G/35-36 MCC 28-2)D02-7828-0 -S35 480V AC Breaker to Cool (ROB- 480 Volt MCCS Turbine 538 F-G/35-36 MCC 28-2)D02-7828-02F1-S35 48VA!Bekrt CWCoe ,Fn2(O- 480 Volt MCCS Turbine 538 F-G/35-36________________

MCC 28-2) _ _________480V AC!/Breaker to DGS Coolng Pumpa 2! (ROB- 48VotCCTubnS8 FG!-3 D02-7828-023D1-S3540VotMCTubn53 F-/-6________________MCC 28-3) __________

480V AC/ Breaker to Valve 1501-22A (ROB-MCC 28-D02-7828-O7B3-S35 480 Volt MCCS Reactor 517.5 N/40____________________

7)__ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Table B-i a Page 28 of 35 B-30 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-7828-07B4-S35 480V AC/ Breaker to Valve 202-9A (ROB-MCC 28-7) 480 Volt MCCS Reactor 517.5 N/40 D02-7828-07C2-S35 480V AC/ Breaker to Valve 202-5A (ROB-MCC 28-7) 480 Volt MCCS Reactor 517.5 N/40 D02-7828-1-1--P06 DISTRIBUTION PANELS/ Distribution Panel 28-1-1 480 Volt MCCS Reactor 517.5 L/38 D02-7828-1


M05 480V AC/ MCC 28-1 480 Volt MCCS Reactor 517.5 L-M/38 D02-7828-2


M05 480V AC/ MCC 28-2 480 Volt MCCS Turbine 538 F-G/35-36 D02-7828-3


M05 480V AC/ MCC 28-3 480 Volt MCCS Turbine 538 F-G/35-36 D02-7828-7


M05 480V AC/ MCC 28-7 480 Volt MCCS Reactor 517.5 N/40 D02-7829-O1D1-S35 480V AC/ Breaker to Valve 2301-4 (ROB-MCC 29-1) 480 Volt MCCS Reactor 517.5 L/44 480V AC/ Breaker to Valve 1402-24B (ROB-MCC 29-D02-7829-01E1-S35 480 Volt MCCS Reactor 517.5 L!44 1)D02-7829-02A1-S35 480V AC! Breaker to 125V Battery Chg. #2 (ROB- 480 Volt MCCS Turbine 517.5 D-E/32-33 MCC 29-2)480V AC! Breaker to DG Cooling Pump (ROB-MCC 29-D02-7829-02A2-S35 480 Volt MCCS Turbine 517.5 D-E/32-33 2)D02-7829-02B2-S35 480V AC! Breaker to Diesel Transfer Pump (ROB- 480 Volt MCCS Turbine 517.5 D-E/32-33 MCC 29-2)D02-7829-02B6-535 480V AC! Breaker to 250V Batt. Chg. #2!3 (ROB-MCC 480 Volt MCCS Turbine 517.5 D-E/32-33 29-2)D02-7829-02D1-S35 480V AC! Breaker to CCSW Cooler C, Fan 1 (ROB- 480 Volt MCCS Turbine 517.5 D-E/32-33 MCC 29-2)D02-7829-02D2-S35 480V AC Breaker to CCSW CooleR C, Fan 2 (ROB- 480 Volt MCCS Turbine 515.5 D-E/32-33 MCC 29-2)D02-7829-02D3-S35 480V AC! Breaker to CCSW Cooler D, Fan 1 (ROB- 480 Volt MCCS Turbine 517.5 D-E/32-33 MCC 29-2)D2-7829-02D4-S35 AC Breaker to CCSW Cooler D, Fan 2 (ROB- 480 Volt MCCS Turbine 517.5 D-E/32-33 MCC 29-2)D02-7829-02D5-S35 480V AC/ Breaker to DG Vent Fan 3 (ROB 29-2) 480 Volt MCCS Turbine 517.5 D-E/32-33 D02-7829-04A1-S35 480V AC/ Breaker to Valve 1402-3B (ROB-MCC 29-4) 480 Volt MCCS Reactor 517.5 M/44 Table B-i a Page 29 of 35 B-31 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-7829-04A3-S35 480V AC/ Breaker to Valve 1501-5C (ROB-MCC 29-4) 480 Volt MCCS Reactor 517.5 M/44 D02-7829-04A4-S35 480V AC/ Breaker to Valve 1501-5D (ROB-MCC 29-4) 480 Volt MCCS Reactor 517.5 M/44 480V AC/ Breaker to Valve 1501-38B (ROB-MCC 29-D02-7829-04B1-S35 480 Volt MCCS Reactor 517.5 M/44 4)D02-7829-04C2-$35 480V AC/ Breaker to Valve 1501-20B (ROB-MCC 29- 480 Volt MCCS Reactor 517.5 M/44 D02-7829-04B3-$35 48VA/rae oVle10-2 RBMC2-480 Volt MCCS Reactor 517.5 M!44 4)D02-7829-04C2-S35 480V AC/ Breaker to Valve 1501-13B (ROB-MCC 29-4) 480 Volt MCCS Reactor S17.S M!44 D02-7829-04C3-$35 480V AC! Breaker to Valve 1501-32B (ROB-MCC 29- 480 Volt MCCS Reactor 517.5 M/44 4)DO2-7829-O4D2-S35 480V AC/ Breaker to Valve 1501-13B (ROB-MCC 29-480 Volt MCCS Reactor 517.5 M/44 D02-7829-04C3-S35 40ACrekrtHCIArCor(RBMC2-480 Volt MCCS Reactor 517.S M!44 4)D02-7829-04D2-S35 480V AC/ Breaker to HPCI Cooling Pump (ROB-MCC 480 Volt MCCS Reactor 517.5 M/44 29-4)DO2-7829-04E4-S35 480V AC/ Breaker to HPCI Air Cooler (ROB-MCC 29- 480 Volt MCCS Reactor 517.5 M/44 4)D02-7829-04D1-.35 480V AC/ B 9-e 480 Volt MCCS Reactor 517.5 M/44 4) _____D02-7829-2

.... M05 480V AC/ Breaker 480 Volt MCCS ColrBor 517.5 D-E/3-C D02-7829-4


M05 480V AC/MCC 29-4 480 Volt MCCS Reactor 517.5 M/44 D02-7829-7


M05 480V AC/MCC 29-7 480 Volt MCCS Reactor 517.5 N/42 D02-7829-8


MO5 480V AC/ MCC 29-8 480 Volt MCCS Turbine 534 VENT R4 2/3 G/32 D02-8300-----BO5 125V DC/Battery Charger #2A 125 VDC / 250 VDC Turbine 549 B RM2 E/31 D02-8300--2A---B05 125V DC/ Battery Charger #2 125 VDC / 250 VDC Turbine 549 B RM2 E/31 D02-8300--BC--B04 125V DC/ Battery #2, Feed to TB Battery Bus #2 125 VDC / 250 VDC Turbine 549 B RM2 E/31 D02-8302A1


P06 125V DC/ TB Main Bus #2A-1 (ROB-Main Bus #2A) 125 VDC / 250 VDC Turbine 549 B RM2 E/31 D02-8302AAA02-M05 250V DC/ Breaker to Steam Valve 2301-8 (ROB-Bus 125 VDC / 250 VDC Reactor 570 M-N/41-42 2A) I I I I Table B-la Page 30 of 35 B-32 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D2-8302A-01-M05 Breaker to Turbine Auxiliary Pump (ROB- 125 VDC / 250 VDC Reactor 570 M-N/41-42 Bus 2A)D02-8302A-C01-M05 250V DC/ Breaker to Turbine Oil Pump (ROB-Bus 2A) 125 VDC / 250 VDC Reactor 570 M-N/41-42 D02-8302A-C02-M05 250V DC/ Breaker to Gland Seal Cond. Fan (ROB-2A) 125 VDC / 250 VDC Reactor 570 M-N/41-42 D02-8302A-DO2-M05 250V DC/ Breaker to Hot. Condensate Pump (ROB- 125 VDC / 250 VDC Reactor 570 M-N/41-42 Bus 2A)D02-8302A-G01-M05 250V DC/ Breaker to Line Valve 1201-2 (ROB-Bus 2A) 125 VDC / 250 VDC Reactor 570 M-N/41-42 D02-8302A-H02-M05 250V DC/ Breaker to Line Valve 1301-2 (ROB-Bus 2A) 125 VDC / 250 VDC Reactor 570 M-N/41-42 D02-8302A


M05 250V DC/ MCC Bus #2A (ROB-RB MCC #2) 125 VDC / 250 VDC Reactor 570 M-N/41-42 D02-8302B-1---P06 125V DC/ TB Res Bus #2B-1 (ROB-TB Res Bus #2B) 125 VDC! 250 VDC Turbine 549 B RM2 E/31 250V DC/ Breaker to Steam Valve 2301-3 (ROB-Bus 125 VDC 250 VDC Reactor 570 M-N/41-42 D02-8302B-L01-M0 250V DC! Breaker to Steam Valve 2301-5 (ROB-Bus 125 VDC/ 250 VDC Reactor 570 M-N/41-42 2B)D02-8302B3-L-02-M05 250V DC/ Breaker to Test Valve 2301-14 (ROB-Bus DO2-8302B-LO1-MOS_

2 )125 VDC!/ 250 VDC Reactor 570 M-N!41-42 2B)D02-8302B


M05 250V DC/ MCC Bus #2B3 (ROB-R MCC #2) 125 VDC! 250 VDC Reactor S70 M-NR41-42 D02-8302B-002-M05 250V DC! Breaker to Line Valve 2301-35 (ROB-Bus 125 VDC / 250 VDC Reactor 570 M-N/41-42 2B)D02-8302B-.....

M05 250V DC/ Breaker to Line Valve 2301-36 (ROB-Bus 125 VDC / 250 VDC Reactor 570 M-N/41-42 2B)D02-8302B-PO1-M05 2B) VC_/_20_VDReacor_50_M-N4_-4 D02-8302B-P02-M05 250V DC/ Breaker to Line Valve 2301-6 (ROB-Bus 2B) 125 VDC / 250 VDC Reactor 570 M-N/41-42 D02-83125-1---P06 125V DC/ TB Res Bus #2, Feed to TB Res Bus #2B-1 125 VDC / 250 VDC Turbine 549 B RM2 E/31 D02-83125-2---P06 125V DC/ TB Battery Bus #2, Feed to Main Bus #2A-1 125 VDC / 250 VDC Turbine 549 B RM2 E/31 D02-83125


P06 125V DC/ RB 125V DC Distribution Panel #2 125 VDC / 250 VDC Reactor 570 M-N/41-42 D02-83250-2---B05 250V DC/ Battery Charger #2 125 VDC / 250 VDC Turbine 549 B RM2 E/31 D02-83250-AO1-MO5 250V DC/ Breaker to TB MCC #2 (ROB-Battery

  1. 2) 125 VDC / 250 VDC Turbine 549 G/31-32 Table B-la Page 31 of 35 B-33 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION 250V DC/ Breaker to Battery #2 (ROB-Battery Charg 125 VDC 250 VDC Turbine 549 G/31-32 DO2-83250-AO2-M05
  1. 2/3)/25 DCTrbn-59 G/13#2/3)250V DC/ Breaker to Battery #2 (ROB-Battery 125 VDC 250 VDC Turbine 549 G/31-32 Charger #2)D02-83250

B04 250V DC/ Battery #2 125 VDC / 250 VDC Turbine 549 B RM2 E/31 D02-83250-102-MO5 250V DC/ Breaker to RB MCC #3 (ROB-TB MCC #2) 125 VDC/ 250 VDC Turbine 549 F-G/31-32 D02-83250


M05 250V DC/ TB MCC #2 125 VDC / 250 VDC Turbine 549 B RM2 E/31 D2-8501-0001AV05 CONTAINMENT SAMPLING Torus Oxygen Sampling Nitrogen Inerting System Reactor 476.5 TORUS BAY 16 Line Valve CONTAINMENT SAMPLING/

Torus Oxygen Sampl.DC2-8501-0001AV27 Nitrogen Inerting System Reactor 476.5 TORUS BAY 16 Solen. Valve D0-51001V5 CONTAINMENT SAMPLING!/Torus Oxygen Sampling Nitrogen Inerting System Reactor 476.5 TORUS BAY 16 Line Valve CONTAINMENT SAMPLING/

Torus Oxygen Samplin D02-8501-0001BV05 LieVav Nitrogen Inerting System Reactor 476.5 TORUS BAY 16 D02-8501-0001BV27 CONTAINMENT SAMPLING!

Torus Oxygen Sampl. Nitrogen Inerting System Reactor 476.5 TORUS BAY 16 Solen. Valve D02-8501-0003AV05 CONTAINMENT SAMPLING/

Drywell Oxy. Sampling Nitrogen Inerting System Reactor 517.5 DRY GALL L/41 Line Valve D2-81-0003AV27 CONTAINMENT SAMPLING Drywell Oxy. Sampl. Nitrogen Inerting System Reactor 517.5 DRY GALL L/41 Solen. Valve CONTAINMENT SAMPLING/

Drywell Oxy. Sampling Nitrogen Inerting System Reactor 517.5 DRY GALL L/41 D02-801-003BV05 Line Valve___________

D2-8501-0003BV CONTAINMENT SAMPLING Drywell Oxy. Sampl. Nitrogen Inerting System Reactor 517.5 DRY GALL L/41 D02-801-003BV27 Solen. Valve __________

CONTAINMENT SAMPLING/

Drywell Oxy. Sampling D02-8501-0005AV05 Nitrogen Inerting System Reactor 545.5 L/ L/D280-05V7 CONTAINMENT SAMPLING!

Drywell Oxy. Sampl. Nitrogen Inerting System Reactor 545.5 L/40 Solen. Valve D02-8501-0005BV05 CONTAINMENT SAMPLING/

Drywell Oxy. Sampling Nitrogen Inerting System Reactor 545.5 L/40 Line Valve D02-8501-0005V27 CONTAINMENT SAMPLING Drywell Oxy. Sampl. Nitrogen Inerting System Reactor 545.5 L/40 Solen. Valve CONTAINMENT SAMPLING/

Drywell Oxy. Sampling D02-8599-06005V05 Nitrogen Inerting System Reactor 575.5 DV40 Table B-la Page 32 of 35 B-34 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-9205-A


V05 CONTAINMENT SAMPLING/

Drywell Oxy. Sampling Drywell Air Sampling Reactor 545.5 L/40 Line Valve .D02-9205-A


V27 CONTAINMENT SAMPLING/

Drywell Oxy. Sampl. Drywell Air Sampling Reactor 545.5 L/40 Solen. Valve CONTAINMENT SAMPLING/

Drywell Oxy. Sampling D02-9205-B


V05 Cin M SAPIG Drywell Air Sampling Reactor 545.5 L/40 Line Valve______

_ ____D02-9205-B


V27 CONTAINMENT SAMPLING/

Dryweli Oxy. Sampl. Drywell Air Sampling Reactor 545.5 L/40 Solen. Valve D02-9206-A-....-V05 CONTAINMENT SAMPLING/

Drywell Oxy. Sampling Line Valve Drywell Air Sampling Reactor 545.5 L/40 D02-9206-A


V27 CONTAINMENT SAMPLING/

Drywell Oxy. Sampl. Drywell Air Sampling Reactor 545.5 L/40 Solen. Valve .CONTAINMENT SAMPLING/

Drywell Oxy. Sampling Drywell Air Sampling Reactor 545.5 L/40 D02-9206-B-....V05 LnOav rwelArSmln Ratr 555 L4 Line Valve _____ _____ _________D02-9206-B


V27 CONTAINMENT SAMPLING!

Drywell Oxy. Sampl. Drywell Air Sampling Reactor 545.5 L/40 Solen. Valve D02-9207-A


V05 CONTAINMENT SAMPLING!

Drywell Sampling Line Drywell Air Sampling Reactor 517.5 DRY LOCK L/39 Valve D02-9207-A


V27 CONTAINMENT SAMPLING/

Drywell Sampling Drywell Air Sampling Reactor 517.5 DRY LOCK L/39 Solenoid Valve CONTAINMENT SAMPLING/

Drywell Sampling Line D02-9207-B


V05 Drywell Air Sampling Reactor 517.5 DRY LOCK L/39________________Valve

_ _ _ _ _D02-9207-B


V27 CONTAINMENT SAMPLING/

Drywell Sampling Drywell Air Sampling Reactor 517.5 DRY LOCK L/39 Solenoid Valve D02-9208-A


V05 CONTAINMENT SAMPLING!

Drywell Sampling Line Drywell Air Sampling Reactor 517.5 DRY LOCK L/39 Valve D02-9208-A


V27 CONTAINMENT SAMPLING/

Drywell Sampling Drywell Air Sampling Reactor 517.5 DRY LOCK L/39 Solenoid Valve D02-9208-B---V05 CONTAINMENT SAMPLING!

Drywell Sampling Line Drywell Air Sampling Reactor 517.5 DRY LOCK L/39 Valve D02-9208-B-.---V27 CONTAINMENT SAMPLING!

Drywell Sampling Drywell Air Sampling Reactor 517.5 DRY LOCK L/39 Solenoid Valve I Table B-i a Page 33 of 35 B-35 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D02-9802-2A---B05 24/48V DC/ Battery Charger #2A 345 kV Switchyard DC Turbine 549 F/31-32 System 345 kV Switchyard DC D02-9802-2ANEGBO5 24/48V DC/ Battery Charger #2A ( Turbine 549 B RM2 E/31 System ,_D02-9802-2APOSBO5 24/48V DC/ Battery Charger #2A 345 kV Switchyard DC Turbine 549 B RM2 E/31 System 345 kV Switchyard DC D02-9802-2B---B05 24/48V DC/ Battery Charger #2B 345 Turbine 549 F/32 System D02-9802-2BNEGBO5 24/48V DC/ Battery Charger #2B ( 345 kV Switchyard DC Turbine 549 B RM2 E/31 System D02-9802-2BPOSB05 24/48V DC/ Battery Charger #2B 345 kV Switchyard DC Turbine 549 B RM2 E/31 System D02-9802A-A21-B11 24/48V DC/ Breaker to Battery Charger #2A 345 kV Switchyard DC Turbine 549 F/31-32 System D02-9802A-A22-B11 24/48V DC/Breaker to Battery C g# 345 kV Switchyard DC Turbine 549 F/31-32 System D02-9802-A


B04 24/48V DC/ Battery #2A 345 kV Switchyard DC Turbine 549 B RM2 E/31 System D02-9802-A.-..P06 24/48V DC/ Distribution Panel #2A 345 kV Switchyard DC Turbine 549 B RM2 E/31 System D02-9802B-A21-B11 24/48V DC/ Breaker to Battery Charger #2B1 345 kV Switchyard DC Turbine 549 F/32 System D02-9802B-A22-B11 24/48V DC!/Breaker to Battery Charger #2B (-) k wicyadD Turbine S49 F!32___________________________________

System _________D02-9802-B


B04 24/48V DC/ Battery #2B 345 kV Switchyard DC Turbine 549 B RM2 E/31 System D02-9802-B


P06 24/48V DC/Distribution Panel #2B1 345 kV Switchyard DC Turbine 549 B RM2 E/31 System CONTROL PANEL/ Unit 2 Diesel Generator Control D02-DGCP PnlTurbine 517.5 DG RM2 G-H/35 Panel D02-LCS1 ------- LS HPCI/ Gland Seal Condenser Drain Pump Level Reactor 476.5 HP RM2 N/45_Switch I I Table B-i a Page 34 of 35 B-36 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION HPCI/ Gland Seal Condenser Drain Pump Level DO2-LCS2-LS..Switch Reactor 476.5 HP RM2 N/45 Switch D02-LOC HPCI/ Lube Oil Cooler Reactor 476.5 HP RM2 N/45 D02-NGC CONTROL PANEL/ Unit 2 Neutral Grounding Cabinet Turbine 517.5 DG RM2 G-H/35 Table B-i a Page 35 of 35 B-37 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Table B-lb. Base List lb-Items Common to Units 2 and 3 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION DOO-2223-0033 CONTROL PANEL/ DG Relaying and Local Panels & Racks Reactor 504.5 DG RM2/3 N/46 Metering Cabinet (Radwaste)

DOO-2223-0041 CONTROL PANEL/ DG Excitation Cabinet Local Panels & Racks Reactor 504.5 DG RM2/3 N/46 (Radwaste)

DOO-2223-0053 CONTROL PANEL/ Diesel Generator Fire Local Panels & Racks Turbine 517.5 G/45 Protection Panel (Radwaste)

DOO-2223-0058 CONTROL PANEL! Diesel Generator Fire Local Panels & Racks Turbine 517.5 G/45 Protection Panel (Radwaste)

DOO-2223-0109 CONTROL PANEL/ DG Cooling Pump Local Panels & Racks Reactor 504.5 DG RM2/3 N/46 Transfer Switch Status (Radwaste)

DOO-2350-A


LS HPCI/ Storage Tank Level Switch HPCI Turbine 517.5 RFP RM G/35 DOO-2350-B


LS HPCI/ Storage Tank Level Switch HPCI Turbine 517.5 RFP RM G/35 DOO-2350-C


LS HPCI/ Storage Tank Level Switch HPCI Turbine 517.5 RFP RM G/35 DOO-2350-D


LS HPCI/ Storage Tank Level Switch HPCI Turbine 517.5 RFP RM G/35 CONDENSATE/

Contaminated D00-3303-A

....-T05 Condensate Storage Tank Condenser System N/A 517.5 N/A CON DENSTAE/ Contaminated DOO-3303-B


T05 Condensae S tage nank Condenser System N/A 517.5 N/A Condensate Storage Tank B D00-3340-0003--LI CONDENSATE/Storage Tank Level Condenser System N/A 517.5 K/35 Indicator DOO-3341-0071ALSH CONDENSATE/Storage Tank Level Condenser System N/A 517.5 K/35 Switch High DOO-3341CONDENSATE/Storage Tank Level Condenser System N/A 517.5 K/35 D00-3341-0072ALSL_

Switch Low D00-3341-0076A-LT CONDENSATE/

Storage Tank Level Transmitter Condenser System N/A 517.5 K/35 D00-3341-0077A-LI CONDENSATE/Storage Tank Local Level Condenser System N/A 517.5 K/35 Indicator DOO-3701-P30. RBCCW/ Cooling Water Pump Rx Bldg Closed Reactor 545.5 M/39-40 D00-3701_....._P30

_RBCCW/CoolingWaterPumpCooling Water DOO-3702--H5 RBCCW/ Cooling Water Heat Exchanger Rx Bldg Closed Reactor 545.5 M-N/38-39 D00-3702_......_H15 RBCCW/Cooling__WaterHeatExchanger Cooling Water Table B-lb Page 1 of 4 B-38 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D00-3901 ------ P30 SERVICE WATER!Service Water Cooling Service Water System C. House 490.67 B-C/3-4 Pump______

________ _DOO-3903 ------ P30 SERVICE WATER/ Diesel Generator Service Water System C. House 490.67 A-B/4 D00-3903__......_P30 Cooling Water Pump SericWteSyteCHuse 49.6_AB/D00-3941-0898--FE SERVICE WATER/ DG Cooling Pump Service Water System Reactor 504.5 N/44-46 D00-3941-0898--FE_

Discharge Flow Element DOO-4600-B


T05 DIESEL GENERATOR/

Primary Gas Air Service Air System Reactor 504.5 DG RM2/3 N/46 Receiver Unit "Al" S i iyR t 5D M N DOO-4600-C


T05 DIESEL GENERATOR/

Primary Gas Air Service Air System Reactor 504.5 DG RM2!3 N!46 Receiver Unit "A2" SrcASsmet 54 DGRM2/3_N/46 DOO-4600-G


T05 DIESEL GENERATOR/

Primary Gas Air Service Air System Reactor 504.5 DG RM2!3 N/46 Receiver Unit "BI" Sveiymacr 0 DGRM2/3_N/46 DIESEL GENERATOR/

Primary Gas Air DOO-4600-H


T05 Receiver Unit "B2" Service Air System Reactor 504.5 DG RM2/3 N/46 D0-5.201 ------ T05 DIESEL GENERATOR/

Diesel Fuel Oil Diesel Oil System N!A 517.5 N!A D00-5201__......_T05 Storage Tank DeliStm/5.

N DOO-5202-T05 DIESEL GENERATOR!

Diesel Fuel Oil Diesel Oil System Turbine 517.5 DG RM2/3 N/46 Storage Day Tank DOO-5203 ------ P30 DIESEL GENERATOR!

Fuel Oil Transfer Diesel Oil System Reactor 504.5 DG RM2/3 N/46___ __ ___ __ ___ __ Pump__ _ _ _ _ _ _ _ _ _ _ _ _ _D00-5741-0048AV72 CONTROL ROOM VENTILATION/

CCSW Heating Boilers & Turbine 534 VENT RM2/3 G/32 Cooling Supply Valve Ventilation System D00-5741-0048BV72 CONTROL ROOM VENTILATION/

Service Heating Boilers & Turbine 534 VENT RM2/3 G!32 Water Supply Valve Ventilation System D00-5741-0054AD05 CONTROL ROOM VENTILATION/

Train Heating Boilers & Turbine 549 H/32 DOO_5741_0054AD05

,"A" Isolation Damper Ventilation System Turbine 549_H/32 D00-5741-0054BD05 CONTROL ROOM VENTILATION/

Train Heating Boilers & Turbine 549 H!32_________________

,"A" Isolation Dam per Ventilation System Turbine 549_H/32 DOO-5741-0054CD05 CONTROL ROOM VENTILATION/

Train Heating Boilers & Turbine 549 H/32"A" Isolation Damper Ventilation System CONTROL ROOM VENTILATION/

Train Heating Boilers &DOO-5741-0054DD05 "A" Isolation Damper Ventilation System Turbine 549 H/32 D00-5741-0054-V27 CONTROL ROOM VENTILATION/

Train Heating Boilers & Turbine 549 H/32"A" Iso. Damper Solen. Ventilation System I 5 3 Table B-i b Page 2 of 4 B-39 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION DOO-5741-0055-D05 CONTROL ROOM VENTILATION/

AFU Heating Boilers & Turbine 534 VENT RM2/3 G/32 Booster Fan Outlet Damper Ventilation System D00-5741-0056-D05 CONTROL ROOM VENTILATION/

AFU Heating Boilers & Turbine 534 VENT RM2/3 G/32_________________

Booster Fan Outlet Damper Ventilation System DOO-5741-0057-D05 CONTROL ROOM VENTILATION/

AFU Heating Boilers & Turbine 534 VENT RM2/3 G/32 Recirculation Damper Ventilation System CONTROL ROOM VENTILATION/

AFU Heating Boilers &DOO-5741 -0058-DOS Inlet Damper Ventilation System Turbine 534 VENT RM2/3 G/32 DOO-5741-0059AD05 CONTROL ROOM VENTILATION/

AHU Heating Boilers & Turbine 534 VENT RM2/3 G/32 Outlet Damper Ventilation System D00-5741-0059BD05 CONTROL ROOM VENTILATION/

AHU Heating Boilers & Turbine 534 VENT RM2/3 G/32 Inlet Damper Ventilation System DOO-5772-01 00-D05 DIESEL GENERATOR/

Ventiliation Fan Heating Boilers. & Reactor 504.5 DG RM2/3 N/46 Inlet Damper Ventilation System DDIESEL GENERATOR/

Ventiliation Fan Heating Boilers &D00-5772-01-D05 IOutlet Damper Ventilation System Reactor 504.5 DG RM2/3 N/46 DO-5790-0003AV10 DIESEL GENERATOR/

Vent. Fan Inlet Heating Boilers & Reactor 504.5 DG RM2/3 N/46 Damper Solen. Oper. Ventilation System DOO-5790-0003AV27 DIESEL GENERATOR/

Vent. Fan Inlet Heating Boilers & Reactor 504.5 N/46 Damper Solenoid Valve Ventilation System D00-5790-0003BV1 0 DIESEL GENERATOR/

Vent. Fan Outlet Heating Boilers & Reactor 504.5 DG RM2/3 N/46 Damper Solen. Oper. Ventilation System D00-5790-0003BV27 DIESEL GENERATOR/

Vent. Fan Outlet Heating Boilers & Reactor 504.5 D /N6 DOO_5790-0003BV27 Damper Solen. Valve Ventilation System Ratr 0. N/DOO-5790--EP2-V27 DIESEL GENERATOR/

Vent. Fan Heating Boilers & Reactor 504.5 DG PNL 2223-56 Dampers Solenoid Valve Ventilation System DOO-5790 ------ F10 DIESEL GENERATOR/

Room Ventiliation Heating Boilers & Reactor 504.5 DG RM2/3 N/46 Fan Ventilation System DOO-6601 ------ G05 DIESEL GENERATOR/

Diesel Engine Diesel Generator Reactor 504.5 DG RM2/3 N/46 Driven Generator DOO-6665 ---P30 DIESEL GENERATOR/

Fuel Oil Priming Diesel Generator Reactor 504.5 N/46 Pump DOO-6740 --.... S35 4160V AC/ Switchgear 40 4160 Volt Switchgear Reactor 504.5 DG RM2/3 N/46 DOO-83250-0---B05 250V DC/ Battery Charger #2/3 125 VDC / 250 VDC Turbine 549 B RM2 E/31 Table B-lb Page 3 of 4 B-40 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 ID DESCRIPTION SYSTEM BUILDING ELEVATION LOCATION D00-9400-01 00-F05 CONTROL ROOM VENTILATION/

Air Chemical Cleaning Turbine 534 VENT RM2/3 G/32 DOO_____9400-01

___ 0Handling Unit System Turbine 534 VENT_______G/32 DOO-9400-0101-Fl0 CONTROL ROOM VENTILATION/

Air Chemical Cleaning Turbine 534 VENT RM2/3 G/32 Filtration Unit Heater System DOO-9400-0102 CONTROL PANEL/ RCU Control Panel Chemical Cleaning Turbine 534 VENT RM2/3 G/32_System_D,00-9400-0102-R15 CONTROL ROOM VENTILATION/

Chemical Cleaning Turbine 534 VENT RM2/3 G/32 Refrigeration Condensing Unit System DOO-9400-0103 CONTROL PANEL/ Control Cabinet 9400- Chemical Cleaning Turbine 534 VENT RM2/3 G/32 103 System D00-9400-01 04AF05 CONTROL ROOM VENTILATION/

AFU Chemical Cleaning Turbine 534 VENT RM2/3 G/32 Booster Fan System Tbe3 VT__2 D00-9400-01 04BF05 CONTROL ROOM VENTILATION/

AFU Chemical Cleaning Turbine 534 VENT RM2/3 G/32 Booster Fan System Tubie_3_VNT

____G3 DOO-9400-0105 CONTROL PANEL/ Control Cabinet 9400- Chemical Cleaning Turbine 534 VENT RM2/3 G/32 105 System CONTROL PANEL/ Unit 2/3 Auxiliary DOO-ACP Control Panel Reactor 504.5 DG RM2/3 N/46 CONTROL PANEL/Unit 2/3 Diesel DOO-DGCP GeNeROr Conto Pnel Reactor 504.5 DG RM2/3 N/46 Generator Control Panel CONTROL PANEL/ Unit 2/3 Neutral D-NGC GroundingReactor 04.5 DG RM2/3 N/46 Table B-i b Page 4 of 4 B-41 RIPTION CLASS BUILDING1 ELEVATION I LOCATION SYSTEM Seismic Licensing Basis?Safety Function(s)

New or Replace IPEEE Enhance-ment?,NEL/ DG (20) Instrumentation and Reactor 504.5 DG RM2/3 Local Panels & y Racks &vletering Cabinet Control Panels and Cabinets N/46 Racks (Radwaste)

Panels ,NELU DG (20) Instrumentation and Reactor 504.5 DG RM2/3 Local Panels & y Racks &inet Control Panels and Cabinets N/46 Racks (Radwaste)

Panels Tank Level (18) Instruments on Racks Turbine 517.5 RFP RM HPCI Y ROIC G/35-RATOR/ Diesel (21) Tanks and Heat Turbine 517 DG RM2/3 Diesel Oil System Y Auxiliary

& y y EC)e Day Tank Exchangers Turbne_17.

N/46 Support 09/1)OM (07) Fluid-Operated Valves VENT Heating Boilers & Auxiliary

&I/ CCSW Cooling Turbine 534 RM2/3 G/32 Ventilation System Support ery Charger #2/3 (16) Battery Chargers and Turbine 549 B RM2 E/31 125 VDC /250 y Electrical y y EC Inverters Turbne_49

_ RM2_E/31_VDC Systems 01/1)OM (11 ) Chillers VENT Chemical Cleaning Auxiliary

&I/ Air Filtration Turbine 534 Y RM2/3 G/32 System Support)OM (09) Fans VENT Chemical Cleaning Auxiliary

&I/ AFU Booster Turbine 534 Y RM2/3 G/32 System Support:CIRCULATION/

(08) Motor-Operated and k Discharge Solenoid-Operated Valves Reactor 515.5 DRYWELL System Y RCIC Isolation Valve (07) Fluid-Operated Valves Reactor 515.42 DRYWELL Nuclear Boiler Y RCIC System:ock Valve (07) Fluid-Operated Valves Reactor 537 DRYWELL Nuclear Boiler Y RCIC PR)System iatic Relief Valve (08) Motor-Operated and Reactor 537 DRYWELL Nuclear Boiler Y RCPC PR)Solenoid-Operated Valves System Overpressure (07) Fluid-Operated Valves Nuclear Boiler Reactor 537 DRYWELL System Y RCPC iv to Scram (07) Fluid-Operated Valves Old ume Scram Reactor 5175 In Hydraulic Control Rod Drive Y RRC ank Row 8, CU System Scram Solenoid (08) Motor-Operated and Control Rod Drive Solenoid-Operated Valves System ink SDV Tank (18) Instruments on Racks Reactor 517.5 J-338- Control Rod Drive SRRC Reactor4 517.5er I RRC ink SDV Tank (18) Instruments on Racks Reactor 517.5 J-U38-Control Rod Drive Y RRC Basis?'~~1 ment?ink SDV Tank (18) Instruments on Racks Reactor 517.5 J-L/38- Control Rod Drive RRC hter 39,43-44 System ink Scram (07) Fluid-Operated Valves ReactorTORUS Control Rod DriveRRC ume Drain Valve BAY 8 System ink Scram (07) Fluid-Operated Valves Reactor 476 TORUS Control Rod Drive RRC ume Drain Valve Reacor_76.

BAY 8 System Y RRC Accumulator, (21) Tanks and Heat Nev)w 8, Position 21 Exchangers Reactor 517.5 In Hydraulic Control Rod Drive y RRC ExhnesCU System lator Insertion (07) Fluid-Operated Valves In Hydraulic Control Rod Drive Ney Nest Bank Row Reactor 517.5 Yn System y RRC (D-7) CU System N to Scram (07) Fluid-Operated Valves Nev ume Scram In Hydraulic Control Rod Drive y RRC ank Row 8, CU System-7)c Control Unit -(00) Other J-K/38- Control Rod Drive Nev)w 8, Position 21 Reactor 517.5 39434 System Y RRC y iAccumulator, (21) Tanks and Heat Old)w 8, Position 2 Exchangers Reactor 517.5 In Hydraulic Control Rod DriveRRC CU SystemYRC lator Insertion (07) Fluid-Operated Valves In Hydraulic Control Rod DriveOld Nest Bank Row Reactor 517.5 In System Y RRC-1-9) CU System c Control Unit -(00) Other J-K/38- Control Rod Drive Old)w 8, Position 2 Reactor 517.5 394344 System Y RRC y Accumulator, (21) Tanks and Heat Ne, w 1, Position17 Exchangers Reactor 517.5 In Hydraulic Control Rod Drive y RRC CU System lator Insertion (07) Fluid-Operated Valves Nev East Bank, Row Reactor 517.5 In Hydraulic Control Rod Drive y RRC M-6) CU System N to Scram (07) Fluid-Operated Valves Ney meReactor 517.5 In Hydraulic Control Rod Drive y RRC ink, Row 1, CU System.6)c Control Unit -(00) Other J-K/38- Control Rod Drive Old w 1, Position 17 Reactor 517.5 39,43-44 System Y RRC y Basis?"-'I ment?i Accumulator, (21) Tanks and Heat In Hydraulic Control Rod Drive Old w 1, Position 8 Exchangers Reactor 517.5 n Hti RRC CU System lator Insertion (07) Fluid-Operated Valves Old East Bank, Row Reactor 517.5 In Hydraulic Control Rod Drive YRRC~-0)CU System)-10)v to Scram (07) Fluid-Operated Valves Old ume Scram Reactor 5175 In Hydraulic Control Rod Drive y RRC ink, Row 1, CU System c Control Unit -(00) Other J-K/38- Control Rod Drive Ney w 1, Position 8 Reactor 517.5 39,43-44 System Y RRC y ink Scram (21) Tanks and Heat Reactor 517.5 J-L/43-44 Control Rod Drive RRC ume Tank Exchangers System ,NELS/ Control (20) Instrumentation and N/A 534 C. RM PNL Control Room y Racks &Control Panels and Cabinets 902-3 Panels Panels ,NELS/ Control (20) Instrumentation and C. RM PL Control Room Racks &Control Panels and Cabinets N/A902-15 Panels Panelsy ,NELS/ Control (20) Instrumentation and C. RM PL Control Room y Racks &Control Panels and Cabinets N/A 534 902-36 Panels Panels Y ,NELS/ Control (20) Instrumentation and Turbine 517.5 AEER PNL Control Room y Racks &Control Panels and Cabinets 902-39 Panels Panels ,NELS/ Control (20) Instrumentation and Turbine AEER PNL Control Room y Racks &Control Panels and Cabinets 517.5 902-41 Panels Panels Y-OOLING/ Shut (08) Motor-Operated and Suction Line Solenoid-Operated Valves Reactor 517.5 H-J/39-40 Shutdown Cooling Y CF DOOLING/ (08) Motor-Operated and TORUS Reactor 476.5 BAY Shutdown Cooling Y RCIC/CF Valve Solenoid-Operated Valves BAY J/38 ONDENSER/

(08) Motor-Operated and Isolation Line Isolation Solenoid-Operated Valves Reactor 537 DRYWELL Condenser Y CF System Exchanger Outlet (08) Motor-Operated and SE C.RM M-Line Valve Solenoid-Operated Valves Reactor 476.5 N/38 LPCI Y DHR ection Line Valve (08) Motor-Operated and Solenoid-Operated Valves Reactor 517.5 K/38-39 LPCI Y RCIC/DHR;sion Chamber (08) Motor-Operated and TORUS lve Solenoid-Operated Valves BAY 2 J Pump "A" (05) Horizontal Pumps Turbine 495 D/36 LPCI Y DHR Basis?... ... -/? ment?Basrisw(18 IstrmementRck

ýader Flow (18) Instruments on Racks Reactor 476.5 M-N/38-39 LPCI Y RCIC/DHR ection Pump "A" (06) Vertical Pumps Reactor 476.5 SE C.RM LPCI Y RCIC/DHR N/39_atExchanger (21)__Tanks19andHeatSE C.RM M-.at Exchanger Tanks and Heat Reactor 476.5 LPCI Y DHR y Exchangers N/38/ Pump "A" and (18) Instruments on Racks Reactor 476.5 M-N/38-39 LPCI Y DHR F lo w E le m e n t R e a c to r 4 7 6 .5 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _;sion Pool (07) Fluid-Operated Valves Reactor 476.5 SE C.RM LPCI Y RCIC/DHR N" Relief Valve N/39 UPPRESSION/

(07) Fluid-Operated Valves Reactor 476 TORUS Drywell Y CF Line Valve Reacto_476.

BAY 8 Containment UPPRESSION/

(07) Fluid-Operated Valves Purge Line Valve Reactor 476.5 TOU DrFient BAY 8 Containment C*UPPRESSION/

(07) Fluid-Operated Valves Reactor 570 FPC RM Drywell ation Line Valve ReactorU57 L/40-41 Containment CF UPPRESSION/

(07) Fluid-Operated Valves Reactor 570 J-K/42 Drywell)rus Vent Valve Reato Containment Y CF*UPPRESSION/

(08) Motor-Operated and TORUS Drywell Nitr. Makeup Solenoid-Operated Valves Reactor 476.5 BAY 9 Containment UPPRESSION/

(07) Fluid-Operated Valves Reactor 570 FPC RM Drywell ition Line Valve Reactor 570 L/40-41 Containment Y CF UPPRESSION/

(07) Fluid-Operated Valves RWCU Drywell: SBGT Line Reactor 570 RWCU Drywent Y CF DEMIN J/42 Containment NT DRAIN/ (07) Fluid-Operated Valves TORUS Radwaste / Spent nent Drain Line Reactor 476.5 Y CF BAY 4 Fuel Pool NT DRAIN/ (07) Fluid-Operated Valves Reactor 476.5 TORUS Radwaste / Spent Y CF)rain Line Valve Reactor 476.5 BAY 14 Fuel Pool'RACKS/ (18) Instruments on Racks Reactor 545.5 M/41 Local Panels & Y Racks &ck 2202-6 Racks (Radwaste)

Panels-RACKS/ (18) Instruments on Racks React or 517.5 K/43 Local Panels & Y Racks &ck 2202-8 Racks (Radwaste)

Panels RACKS/ (18) Instruments on Racks Turbine 517.5 AEER 2202- Local Panels & Y Racks &y ck 2202-70A 70A Racks (Radwaste)

Panels-RACKS/ (18) Instruments on Racks Tubie2382-5Local Panels & Racks &ck 2202-73A Turbine 538 H/5 7A Racks (Radwaste)

Y Panels Y (2) ntrmnttonan G M G Local Panels & Racks&RAK/ (8 ntuet nRcs Turbine 517.5 /3 Y y ,NEU DG-, -I -_ -- m -- -(20) Instrumentation and Turbine 517.5 DG RM2 G- Local Panels &Y Racks &____ -I-¥ Basis?ment?,NEL/ DG (20) Instrumentation and Turbine 517.5 DG RM2 G- Local Panels & y Racks & Y ,inet Control Panels and Cabinets H/35 Racks (Radwaste)

Panels-RACKS/ (18) Instruments on Racks Reactor 5455 N/42 Local Panels & Racks & y ck 2252-84 Reactor 545.5 N/42 Racks (Radwaste)

Panels Y Steam Line (08) Motor-Operated and Reactor 476.5 HP RM2 HPCI Y RCIC PR)Solenoid-Operated Valves N/45 RA\sate Tank (08) Motor-Operated and Reactor 476.5 HP RM2 HPCI Y RCIC PRi.I Pump Valve Solenoid-Operated Valves N/44 ump Injection (08) Motor-Operated and Turbine 517.5 X AREA G- HPCI Y RCIC PR)Solenoid-Operated Valves H/41 RA\;sion Pool (08) Motor-Operated and HP RM2 PR)Ialve Solenoid-Operated Valves Reactor 476.5 N/44 HPCI Y RCIC urbine Cooling (05) Horizontal Pumps Reactor 476.5 HP RM2 HPCI Y RCIC N/44 ump (05) Horizontal Pumps Reactor 476.5 HP RM2 HPCI Y RCIC PRA N/45 RA\ieal Condenser (09) Fans Reactor 476.5 HP RM2 HPCI Y RCIC N/45-46 urbine Pressure (20) Instrumentation and HP RM2RCIC Control Panels and Cabinets N/44/ell Coolers Inlet (08) Motor-Operated and Reactor 545.5 L-M/40 Rx Bldg Closed y Auxiliary

&alve Solenoid-Operated Valves Cooling Water Support TER/ Diesel (05) Horizontal Pumps Service Water Auxiliary

&fling Water Pump C. House 490.67 A-B/4 System Y Support"RATOR/ (12) Air Compressors DG RM2 G- Auxiliary

&Jr Receiver Unit Turbine 528.25 DG Service Air System Y H/35 Support-RATOR/ Fuel (05) Horizontal Pumps Turbine 517.5 DG RM2 G- Diesel Oil System y Auxiliary

&imp H/35 Support Y nergency Room (10) Air Handlers Reactor 476.5 SE C.RM Heating Boilers & Y RCIC y Reactor___

476.5__ M/38 Ventilation System YRCICy mergency Air (10) Air Handlers Reactor 476.5 HP RM2 Heating Boilers & y RCIC PRj N/45 Ventilation System RA\ERATOR/ Diesel (17) Engine-Generators Turbine 517.5 DG RM2 G- Diesel Generator Y Auxiliary

& PR'Generator H/35 Support'itchgear 23 (03) Medium Voltage 4160 Volt Electrical Switchgear Turbine 534 D-E/31-32 4160hea Volt_ yses ___-her2 wtherSwitchgear Y SystemsY (02) Low Voltage Switchgear Reactor 570 M-N/40-41 480 Volt Electrical EC chgear 2 (02) Low Voltage Switchgear Systems lr02/'l.chgear 29 (02) Low Voltage Switchgear Reactor 570 M-N/40-41 480 Vo It Y Electrical EC__11 Y V Basis?ment?isformer 29, (04) Transformers Electrical lEC gearReactor 570 N40 Transformer 29/39 Y Systems Y 08/(N PANELS/ (20) Instrumentation and Reactor 517.5 U38 480 Volt MCCS y Racks &nel 28-1-1 Control Panels and Cabinets Panels 28-7 (01) Motor Control Centers Electrical Reactor 517.5 N/40 480 Volt MCCS Y Systems Y ery Charger #2A (16) Battery Chargers and Turbine 549 B RM2 E/31 125 VDC / 250 Electrical EC________I nverters _____ _____VDC Systems ____ ____09/1 ery Charger #2 (16) Battery Chargers and EC Inverters 125 VDC / 250 Electrical 09/'Turbine 549 B RM2 E/31 VDC Systems Y EC 05/: ery #2, Feed to (15) Batteries on Racks Turbine 549 B RM2 E/31 125 VDC / 250 y Electrical Y PR 3 #2 Turbine 549 VDC Systems RAI Bus #2A (ROB- (01) Motor Control Centers Reactor 570 M-N/41-42 VDC /250 Electrical Y Y EC Rectr 7 MN/1-2VDC Systems yy 02/(Bus #2B (ROB- (01) Motor Control Centers Reactor 570 M-N/41-42 125 VDC / 250 y Electrical Y y EC VDC Systems 01y/3attery Bus #2, (01) Motor Control Centers Turbine 549 B RM2 E/31 125 VDC /250 Electrical Y Y EC 3us #2A-1 ___________

___ ____ ____VDC Systems yy 12/'125V DC (01) Motor Control Centers Reactor 570 MN/41-42 125 VDC / 250 Electrical y y EC inel#2 Reactor 570 VDC Systems Y Y 02/(3ker to TB MCC (14) Distribution Panels Turbine 549 G/31-32 125 VDC / 250 y Electrical

ry #2) VDC Systems ery #2 (15) Batteries on Racks Turbine 549 B RM2 E/31 125 VDC / 250 y Electrical VDC Systems*eaker to Battery (14) Distribution Panels 345 kV Switchyard Electrical

+)Turbine 549 F/3132 DC System Systems stribution Panel (01) Motor Control Centers Turbine 549 B RM2 E/31 345 kV Switchyard y Electrical DC System Systems ,NEL/ Unit 2 (20) Instrumentation and DG RM2 G- Racks &tor Control Panel Control Panels and Cabinets Turbine 517.5 H/35 YPanels ,NEU Unit 2 (20) Instrumentation and Turbine 517.5 DG RM2 G- y Racks &ding Cabinet Control Panels and Cabinets H/35 Panels 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 C Seismic Walkdown Checklists (SWCs)Table C-1 provides a description of each item, anchorage verification confirmation, a list of Area Walk-By Checklists associated with each item, comments, and page numbers of each Seismic Walkdown Checklist.

C-1 12Q0108.30-R-001, Rev. I Correspondence No.: RS-12-167 Table C-1. Summary of Seismic Walkdown Checklists COMPONENT Anchorage C O DESCRIPTION Verification AWC COMMENTS PAGE ID Confirmed?

DOO-2223-CONTROL PANEL/ DG 0033 Relaying and Metering Cabinet D00-2223-CONTROL PANEL/ DG Y 14 C-12 0041 Excitation Cabinet D00-2350-A----.

HPCI/ Storage Tank Level N 29 C- 16 LS Switch D00-5202 ------ DIESEL GENERATOR/

Diesel N 34 C- 19 T05 Fuel Oil Storage Day Tank N 34__1 CONTROL ROOM 00-572 VENTILATION/

CCSW Cooling N/A 31 C- 23 Supply Valve D00-83250-0---

B05 250V DC/ Battery Charger #2/3 N 33 C-27 B05 DOO-9400-CONTROL ROOM VENTILATION/

Air Filtration Y 31 C- 31 Unit Heater DOO-9400-CONTROL ROOM VENTILATION/

AFU Booster Y 31 C- 35 0104AF05 Fa________

Fan D02-0202-REACTOR RECIRCULATION/

N/A OUTAGE 0005AV20 Recirc Pump A Discharge Valve D02-0203-MAIN STEAM/ Isolation Valve N/A OUTAGE 0001 AV05 D02-0203-ADS/ Target Rock Valve N/A OUTAGE 0003AV26 D02-0203-ADS/ Electromatic Relief Valve N/A OUTAGE 0003BV26 D02-0203-ADS/REACTOR OVERPRESSURE RELIEF N/A OUTAGE 0004AV26 VAV________

VALVE D02-0302-CRD/ Backup Scram Solenoid N/A 3 C- 39 0019AV27 Valve D02-0302-CRD/ West Bank SDV Tank 0082A-LS Level Switch D02-0302-CRD/ West Bank SDV Tank N/A 19 C-47 0108A-LE Level Element D02-0302-CRD/ West Bank SDV Tank N 20 C- 50 0109C-LT Level Transmitter D02-0302-CRD/ West Bank Scram 0157AV05 Discharge Volume Drain Valve Table C-1 Page 1 of 6 C-2 12Q0108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 COMPONENT Anchorage C O DESCRIPTION Verification AWC COMMENTS PAGE ID Confirmed?

D02-0302-CRD/ West Bank Scram 0158AV05 Discharge Volume Drain Valve D02-0305-CRD/ Insertion Accumulator, 0014-0027-West Bank, Row 8, Position 21 N/A 20 C- 65 0125-Al 0 (D-7)D02-0305-CRD/ Accumulator Insertion 0014-0027-Scram Valve, West Bank Row N/A 20 C- 67 0126-V05 8, Position 21 (D-7)D02-0305-CRD/ Withdraw to Scram 0014-0027-Discharge Volume Scram Valve, N/A 20 C- 69 West Bank Row 8, Position 21 0127-V05 (D7 (D-7)D02-0305--

CRD/ Hydraulic Control Unit -0014-0027-West Bank, Row 8, Position 21 Y 20 C- 71 H20 (D-7)D02-0305-CRD/ Insertion Accumulator, 0030-0035-West Bank, Row 8, Position 2 N/A 20 C-77 0125-Al0 (H-9)D02-0305-CRD/ Accumulator Insertion 0030-0035-Scram Valve, West Bank Row N/A 20 C- 79 0126-VO5 8, Position 2 (H-9)D02-0305-CRD/ Withdraw to Scram 0030-0035-Discharge Volume Scram Valve, N/A 20 C- 81 01 2V05 West Bank Row 8, Position 2 (H-9)D02-0305-CRD/ Hydraulic Control Unit -0030-0035-West Bank, Row 8, Position 2 Y 20 C- 83 H20 (H-9)D02-0305-CRD/ Insertion Accumulator, 0046-0023-East Bank, Row 1, Position'17 N/A 3 C- 91 0125-AlO (M-6)D02-0305-CRD/ Accumulator Insertion 0046-0023-Scram Valve, East Bank, Row N/A 3 C- 93 0126-VO5 1, Postion 17 (M-6)D02-0305..

CRD/ Withdraw to Scram 0046-0023-Discharge Volume Scram Valve, N/A 3 C- 95 East Bank, Row 1, Postion 17 0127-V05 (-6 _____(M-6)D02-0305-CRD/ Hydraulic Control Unit -0046-0023-East Bank, Row 1, Position 17 Y 3 C- 97 H20 (M-6)D02-0305-CRD/ Insertion Accumulator, 0054-0039-East Bank, Row 1, Position 8 (P- N/A 3 C- 103 0125-Al0 10) 1 1 1 1 1 Table C-1 Page 2 of 6 C-3 12Qo108.30-R-eo1, Rev. 1 Correspondence No.: RS-12-167 COMPONENT Anchorage C O DESCRIPTION Verification AWC COMMENTS PAGE ID Confirmed?

D02-0305-CRD/ Accumulator Insertion 0054-0039-Scram Valve, East Bank, Row N/A 3 C- 105 0126-VO5 1, Postion 8 (P-10)D02-0305-CRD/ Withdraw to Scram 0054-0039-Discharge Volume Scram Valve, N/A 3 C- 107 East Bank, Row 1, Postion 8 (P-0127-V05 1) __10)D02-0305-CRD/ Hydraulic Control Unit -0054-0039-East Bank, Row 1, Position 8 (P- Y 3 C- 109 H20 10)D02-0318-A----

CRD/ West Bank Scram T05 Discharge Volume Tank D02-0902-CONTROL PANELS/ Control -C- 118 0003 Panel 902-3 D02-0902-CONTROL PANELS/ Control -C- 121 0015 Panel 902-15 D02-0902-CONTROL PANELS/ Control 0036 Panel 902-36 D02-0902-CONTROL PANELS/ Control Y 26 C- 128 0039 Panel 902-39 D02-0902-CONTROL PANELS/ Control 0041 Panel 902-41 002-1 001- SHUTDOWN COOLING/ Shut Down Pumps Suction Line N/A 18 C-137 0002AV20 Vav______Valve D02-1001-SHUTDOWN COOLING/N/A 7C- 141 0005AV20 Injection Line Valve D02-1301 -ISOLATION CONDENSER/

Steam Return Line isolation N/A OUTAGE 0004-V20 Vav______Valve D02-1501-CCSW/ Heat Exchanger Outlet N/A 5 C-145 0003AV20 Service Water Line Valve D02-1501-LPCI/ LPCI Injection Line Valve N/A 3 & 10 C- 148 0021AV20 D02-1501-LPCI/ Suppression Chamber N/A 8 C-153 0038AV20 Spray Line Valve 002-1501-CCSW/ CCSW Pump "A" Y 27 C-157 0044AP30 D02-1501-LPCI/ LPCI Header Flow N 11 C-167 0058A-FT Transmitter 002-1502-A----

LPCI/ LPCI Injection Pump "A" Y 11 C-173 P30 D02-1503-A


00215 LPCI/ LPCI Heat Exchanger Y 5 C-177 H15_ _ _ _ _ __ _ _ _ _ __ _ __ _ _ _Table C-1 Page 3 of 6 C-4 12Q0108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 COMPONENT Anchorage C O DESCRIPTION Verification AWC COMMENTS PAGE ID Confirmed?

D02-1541 ----- A- CCSW/ CCSW Pump "A" and N/A OUTAGE FE "B" Discharge Flow Element D02-1599-LPCI/ Suppression Pool Suction N/A 11 C- 181 0013AV26 Line "A" Relief Valve D02-1601-PRESSURE SUPPRESSION/

0021-VO5 Drywell Purge Line Valve D02-1601-PRESSURE SUPPRESSION/

0022-VO5 Drywell/Torus Purge Line Valve D02-1601-PRESSURE SUPPRESSION/

0023-VO5 Drywell Ventiliation Line Valve N/A 4 C- 184 D02-1601-PRESSURE SUPPRESSION/

0024-VO5 Drywell and Torus Vent Valve D02-1601 -PRESSURE SUPPRESSION/

0057-V20 Drywell/Torus Nitr. Makeup N/A OUTAGE Valve D02-1601-PRESSURE SUPPRESSION/

0062-VO5 Drywell Ventilation Line Valve N/A 4 C-194 PRESSURE SUPPRESSION/

D060- Containment to SBGT Line N/A 23 C- 197 0063-V05 Vle______

___ _____Valve D02-2001 -RB EQUIPMENT DRAIN/0005-VO5 Drywell Equipment Drain Line N/A OUTAGE Valve D02-2001-RB EQUIPMENT DRAIN/01 05-VO5 Drywell Floor Drain Line Valve D02-2202-INSTRUMENT RACKS/0006 Instrument Rack 2202-6Y21C20 D02-2202-INSTRUMENT RACKSC-20 0008 Instrument Rack 2202-8 D02-2202-INSTRUMENT RACKS/0070A Instrument Rack 2202-70A D02-2202-INSTRUMENT RACKS/0073A Instrument Rack 2202-73A D02-2252-CONTROL PANEL/ DG 0010 Metering and Relay Cabinet D02-2252-CONTROL PANEL/ DG N 28 C- 224 0021 Excitation Cabinet D02-2252-INSTRUMENT RACKS/0084 Instrument Rack 2252-84 D02-2301-HPCI/ Turbine Steam Line N/A 12 C- 231 0003-V20 Valve N/A 12 _C-_231 D02-2301-HPCI/ Condensate Tank Supply N/A. 12 C- 235 0006-V20 to HPCI Pump Valve I I I I Table C-I Page 4 of 6 C-5 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 COMPONENT Anchorage C O DESCRIPTION Verification AWC COMMENTS PAGE ID Confirmed?

D02-2301-HPCI/ HPCI Pump Injection Line N/A OUTAGE 0008-V20 Valve D02-2301-HPCI/ Suppression Pool Suction N/A 12 C-239 0035-V20 Line Valve D02-2301-HPCI/ HPCI Turbine Cooling Y 12 C- 242 0057-P30 Water Pump D02-2302-HPCI/ HPCI Pump Y 12 C- 246 P30 D02-2320-HPCI/ Gland Seal Condenser 12 C- 250 GSCE-F05 Exhaust Fan D02-2380 ------ HPCl/ HPCI Turbine Pressure N 13 C-255 PSH Switch D02-3702 ------ RBCCW/ Drywell Coolers Inlet N/A 9 C- 259 V20 Header Line Valve D02-3903 ------ SERVICE WATER/ Diesel P30 Generator Cooling Water Pump D02-4600-B


DIESEL GENERATOR/

Primary Y 28 C- 269 T05 Gas Air Receiver Unit "Al" D02-5203 ------ DIESEL GENERATOR/

Fuel Oil 28 C- 273 P30 Transfer Pump D02-5746-A


LPCI/ LPCI Emergency Room 5 C- 277 H15 Air Cooler D02-5747 ------ HPCI/ HPCI Emergency Air 12 C- 281 H15 Cooler D02-6601 ------ DIESEL GENERATOR/

Diesel Y 28 C- 284 G05 Engine Driven Generator D42-6723-4160V AC/ Switchgear 23 Y 30 C-288 S35 D02-7328-480V AC/ Switchgear 28 Y 22 C- 292 S35 D02-7329-....

S35 480V AC/ Switchgear 29 Y 22 C-298 S35 D02-7329 ------ 480V AC/ Transformer 29, Feed T10 to Switchgear 29 N 22 C- 302 D02-7828-1-1--

DISTRIBUTION PANELS/ Y 15 C- 306 P06 Distribution Panel 28-1-1 D02-7828-7----

480V AC/ MCC 28-7 Y 16 C- 309 M05 D02-8300--2A-125V DC/ Battery Charger #2A Y 33 C- 314 B05 D02-8300--2---

D05 0 I 125V DC/ Battery Charger #2 Y 33 C- 317 805 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Table C-1 Page 5 of 6 C-6 12Q0108.30-R-001, Rev. I Correspondence No.: RS-12-167 COMPONENT Anchorage C O DESCRIPTION Verification AWC COMMENTS PAGE ID Confirmed?

D02-8300--BC-.

125V DC/ Battery #2, Feed to Y 24 C- 320 B04 TB Battery Bus #2 D02-8302A


250V DC/ MCC Bus #2A (ROB- Y 22 C- 324 M05 RB MCC #2)D02-8302B


250V DC/ MCC Bus #2B (ROB- y 22 C- 329 M05 RB MCC #2) __2_ C-32 D02-83125-2---

125V DC/ TB Battery Bus #2, N 33 C- 335 P06 Feed to Main Bus #2A-1 N_3C _3 D02-83125


125V DC/ RB 125V DC Y 22 C- 340 P06 Distribution Panel #2 1 D02-83250-250V DC/ Breaker to TB MCC A01-M05 #2 (ROB-Battery

  1. 2)D02-83250-250V DC/ Battery #2 Y 25 C- 350 B04 D02-9802A-24/48V DC/ Breaker to Battery N 33 C- 353 A21-B11 Charger #2A (+)D02-9802-A

24/48V DC/ Distribution Panel P06 #2A N 33 C-355 D02-DGCP CONTROL PANEL Unit 2 Diesel Generator Control Panel D02-NGC CONTROL PANEL/ Unit 2 N 28 C- 361_Neutral Grounding Cabinet I Table C-1 Page 6 of 6 C-7 12Q0108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-2223-0033 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL DG Relaying and Metering Cabinet Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 504.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-8 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Seismic Walkdown Checklist (SWC)Status: Y- N U Equipment ID No.: D00-2223-0033 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANIEU DG Relaying and Metering Cabinet Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Cabinet is attached to adjacent cabinet 2/3-6600 NGT at top to prevent interaction between the two.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Panel welded to the floor. On the front end of the panel there are 1" long x 3/16" fillets in each corner and in the rear there are one 3/4" long 3/16" fillet in one corner and one 1/2" long 3/16" fillet in the other.Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 Evaluated by: 9c.AdQ,- David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-9 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

DOO-2223-0033 (20) Instrumentation and Control Panels and Cabinets CONTROL PANEL/ DG Relaying and Metering Cabinet Photos M(U._UZ41 MU U242 C-10 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: E[I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D00-2223-0033 Equipment Class: (20) Instrumentation and Control Panels and Cabinets MG_0243 MG0244 MG 0245 C-11 12Qo108.30-R-O-1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: F-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D00-2223-0041 Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment Descriotion:

CONTROL PANEL DG Excitation Cabinet Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 504.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraae 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-12 12QO108.30-R-oo1, Rev. 1 Correspondence No.: RS-1 2-1 67 Sheet 2 of 4 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-2223-0041 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL DG Excitation Cabinet Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

1-inch clearance to adjacent panel 2223-33. Gap is judged to be acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Panel welded to the floor. The panel is welded to an embed with 3/16" thick fillets. Base angle encases a concrete pad.Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 Evaluated by: ,QJA -David Carter Date: 10/2/2012ý- C" '4e James Griffith 10/2/2012 C-13 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauioment Descriotion:

DOO-2223-0041 (20) Instrumentation and Control Panels and Cabinets CONTROL PANEL/ DG Excitation Cabinet Photos MG 0238 MG 0239 C-14 12QO108.30-R-0O1, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-2223-0041 Equipment Class: (20) Instrumentation and Control Panels and Cabinets EaUiDment Descriotion:

CONTROL PANEL DG Excitation Cabinet MG 0240 C-15 12QO108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-2350-A


LS Equipment Class: (18) Instruments on Racks Eauipment Descriotion:

HPCI/ Storage Tank Level Switch Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Tube steel cantilever floor support with four anchors.Yes C-16 12Q-108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: FY-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-2350-A


LS Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

HPCI/ Storage Tank Level Switch Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/17/2012 Evaluated by: xQJAdQ-.k David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-17 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: [-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-2350-A


LS Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

HPCI/ Storage Tank Level Switch MG 0200 MG 0201 C-18 12QO108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 1 of 4 Status: [FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D00-5202 ------ T05 Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

DIESEL GENERATOR/

Diesel Fuel Oil Storage Day Tank Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

-Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Minor shrinkage cracking in grout pad judged to be acceptable.

5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes C-19 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: FYj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-5202 ------ T05 Equipment Class: (21) Tanks and Heat Exchangers EquiDment DescriDtion:

DIESEL GENERATOR/

Diesel Fuel Oil StoraQe Day Tank 8. Are overhead equipment, distribution systems, ceiling tiles and ,lighting, and masonry block walls not likely to collapse onto the equipment?

Diesel oil day tank room masonry walls are safety-related (drawing B-1709, Rev. A).9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & B. Weight -10/15/2012 Evaluated by: James Griffith Date: 10/24/2012 Bryan Weight 10/24/2012 C-20 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-5202----T05 Equipment Class: (21) Tanks and He Ecuipment

==

Description:==

DIESEL GENERAl at Exchangers OR/ Diesel Fuel Oil Storage Day Tank Photos C-21 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D00-5202 ------ T05 Equipment Class: (21) Tanks and Heat Exchangers C-22 12QO108.30-R-0O1, Rev. I Correspondence No.: RS-12-167 Sheet 1 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D00-5741-0048AV72 Equipment Class: (7) Fluid-Operated Valves EauiDment Descriotion:

CONTROL ROOM VENTILATION/

CCSW Coolina SuDoIv Valve Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 534.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage

.1 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yoke support anchorage acceptable.

Yes C-23 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D00-5741-0048AV72 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

CONTROL ROOM VENTILATION/

CCSW Cooling Supply Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

1-inch clearance between pipe and solenoid.

Judged acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/16/2012 Evaluated by: P=fJk- David Carter Date: 10/2/2012 D' e James Griffith 10/2/2012 C-24 12Q0108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: FYj] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

D00-5741-0048AV72 (7) Fluid-Operated Valves CONTROL ROOM VENTILATION/

CCSW Cooling Supply Valve MG 0090 MG_0092 MG 0093 C-25 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-5741-0048AV72 Equipment Class: (7) Fluid-Operated Valves MG_0094 MG 0096 MG 0097 C-26 i2QO1O8.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: Fj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-83250-0---B05 Equipment Class: (16) Battery Chargers and Inverters Eauipment

==

Description:==

250V DC/ Battery Charaer #2/3 Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 549.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas.

Additional space is Drovided at the end of this checklist for documentina other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?No Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-27 12-Q108.30-R-0o1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-83250-0---B05 Equipment Class: (16) Battery Chargers and Inverters EQuipment

==

Description:==

250V DC/ Battery Charqer #2/3 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Lighting above 250V #2 and #2/3 battery chargers has open S-hooks to be addressed via CAP.IR 1389329: There are two lights above U-213 250 VDC battery charger and the U-2 250 VDC Battery Charger that have open 'S' hooks at the link at the ceiling.Discussed with Operations.

Mitigating items prevent interaction with battery chargers.

Judged to be acceptable.

Masonry wall in vicinity.

Safety related wall.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions.that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/16/2012 Evaluated by: 9QJV0Q.k-David Carter Date: 10/2/2012ý- b James Griffith 10/2/2012 C-28 1200108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

DOO-83250-O-B305 (16) Battery Chargers and Inverters 250V DC/ Battery Charger #2/3 Photos MG 0064 MG 0065 C-29 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: DOO-83250-0---B05 (16) Battery Chargers and Inverters MG_0070 MU UU71 MG 0072 C-30 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0101-FlO Equipment Class: (11) Chillers Equipment

==

Description:==

CONTROL ROOM VENTILATION/

Air Filtration Unit Heater Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 534.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-31 12Q0108.30-R-0o1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: [-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0101-FlO Equipment Class: (11) Chillers Equipment

==

Description:==

CONTROL ROOM VENTILATION/

Air Filtration Unit Heater Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Unit mounted by 8 -3/4" concrete expansion anchors, 4 per side.Seismic Walkdown Team: D. Carter & J. Griffith -7/16/2012 Evaluated by: David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-32 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0101-F10 Equipment Class: (11) Chillers Equipment

==

Description:==

CONTROL ROOM VENTILATION/

Air Filtration Unit Heater MG 0107 MG 0108 C-33 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: DOO-9400-0101-Fl 0 (11) Chillers M(.011 U MU U1 11 C-34 12QO108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 1 of 4 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0104AF05 Equipment Class: (9) Fans Equipment

==

Description:==

CONTROL ROOM VENTILATION/

AFU Booster Fan Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 534.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes Yes Yes Yes C-35 12Q-108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0104AF05 Equipment Class: (9) Fans Eauioment

==

Description:==

CONTROL ROOM VENTILATION/

AFU Booster Fan Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Duct support and fan support are common and are judged to be acceptable.
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found noadverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Small fan mounted by 6 -3/8" Wedge type concrete expansion anchors.Seismic Walkdown Team: D. Carter & J. Griffith -7/16/2012 Evaluated by: AQ,/,-.1k David Carter Date: 10/2/2012" b James Griffith 10/2/2012 C-36 12Q0108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 3 of 4 Status: r-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D00-9400-0104AF05 Equipment Class: (9) Fans Equipment

==

Description:==

CONTROL ROOM VENTILATION/

AFU Booster Fan Photos MG 0100 MG 0101 C-37 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 4 Status: [-7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0104AF05 Equipment Class: (9) Fans MG 0102 MG 0104 C-38 12QO108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CRD/ Backup Scram Solenoid Valve Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.

Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-39 12.. 108.30-R-oo1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CRD/ Backup Scram Solenoid Valve Interaction Effects.7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/18/2012 Evaluated by: 9.JA/.k David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-40 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CRD/ Backup Scram Solenoid Valve Photos RI1.. 1I4KA MG 0365 MG 0367 C-41 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0082A-LS Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ West Bank SDV Tank Level Switch Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Wall-mounted box with 4 anchors (2 top, 2 bottom) at outside face of TIP room wall near west CRD bank.Yes C-42 12Q-108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0082A-LS Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ West Bank SDV Tank Level Switch Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes, adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/18/2012 See Area Walkby for rack 2202-8.Evaluated by: Q.&/~k David Carter Date: 10/2/2012 J- James Griffith 10/2/2012 C-43 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0082A-LS Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ West Bank SDV Tank Level Switch Photos MG_0430 MG_0431 C-44 12Q0108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 4 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D02-0302-0082A-LS (18) Instruments on Racks I1 MG 0434 MG 0435 C-45 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0082A-LS Equipment Class: (18) Instruments on Racks V Tank I MG 0436 MG 0437 C-46 12Q0108.30-R-001, Rev. I Correspondence No.: RS-12-167 Sheet 1 of 3 Status: [- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0108A-LE Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ West Bank SDV Tank Level Element Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Level element fastened to SDV tank D02-0318-A---T05 Yes C-47 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0108A-LE Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ West Bank SDV Tank Level Element Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/19/2012 Evaluated by: sQ-AJQ-. David Carter Date: 10/2/2012 (T- James Griffith 10/2/2012 C-48 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0108A-LE Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ West Bank SDV Tank Level Element MGU0U75 MG 0676 C-49 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0109C-LT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ West Bank SDV Tank Level Transmitter Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage'configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Level transmitter mounted to manufacturer's bracket. Bracket is bolted to plate (4 bolts). Plate is bolted to 2 unistruts (2 bolts each). Unistruts welded to 4-anchor base plate. Base plate bolted to outside face of TIP room wall near west CRD bank.Yes C-50 1200108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0109C-LT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ West Bank SDV Tank Level Transmitter Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/18/2012 See Area Walk-by for rack 2202-8.Evaluated by: David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-51 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0109C-LT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ West Bank SDV Tank Level Transmitter Photos MG_0438 MG 0439 MG_0440 MG_0446 C-52 12Q0108.30-R-OO1, Rev. I Correspondence No.: RS-12-167 Sheet 4 of 5 Status: F IN U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0109C-LT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ West Bank SDV Tan k Level Transn MG 0449 M(U U45U C-53 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: Fj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 002-0302-01 09C-LT (18) Instruments on Racks Pon/ Itu T MUU403 MU 0451 C-54 12QO108.30-R-O01, Rev. 1 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: F71 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0157AV05 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

CRD/ West Bank Scram Discharge Volume Drain Valve Project: Dresden 2 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-55 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0157AV05 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

CRD/ West Bank Scram Discharge Volume Drain Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -7/20/2012 Evaluated by: Z-ak4Y, David Carter Date: 10/2/2012 James Griffith 10/2/2012 C-56 1200108.30-R-OO1, Rev. 1 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: FLI_ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauioment Descriotion:

D02-0302-0157AV05 (7) Fluid-Operated Valves CRD/ West Bank Scram Discharge Volume Drain Valve Photos Photos MG 0890 MU UUM C-57 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D02-0302-0157AV05 Equipment Class: (7) Fluid-Operated Valves MG 0899 MG 0900 C-58 12Q0108.30-R-001, Rev. 1 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D02-0302-0157AV05 (7) Fluid-Operated Valves Discharge Volume Drain Valve MG_0901 C-59