12Q0106.30-R-002, Rev. 2, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 3, Part 2 of 11
ML12348A256
Person / Time
Site: Dresden Constellation icon.png
Issue date: 11/15/2012
From: Delaney M
Exelon Generation Co, Stevenson & Associates
To:
Office of Nuclear Reactor Regulation
References
RS-12-167 12Q0106.30-R-002, Rev 2
Download: ML12348A256 (66)


Text

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 11 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0102-R15 Equipment Class: (11) Chillers Equipment

==

Description:==

CONTROL ROOM VENTILATION/

Refrigeration Condensing Unit Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 534.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes Additional washers under some anchor nuts judged to be acceptable.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes Shrinkage cracks in floor judged to be acceptable.

5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-23 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 11 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D00-9400-0102-R15 Equipment Class: (11) Chillers Equipment

==

Description:==

CONTROL ROOM VENTILATION/

Refrigeration Condensing Unit Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tilesand lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Compressor/chiller mounted by 8 -3/4" Wedge type concrete expansion anchors, 4 per side.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/30/2012 Area walk-by for Unit 2 Ventilation Room also pertains to this piece of equipment.

Evaluated by: ' James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-24 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 11 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0102-R15 Equipment Class: (11) Chillers Equipment

==

Description:==

CONTROL ROOM VENTILATION/

Refrigeration Condensing Unit C-25 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 11 Status: [y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0102-R15 Equipment Class: (11) Chillers C-26 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 11 Status: EY-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0102-R15 Equipment Class: (11) Chillers C-27 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 11 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0102-R15 Equipment Class: (11) Chillers n: CONTROL ROOM VENTILATI C-28 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 11 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0102-R15 Equipment Class: (11) Chillers C-29 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 11 Status: Y-ZI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0102-R15 Equipment Class: (11) Chillers C-30 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 11 Status: EII1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0102-R15 Equipment Class: (11) Chillers C-31 Dresden Generating Station Unit 3 1200108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 10 of 11 Status: LIII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0102-R15 Equipment Class: (11) Chillers C-32 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 11 of 11 Status: YI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0102-R15 Equipment Class: (11) Chillers nmpnt 1npAnrintion:

CONTROL F)OM VENTILATION/

Refrigeration Condensing Unit=C-33 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0104BF05 Equipment Class: (9) Fans Equipment

==

Description:==

CONTROL ROOM VENTILATION/

AFU Booster Fan Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 534.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-34 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D00-9400-0104BF05 Equipment Class: (9) Fans Equipment

==

Description:==

CONTROL ROOM VENTILATION/

AFU Booster Fan Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Lighting fixtures judged to be acceptable.

Adjacent masonry walls are well-supported and judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Small fan mounted by 6 -3/8" Wedge type concrete expansion anchors.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/30/2012 Fan DOO-9400-104A area walk-by pertains to this fan also.Evaluated by: 1 ' James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-35 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: T1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0104BF05 Equipment Class: (9) Fans Equipment

==

Description:==

CONTROL ROOM VENTILATION/

AFU Booster Fan 20120730-Dresden-3 054 zu1 zU iu-uresoen-j uoo C-36 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0104BF05 Equipment Class: (9) Fans C-37 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0104BF05 Equipment Class: (9) Fans C-38 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: Y--j N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0104BF05 Equipment Class: (9) Fans C-39 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: Y-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-9400-0104BF05 Equipment Class: (9) Fans Equipment

==

Description:==

CONTROL ROOM VENTILATION/

AFU Booster Fan C-40 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D00-ACP Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment

==

Description:==

CONTROL PANEL/ Unit 2/3 Auxiliary Control Panel Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 504.50 ft, ALL Manufacturer/Model:

  • Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWVEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-41 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-ACP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL/ Unit 2/3 Auxiliary Control Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Column mounted panel. Bolted to column with four 3/8" shell type expansion bolts (one in each corner)through a 1/2" shim plate.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 See U2/3 Diesel Generator Room area walk-by notes completed during U2 walkdown for further information.

C-42 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: Y-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-ACP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauinment Descrintion:

CONTROL PANEL/ Unit 2/3 Auxiliarv Control Panel Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-43 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-ACP Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-44 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-ACP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL Unit 2/3 Auxiliary Control Panel IU 20120731-Dresden-3 456 20120731-Dresden-3 457 C-45 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: I-Yj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauipment

==

Description:==

CONTROL PANEL/ Unit 2/3 Diesel Generator Control Panel Project: Dresden 3 SWEL Location (Bldg, Elev,. Room/Area):

Reactor, 504.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Panel is anchored to Diesel Generator skid.5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes Yes C-46 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL Unit 2/3 Diesel Generator Control Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Edge of panel door protrudes.

Door is adequately latched and judged to be acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Several tubes and conduits are in close proximity to one another. All are flexible and all have the same driver (Diesel Generator skid). Tubes and conduits are judged acceptable.

Comments SEWS Anchorage Notes: Panel welded to the base of the skid and braced at the top to the expansion water tank that is supported by the Diesel Skid.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 C-47 Dresden Generating Station Unit 3 1200108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL PANEL Unit 2/3 Diesel Generator Control Panel Photos C-48 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-DGCP Equipment Class: (20) Instrum entation and Control Panels and Cabinets C-49 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-50 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-51 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-DGCP Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-52 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment Descriotion:

CONTROL PANEL/ Unit 2/3 Neutral GroundinQ Cabinet Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 504.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%.of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-53 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment DescriDtion:

CONTROL PANEL Unit 2/3 Neutral Groundina Cabinet Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Cabinet restrained at top to column and Cabinet 2223-33 via 2 clips on each side. Judged to be acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Panel is welded to an embed with 3/16" thick fillets (the two in front are 1/2" long and the two in the rear are 3/4" and 1'" in length) on in each corner of the panel.Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-54 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: LIII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauipment Descriltion:

DOO-NGC (20) Instrumentation and Control Panels and Cabinets CONTROL PANEL/ Unit 2/3 Neutral Grounding Cabinet C-55 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets J Unit C-56 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-57 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: L-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: DOO-NGC Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equioment Descrotion:

CONTROL PANEL/ Unit 2/3 Neutral Groundina Cabinet C-58 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet I of 11 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CRDI Backup Scram Solenoid Valve Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-59 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 11 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CRD/ Backup Scram Solenoid Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 Missing support clamp on copper pipe near Valve 3-302-20B.

Condition judged to be acceptable based on totality of piping system support. See IR 1395804.See U3 West HCU Bank area walk-by for further notes.Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-60 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 11 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CRD/ Backup Scram Solenoid Valve Photos 20 C-61 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 11 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves r-C-62 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 11 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-63 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 11 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-64 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 11 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-65 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 11 Status: Y-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CRDI Backup Scram Solenoid Valve C-66 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 11 Status: E-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-67 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 10 of I1 Status: [1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves ipment

Description:

CRD/ Backup Scram Solenoid Valve C-68 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 11 of 11 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0019AV27 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-69 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082B-LT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ East Bank SDV Tank Level Transmitter Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracks in wall judged to be acceptable.

5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-70 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082B-LT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ East Bank SDV Tank Level Transmitter Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 See U3 East HCU Bank area walk-by for further notes.Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-71 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: EY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082B-LT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ East Bank SDV Tank Level Transmitter Photos C-72 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: YI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082B-LT Equipment Class: (18) Instruments on Racks pment

Description:

CRD/ East Bank SDV Tank C-73 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: [Y-7j N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082B-LT Equipment Class: (18) Instruments on Racks C-74 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: Y-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082B-LT Equipment Class: (18) Instruments on Racks C-75 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-1 2-167 Sheet 1 of 7 Status: ETi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082E-LT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ East Bank SDV Tank Level Transmitter Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage-cracks in wall judged to be acceptable.

5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-76 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: jY-j N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082E-LT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ East Bank SDV Tank Level Transmitter Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 See U3 East HCU Bank area walk-by for further notes.Evaluated by: James Griffith Date: 9(30/2012 Michael Wodarcyk 9/30/2012 C-77 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082E-LT Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CRD/ East Bank SDV Tank Level Transmitter Photos C-78 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082E-LT Equipment Class: (18) Instruments on Racks T C-79 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: [Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082E-LT Equipment Class: (18) Instruments on Racks VT.C-80 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082E-LT Equipment Class: (18) Instruments on Racks Bank SDV Tank C-81 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0302-0082E-LT Equipment Class: (18) Instruments on Racks C-82 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: [V ] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-0125-Al0 Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

CRD/ Insertion Accumulator, West Bank, Row 8, Position 15 (C-8)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

The insertion accumulator is an in-line component that is adequately restrained to the CRD/HCU support frame.Yes C-83 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-0125-Al0 Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

CRD/ Insertion Accumulator, West Bank, Row 8, Position 15 (C-8)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 For photographs, see SWC for D03-0305-0010-0031 -H20.Evaluated by: James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 Photos C-84 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-0126-V05 Equipment Class: (7) Fluid-Operated Valves CRD/ Accumulator Insertion Scram Valve, West Bank, Row 8, Position 15 (C-Equipment

==

Description:==

8)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

The insertion scram valve is an in-line component with the operator adequately restrained to the CRD/HCU support frame.Yes C-85 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-0126-VO5 Equipment Class: (7) Fluid-Operated Valves CRD/ Accumulator Insertion Scram Valve, West Bank, Row 8, Position 15 (C-Equipment

==

Description:==

8)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/12 For photographs, see SWC for D03-0305-0010-0031-H20.

Evaluated by: James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 Photos C-86 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 2 Status: T N, U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-0127-VO5 Equipment Class: (7) Fluid-Operated Valves CRD/ Withdraw to Scram Discharge Volume Scram Valve, West Bank, Row 8, Equipment

==

Description:==

Position 15 (C-8)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

The discharge volume scram valve is an in-line component with the operator adequately restrained to the CRD/HCU support frame.Yes C-87 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 2 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-0305-0010-0031-0127-VO5 Equipment Class: (7) Fluid-Operated Valves CRD/ Withdraw to Scram Discharge Volume Scram Valve, West Bank, Row 8, Equipment

==

Description:==

Position 15 (C-8)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk-7/31/2012 For photographs, see SWC for D03-0305-0010-0031 -H20.Evaluated by: James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 Photos C-88