Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22047A13215 February 2022Owner'S Activity Report Submittal Fifth 10-Year Interval 2021 Refueling Outage ActivitiesPacking leak
ML20303A17523 October 2020Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting
ML18138A3856 March 2019Staff Assessment of Flood Hazard Integrated Assessment (CAC Nos. MG0221 and MG0222; EPID L-2017-JLD-0050)Hydrostatic
FLEX
Fukushima Dai-Ichi
Hardened vent
Backfit
SVPLTR 19-0005, Owner'S Activity Report Submittal Fifth 10-Year Interval 2018 Refueling Outage Activities8 February 2019Owner'S Activity Report Submittal Fifth 10-Year Interval 2018 Refueling Outage Activities
ML18082A08113 March 2018Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-conformances Identified in Response to Regulatory Issues Summary 2015-06, Tornado Missile...Safe Shutdown
Unanalyzed Condition
High winds
Ultimate heat sink
Enforcement Discretion
FLEX
Tornado Generated Missile
Tornado Missile Protection
Spent Fuel Pool Instrumentation
TORMIS
Tornado Missile Risk Evaluator
ML18052A48612 February 2017Owner'S Activity Report Submittal; Fifth 10-Year Interval 2017 Refueling Outage ActivitiesWeld Overlay
Squib
VT-2
Containment Hardened Vent
ML16291A0218 November 2016Staff Review of Spent Fuel Pool Evaluation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1Safe Shutdown Earthquake
Fukushima Dai-Ichi
RS-16-124, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident31 August 2016Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentSafe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
ML16190A1166 July 20162015 Regulatory Commitment Change Summary Report
RS-16-100, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal30 June 2016Mitigating Strategies Flood Hazard Assessment (Msfha) SubmittalSafe Shutdown
Ultimate heat sink
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Earthquake
Hardened vent
SVPLTR 16-0017, Submittal of Post Accident Monitoring Report Instrumentation8 April 2016Submittal of Post Accident Monitoring Report InstrumentationPost Accident Monitoring
ML15307A0564 November 2015Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanisms ReevaluationFukushima Dai-Ichi
RS-15-265, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors23 October 2015Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors
ML15097A51927 April 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Relating to Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-IchiSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML15007A49111 February 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents)FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Design basis earthquake
Containment Hardened Vent
Earthquake
Scaffolding
SVPLTR 15-0014, Owner'S Activity Report Submittal Fifth 10-Year Interval 2014 Refueling Outage Activities11 February 2015Owner'S Activity Report Submittal Fifth 10-Year Interval 2014 Refueling Outage Activities
RS-14-208, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 August 2014Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Ultimate heat sink
Time to boil
FLEX
Hardened vent
GOTHIC
RS-14-122, Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flooding Hazard Reevaluation Report - Redacted19 May 2014Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flooding Hazard Reevaluation Report - RedactedSafe Shutdown
High winds
Fukushima Dai-Ichi
ML14153A00629 April 2014Revision 4 to Local Intense Precipitation Evaluation ReportCommercial Grade Dedication
RS-14-067, Seismic Hazard and Screening Report (Central and Eastern United States (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of The..31 March 2014Seismic Hazard and Screening Report (Central and Eastern United States (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of The..Safe Shutdown
Unanalyzed Condition
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Seismic Walkdown Report
SVPLTR 14-0013, Owner'S Activity Report Submittal Fifth 10-Year Interval 2013 Refueling Outage Activities28 February 2014Owner'S Activity Report Submittal Fifth 10-Year Interval 2013 Refueling Outage Activities
IR 05000272/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000456/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
ML13008A21931 January 2013U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000454/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000461/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000237/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000289/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000254/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000277/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000219/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000352/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000373/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
ML12348A26015 November 201212Q0106.30-R-002, Rev. 2, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 3, Part 6 of 11
ML12348A25615 November 201212Q0106.30-R-002, Rev. 2, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 3, Part 2 of 11Scram Discharge Volume
ML12348A25715 November 201212Q0106.30-R-002, Rev. 2, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 3, Part 3 of 11Scram Discharge Volume
ML12348A25815 November 201212Q0106.30-R-002, Rev. 2, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 3, Part 4 of 11
ML12348A25915 November 201212Q0106.30-R-002, Rev. 2, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 3, Part 5 of 11
ML12348A26115 November 201212Q0106.30-R-002, Rev. 2, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 3, Part 7 of 11
ML12348A26315 November 201212Q0106.30-R-002, Rev. 2, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 3, Part 9 of 11Scaffolding
ML12348A26415 November 201212Q0106.30-R-002, Rev. 2, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 3, Part 10 of 11Scaffolding
ML12348A26615 November 201212Q0108.30-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 2, Part 1 of 7Safe Shutdown
Unanalyzed Condition
Ultimate heat sink
Commercial Grade Dedication
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Arc flash
Fukushima Dai-Ichi
Design basis earthquake
Frazil ice
Earthquake
Scaffolding
Weak link
Power Uprate
Seismic Walkdown Report
ML12348A26715 November 201212Q0108.30-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 2, Part 2 of 7Scram Discharge Volume
ML12348A26815 November 201212Q0108.30-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 2, Part 3 of 7Scram Discharge Volume
ML12348A26915 November 201212Q0108.30-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 2, Part 4 of 7Scram Discharge Volume
ML12348A26215 November 201212Q0106.30-R-002, Rev. 2, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 3, Part 8 of 11
ML12348A27315 November 201212Q0106.30-R-002, Rev. 2, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 3, Part 1 of 11Safe Shutdown
Unanalyzed Condition
Ultimate heat sink
Commercial Grade Dedication
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Arc flash
Fukushima Dai-Ichi
Design basis earthquake
Scram Discharge Volume
Frazil ice
Earthquake
Scaffolding
Weak link
Power Uprate
Seismic Walkdown Report
ML12348A27215 November 201212Q0108.30-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 2, Part 7 of 7Safe Shutdown
Earthquake
Scaffolding
ML12348A27115 November 201212Q0108.30-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 2, Part 6 of 7Scaffolding
ML12348A27015 November 201212Q0108.30-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 2, Part 5 of 7