ML20207G057: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_                        -
{{#Wiki_filter:.
8 o_
8 o_
9
9 Alab;ma Power Company 600 North 18th Street Post Office Box 2641 Birrningham, Alabama 352914400 Telephone 205 2501837 W. G. Hairston,111 Senior Vice President Nuclear Operations the soahem dectnc system 10CFR50.55a(g) 10CFR50.36 August 15, 1988 Docket No. 50-348 U. S. Nuclear Regulatory Commission ATTN:
    $'          Alab;ma Power Company 600 North 18th Street Post Office Box 2641 Birrningham, Alabama 352914400 Telephone 205 2501837 W. G. Hairston,111 Senior Vice President Nuclear Operations the soahem dectnc system 10CFR50.55a(g) 10CFR50.36 August 15, 1988 Docket No. 50-348                                                                   ,
Document Control Desk Vashington, D. C.
U. S. Nuclear Regulatory Commission ATTN:       Document Control Desk           '
20555 Gentlemen:
Vashington, D. C. 20555 Gentlemen:
Joseph M. Farley Nuclear Plant - Unit 1 Interval 1/ Period 3/ Outage 3 and Interval 2/ Period 1/ Outage 1 Inservice Inspection Reports Pursuant to the requirements of 10CFR50.55a(g) Alabama Power Company herevith submits the Joseph M. Farley Nuclear Plant Unit 1 Reports for Interval 1/ Period 3/ Gutage 3 and Interval 2/ Period 1/ Outage 1.
Joseph M. Farley Nuclear Plant - Unit 1 Interval 1/ Period 3/ Outage 3 and Interval 2/ Period 1/ Outage 1 Inservice Inspection Reports Pursuant to the requirements of 10CFR50.55a(g) Alabama Power Company herevith submits the Joseph M. Farley Nuclear Plant Unit 1 Reports for Interval 1/ Period 3/ Gutage 3 and Interval 2/ Period 1/ Outage 1. These reports describe and summarize the inservice inspection detivities which vere performed during the Unit 1 eighth refueling outage and vere completed on May 17, 1988.
These reports describe and summarize the inservice inspection detivities which vere performed during the Unit 1 eighth refueling outage and vere completed on May 17, 1988.
As described in Alabama Power Company letter of January 13, 1987, completion of the Unit 1 First Ten Year Interval examinations was deferred until the eighth refueling outage. This deferral was within the twelve month extensten permitted by the ASME Code, Section XI, IVA-2400. Areas of examination included the reactor vessel velds, interior surfaces and lover internals and the main steam loops A and B piping velds. No credit was taksn for these examinations toward the Interval 2 examination requirements. Completely separate and distinct examinations and reports vere made as required for each Interval's examinations.
As described in Alabama Power Company letter of January 13, 1987, completion of the Unit 1 First Ten Year Interval examinations was deferred until the eighth refueling outage. This deferral was within the twelve month extensten permitted by the ASME Code, Section XI, IVA-2400.
Included in the Interval 2/ Period 1/ Outage 1 report are the results of the steam generator eddy current testing conducted during this outage as required by 10CFR50.55a(g) and Section 4.4.6.5.b of the Farley Nuclear Plant Unit 1 Technical Specifications.             Specifically, the results and a summary may be found in Tab B.                                                                           l Other pertinent report information, including as applicable, examination plans and schedules, examination results and reports, examination methods and procedures, evaluation of results, and corrective actions and repairs,                               i le available at Parley Nuclear Plant for your review.                                           [OYl I 7-8900230367 800815 PD        ADOCK 0500034G                                                                           l
Areas of examination included the reactor vessel velds, interior surfaces and lover internals and the main steam loops A and B piping velds. No credit was taksn for these examinations toward the Interval 2 examination requirements.
                      $                                                                          4/A /TGV         Of SC
Completely separate and distinct examinations and reports vere made as required for each Interval's examinations.
Included in the Interval 2/ Period 1/ Outage 1 report are the results of the steam generator eddy current testing conducted during this outage as required by 10CFR50.55a(g) and Section 4.4.6.5.b of the Farley Nuclear Plant Unit 1 Technical Specifications.
Specifically, the results and a summary may be found in Tab B.
Other pertinent report information, including as applicable, examination plans and schedules, examination results and reports, examination methods and procedures, evaluation of results, and corrective actions and repairs, i
le available at Parley Nuclear Plant for your review.
[OYl I 7-8900230367 800815 P D ADOCK 0500034G l
4/A /TGV Of SC


  ,      .                                                                                      Q
Q
              *Y d#   =
*Y d#
U. S. Nuclear Regulatory Commission                         August 15, 1988 Page 2 s
=
                .If you~should have any questions, please advise.
U. S. Nuclear Regulatory Commission August 15, 1988 Page 2 s
Respectfully submitted, ALABAMA POWER COMPANY u).J. Sha V. G. Hairston, III VGH,III/CDPicht-8.25 Enclosure cc   Mr. L. B. Long Dr. J. N. Grace v/l enclosure Mr. E. A. Reeves Mr. W.11. Bradford
.If you~should have any questions, please advise.
                                                                                                /
Respectfully submitted, ALABAMA POWER COMPANY u).J. Sha V. G. Hairston, III VGH,III/CDPicht-8.25 Enclosure cc Mr. L. B. Long Dr. J. N. Grace v/l enclosure Mr. E. A. Reeves Mr. W.11. Bradford
/


i, bc: Mr. Bill M. Guthrie Mr. R. P. Mcdonald Mr. J. D. Voodard Mr. J. V. McGovan Mr. D. N. Morey Mr. V. B. Shipman Mr. R. D. Hill Mr. C. D. Nesbitt Mr. R. G. Berryhill Mr. Scott Fulmer Mr. D. E. Mansfield   v/l enclosure Mr. J. E. Garlington Mr. J. A. Ripple Mr. D. B. Hartline Mr. J. R. Crane Mr. T. N. Epps       v/l enclosure Mr. K. C. Gandhi FNP Document Control File   K-23.1.8 K-24.1.8 l
i, bc:
Mr. Bill M. Guthrie Mr. R. P. Mcdonald Mr. J. D. Voodard Mr. J. V. McGovan Mr. D. N. Morey Mr. V. B. Shipman Mr. R. D. Hill Mr. C. D. Nesbitt Mr. R. G. Berryhill Mr. Scott Fulmer Mr. D. E. Mansfield v/l enclosure Mr. J. E. Garlington Mr. J. A. Ripple Mr. D. B. Hartline Mr. J. R. Crane Mr. T. N. Epps v/l enclosure Mr. K. C. Gandhi FNP Document Control File K-23.1.8 K-24.1.8 l
O P
O P
                                                                          $}}
$}}

Latest revision as of 21:31, 6 December 2024

Forwards Vols 1-4 to Westinghouse Rept Entitled, Interval 1,Period 3,Outage 3 Inservice Insp Rept of Jm Farley Nuclear Plant Unit 1. W/O Interval 2,Period 1,Outage 1 Rept Containing Results of Steam Generator Eddy Current Testing
ML20207G057
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/15/1988
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML19297G830 List:
References
NUDOCS 8808230367
Download: ML20207G057 (3)


Text

.

8 o_

9 Alab;ma Power Company 600 North 18th Street Post Office Box 2641 Birrningham, Alabama 352914400 Telephone 205 2501837 W. G. Hairston,111 Senior Vice President Nuclear Operations the soahem dectnc system 10CFR50.55a(g) 10CFR50.36 August 15, 1988 Docket No. 50-348 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Vashington, D. C.

20555 Gentlemen:

Joseph M. Farley Nuclear Plant - Unit 1 Interval 1/ Period 3/ Outage 3 and Interval 2/ Period 1/ Outage 1 Inservice Inspection Reports Pursuant to the requirements of 10CFR50.55a(g) Alabama Power Company herevith submits the Joseph M. Farley Nuclear Plant Unit 1 Reports for Interval 1/ Period 3/ Gutage 3 and Interval 2/ Period 1/ Outage 1.

These reports describe and summarize the inservice inspection detivities which vere performed during the Unit 1 eighth refueling outage and vere completed on May 17, 1988.

As described in Alabama Power Company letter of January 13, 1987, completion of the Unit 1 First Ten Year Interval examinations was deferred until the eighth refueling outage. This deferral was within the twelve month extensten permitted by the ASME Code,Section XI, IVA-2400.

Areas of examination included the reactor vessel velds, interior surfaces and lover internals and the main steam loops A and B piping velds. No credit was taksn for these examinations toward the Interval 2 examination requirements.

Completely separate and distinct examinations and reports vere made as required for each Interval's examinations.

Included in the Interval 2/ Period 1/ Outage 1 report are the results of the steam generator eddy current testing conducted during this outage as required by 10CFR50.55a(g) and Section 4.4.6.5.b of the Farley Nuclear Plant Unit 1 Technical Specifications.

Specifically, the results and a summary may be found in Tab B.

Other pertinent report information, including as applicable, examination plans and schedules, examination results and reports, examination methods and procedures, evaluation of results, and corrective actions and repairs, i

le available at Parley Nuclear Plant for your review.

[OYl I 7-8900230367 800815 P D ADOCK 0500034G l

4/A /TGV Of SC

Q

  • Y d#

=

U. S. Nuclear Regulatory Commission August 15, 1988 Page 2 s

.If you~should have any questions, please advise.

Respectfully submitted, ALABAMA POWER COMPANY u).J. Sha V. G. Hairston, III VGH,III/CDPicht-8.25 Enclosure cc Mr. L. B. Long Dr. J. N. Grace v/l enclosure Mr. E. A. Reeves Mr. W.11. Bradford

/

i, bc:

Mr. Bill M. Guthrie Mr. R. P. Mcdonald Mr. J. D. Voodard Mr. J. V. McGovan Mr. D. N. Morey Mr. V. B. Shipman Mr. R. D. Hill Mr. C. D. Nesbitt Mr. R. G. Berryhill Mr. Scott Fulmer Mr. D. E. Mansfield v/l enclosure Mr. J. E. Garlington Mr. J. A. Ripple Mr. D. B. Hartline Mr. J. R. Crane Mr. T. N. Epps v/l enclosure Mr. K. C. Gandhi FNP Document Control File K-23.1.8 K-24.1.8 l