| {{#Wiki_filter:August 25, 2021 | | {{#Wiki_filter:August 25, 2021 |
|
| |
|
| ==SUBJECT:==
| | M Bob Coffey Executive Vice President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd. |
| UPDATED INSPECTION PLAN FOR TURKEY POINT UNITS 3 & 4 (Report 05000250/2021005 and 05000251/2021005)
| |
|
| |
|
| ==Dear Mr. Coffey:==
| | Juno Beach, FL 33408 |
| The enclosed inspection plan lists the inspections scheduled through June 30, 2023 for Turkey Point Units 3& 4. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
| |
|
| |
|
| In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:
| | SUBJECT: UPDATED INSPECTION PLAN FOR TURKEY POINT UNITS 3 & 4 (Report 05000250/2021005 and 05000251/2021005) |
| https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling. The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately.
| |
|
| |
|
| In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| | ==Dear M Coffey :== |
| | The enclosed inspection plan lists the inspections scheduled through June 30, 2023 for Turkey Point Units 3& The NRC provides the inspecti on plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last twelve months of the i nspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change In response to the COVID - 19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the RO Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if neede This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID - 19 Telework Restriction s (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: |
| | https://www.nrc.gov/about - nrc/covid - 19/security - ep/. Similarly, the NRC has developed guidance if force - on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID - 19 PH These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID - 19 PH The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID - 19 PH NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and schedulin Coffey - 2 - |
|
| |
|
| Please contact me at 404-997-4628 with any questions you have regarding this letter. | | The NRC will also be performing baseline inspections of licensee cyber security program The specific schedule and procedure to be used for these inspections is being developed by the NRC staf The staff expects to communicate the schedule for these inspections to each utility separatel In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | |
| | Please contact me at 404-997-4628 with any questions you have regarding this lette |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/ | | /RA/ |
| David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-250 and 50-251 License Nos. DPR-31 and DRP-41 Enclosure:
| |
| Turkey Point Inspection/Activity Plan (09/01/2021 - 06/30/2023)
| |
| Distribution: via ListServe
| |
|
| |
|
| ML21237A432 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RII/DRP/RPB3 RII/DRP/RPB3 NAME J. Hamman D. Dumbacher DATE 08/25/21 08/25/21 | | David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects |
| | |
| | Docket Nos. 50-250 and 50- 251 License Nos. DPR-31 and DRP-41 |
| | |
| | Enclosure: |
| | Turkey Point Inspection /Activity Plan (09/01/2021 - 06/30/2023) |
| | |
| | Distribution: via ListServe Coffey - 3 - |
| | |
| | SUBJECT: UPDATED INSPECTION PLAN FOR TURKEY POINT UNITS 3 & 4 (Report 05000250/2021005 and 05000251/2021005) - dated August 25, 2021 |
| | |
| | DISTRIBUTION: Kowal, RII Gibson, RII OE Mail RIDSNRRDRO RidsNrrPMStLucie Resource ROPassessment Resource ROPreports Resource PUBLIC |
| | |
| | ADAMS ACCESSION NUMBER: ML21237A432 X SUNSI Review X Non -Sensitive X Publicly Available Sensitive n -Publiclyvlable |
| | |
| | OFFICE I/DRP/B3 I/DRP/B3 ME Hamn Dcher TE 0 25/ 0 1 |
| | |
| | O FFIAL RERD COPY IP 22b Site Inspection Activity Plan Turkey Point |
| | |
| | 09/01/2021 - 06/30/2023 |
| | |
| | Unit Start End Activity CAC Title Staff Count |
| | |
| | TURKEY POINT REQUAL INSPECTION 2 |
| | |
| | 3, 4 9/20/2021 9/24/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance |
| | |
| | RP OCCUPATIONAL RAD SAFETY INSPECTION 3 |
| | |
| | 3, 4 10/4/2021 10/8/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls |
| | |
| | 3, 4 10/4/2021 10/8/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls |
| | |
| | 3, 4 10/4/2021 10/8/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation |
| | |
| | 3, 4 10/4/2021 10/8/2021 IP 71124.04 000728 Occupational Dose Assessment |
| | |
| | 3, 4 10/4/2021 10/8/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation |
| | |
| | 3, 4 10/4/2021 10/8/2021 IP 71151 000746 Performance Indicator Verification |
| | |
| | 3, 4 11/1/2021 11/5/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls |
| | |
| | 3, 4 11/1/2021 11/5/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls |
| | |
| | 3, 4 11/1/2021 11/5/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation |
| | |
| | 3, 4 11/1/2021 11/5/2021 IP 71124.04 000728 Occupational Dose Assessment |
| | |
| | 3, 4 11/1/2021 11/5/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation |
| | |
| | 3, 4 11/1/2021 11/5/2021 IP 71151 000746 Performance Indicator Verification |
| | |
| | UNIT 3 IN-SERVICE INSPECTION + SG 1 |
| | |
| | 3 10/11/2021 10/22/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR) |
| | |
| | SECURITY BASELINE INSPECTION 3 |
| | |
| | 3, 4 1/8/2022 1/12/2022 IP 71130.02 000734 Access Control |
| | |
| | 3, 4 1/8/2022 1/12/2022 IP 71130.05 000737 Protective Strategy Evaluation |
| | |
| | 3, 4 1/8/2022 1/12/2022 IP 71130.09 001656 Security Plan Changes |
| | |
| | 3, 4 1/8/2022 1/12/2022 IP 71151 001338 Performance Indicator Verification |
| | |
| | EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2 |
| | |
| | 3, 4 1/10/2022 1/14/2022 IP 71114.02 000717 Alert and Notification System Testing |
| | |
| | 3, 4 1/10/2022 1/14/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System |
| | |
| | 3, 4 1/10/2022 1/14/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes |
| | |
| | 3, 4 1/10/2022 1/14/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness |
| | |
| | 3, 4 1/10/2022 1/14/2022 IP 71151 001397 Performance Indicator Verification |
| | |
| | UNIT 4 IN-SERVICE INSPECTION +SG 2 |
| | |
| | 4 3/14/2022 3/18/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR) |
| | |
| | RP OCCUPATIONAL AND TRANSPORTATION BASELINE INSPECTION 2 |
| | |
| | 3, 4 3/14/2022 3/18/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls |
| | |
| | 3, 4 3/14/2022 3/18/2022 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation |
| | |
| | Prepared on 8/20/2021 1:21:23 PM 1 of 3 IP 22b Site Inspection Activity Plan |
| | |
| | 3, 4 3/14/2022 3/18/2022 IP 71151 000746 Performance Indicator Verification |
| | |
| | TRIENNIAL HEAT SINK PERFORMANCE 1 |
| | |
| | 3, 4 7/18/2022 7/22/2022 IP 71111.07SIX 000700 Heat Sink Performance |
|
| |
|
| IP 22b Site Inspection Activity Plan Turkey Point 09/01/2021 - 06/30/2023 Unit Start End Activity CAC Title Staff Count TURKEY POINT REQUAL INSPECTION 2 3, 4 9/20/2021 9/24/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RP OCCUPATIONAL RAD SAFETY INSPECTION 3 3, 4 10/4/2021 10/8/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3, 4 10/4/2021 10/8/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 3, 4 10/4/2021 10/8/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 10/4/2021 10/8/2021 IP 71124.04 000728 Occupational Dose Assessment 3, 4 10/4/2021 10/8/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation 3, 4 10/4/2021 10/8/2021 IP 71151 000746 Performance Indicator Verification 3, 4 11/1/2021 11/5/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3, 4 11/1/2021 11/5/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 3, 4 11/1/2021 11/5/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 11/1/2021 11/5/2021 IP 71124.04 000728 Occupational Dose Assessment 3, 4 11/1/2021 11/5/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation 3, 4 11/1/2021 11/5/2021 IP 71151 000746 Performance Indicator Verification UNIT 3 IN-SERVICE INSPECTION + SG 1 3 10/11/2021 10/22/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
| | 3, 4 7/18/2022 7/22/2022 IP 71111.07T 000700 Heat Sink Performance |
| SECURITY BASELINE INSPECTION 3 3, 4 1/8/2022 1/12/2022 IP 71130.02 000734 Access Control 3, 4 1/8/2022 1/12/2022 IP 71130.05 000737 Protective Strategy Evaluation 3, 4 1/8/2022 1/12/2022 IP 71130.09 001656 Security Plan Changes 3, 4 1/8/2022 1/12/2022 IP 71151 001338 Performance Indicator Verification EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2 3, 4 1/10/2022 1/14/2022 IP 71114.02 000717 Alert and Notification System Testing 3, 4 1/10/2022 1/14/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 3, 4 1/10/2022 1/14/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3, 4 1/10/2022 1/14/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness 3, 4 1/10/2022 1/14/2022 IP 71151 001397 Performance Indicator Verification UNIT 4 IN-SERVICE INSPECTION +SG 2 4 3/14/2022 3/18/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
| | |
| RP OCCUPATIONAL AND TRANSPORTATION BASELINE INSPECTION 2 3, 4 3/14/2022 3/18/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3, 4 3/14/2022 3/18/2022 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Prepared on 8/20/2021 1:21:23 PM 1 of 3
| | NFPA 805 TRIENNIAL FIRE PROTECTION INSPECTION 4 |
| | |
| | 3, 4 10/3/2022 10/7/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI) |
|
| |
|
| IP 22b Site Inspection Activity Plan 3, 4 3/14/2022 3/18/2022 IP 71151 000746 Performance Indicator Verification TRIENNIAL HEAT SINK PERFORMANCE 1 3, 4 7/18/2022 7/22/2022 IP 71111.07SIX 000700 Heat Sink Performance 3, 4 7/18/2022 7/22/2022 IP 71111.07T 000700 Heat Sink Performance NFPA 805 TRIENNIAL FIRE PROTECTION INSPECTION 4 3, 4 10/3/2022 10/7/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
| |
| 3, 4 10/17/2022 10/21/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI) | | 3, 4 10/17/2022 10/21/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI) |
| TARGET SET INSPECTION 1 3, 4 10/3/2022 10/7/2022 IP 71130.14 000743 Review of Power Reactor Target Sets DESIGN BASES ASSURANCE INSPECTION (PROGRAMS) 3 3, 4 10/31/2022 11/4/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 3, 4 11/14/2022 11/18/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements EMERGENCVY PREPAREDNESS EXERCISE INSPECTION 5 3, 4 2/13/2023 2/17/2023 IP 71114.01 000716 Exercise Evaluation 3, 4 2/13/2023 2/17/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3, 4 2/13/2023 2/17/2023 IP 71151 001397 Performance Indicator Verification DESIGN BASES ASSURANCE INSPECTION (TEAMS) 6 3, 4 3/6/2023 3/10/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams) | | |
| | TARGET SET INSPECTION 1 |
| | |
| | 3, 4 10/3/2022 10/7/2022 IP 71130.14 000743 Review of Power Reactor Target Sets |
| | |
| | DESIGN BASES ASSURANCE INSPECTION (PROGRAMS) 3 |
| | |
| | 3, 4 10/31/2022 11/4/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 3, 4 11/14/2022 11/18/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements |
| | |
| | EMERGENCVY PREPAREDNESS EXERCISE INSPECTION 5 |
| | |
| | 3, 4 2/13/2023 2/17/2023 IP 71114.01 000716 Exercise Evaluation |
| | |
| | 3, 4 2/13/2023 2/17/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes |
| | |
| | 3, 4 2/13/2023 2/17/2023 IP 71151 001397 Performance Indicator Verification |
| | |
| | DESIGN BASES ASSURANCE INSPECTION (TEAMS) 6 |
| | |
| | 3, 4 3/6/2023 3/10/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams) |
| | |
| 3, 4 3/20/2023 3/24/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams) | | 3, 4 3/20/2023 3/24/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams) |
| TURKEY POINT INITIAL LICENSE EXAM 5 3, 4 2/13/2023 2/17/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV) | | |
| | TURKEY POINT INITIAL LICENSE EXAM 5 |
| | |
| | 3, 4 2/13/2023 2/17/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV) |
| | |
| 3, 4 3/20/2023 3/31/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD) | | 3, 4 3/20/2023 3/31/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD) |
| CYBER SECURITY INSPECTION 2 3, 4 4/3/2023 4/7/2023 IP 71130.10P 000741 Cyber Security UNIT 3 IN-SERVICE INSPECTION +SG 2 3 4/10/2023 4/14/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
| |
| RP OCCUPATIONAL RADIATION SAFETY BASELINE 3 3, 4 4/17/2023 5/5/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3, 4 4/17/2023 5/5/2023 IP 71124.02 000726 Occupational ALARA Planning and Controls 3, 4 4/17/2023 5/5/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 4/17/2023 5/5/2023 IP 71124.04 000728 Occupational Dose Assessment 3, 4 4/17/2023 5/5/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation 3, 4 4/17/2023 5/5/2023 IP 71151 000746 Performance Indicator Verification 3, 4 5/15/2023 5/19/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3, 4 5/15/2023 5/19/2023 IP 71124.02 000726 Occupational ALARA Planning and Controls Prepared on 8/20/2021 1:21:23 PM 2 of 3
| |
|
| |
|
| IP 22b Site Inspection Activity Plan 3, 4 5/15/2023 5/19/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 5/15/2023 5/19/2023 IP 71124.04 000728 Occupational Dose Assessment 3, 4 5/15/2023 5/19/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation 3, 4 5/15/2023 5/19/2023 IP 71151 000746 Performance Indicator Verification SECURITY BASELINE INSPECTION 3 3, 4 5/22/2023 5/26/2023 IP 71130.02 000734 Access Control 3, 4 5/22/2023 5/26/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 3, 4 5/22/2023 5/26/2023 IP 71130.07 000739 Security Training 3, 4 5/22/2023 5/26/2023 IP 71130.09 001656 Security Plan Changes 3, 4 5/22/2023 5/26/2023 IP 71151 001338 Performance Indicator Verification Prepared on 8/20/2021 1:21:23 PM 3 of 3 | | CYBER SECURITY INSPECTION 2 |
| | |
| | 3, 4 4/3/2023 4/7/2023 IP 71130.10P 000741 Cyber Security |
| | |
| | UNIT 3 IN-SERVICE INSPECTION +SG 2 |
| | |
| | 3 4/10/2023 4/14/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR) |
| | |
| | RP OCCUPATIONAL RADIATION SAFETY BASELINE 3 |
| | |
| | 3, 4 4/17/2023 5/5/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls |
| | |
| | 3, 4 4/17/2023 5/5/2023 IP 71124.02 000726 Occupational ALARA Planning and Controls |
| | |
| | 3, 4 4/17/2023 5/5/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation |
| | |
| | 3, 4 4/17/2023 5/5/2023 IP 71124.04 000728 Occupational Dose Assessment |
| | |
| | 3, 4 4/17/2023 5/5/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation |
| | |
| | 3, 4 4/17/2023 5/5/2023 IP 71151 000746 Performance Indicator Verification |
| | |
| | 3, 4 5/15/2023 5/19/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls |
| | |
| | 3, 4 5/15/2023 5/19/2023 IP 71124.02 000726 Occupational ALARA Planning and Controls |
| | |
| | Prepared on 8/20/2021 1:21:23 PM 2 of 3 IP 22b Site Inspection Activity Plan |
| | |
| | 3, 4 5/15/2023 5/19/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation |
| | |
| | 3, 4 5/15/2023 5/19/2023 IP 71124.04 000728 Occupational Dose Assessment |
| | |
| | 3, 4 5/15/2023 5/19/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation |
| | |
| | 3, 4 5/15/2023 5/19/2023 IP 71151 000746 Performance Indicator Verification |
| | |
| | SECURITY BASELINE INSPECTION 3 |
| | |
| | 3, 4 5/22/2023 5/26/2023 IP 71130.02 000734 Access Control |
| | |
| | 3, 4 5/22/2023 5/26/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance |
| | |
| | 3, 4 5/22/2023 5/26/2023 IP 71130.07 000739 Security Training |
| | |
| | 3, 4 5/22/2023 5/26/2023 IP 71130.09 001656 Security Plan Changes |
| | |
| | 3, 4 5/22/2023 5/26/2023 IP 71151 001338 Performance Indicator Verification |
| | |
| | Prepared on 8/20/2021 1:21:23 PM 3 of 3 |
| }} | | }} |
|
---|
Category:Inspection Plan
MONTHYEARIR 05000250/20230062024-02-28028 February 2024 Annual Assessment Letter for Turkey Point Units 3 & 4 - Report 05000250/2023006 and 05000251/2023006 IR 05000250/20240112024-02-15015 February 2024 Notification of Turkey Point Nuclear Generating Station - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000250/2024011 and 05000251/2024011 ML23265A2692023-09-15015 September 2023 Turkey Point,_Rp Document Request 2023-004 IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) ML23159A0852023-06-0909 June 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000250/20220062023-03-0101 March 2023 Annual Assessment Letter for Turkey Point, Units 3 & 4 (Report 05000250/2022006 and 05000251/2022006) ML23038A1892023-02-0303 February 2023 RP RFI April 2023 IR 05000250/20220052022-08-26026 August 2022 Updated Inspection Plan for Turkey Point Units 3 & 4 Report 05000250 2022005 and 05000251 2022005-Final ML22196A0722022-07-19019 July 2022 Notification of an NRC Fire Protection Team Inspection and Request for Information IR 05000250/20210062022-03-0202 March 2022 Annual Assessment Letter for Turkey Point, Units 3 and 4 (Report No. 05000250/2021006 and 05000251/2021006) ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections IR 05000250/20210052021-08-25025 August 2021 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2021005 and 05000251/2021005) ML21196A1042021-07-15015 July 2021 Notification of Supplemental Inspection (95001) and Request for Information ML21182A1912021-07-0101 July 2021 Requalification Program Inspection - Turkey Point Nuclear Plant, Units 3 and 4 ML20315A0182020-11-10010 November 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML19346G7212019-12-12012 December 2019 Radiation Safety Baseline Inspection RFI 2020-001 ML20028C7372019-12-0202 December 2019 Notification of Inspection and Request for Information IR 05000250/20190052019-08-27027 August 2019 Updated Inspection Plan for Turkey Point Nuclear Generating Station, Unit 3 and Unit 4 - (Report 05000250/2019005 and 05000251/2019005) ML19137A0452019-05-17017 May 2019 Heat Sink RFI 2019003 IR 05000250/20180062019-03-0404 March 2019 Annual Assessment Letter for Turkey Point Nuclear Generating Station, Unit 3 and 4 - Report 05000250/2018006 and 05000251/2018006, Report 05000250/2018402 and 05000251/2018402, Report 05000250/2018501 and 05000251/2018501 ML19057A0932019-02-26026 February 2019 RP RFI Notification ML19030A7652019-01-23023 January 2019 Tp U4 ISI RFI ML18219A6562018-08-0707 August 2018 Baseline Inservice Inspection Initial Information Request ML18059A0282018-02-28028 February 2018 EOC Assessment Letter Final ML17111A7482017-04-18018 April 2017 Requalification Program Inspection - Turkey Points 3 and 4 IR 05000250/20160062017-03-0101 March 2017 Annual Assessment Letter for Turkey Point Nuclear Generating Station, Units 3 and 4 (Report 05000250/2016006 and 05000251/2016006) IR 05000250/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Turkey Point Nuclear Generating Station Unit 3 and Unit 4 - NRC Inspection Report 05000250/2016005 and 05000251/2016005 ML16064A0632016-03-0303 March 2016 Turkey Point Nuclear Generating Station - Notification of Inspection and Request for Information ML16041A1282016-02-10010 February 2016 U-4 ISI 2016002 RFI as IR 05000250/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Turkey Point Nuclear Generating Units 3 & 4 (Report 05000250/2015005 and 05000251/2015005) IR 05000051/20140012015-03-0404 March 2015 Annual Assessment Letter for Turkey Point Nuclear Generating Unit 3 and Unit 4, (Report 05000250/2014001 and 0500051/2014001) ML14245A1862014-09-0202 September 2014 Mid-Cycle Ltr 2014 L-2014-073, Inservice Inspection Plan Relief Request No. 142014-03-14014 March 2014 Inservice Inspection Plan Relief Request No. 14 IR 05000250/20130012014-03-0404 March 2014 Annual Assessment Letter for Turkey Point Nuclear Generating Unit 3 and Unit 4 (Report 05000250/2013001 and 05000251/2013001) ML13246A1002013-09-0303 September 2013 Mid-Cycle Assessment Letter IR 05000250/20120012013-03-0404 March 2013 Annual Assessment Letter for Turkey Point Nuclear Plant, Units 3 & 4 (IR 05000250-12-001 and 05000251-12-001) ML13022A5712013-01-22022 January 2013 Notification of Inspection and Request for Information ML12248A2022012-09-0404 September 2012 Mid Cycle Assessment Letter Turkey Point 2012 ML1206502742012-03-0505 March 2012 EOC Report 22 ML1124403682011-09-0101 September 2011 Report 22 - Turkey Point ML1106302102011-03-0404 March 2011 Inspection/Activity Plan, Report 22, 03/01/2011 - 06/30/2012 ML1024408162010-09-0101 September 2010 Report 22 - 2010 Mid-Cycle, Inspection/Activity Plan 09/01/2010 - 12/31/2011 ML1006206272010-03-0303 March 2010 Report 22 - 201001, Inspection/Activity Plan ML0924404362009-09-0101 September 2009 Report 22, Inspection/Activity Plan, 09/01/2009 - 12/31/2010 ML0906306152009-03-0404 March 2009 Report 22 - Inspection/Activity Plan 03/01/2009 - 06/30/2010 ML0824610222008-09-0202 September 2008 Inspection/Activity Plan, 09/01/2008 - 12/31/2009, Report 22 ML0724305032007-08-31031 August 2007 Inspection/Activity Plan 09/01/2007-03/31/2009 ML0706000422007-03-0101 March 2007 Inspection / Activity Plan 03/01/2007 - 09/30/2008 ML0624302952006-08-30030 August 2006 Mid-Cycle Performance Review and Inspection Plan, 08/01/06 - 07/31/07 IR 05000250/20060012006-03-0202 March 2006 Inspection/Activity Plan - Turkey Point Nuclear Plant (NRC Inspection Report 05000250-06-001 and 05000251-06-001) 2024-02-28
[Table view] Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] |
Text
August 25, 2021
M Bob Coffey Executive Vice President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd.
Juno Beach, FL 33408
SUBJECT: UPDATED INSPECTION PLAN FOR TURKEY POINT UNITS 3 & 4 (Report 05000250/2021005 and 05000251/2021005)
Dear M Coffey :
The enclosed inspection plan lists the inspections scheduled through June 30, 2023 for Turkey Point Units 3& The NRC provides the inspecti on plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last twelve months of the i nspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change In response to the COVID - 19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the RO Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if neede This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID - 19 Telework Restriction s (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:
https://www.nrc.gov/about - nrc/covid - 19/security - ep/. Similarly, the NRC has developed guidance if force - on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID - 19 PH These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID - 19 PH The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID - 19 PH NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and schedulin Coffey - 2 -
The NRC will also be performing baseline inspections of licensee cyber security program The specific schedule and procedure to be used for these inspections is being developed by the NRC staf The staff expects to communicate the schedule for these inspections to each utility separatel In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4628 with any questions you have regarding this lette
Sincerely,
/RA/
David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects
Docket Nos. 50-250 and 50- 251 License Nos. DPR-31 and DRP-41
Enclosure:
Turkey Point Inspection /Activity Plan (09/01/2021 - 06/30/2023)
Distribution: via ListServe Coffey - 3 -
SUBJECT: UPDATED INSPECTION PLAN FOR TURKEY POINT UNITS 3 & 4 (Report 05000250/2021005 and 05000251/2021005) - dated August 25, 2021
DISTRIBUTION: Kowal, RII Gibson, RII OE Mail RIDSNRRDRO RidsNrrPMStLucie Resource ROPassessment Resource ROPreports Resource PUBLIC
ADAMS ACCESSION NUMBER: ML21237A432 X SUNSI Review X Non -Sensitive X Publicly Available Sensitive n -Publiclyvlable
OFFICE I/DRP/B3 I/DRP/B3 ME Hamn Dcher TE 0 25/ 0 1
O FFIAL RERD COPY IP 22b Site Inspection Activity Plan Turkey Point
09/01/2021 - 06/30/2023
Unit Start End Activity CAC Title Staff Count
TURKEY POINT REQUAL INSPECTION 2
3, 4 9/20/2021 9/24/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
RP OCCUPATIONAL RAD SAFETY INSPECTION 3
3, 4 10/4/2021 10/8/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
3, 4 10/4/2021 10/8/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls
3, 4 10/4/2021 10/8/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
3, 4 10/4/2021 10/8/2021 IP 71124.04 000728 Occupational Dose Assessment
3, 4 10/4/2021 10/8/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation
3, 4 10/4/2021 10/8/2021 IP 71151 000746 Performance Indicator Verification
3, 4 11/1/2021 11/5/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
3, 4 11/1/2021 11/5/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls
3, 4 11/1/2021 11/5/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
3, 4 11/1/2021 11/5/2021 IP 71124.04 000728 Occupational Dose Assessment
3, 4 11/1/2021 11/5/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation
3, 4 11/1/2021 11/5/2021 IP 71151 000746 Performance Indicator Verification
UNIT 3 IN-SERVICE INSPECTION + SG 1
3 10/11/2021 10/22/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
SECURITY BASELINE INSPECTION 3
3, 4 1/8/2022 1/12/2022 IP 71130.02 000734 Access Control
3, 4 1/8/2022 1/12/2022 IP 71130.05 000737 Protective Strategy Evaluation
3, 4 1/8/2022 1/12/2022 IP 71130.09 001656 Security Plan Changes
3, 4 1/8/2022 1/12/2022 IP 71151 001338 Performance Indicator Verification
EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2
3, 4 1/10/2022 1/14/2022 IP 71114.02 000717 Alert and Notification System Testing
3, 4 1/10/2022 1/14/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
3, 4 1/10/2022 1/14/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
3, 4 1/10/2022 1/14/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness
3, 4 1/10/2022 1/14/2022 IP 71151 001397 Performance Indicator Verification
UNIT 4 IN-SERVICE INSPECTION +SG 2
4 3/14/2022 3/18/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL AND TRANSPORTATION BASELINE INSPECTION 2
3, 4 3/14/2022 3/18/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
3, 4 3/14/2022 3/18/2022 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation
Prepared on 8/20/2021 1:21:23 PM 1 of 3 IP 22b Site Inspection Activity Plan
3, 4 3/14/2022 3/18/2022 IP 71151 000746 Performance Indicator Verification
TRIENNIAL HEAT SINK PERFORMANCE 1
3, 4 7/18/2022 7/22/2022 IP 71111.07SIX 000700 Heat Sink Performance
3, 4 7/18/2022 7/22/2022 IP 71111.07T 000700 Heat Sink Performance
NFPA 805 TRIENNIAL FIRE PROTECTION INSPECTION 4
3, 4 10/3/2022 10/7/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
3, 4 10/17/2022 10/21/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
TARGET SET INSPECTION 1
3, 4 10/3/2022 10/7/2022 IP 71130.14 000743 Review of Power Reactor Target Sets
DESIGN BASES ASSURANCE INSPECTION (PROGRAMS) 3
3, 4 10/31/2022 11/4/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 3, 4 11/14/2022 11/18/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements
EMERGENCVY PREPAREDNESS EXERCISE INSPECTION 5
3, 4 2/13/2023 2/17/2023 IP 71114.01 000716 Exercise Evaluation
3, 4 2/13/2023 2/17/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
3, 4 2/13/2023 2/17/2023 IP 71151 001397 Performance Indicator Verification
DESIGN BASES ASSURANCE INSPECTION (TEAMS) 6
3, 4 3/6/2023 3/10/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
3, 4 3/20/2023 3/24/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
TURKEY POINT INITIAL LICENSE EXAM 5
3, 4 2/13/2023 2/17/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
3, 4 3/20/2023 3/31/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
CYBER SECURITY INSPECTION 2
3, 4 4/3/2023 4/7/2023 IP 71130.10P 000741 Cyber Security
UNIT 3 IN-SERVICE INSPECTION +SG 2
3 4/10/2023 4/14/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RADIATION SAFETY BASELINE 3
3, 4 4/17/2023 5/5/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
3, 4 4/17/2023 5/5/2023 IP 71124.02 000726 Occupational ALARA Planning and Controls
3, 4 4/17/2023 5/5/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
3, 4 4/17/2023 5/5/2023 IP 71124.04 000728 Occupational Dose Assessment
3, 4 4/17/2023 5/5/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation
3, 4 4/17/2023 5/5/2023 IP 71151 000746 Performance Indicator Verification
3, 4 5/15/2023 5/19/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
3, 4 5/15/2023 5/19/2023 IP 71124.02 000726 Occupational ALARA Planning and Controls
Prepared on 8/20/2021 1:21:23 PM 2 of 3 IP 22b Site Inspection Activity Plan
3, 4 5/15/2023 5/19/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
3, 4 5/15/2023 5/19/2023 IP 71124.04 000728 Occupational Dose Assessment
3, 4 5/15/2023 5/19/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation
3, 4 5/15/2023 5/19/2023 IP 71151 000746 Performance Indicator Verification
SECURITY BASELINE INSPECTION 3
3, 4 5/22/2023 5/26/2023 IP 71130.02 000734 Access Control
3, 4 5/22/2023 5/26/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
3, 4 5/22/2023 5/26/2023 IP 71130.07 000739 Security Training
3, 4 5/22/2023 5/26/2023 IP 71130.09 001656 Security Plan Changes
3, 4 5/22/2023 5/26/2023 IP 71151 001338 Performance Indicator Verification