      4 I
                                                APPENDIX A
                                          -NOTICE OF VIOLATION
                                                    <
  '
        - Public Service Company of Colorado-
                                  '
                                                            Docket: 50-267
          Fort St. Vrain                                    License: DPR-34
                                        ,
                                                                :,.
          During-an NRC inspection conducted ~on October 18,through November 21, 1987, a          '
                                                                                                    .
          violation of.NRC requirements was identified. The violation involved failure
          to make management notifications required by Section 2.1 and Attachment 2 of
          the "Fort St. Vrain Medical Emergency Plan," Issue 20. In accordance with the
                        .
          "General. Statement of Policy ~'and Procedure for NRC Enforcement Actions," 10 CFR    ,
          Part 2, Appendix C (1987), the violation is listed below:
                The licensee's Technical Specification AC 7.4.a.5 requires written
              -procedures be established and implemented covering emergency plan
                implementation.
                The "Fort St. Vrain: Medical . Emergency Plan (MEP)," Issue 20, including
                Procedural Deviation Reports 87-2039 and 87-2042 prescribes those actions
'
                taken in the event of onsite injury to personnel.
                Contrary to the abow, on October 26, 1987, the shift supervisor failed
                to make the management notifications required by Section 2.1 and
                Attachment 2 of MEP, Issue 20 when a contractor electrician had injured
                himself in a fall while onsite and had been transferred by amublance to
                an off site medical facilty.
.
                    This is a Severity Level V violation.    (Supplement;VIII.E)(267/8725-01)
          Pursuant to the provisions of 10 CFR 2.201, is hereby required to submit a
4
          written statement or explanstion to this Office within 30 days of the date of
          the letter transmitting this Notice. This reply, should include for each
        -violation: (1) the reason for the violation if admitted, (2) the corrective
i        steps that have been taken and the results achieved, (3) the corrective steps
          that will be taken to avoid further violations, and (4) the date when full
          compliance will be achieved. Where good cause is shown, consideration will be
          given to extending the response time,
,
,
n
          Dated at Arlington, Texas,
          this Ag a day of %                    1987.
L
;
          8801200445
            DR
                          080115
                  ADOCK 050002e7
                              PDR
}}

Latest revision as of 19:08, 8 September 2023

Notice of Violation from Insp on 871018-1121.Violation Noted:Failure to Make Mgt Notifications Required by Medical Emergency Plan
ML20195J010
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/15/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20195J000 List:
References
50-267-87-25, NUDOCS 8801200445
Download: ML20195J010 (1)


See also: IR 07100018/2011021

Text

m

,

4 I

APPENDIX A

-NOTICE OF VIOLATION

<

'

- Public Service Company of Colorado-

'

Docket: 50-267

Fort St. Vrain License: DPR-34

,

,.

During-an NRC inspection conducted ~on October 18,through November 21, 1987, a '

.

violation of.NRC requirements was identified. The violation involved failure

to make management notifications required by Section 2.1 and Attachment 2 of

the "Fort St. Vrain Medical Emergency Plan," Issue 20. In accordance with the

.

"General. Statement of Policy ~'and Procedure for NRC Enforcement Actions," 10 CFR ,

Part 2, Appendix C (1987), the violation is listed below:

The licensee's Technical Specification AC 7.4.a.5 requires written

-procedures be established and implemented covering emergency plan

implementation.

The "Fort St. Vrain: Medical . Emergency Plan (MEP)," Issue 20, including

Procedural Deviation Reports 87-2039 and 87-2042 prescribes those actions

'

taken in the event of onsite injury to personnel.

Contrary to the abow, on October 26, 1987, the shift supervisor failed

to make the management notifications required by Section 2.1 and

Attachment 2 of MEP, Issue 20 when a contractor electrician had injured

himself in a fall while onsite and had been transferred by amublance to

an off site medical facilty.

.

This is a Severity Level V violation. (Supplement;VIII.E)(267/8725-01)

Pursuant to the provisions of 10 CFR 2.201, is hereby required to submit a

4

written statement or explanstion to this Office within 30 days of the date of

the letter transmitting this Notice. This reply, should include for each

-violation: (1) the reason for the violation if admitted, (2) the corrective

i steps that have been taken and the results achieved, (3) the corrective steps

that will be taken to avoid further violations, and (4) the date when full

compliance will be achieved. Where good cause is shown, consideration will be

given to extending the response time,

,

,

n

Dated at Arlington, Texas,

this Ag a day of % 1987.

L

8801200445

DR

080115

ADOCK 050002e7

PDR