IR 05000267/1990018
| ML20062H826 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 11/20/1990 |
| From: | Cain C, Caldwell R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20062H816 | List: |
| References | |
| 50-267-90-18, NUDOCS 9012060192 | |
| Download: ML20062H826 (2) | |
Text
em
.,
.
j
'
'.
n.
l
,
,
APPENDIX B
.
\\
\\
'
U.S. NUCLEAR REGULATORY. COMMISSION-
!
REGION'IV
'
'
NRC Inspection Report:
50-267/90-18 Operating License: ~ DPR-34 '
q
-
Docket:
50-267
)
.;
Licensee:
Public Service Company of Colorado (PSC)
P.O. Box 840
"
Denver, Colorado-. 80201-0840
Facility Name:
Fort St. Vrain Nuclear Generating Station!(FSV)
'
'
Inspection At:
FSV, Platteville, Colorado
Inspection Conducted: October-22-26, 1990-Inspector:
h.M44 [.Mah kC-IlJeffo-R. A. Caldwell, Senior Security;lnspectorc at i
'
Nuclear Materials and' Safeguards' Inspection Section
.
Approved:
l' b :
-
II!88!f0 Charles L. Cain, Chief, Nuclear. Materials and Datle.
Safeguards Inspection Section~-
..!
Inspection Summary Inspection Conducted October 22-26, 1990 (Report 50-267/90-18).
-
Areas Inspected: RoiJtine,unannouncedinspectionofithe '1'icenseefsphysical security program. The areas inspected within the physical.-security program included protected and vital area (VA) barriers,. detection and assessment. aids; protected and VA-access control of. personnel, packages, and. vehicles; communications; and testing, maintenance,.and compensatory measures.
.
Results: Within the program areas inspected, one violation was identified'
'
.(inadequate detection aids protocted area, paragraph 3).
Immediate corrective action was taken with regard to Violation 267/9018-01, Land the root cause of the problem was addressed. <The inspector determined that the-
-
licensee's corrective action was prompt and adequate;'therefore, no response to this' violation 1s required.
. ENCLOSURE CONTAINS '
.
UPON SEPARATION THIS-y.
O[0ggo oO
PACE IS 0[ CONTROLLED ~
.
-
mn
m sm
.
..
.
l.
',
.
..
.g
!
Lj
The licensee no longer has new fuel stored on site and is not operating the reactor. The licensee has submitted a 10-CFR 50.59 change to the. physical a
security plan (PSP).
This PSP submission is expected.to be approved by the j
Office of Nuclear Reactor Regulation.
'
'l
'!
l
,
i
<
!(
,
I ENCLOSURE CONTAINS-SAFEGUARDS INFORMAil0N UPON SEPARATION THIS
'
PAGE IS DECONTROLLED.
o