PNO-IV-89-052A, on 890818,after Attempting to Withdraw & Insert Control Rod Pair from Region 19,control Rod Motor Stopped Drawing Current & Indicated Open Conductor or Thermal Overload.Pair Will Be Withdrawn Using Bldg Crane

From kanterella
Jump to navigation Jump to search
PNO-IV-89-052A:on 890818,after Attempting to Withdraw & Insert Control Rod Pair from Region 19,control Rod Motor Stopped Drawing Current & Indicated Open Conductor or Thermal Overload.Pair Will Be Withdrawn Using Bldg Crane
ML20246E118
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/21/1989
From: Westerman T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
References
PNO-IV-89-052A, PNO-IV-89-52A, NUDOCS 8908290013
Download: ML20246E118 (1)


_

5 August 21, 1989

.. ',o PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE -- PNO-IV-89-52A This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region IV staff on this date.

FACILITY: Public Service Company of Colorado Licensee Emergency Classification:

Fort St. Vrain '

Notification of Unusual Event Docket: 50-267 Alert Site Area Emergency General Emergency 1 Not Applicable

SUBJECT:

UNPLANNED REACTOR SHUTDOWN DUE TO INOPERABLE CONTROL R0D

'This is an update of the preliminary notification issued on August 18, 1989.

After attempts to withdraw and insert the control rod pair from Region 19, the control rod motor stopped drawing current which indicated an apparent open conductor or thermal overload. The rod pair is at 69 inches withdrawn. The licensee has made no further attempt to withdraw the rod pair.

Present licensee plans are to cool down to the refueling mode and withdraw the control rod pair using the Luilding crane. Since the rod pair are extended approximately 120 inches, they cannot be withdrawn into the shielded transfer cask. The control rod pair would be hoisted out of the reactor vessel, moved across the operating deck, and deposited into the shielded hot cell fa.ility.

The licensee's plan is being reviewed by Region IV and NRR. The licensee is providing a copy of the safety analysis and ALARA plan to the staff. The attempt to remove the control rod pair is planned to occur no earlier than 9 p.m. MDT tonight.

Additional Region IV coverage, including an HP, are being sent to assist the resident inspectors in observing the licensee's actions.

This information ha3 been confirmed with a licensee representative.

CONTACT: T. Westerman FTS 728-8145 DISTRIBUTION:

OWFN NMBB NL MAIL: DCS (Orig. IE34)

Chmn. Carr SECY NM55 %EDE TES DOT (Transp. Only)

Comm. Roberts CA NRR ARM Comm. Rogers OGC OIG OGC FAX: (5520: h890#M6j Comm. Curtiss GPA 01 WO gions & HQ)

ACRS PA SLITP H-St PDR ED0 OE M '- NSAC EW-W RRI EIXP NRC Ops Ctr Licensee (Reactor) l l RIV. :DRP RA JLMilhoan;df RDM tin #(

8/p/89 8/t>/89 soos290013 8908M mJhoo2n ecc f i

1