Notice of Violation from Insp on 880911-1022.Violation Noted:Fire Doors 13 & 9 Between 480 Vac Switchgear Room & Bldg 10 Propped Opened W/No Fire Watch Established
ML20206M425
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/17/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20206M422 List:
References
50-267-88-25, NUDOCS 8811300561
Download: ML20206M425 (1)


Text

- .

Y. ,

APPENDIX A NOTICE OF VIOLATION Public Service Compny of Colorado .

Docket: 50-267 Fort St. Vrain Nuclear Generating Station License: DPR-34 c During an NR'C inspection conducted on September 11 through October 22, 1988, a violation of NRC requirements was identified. The violation involved a. failure to-follow procedures. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the violation is listed below:

Inoperable Fire Door 10 CFR Part 50, Appendix R, paragraph III.N. "Fire Doors " requires, in part, that fire doors be self closing or provided with closing mechanisms.

Additionally, fire doors are to be kept closed or provided with automatic release mechanisms.

The licensee's fire protection program plan as stated in Fire Protection Operability Requirement FPOR-14 requires, in part, that a continuous fire watch be established for fire doors that are opened for more than 20 minutes at a time.

Contrary to the above, on September 17, 1988, at 5:19 a.m. MDT, the NRC resident inspectors fcund Fire Doors 13 and 9 between the 480 VAC

, Switchgear Room and Building 10 propped open with no fire watch established.

i This is a Severity Level IV violation. (SupplementI)(267/8825-01) i Pursuant to the provisions of 10 CFR Part 2.201, Public Service Company of

Colorado is hereby required to submit to this office, within 30 days of the
date of the letter transmitting this Notice, a written statement or explanation
in reply, including for each violation
(1) the reason for the violation if
admitted, (2) the corrective steps that have been '* ken and the results I

achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

4 i

! Dated at Arlington, Texas, J this /7dday off/cw,.4t1988 i

1 i

l i 8911300561 891117 j gDR ADOCK0500pg7 L