Category:INSPECTION REPORT
MONTHYEARIR 05000267/19970011997-04-0707 April 1997 Insp Rept 50-267/97-01 on 970310-11.No Violations Noted. Major Areas Inspected:Reviews of Status of Radiation Protection,Environ Monitoring & Radwaste Mgt Programs IR 05000267/19960051996-12-23023 December 1996 Insp Rept 50-267/96-05 on 961203-05.No Violations Noted. Major Areas Inspected:Access Licensees Implementation of Radiation Protection Program & Decommissioning Plan & Included Reviews of Status of Radiation Protection IR 05000267/19900171990-11-29029 November 1990 Insp Rept 50-267/90-17 on 901001-1109.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety, Monthly Surveillance & Maint Observation IR 05000267/19900181990-11-20020 November 1990 Partially Withheld Insp Rept 50-267/90-18 on 901022-26. Violation Noted.Major Areas Inspected:Physical Security Program,Including Protected & Vital Area Barriers,Detection & Assessment Aidscommunications,Testing,Packages & Maint IR 05000267/19900191990-11-16016 November 1990 Insp Rept 50-267/90-19 on 901015-19.No Violations or Deviations Noted.Areas Inspected:Stated Radiological Controls IR 05000267/19900201990-11-14014 November 1990 Insp Rept 50-267/90-20 on 901029-1102.Noncitable Violation Noted.Major Areas Inspected:Insp of Fire Protection/ Prevention Program IR 05000267/19900141990-10-11011 October 1990 Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted IR 05000267/19900111990-08-15015 August 1990 Insp Rept 50-267/90-11 on 900601-0728.No Violations Noted. Major Areas Inspected:Onsite Followup of Ler,Operational Safety Verification,Monthly Maint Observation & Monthly Surveillance Observation IR 05000267/19900131990-08-0303 August 1990 Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program Including Emergency Detection & Classification,Knowledge & Performance of Duties IR 05000267/19900101990-07-25025 July 1990 Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Radioactive Matl Transportation Program,Liquid & Gaseous Radwaste Mgt Programs,Including Radiological Effluent Releases IR 05000267/19890191989-10-0202 October 1989 Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted.Major Areas Inspected:Region 19 CRD Assembly Recovery Activities,Followup on Region 19 CRD Clevis Bolt Failures & Steam Generator Ring Header Problems IR 05000267/19890161989-09-26026 September 1989 Insp Rept 50-267/89-16 on 890716-0831.Violation Noted.Major Areas Inspected:Onsite Followup of Ler,Followup on Violations,Followup of Open Item,Review of Part 21 Repts & Review of Licensee Action of Events IR 05000267/19890131989-08-16016 August 1989 Insp Rept 50-267/89-13 on 890626-30.Violation Noted.No Deviations Noted.Major Areas Inspected:Radwaste Sys IR 05000267/19890141989-08-15015 August 1989 Insp Rept 50-267/89-14 on 890710-14.Violation Noted.Major Areas Inspected:Radiation Protection Program ML20245J5791989-08-10010 August 1989 Insp Rept 50-267/89-17 on 890717-21.Violations Noted.Major Areas Inspected:Licensee Programs for Instrument Calibr & Functional Testing of Diesel Fuel Oil Quality & Storage & Actions on Previously Identified Insp Findings ML20245H3971989-08-0808 August 1989 Insp Rept 50-267/89-12 on 890601-0715.Violation Noted.Major Areas Inspected:Onsite Followup of Lers,Operational Safety Verification & Monthly Surveillance & Maint Observations ML20248E0261989-08-0101 August 1989 Team Insp Rept 50-267/89-08 on 890522-26.Violations Noted. Major Areas Inspected:Maint Activities Re Reactor Water Cooling Sys (Sys 46) IR 05000267/19890151989-07-11011 July 1989 Insp Rept 50-267/89-15 on 890623-27.Violation Noted.Major Areas Inspected:Circumstances & Events Associated W/ Operation of Facility Above Authorized Max Power Level of 82% of Full Power IR 05000267/19890101989-06-15015 June 1989 Insp Rept 50-267/89-10 on 890501-31.No Violations Noted. Major Areas inspected:follow-up of Ler,Licensee Action on Previously Identified Insp Findings,Operational Safety Verification & Monthly Surveillance Observation ML20244C1301989-06-0101 June 1989 Insp Rept 50-267/89-07 on 890319-0430.Violations Noted.Major Areas Inspected:Previously Identified Insp Findings, Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation IR 05000267/19890061989-04-24024 April 1989 Partially Withheld Insp Rept 50-267/89-06 on 890313-17 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support & Security Program Plan & Protected & Vital Area Barriers ML20245C8341989-04-13013 April 1989 Insp Rept 50-267/89-03 on 890201-0318.Violations Noted. Major Areas Inspected:Lers,Reserve Shutdown Matl Removal, Operational Safety Verification,Radiological Controls, Monthly Surveillance Observation & Maint Observation IR 05000267/19890051989-04-12012 April 1989 Insp Rept 50-267/89-05 on 890306-10 & 13-17.No Violations Noted.Major Areas Inspected:Previously Identified Insp Items,Surveillance Procedures & Records,Allegation Followup & Preparations for Refueling IR 05000267/19890041989-03-16016 March 1989 Insp Rept 50-267/89-04 on 880227-0303.No Violations or Deviations Noted.Major Areas Inspected:Licensed Operator Training IR 05000267/19890011989-02-16016 February 1989 Partially Withheld Insp Rept 50-267/89-01 on 890109-13 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Licensee Physical Security Program Including Mgt Support, Security Program Plan,Audits & Security Training IR 05000267/19890021989-01-17017 January 1989 Insp Rept 50-267/89-02 on 890101-31.Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Insp Findings,Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation IR 05000267/19880211988-11-21021 November 1988 Insp Rept 50-267/88-21 on 880926-30.Violation & Deviations Noted.Major Areas Inspected:Implementation of & Compliance to Safe Shutdown Requirements of 10CFR50,App R IR 05000267/19880281988-11-18018 November 1988 Insp 50-267/88-28 Canceled & No Insp Rept to Be Issued for Rept Number ML20206M4311988-11-16016 November 1988 Insp Rept 50-267/88-25 on 880911-1022.Violations Noted. Major Areas Inspected:Previously Identified Insp Findings, Licensee Action in Response to NRC Bulletins,Operational Safety Verification & Monthly Maint Observation IR 05000267/19880261988-11-0404 November 1988 Insp Rept 50-267/88-26 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected:Failure of Emergency Diesel Generator Output Breakers to Automatically Close During 881011 Test & Routine Insp of Instrument Calibr IR 05000267/19880241988-10-12012 October 1988 Insp Rept 50-267/88-24 on 880926-30.No Violations or Deviations Noted.Major Areas inspected:safety-related Surveillance Testing & post-mod Testing IR 05000267/19880231988-10-0303 October 1988 Insp Rept 50-267/88-23 on 880912-16.Violations & Deviations Noted.Major Areas Inspected:Refurbishment of Reactor Helium Circulator IR 05000267/19880181988-09-29029 September 1988 Insp Rept 50-267/88-18 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Licensed Operator, Nonlicensed Staff & General Employee Training IR 05000267/19880201988-09-29029 September 1988 Insp Rept 50-267/88-20 on 880801-0910.Violations Noted. Major Areas Inspected:Operational Safety Verification,Ler Review,Monthly Maint Observations,Esf Walkdown,Radiological Protection & Security Observations ML20154N0081988-09-16016 September 1988 Insp Rept 50-267/88-17 on 880724-0802.Violations Noted. Major Areas Inspected:Licensee Radiation Protection Program ML20154E4341988-09-0808 September 1988 Insp Rept 50-267/88-15 on 880711-0805.Violation & Deviation Noted.Major Areas Inspected:Previous Insp Findings,Ler Followup,Control of Design Changes & Mods & Activities Re Refurbishment of Reactor Helium Circulators ML20155B8411988-09-0202 September 1988 Operational Safety Team Insp Rept 50-267/88-200 on 880509-20.Major Areas Inspected:Operations,Maint, Surveillance,Mgt Oversight,Safety Review & QA Programs IR 05000267/19880141988-09-0202 September 1988 Insp Rept 50-267/88-14 on 880725-0805.Violations & Deviations Noted.Major Areas Inspected:Followup of Previous Insp Findings,Status of Reg Guide 1.97 Implementation,Status of Generic Ltr 83-28 Implementation & Followup of LERs IR 05000267/19880191988-08-30030 August 1988 Partially Withheld Insp Rept 50-267/88-19 on 880810-11 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Licensee Safeguards Contingency Plan Implementation & Physical Protection of Safeguards Info IR 05000267/19880161988-08-26026 August 1988 Insp Rept 50-267/88-16 on 880701-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Ler Review,Monthly Maint Observation,Monthly Surveillance & Monthly Security Observation ML20151X4411988-08-11011 August 1988 Insp Rept 50-267/88-13 on 880601-30.Violation Noted.Major Areas Inspected:Licensee Action on NRC Bulletins,Operational Safety Verification,Followup of Allegations,Equipment Qualification Temp Profile & Radiological Protection ML20150C2571988-06-21021 June 1988 Insp Rept 50-267/88-12 on 880501-31.Deviation Noted.Major Areas Inspected:Operational Safety Verification,Ler Review, Monthly Maint Observation,Monthly Surveillance Observation, Radiological Protection & Monthly Security Observation IR 05000267/19880101988-06-0808 June 1988 Insp Rept 50-267/88-10 on 880401-30.Violations Noted.Major Areas Inspected:Followup of Licensee Action on Previously Identified Findings,Followup of Allegation 88-A-01, Operational Safety Verification & Fire Protection IR 05000267/19880111988-05-25025 May 1988 Insp Rept 50-267/88-11 on 880425-29.Violations Noted.Major Areas Inspected:Emergency Response Program,Including Training,Emergency Facilities,Equipment,Instrumentation & Supplies IR 05000267/19880091988-05-13013 May 1988 Insp Rept 50-267/88-09 on 880411-15.No Violations or Deviations Noted.Major Areas Inspected:Licensee Chemistry/ Radiochemistry Program & Water Chemistry & Radiochemistry Confirmatory Measurements IR 05000267/19880071988-05-12012 May 1988 Insp Rept 50-267/88-07 on 880301-31.Violations Noted.Major Areas Inspected:Followup of Licensee Action on Previously Identified Findings,Operational Safety Verification,Review of 10CFR50.59 Safety Evaluations & Radiological Protection IR 05000267/19880081988-04-19019 April 1988 Insp Rept 50-267/88-08 on 880321-25.Violations Noted.Major Areas Inspected:Qa Program,Implementation of 10CFR21,LER Followup & Actions on Previous Insp Findings ML20151R7491988-04-0808 April 1988 Partially Withheld Insp Rept 50-267/88-05 on 880229-0304 (Ref 10CFR73.21).Major Areas Inspected:Insp of Previously Identified Items,Security Plan & Procedures,Security Organization,Locks,Keys & Combinations & Protected Areas IR 05000267/19880041988-03-30030 March 1988 Insp Rept 50-267/88-04 on 880222-26.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection/ Prevention Program & Implementation IR 05000267/19880061988-03-25025 March 1988 Insp Rept 50-267/88-06 on 880229-0304.No Violations Noted. Major Areas Inspected:Licensee Actions Re IE Bulletin 85-003 1997-04-07
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000267/19970011997-04-0707 April 1997 Insp Rept 50-267/97-01 on 970310-11.No Violations Noted. Major Areas Inspected:Reviews of Status of Radiation Protection,Environ Monitoring & Radwaste Mgt Programs IR 05000267/19960051996-12-23023 December 1996 Insp Rept 50-267/96-05 on 961203-05.No Violations Noted. Major Areas Inspected:Access Licensees Implementation of Radiation Protection Program & Decommissioning Plan & Included Reviews of Status of Radiation Protection IR 05000267/19900171990-11-29029 November 1990 Insp Rept 50-267/90-17 on 901001-1109.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety, Monthly Surveillance & Maint Observation IR 05000267/19900181990-11-20020 November 1990 Partially Withheld Insp Rept 50-267/90-18 on 901022-26. Violation Noted.Major Areas Inspected:Physical Security Program,Including Protected & Vital Area Barriers,Detection & Assessment Aidscommunications,Testing,Packages & Maint IR 05000267/19900191990-11-16016 November 1990 Insp Rept 50-267/90-19 on 901015-19.No Violations or Deviations Noted.Areas Inspected:Stated Radiological Controls IR 05000267/19900201990-11-14014 November 1990 Insp Rept 50-267/90-20 on 901029-1102.Noncitable Violation Noted.Major Areas Inspected:Insp of Fire Protection/ Prevention Program IR 05000267/19900141990-10-11011 October 1990 Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted IR 05000267/19900111990-08-15015 August 1990 Insp Rept 50-267/90-11 on 900601-0728.No Violations Noted. Major Areas Inspected:Onsite Followup of Ler,Operational Safety Verification,Monthly Maint Observation & Monthly Surveillance Observation IR 05000267/19900131990-08-0303 August 1990 Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program Including Emergency Detection & Classification,Knowledge & Performance of Duties IR 05000267/19900101990-07-25025 July 1990 Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Radioactive Matl Transportation Program,Liquid & Gaseous Radwaste Mgt Programs,Including Radiological Effluent Releases IR 05000267/19890191989-10-0202 October 1989 Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted.Major Areas Inspected:Region 19 CRD Assembly Recovery Activities,Followup on Region 19 CRD Clevis Bolt Failures & Steam Generator Ring Header Problems IR 05000267/19890161989-09-26026 September 1989 Insp Rept 50-267/89-16 on 890716-0831.Violation Noted.Major Areas Inspected:Onsite Followup of Ler,Followup on Violations,Followup of Open Item,Review of Part 21 Repts & Review of Licensee Action of Events IR 05000267/19890131989-08-16016 August 1989 Insp Rept 50-267/89-13 on 890626-30.Violation Noted.No Deviations Noted.Major Areas Inspected:Radwaste Sys IR 05000267/19890141989-08-15015 August 1989 Insp Rept 50-267/89-14 on 890710-14.Violation Noted.Major Areas Inspected:Radiation Protection Program ML20245J5791989-08-10010 August 1989 Insp Rept 50-267/89-17 on 890717-21.Violations Noted.Major Areas Inspected:Licensee Programs for Instrument Calibr & Functional Testing of Diesel Fuel Oil Quality & Storage & Actions on Previously Identified Insp Findings ML20245H3971989-08-0808 August 1989 Insp Rept 50-267/89-12 on 890601-0715.Violation Noted.Major Areas Inspected:Onsite Followup of Lers,Operational Safety Verification & Monthly Surveillance & Maint Observations ML20248E0261989-08-0101 August 1989 Team Insp Rept 50-267/89-08 on 890522-26.Violations Noted. Major Areas Inspected:Maint Activities Re Reactor Water Cooling Sys (Sys 46) IR 05000267/19890151989-07-11011 July 1989 Insp Rept 50-267/89-15 on 890623-27.Violation Noted.Major Areas Inspected:Circumstances & Events Associated W/ Operation of Facility Above Authorized Max Power Level of 82% of Full Power IR 05000267/19890101989-06-15015 June 1989 Insp Rept 50-267/89-10 on 890501-31.No Violations Noted. Major Areas inspected:follow-up of Ler,Licensee Action on Previously Identified Insp Findings,Operational Safety Verification & Monthly Surveillance Observation ML20244C1301989-06-0101 June 1989 Insp Rept 50-267/89-07 on 890319-0430.Violations Noted.Major Areas Inspected:Previously Identified Insp Findings, Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation IR 05000267/19890061989-04-24024 April 1989 Partially Withheld Insp Rept 50-267/89-06 on 890313-17 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support & Security Program Plan & Protected & Vital Area Barriers ML20245C8341989-04-13013 April 1989 Insp Rept 50-267/89-03 on 890201-0318.Violations Noted. Major Areas Inspected:Lers,Reserve Shutdown Matl Removal, Operational Safety Verification,Radiological Controls, Monthly Surveillance Observation & Maint Observation IR 05000267/19890051989-04-12012 April 1989 Insp Rept 50-267/89-05 on 890306-10 & 13-17.No Violations Noted.Major Areas Inspected:Previously Identified Insp Items,Surveillance Procedures & Records,Allegation Followup & Preparations for Refueling IR 05000267/19890041989-03-16016 March 1989 Insp Rept 50-267/89-04 on 880227-0303.No Violations or Deviations Noted.Major Areas Inspected:Licensed Operator Training IR 05000267/19890011989-02-16016 February 1989 Partially Withheld Insp Rept 50-267/89-01 on 890109-13 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Licensee Physical Security Program Including Mgt Support, Security Program Plan,Audits & Security Training IR 05000267/19890021989-01-17017 January 1989 Insp Rept 50-267/89-02 on 890101-31.Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Insp Findings,Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation IR 05000267/19880211988-11-21021 November 1988 Insp Rept 50-267/88-21 on 880926-30.Violation & Deviations Noted.Major Areas Inspected:Implementation of & Compliance to Safe Shutdown Requirements of 10CFR50,App R IR 05000267/19880281988-11-18018 November 1988 Insp 50-267/88-28 Canceled & No Insp Rept to Be Issued for Rept Number ML20206M4311988-11-16016 November 1988 Insp Rept 50-267/88-25 on 880911-1022.Violations Noted. Major Areas Inspected:Previously Identified Insp Findings, Licensee Action in Response to NRC Bulletins,Operational Safety Verification & Monthly Maint Observation IR 05000267/19880261988-11-0404 November 1988 Insp Rept 50-267/88-26 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected:Failure of Emergency Diesel Generator Output Breakers to Automatically Close During 881011 Test & Routine Insp of Instrument Calibr IR 05000267/19880241988-10-12012 October 1988 Insp Rept 50-267/88-24 on 880926-30.No Violations or Deviations Noted.Major Areas inspected:safety-related Surveillance Testing & post-mod Testing IR 05000267/19880231988-10-0303 October 1988 Insp Rept 50-267/88-23 on 880912-16.Violations & Deviations Noted.Major Areas Inspected:Refurbishment of Reactor Helium Circulator IR 05000267/19880181988-09-29029 September 1988 Insp Rept 50-267/88-18 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Licensed Operator, Nonlicensed Staff & General Employee Training IR 05000267/19880201988-09-29029 September 1988 Insp Rept 50-267/88-20 on 880801-0910.Violations Noted. Major Areas Inspected:Operational Safety Verification,Ler Review,Monthly Maint Observations,Esf Walkdown,Radiological Protection & Security Observations ML20154N0081988-09-16016 September 1988 Insp Rept 50-267/88-17 on 880724-0802.Violations Noted. Major Areas Inspected:Licensee Radiation Protection Program ML20154E4341988-09-0808 September 1988 Insp Rept 50-267/88-15 on 880711-0805.Violation & Deviation Noted.Major Areas Inspected:Previous Insp Findings,Ler Followup,Control of Design Changes & Mods & Activities Re Refurbishment of Reactor Helium Circulators ML20155B8411988-09-0202 September 1988 Operational Safety Team Insp Rept 50-267/88-200 on 880509-20.Major Areas Inspected:Operations,Maint, Surveillance,Mgt Oversight,Safety Review & QA Programs IR 05000267/19880141988-09-0202 September 1988 Insp Rept 50-267/88-14 on 880725-0805.Violations & Deviations Noted.Major Areas Inspected:Followup of Previous Insp Findings,Status of Reg Guide 1.97 Implementation,Status of Generic Ltr 83-28 Implementation & Followup of LERs IR 05000267/19880191988-08-30030 August 1988 Partially Withheld Insp Rept 50-267/88-19 on 880810-11 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Licensee Safeguards Contingency Plan Implementation & Physical Protection of Safeguards Info IR 05000267/19880161988-08-26026 August 1988 Insp Rept 50-267/88-16 on 880701-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Ler Review,Monthly Maint Observation,Monthly Surveillance & Monthly Security Observation ML20151X4411988-08-11011 August 1988 Insp Rept 50-267/88-13 on 880601-30.Violation Noted.Major Areas Inspected:Licensee Action on NRC Bulletins,Operational Safety Verification,Followup of Allegations,Equipment Qualification Temp Profile & Radiological Protection ML20150C2571988-06-21021 June 1988 Insp Rept 50-267/88-12 on 880501-31.Deviation Noted.Major Areas Inspected:Operational Safety Verification,Ler Review, Monthly Maint Observation,Monthly Surveillance Observation, Radiological Protection & Monthly Security Observation IR 05000267/19880101988-06-0808 June 1988 Insp Rept 50-267/88-10 on 880401-30.Violations Noted.Major Areas Inspected:Followup of Licensee Action on Previously Identified Findings,Followup of Allegation 88-A-01, Operational Safety Verification & Fire Protection IR 05000267/19880111988-05-25025 May 1988 Insp Rept 50-267/88-11 on 880425-29.Violations Noted.Major Areas Inspected:Emergency Response Program,Including Training,Emergency Facilities,Equipment,Instrumentation & Supplies IR 05000267/19880091988-05-13013 May 1988 Insp Rept 50-267/88-09 on 880411-15.No Violations or Deviations Noted.Major Areas Inspected:Licensee Chemistry/ Radiochemistry Program & Water Chemistry & Radiochemistry Confirmatory Measurements IR 05000267/19880071988-05-12012 May 1988 Insp Rept 50-267/88-07 on 880301-31.Violations Noted.Major Areas Inspected:Followup of Licensee Action on Previously Identified Findings,Operational Safety Verification,Review of 10CFR50.59 Safety Evaluations & Radiological Protection IR 05000267/19880081988-04-19019 April 1988 Insp Rept 50-267/88-08 on 880321-25.Violations Noted.Major Areas Inspected:Qa Program,Implementation of 10CFR21,LER Followup & Actions on Previous Insp Findings ML20151R7491988-04-0808 April 1988 Partially Withheld Insp Rept 50-267/88-05 on 880229-0304 (Ref 10CFR73.21).Major Areas Inspected:Insp of Previously Identified Items,Security Plan & Procedures,Security Organization,Locks,Keys & Combinations & Protected Areas IR 05000267/19880041988-03-30030 March 1988 Insp Rept 50-267/88-04 on 880222-26.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection/ Prevention Program & Implementation IR 05000267/19880061988-03-25025 March 1988 Insp Rept 50-267/88-06 on 880229-0304.No Violations Noted. Major Areas Inspected:Licensee Actions Re IE Bulletin 85-003 1997-04-07
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000267/19970011997-04-0707 April 1997 Insp Rept 50-267/97-01 on 970310-11.No Violations Noted. Major Areas Inspected:Reviews of Status of Radiation Protection,Environ Monitoring & Radwaste Mgt Programs IR 05000267/19960051996-12-23023 December 1996 Insp Rept 50-267/96-05 on 961203-05.No Violations Noted. Major Areas Inspected:Access Licensees Implementation of Radiation Protection Program & Decommissioning Plan & Included Reviews of Status of Radiation Protection IR 05000267/19940031996-04-0202 April 1996 Revised NOV from Insp Rept 50-267/94-03.Violation Noted: Contractor to Licensee Submitted Inaccurate Radiation Surveys ML20136B3051996-04-0202 April 1996 Revised NOV from Insp Rept 50-267/94-03.Violation Noted: Numerous Required Records of Radiation Surveys Were Created Which Were Not Complete & Accurate ML20137H1731995-08-17017 August 1995 Investigation Rept 4-95-015.Noncompliance Noted.Major Areas Investigated:Alleged Deliberate Failure of Contract Employee to Perform Daily Response Checks on Portable Contamination Monitor ML20137K0551995-05-26026 May 1995 Investigation Rept 4-94-010 on 950526.No Noncompliance Noted.Major Areas Investigated:Allegations Re Falsification of Radiation Survey Records ML20058P5931993-10-12012 October 1993 EN-93-101:on 931012,notice of Proposed Imposition of Civil Penalty in Amount of $80,000 Issued to Licensee.Action Discussed in SECY-93-263 & Approved by Commission on 931007 ML20062H8191990-11-29029 November 1990 Notice of Violation from Insp on 901022-26.Violation Noted: Test of Protected Area Intrusion Detection Zones Defeated by Testing Personnel Jumping Over Zone IR 05000267/19900171990-11-29029 November 1990 Insp Rept 50-267/90-17 on 901001-1109.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety, Monthly Surveillance & Maint Observation IR 05000267/19900181990-11-20020 November 1990 Partially Withheld Insp Rept 50-267/90-18 on 901022-26. Violation Noted.Major Areas Inspected:Physical Security Program,Including Protected & Vital Area Barriers,Detection & Assessment Aidscommunications,Testing,Packages & Maint IR 05000267/19900191990-11-16016 November 1990 Insp Rept 50-267/90-19 on 901015-19.No Violations or Deviations Noted.Areas Inspected:Stated Radiological Controls IR 05000267/19900201990-11-14014 November 1990 Insp Rept 50-267/90-20 on 901029-1102.Noncitable Violation Noted.Major Areas Inspected:Insp of Fire Protection/ Prevention Program ML20058E4951990-10-30030 October 1990 Notice of Violation from Insp on 900928.Violation Noted: Licensee Did Not Perform Radiation & Airborne Surveys Before Allowing Special Svcs Licensed Operator to Enter Hot Svc Facility to Remove Five Unshielded Radioactive Samples IR 05000267/19900141990-10-11011 October 1990 Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted IR 05000267/19900111990-08-15015 August 1990 Insp Rept 50-267/90-11 on 900601-0728.No Violations Noted. Major Areas Inspected:Onsite Followup of Ler,Operational Safety Verification,Monthly Maint Observation & Monthly Surveillance Observation IR 05000267/19900131990-08-0303 August 1990 Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program Including Emergency Detection & Classification,Knowledge & Performance of Duties IR 05000267/19900101990-07-25025 July 1990 Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Radioactive Matl Transportation Program,Liquid & Gaseous Radwaste Mgt Programs,Including Radiological Effluent Releases IR 05000267/19890191989-10-0202 October 1989 Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted.Major Areas Inspected:Region 19 CRD Assembly Recovery Activities,Followup on Region 19 CRD Clevis Bolt Failures & Steam Generator Ring Header Problems ML20248B3051989-09-26026 September 1989 Notice of Violation from Insp on 890716-0831.Violation Noted:Four Reactor Engineers Worked on safety-related Test of Reactor Core Beyond Tech Specs Limit W/O Documented Authorization IR 05000267/19890161989-09-26026 September 1989 Insp Rept 50-267/89-16 on 890716-0831.Violation Noted.Major Areas Inspected:Onsite Followup of Ler,Followup on Violations,Followup of Open Item,Review of Part 21 Repts & Review of Licensee Action of Events PNO-IV-89-055, on 890829,Board of Directors Directed Termination of Nuclear Operations at Facility for 100-day Cooldown Period in Preparation for 30-month Reactor Defueling.Nrc Currently Reviewing Defueling Safety Analysis1989-08-29029 August 1989 PNO-IV-89-055:on 890829,Board of Directors Directed Termination of Nuclear Operations at Facility for 100-day Cooldown Period in Preparation for 30-month Reactor Defueling.Nrc Currently Reviewing Defueling Safety Analysis PNO-IV-89-052C, updates 890818,21 & 23 Unplanned Reactor Shutdowns Due to Inoperable Control Rod.Control Rod Assembly Will Be Removed Using Bldg Crane.Aluminum Shutter Will Be Remotely Placed on Bottom of Canister1989-08-25025 August 1989 PNO-IV-89-052C:updates 890818,21 & 23 Unplanned Reactor Shutdowns Due to Inoperable Control Rod.Control Rod Assembly Will Be Removed Using Bldg Crane.Aluminum Shutter Will Be Remotely Placed on Bottom of Canister PNO-IV-89-052B, on 890823,unplanned Reactor Shutdown Due to Inoperable Control Rod.Licensee Plans to Remove Control Rod Pair W/Bldg Crane in Unshielded Configuration to Shielded, Contained Evolution1989-08-23023 August 1989 PNO-IV-89-052B:on 890823,unplanned Reactor Shutdown Due to Inoperable Control Rod.Licensee Plans to Remove Control Rod Pair W/Bldg Crane in Unshielded Configuration to Shielded, Contained Evolution PNO-IV-89-052A, on 890818,after Attempting to Withdraw & Insert Control Rod Pair from Region 19,control Rod Motor Stopped Drawing Current & Indicated Open Conductor or Thermal Overload.Pair Will Be Withdrawn Using Bldg Crane1989-08-21021 August 1989 PNO-IV-89-052A:on 890818,after Attempting to Withdraw & Insert Control Rod Pair from Region 19,control Rod Motor Stopped Drawing Current & Indicated Open Conductor or Thermal Overload.Pair Will Be Withdrawn Using Bldg Crane ML20246E6011989-08-21021 August 1989 Notice of Violation from Insp on 890710-14.Violation Noted:From 890101-0712,only Three of Seven Shipments of Nonexempt Radioactive Matls Had Current License on File PNO-IV-89-052, on 890817,unplanned Reactor Shutdown Due to Inoperable Control Rod Drive Occurred.Attempts to Clear Cause of Slack Cable Light Failed.Loop 2 Shutdown Due to Upset in Bearing Water Sys Occurred During Plant Shutdown1989-08-18018 August 1989 PNO-IV-89-052:on 890817,unplanned Reactor Shutdown Due to Inoperable Control Rod Drive Occurred.Attempts to Clear Cause of Slack Cable Light Failed.Loop 2 Shutdown Due to Upset in Bearing Water Sys Occurred During Plant Shutdown IR 05000267/19890131989-08-16016 August 1989 Insp Rept 50-267/89-13 on 890626-30.Violation Noted.No Deviations Noted.Major Areas Inspected:Radwaste Sys IR 05000267/19890141989-08-15015 August 1989 Insp Rept 50-267/89-14 on 890710-14.Violation Noted.Major Areas Inspected:Radiation Protection Program ML20245J5721989-08-10010 August 1989 Notice of Violation from Insp on 890717-21.Violation Noted: Procedures Covering Timely Testing of Reactor Protection Sys Startup Channel & Periodic Test & Calibr of Diesel Engine Overspeed Trip for diesel-driven Fire Pump Not Established ML20245J5791989-08-10010 August 1989 Insp Rept 50-267/89-17 on 890717-21.Violations Noted.Major Areas Inspected:Licensee Programs for Instrument Calibr & Functional Testing of Diesel Fuel Oil Quality & Storage & Actions on Previously Identified Insp Findings ML20246A7061989-08-0909 August 1989 Exam Rept 50-267/OL 89-02 During Wk of 890710.Exam Results: Three of Four Limited Senior Reactor Operator Applicants Passed Exam.Answer Key Encl ML20245H3941989-08-0808 August 1989 Notice of Violation from Insp on 890628.Violation Noted:On 890625,util Failed to Verify Positioning of HS-6335 to Tank 1 B,Resulting in Unanalyzed Gaseous Waste Release ML20245H3971989-08-0808 August 1989 Insp Rept 50-267/89-12 on 890601-0715.Violation Noted.Major Areas Inspected:Onsite Followup of Lers,Operational Safety Verification & Monthly Surveillance & Maint Observations ML20248E0101989-08-0303 August 1989 Notice of Violation from Insp on 880522-26.Violations Noted: Inadequate Testing of cross-connect Valves Per Tech Spec SR 5.3.4 & Failure to Test High Flow Alarms Per Tech Spec SR 5.4.5 ML20248E0261989-08-0101 August 1989 Team Insp Rept 50-267/89-08 on 890522-26.Violations Noted. Major Areas Inspected:Maint Activities Re Reactor Water Cooling Sys (Sys 46) ML20247L6141989-07-14014 July 1989 Notice of Violation from Insp on 890623-27.Violation Noted: Failure to Provide Adequate Administrative Control of Plant Changes That Affect safety-related Plant Procedures IR 05000267/19890151989-07-11011 July 1989 Insp Rept 50-267/89-15 on 890623-27.Violation Noted.Major Areas Inspected:Circumstances & Events Associated W/ Operation of Facility Above Authorized Max Power Level of 82% of Full Power PNO-IV-89-044, on 890628,pressure in Waste Gas Receiver a Decreased from 250 Psig & Pressure in Receiver a Decreased from 60 to 50 Psig.Caused by Erroneous Valve Lineup.Plant Stack Monitors Did Not Alarm1989-06-28028 June 1989 PNO-IV-89-044:on 890628,pressure in Waste Gas Receiver a Decreased from 250 Psig & Pressure in Receiver a Decreased from 60 to 50 Psig.Caused by Erroneous Valve Lineup.Plant Stack Monitors Did Not Alarm PNO-IV-89-040, from 890622-23,power Exceeded 82% & Secondary Heat Balance Indication in Control Room Read Approx 79.2%.On 890623,discovered Incorrect Input Into Secondary Heat Balance Calculation.Power Reduced to 65% Pending Evaluation1989-06-23023 June 1989 PNO-IV-89-040:from 890622-23,power Exceeded 82% & Secondary Heat Balance Indication in Control Room Read Approx 79.2%.On 890623,discovered Incorrect Input Into Secondary Heat Balance Calculation.Power Reduced to 65% Pending Evaluation ML20245G4781989-06-22022 June 1989 Exam Rept 50-267/OL-9-01 on 890523-25.Exam Results:Two Senior Reactor Operator & Three Reactor Operator Candidates Passed All Portions of Exams & Issued Appropriate Licenses. One Reactor Operator Failed Written Exam IR 05000267/19890101989-06-15015 June 1989 Insp Rept 50-267/89-10 on 890501-31.No Violations Noted. Major Areas inspected:follow-up of Ler,Licensee Action on Previously Identified Insp Findings,Operational Safety Verification & Monthly Surveillance Observation ML20244C1271989-06-0808 June 1989 Notice of Violation from Insp on 890324-0430.Violations Noted:Two Examples of Failing to Comply W/Tech Spec Requirements & Inadequate Control of Replacement Parts for safety-related Equipment ML20244C1301989-06-0101 June 1989 Insp Rept 50-267/89-07 on 890319-0430.Violations Noted.Major Areas Inspected:Previously Identified Insp Findings, Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation PNO-IV-89-036, on 890529,two Teenagers Shot by off-duty Security Guard Following Confrontation Re Assault.Guard Arrested & Being Held for Murder.Licensee Plans to Issue Press Release.State of Co Will Be Informed.Record Copy1989-05-30030 May 1989 PNO-IV-89-036:on 890529,two Teenagers Shot by off-duty Security Guard Following Confrontation Re Assault.Guard Arrested & Being Held for Murder.Licensee Plans to Issue Press Release.State of Co Will Be Informed.Record Copy PNO-IV-89-031, on 890427,CRD 3 Failed to Insert on Scram During Performance of Weekly Partial Insertion Scram Tests. Troubleshooting Confirmed That CRD Brake Deenergized & That Rod Out Limit Cleared.Licensee Plans to Replace CRDs 3 & 71989-04-28028 April 1989 PNO-IV-89-031:on 890427,CRD 3 Failed to Insert on Scram During Performance of Weekly Partial Insertion Scram Tests. Troubleshooting Confirmed That CRD Brake Deenergized & That Rod Out Limit Cleared.Licensee Plans to Replace CRDs 3 & 7 IR 05000267/19890061989-04-24024 April 1989 Partially Withheld Insp Rept 50-267/89-06 on 890313-17 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support & Security Program Plan & Protected & Vital Area Barriers ML20245C8311989-04-14014 April 1989 Notice of Violation from Insp on 890217.Violation Noted: Stairway of Reactor Bldg Utilized by Potentially Contaminated Individuals Prior to Performing Whole Body Frisk & by Individuals Exiting Area After Frisking ML20245C8341989-04-13013 April 1989 Insp Rept 50-267/89-03 on 890201-0318.Violations Noted. Major Areas Inspected:Lers,Reserve Shutdown Matl Removal, Operational Safety Verification,Radiological Controls, Monthly Surveillance Observation & Maint Observation IR 05000267/19890051989-04-12012 April 1989 Insp Rept 50-267/89-05 on 890306-10 & 13-17.No Violations Noted.Major Areas Inspected:Previously Identified Insp Items,Surveillance Procedures & Records,Allegation Followup & Preparations for Refueling IR 05000267/19870351989-04-0707 April 1989 Final SALP Rept 50-267/87-35 for May 1987 - Aug 1988. Category 1 Assigned in Areas of Maint,Fire Protection & Radiological Controls 1997-04-07
[Table view] |
Text
-I
.
~
,
ENCLOSURE U.S. NUCLEAR R LATORY COMMISSION ,
'ON IV_ :
I Docket No.: 50-267 i
.
i
. License No.: DPR-34 Report No.: 50-267/97 01 l
Licensee: Public Service Company of Colorado (PSCo)
. Facility: Fort St. Vrain Nuclear Generating Station (FSV) l Location: Platteville, Colorado l Dates: March 10 through 11,1997 ,
inspector: L. C. Carson 11, Health Physicist
.. Approved by: D. Blair Spitzberg, Ph.D., Chief Nuclear Materials Licensing Branch Division of Nuc! car Materials Safety Attachment: Supplemental inspection Information
!
l l
!
t
.
L i I
'
i l
,
i
,
w
, s 9704150033 970407ADOCK 05000267 ; ,
.
PDR-
-
G PDR- 5 .;;,
"
__ .. ,
_
-
a l
l
.
-2- l
)
l EXECUTIVE SUMMARY l I
Fort St. Vrain Nuclear Generating Station l NRC Inspection Report 50 267/97-01 :
!
.This announced inspection was conducted to assess the licensee's implementation of the :
radiation protection program and Decommissioning Plan in preparation for license -
termination. This inspection included reviews of the status of the radiation protection, environmental monitoring, and radwaste management program >
The following is a summary of the findings of this inspection:
- The licensee'had conspicuously placarded in accordance with license requirements
'
and licensee commitments, reactor building locations containing grout filled pipes embedded in concrete that had known residual contamination (Section 2).
- The inspector's exposure rate measurements of on-site and off-site f acilities were in close agreement with licensee measurements and met the Decommissioning o'an release requirements (Section 2),
- The licensee's radiation protection program met the requirements of the _
Decommissioning Technical Specifications,10 CFR Part 19, and 10 CFR Part 20. All I radiation sources and waste had been removed from the site and properly disposed (Section 3).
i ;
'
i * The licensee had implemented the radiologl cal environmental monitoring and
- radwaste management programs as required by the Decommissioning Technical ,
Specifications. The 1996 Annual Radiological Environmental Opera *ing Report and !
the 1996 Annual Radioactive Effluent Release Report met the Dec' 'ssioning ,
Technical Specifications requirements (Section 4). ;
.
.
'
l
'
i r
i i
i s
l.
e a
9-
-- - . , - . - - ,
- . . - , .
- - . . ---
!
.
'
i l-3- )
J j
Beoort D11 ails 1 Plant Status j l
On November 23,1992, the NRC issued an Order which authorized the l deccmmissioning of FSV. As of November 1,1996, decontamination and decommissioning at FSV were complete. On November 7,1996, PSCo submitted to the NRC a " Request to Terminate the FSV Facility Operating License," which is a 10 CFR Part 50 possession-only licens PSCo's objective was to dismantle, decommission, and release the FSV site for unrestricted use; however, the FSV f acility will be largely lef t intact following ;
decommissioning. The Prestressed Concrete Reactor Vessel, reactor building, turbine >
building, liquid waste system, and the radioactive balance-of-plant equipment were dismantled or decontaminated as described in the FSV Decommissioning Pla During this inspection, the primary activities in progress at FSV consisted of terminating and pnacing out the 10 CFR Part 50 license radiation protection and decommiscioning activities. This final NRC inspection of the 10 CFR Part 50 :
licensed activities at F.SV was to verify that residual radioa:,uvity and radiation exposure rates were at the levels described in the Decommissioning Pla !
2 Closeout and Inspection Survey (83890)
2.1. Insoection Scone This inspection activity involved touring the FSV site and performing exposure rate
<
surveys. The purpose of this inspection was to measure radiation levels on site and off site. The inspector was to detetmine the residual exposure rate levels remaining 1 on site and if any sources of radioactive material remained with the hcense .2 Observations and Findina; a. Residual Radioactivitv P!acues The natural radiation background at FSV on site and off site was 15 microRoentgen/ hour (pR/hr). The FSV Decommissioning Plan established a site residual radioactivity and exposure rate release criteria from licensed material of 5 R/hr above background when averaged over 10 square-meters, and no single measurement could be 10 pR/hr above backgroun i Reacter building tours were conducted to observe the location of grouted embedded piping. According to NRC correspondence dated June 18,1996, the licensee had to place warning plaques around the reactor building and Prestressed Concrete Reactor Vessel. Since the last inspection, the licensee had mounted the caution plaques as i required before license termination. The inspector observed each of the seven l
.
-4-plaques and concluded that the plaques were mounted in conspicuous location The plaques read as follows:
" Caution: Grout-filled pipes embedded in concrete contain fixed radioactive contamination on inner surf aces as follows:
- Contamination levels are 2,800 disintegrations per minute /100 centimeters squared (dpm/100 cm2 ) average,87,000 dpm/100 cm2 maximu These levels of radioactive contamination have been accepted by the U.S. Nuclear Regulatory Commission for building occupancy and dismantlement."
b. Site Tours and Exoosure Rate Survevs The inspector conducted exposure rate surveys of the reactor building which included Level 11, around the Prestressed Concrete Reactor Vessel, reactor building
"
basement sump area, new fuel storage area, and the liquid radwaste syste Radiation levels in the reactor building measured 5-15 R/h i
1 The inspector conducted surveys during tours of the turbine building and ;
radiochemistry laboratory. Radiaticn levels in these two areas measured 15-20 R/hr. The inspector toured and surveyed the areas inside and outside the FSV security fence line, and the radiation levels in these two areas measured 10-15 R/h Finally, the inspector toured and surveyed the Farm Pond, Goosequill Ditch, and Jay l Thomas Ditch. This area included licensee property inside and outsid/s the FSV owner controlled area where the licensee had conducted extensive sampling, radioisotopic analysis, and exposure rate measurements wh;ch included, soil, ;
'
pavement, water, and basin sediment. Radiation levels in the Farm Pond, Goosequill Ditch, and Jay Thomas Ditch areas measured 10-15 R/h .3 Conclusion The licensee conspicuously placarded locations in the reactor building with known residual contamination contained in pipes unbedded in concrete in accordance with license requirements and licensee commitments. The inspector's exposure rate ;
measurements of on-site and off-site f acilities were in close agreement with licensee !
measurements and met the Decommissioning Plan's exposure rate release requirement .
l
.
-5- i
?
I E
'
3 Occupational Exposure During SAFESTOR and DECON (83100)
l
- insoection Scone' ;
The purpose of this inspection activity was to review FSV's radiation protection_
.
program through the completion of the decommissioning project. The inspector i reviewed the licensee's radioactive material control l l
.
3.2 Observations and Findinas !
'
.
a. Control of Radioactive Materials Since the last inspection, the licensee found four check sources that were left in I plant radiation instruments. These check sources included two americium-241 sources (0.027 and 0.05 microcuries), a barium-133 source (0.932 microcuries), and a cesium-137 source (24.1 microcuries). The licensee documented their findings in
'
- Problem Report 97-01-001, which included a memorandum dated February 20, l
! 1997. The memorandum stated all remaining radiation check sources received by 1 the licensee's contractor Scientific Ecology Group had been sent to the Hanford, ,
'
! ' Washington, radwaste disposal site. The inspector determined that all radiation sources associated with FSV's 10 CFR Part 50 operations had been transferred to
. authorized recipient .
l
!
t i Solid Radwaste Storaae and Processina a.
j_ As previously documented in NRC Inspection Report 50-267/96-05, no solid j radwaste exists at FSV. However, the inspector had determined that some FSV solid radwaste shipped to off-site processors had not been buried at an authorized disposal facility. Licensee management updated the inspector on the status of all radwaste
'
shipped from FSV in 1996. The inspector reviewed FSV's certificate of disposal ,
i dated January 23,1997, for radwaste shipment No. 706-01-001 to the processor l
'
Envirocare of Utah. The certificate stated that 172.5 cubic feet (ft') of mixed low-level radwaste were processed and disposed of at the Envirocare facility on December 3,1996. According to the radiation protection manager, only contaminated lead ingots remained to be buried at the Envirocare f acility, approximately 40 ft at less than 1 millicurie. The licensee addressed this matter in the licensee's final Annual Radioactive Effluent Release Report of 1996 that was submitted on March 11,1997. On March 24,1997, the radiation protection manager notified the inspector that Scientific Ecology Group shipped the i l contaminated lead to the Envirocare facility, and this represented the only remaining FSV radwaste.
[
.
'
.
l i
e C
- ye-.er_, m.._,
l 6-t Conclusion The licensee's radiation protection program met the Decommissioning Technical Specifications,10 CFR Part 19, and 10 CFR Part 20. All radiation sources and waste had been removed from the site and properly dispose Radiological Environmental Monitoring and Radioactive Waste Management (80721 &
E4101) Insoection Scone The radiological environmental monitoring and radioactive waste management programs were inspected to ensure that the license requirernents in these areas were implemented in accordance with the Decommissioning Technical Specifications, Offsite Dose Calculation Manual, and Radiological Environmental Monitoring Progra .2 Observations and Findinas Radioloaical Environmental Monitorina Prooram and Ooeratina Reoort The licensee is required to have a Radiological Environmental Monitoring Program to comply with the Decommissioning Technical Specifications, Section 5.4.4.b. The Offsite Dose Calculation Manual, a supporting document of the Decommissioning Technical Specifications, provides the description of the Radiological Environmental Monitoring Program requirement Environmental monitoring consisted of the collection and analysis of samples of air, water, soil, biota (animal and plant life), and other media from the area around the site. Environmental monitoring was implemented to demonstrate that the f acility complied with applicable standards and to assess FSV's effect on the local environmen Section 5.5.1.b of the Decommissioning Technical Specifications requires that the licensee submit an Annual Radiological Environmental Operating Report to the NRC by May of each year. The inspector reviewed the licensee's 1996 Annual Radiological Environmental Operating Report that was submitted on January 13, 1997. The inspector noted that the food product analyses and the Land Census Report were not included in the 1996 environmental report because these reports were no longer relevan The 1996 environmental report was found to be adequate, and the inspector identified no concerns in this are !
.
F
-
!
-
! Review of Annual Radioactive Effluent Release' Recort f
I The inspector reviewed the licensee's 1996 Annual Radioactive Effluent Release >
Report. This report was tha final such report to be submitted under the license. The l report summarized the gaseous effluent, liquid effluent, and solid radwaste released !
from the site during calendar year 1996. The licensee concluded that the releases were within the limits of 10 CFR Parts 20. The inspector identified no specific concerns during the review of the effluent release repor Post Decommissionina Effluent and Environmental Monitorina l
'
NRC Inspection Report 50-267/96-05 documented that on November 20,1996,FSV sent a letter to the NRC regarding the reactor building sump groundwater releases (
,.
being conducted pursuant to the National Pollutant Discharge Elimination
<
System (NPDES). However, the inspector noted that licensee's gamma spectrum
- lower limits of detection did not match the limits of detection established in >
j Table F-2 of the Offsite Dose Calculation Manual (ODCM). The radiation protection
,
manager committed to collect a water sarnple from the RBS and have the samples l analyzed by Colorado State University at the environmentallimits of detection, l During this inspection, the results of Colorado State University's analysis were j reviewed and found acceptable.
- ~
Since the last inspection, the licensee found water in some reactor building piping I that they had previously drained. Some water samples measured between
,
44,000 picocuries/ liter and 118,000 picoeuries/ liter for tritium (H-3), levels well below the release concentration for tritium specified in 10 CFR Part 20 and the NPDES discharge permit. The licensee documented their findings in Problem
,
Report 97-03-001. The licensee collected smear samples from the interior of the piping to determine if removable radioactivity existed above the licensee's limit of
'
"
40,000 dpm/100 cm for removable tritium contamination. The maximum smearable I contamination found was 2,194 dpm/100 cm2. The licensee determined that they would drain the residual water into the reactor building sump and dilute the tritium to
'
below the environmental lower limits of detection specified in the ODCM (2000 picoeuries/ liter). This water would then be discharged under the NPDES permit
,
through the turbine building sump to the drain slew to St. Vrain Creek. The licensee i discussed this matter with representatives of the Colorado Department of Public )
'
Health and Environment who found the plan acceptabl .3 Conclusion The licensee had implemented the radiological environmental monitoring and
,
radwaste management programs as required by the Decommissionir.g Technical Specifications. The 1996 Annual Radiological Environmental Operating Report and l
,
'
the 1996 Annual Radioactive Effluent Release Report met the Decommissioning ;
- Technical Specifications requirements.
i
,
k - we ,
. . _ . - . _ . - _ . . _ _ . _ _ _ _ _ _ . _ _ _ -_
,
i
.
.
-8 5 Followup on Corrective Actions for Violations and Deviations (92702) :
!
' (Closed) Violation item 50-267/9604-01: Inadeauate Procedures and Alarm Setooints for Tool Monitor Ooeration ;
!
On October 3,1996, inspectors identified that licensee procedures for the release of i materials and equipment from radiologically controlled areas were inadequate. The licensee wrote the procedures in such a way that materials and equipment could b released for unrestricted use with detectable amounts of radioactive materia Specifically, the procedures allowed for the use of tool contamination monitors with ,
setpoints well above their minimum detectable activity, thereby allowing the release of equipment with radioactive material which the monitor had the capability of I detecting. Further, once equipment alarmed the tool monitor, procedures allowed !
the use of less sensitive instrumerits (pancake probes) to determine whether radioactive material was detectable. Therefore, FSV potentially allowed equipment .
released with radioactive material which was detectable by the tool monitor, j
!
!
The inspector concluded that this was a violation of the followin * Decommissioning Plan, Section 3.2.6.8, states, in part, that procedures for
'
I the release of materials and equipment from Radiologically Controlled Areas
- will be developed. Materials will not be released for unrestricted use if it j contains detectable amounts of radioactive materia :
!
l = Decommissioning Technical Specification, License Condition 5.4.1(a), '
,
'
" Procedure for License DPR-34," states, in part, that written procedures,
- plans, manuals, and/or programs shall be established, implemented, and
'
'
maintained covering the Radiation Protection Program.
! The inspector performed an on site review of the licensee's corrective actions that were detailed in an FSV letter dated December 20,1996, and concluded that FSV had implemented the commitment items in the letter. The licensee had taken the tool monitor out of operation when the violation was identified. The corrective i i actions appeared to have precluded recurrence of the violatio ,
5.2 [ Closed) Violation item 50-267/9602-02: Failure to Follow Scientific Ecoloav Grouc ,
Quality Assurcnce Procedures I
.
The inspectors examined the implementation of FSV's Quality Assurance program with respect to final site survey activities and found that Scientific Ecology Group's '
'
,
!
!
t I
!
I
_ - _ _ . . _ . . _ t
-- . . . . . . . _ _ . _ _ _ _ . - . _ . _ - . - _ . _ . _ _ _ _ . _ _ _ . . _ _
..
,
.i
-
i
,
a-9- ;
A d
Quality Assurance program implementation at FSV was violating requirements in the ;
',
~ following areas: !.
c t
'
- Nonconformance Reporting a _ Corrective Action Report ,
!
,
'
The inspector performed an on site review of the licensee's corrective actions that were detailed in an FSV letter dated May 29 and July 3,1996. The inspector ~ j
- concluded that FSV had implemented the commitment items in the letters. The ;
i corrective actions appeared to have precluded recurrence of the violation '
6 Exit Meeting s
An exit meeting was conducted on March 11,1997. During the meeting, the inspector reviewed the scope and findings of the inspection. The licensee did not identify as proprietary any information provided to, or reviewed by, the inspector.
- ,
.
!
l l
.
!
l
.
'
.
t ATTACHMENI SUPPLEMENTAL INSPECTION INFORMATION
,
PARTIAL LIST OF PERSONS CONTACTED LisDIIHR T. Borst, Radiation Protection Manager S. Chesnutt, Senior Project Assurance Engineer / Licensing & Compliance M. Holmes, Project Assurance Manager D. Seymour, Senior Quality Assurance Engineer Contractor Personnel J. Dickerson, Health Physics Engineer, Scientific Ecology Group B. Dyck, Westinghouse Licensing Engineer J. Rood, Final Survey Lead Engineer, Scientific Ecaiugy Group
NRC Reaion IV farannnel ,
!
L. Carson 11, Health Physicist, Division of Nuclear Materials Safety I
INSPECTION PROCEDURES USED l l
IP 2560 " Decommissioning inspection Program" IP 80721 " Radiological Environmental Monitoring" IP 83100 " Occupational Exposure During SAFESTOR and DECON" IP 83890 " Closeout and Inspection Survey" IP 84101 " Radioactive Waste Management" IP 92702 " Followup on Corrective Actions for Violations and Deviation" ,
l
'
I
,
ITEMS OPENED, CLOSED, AND DISCUSSED l Ooened None ClDMd
'
50-267/9604-01 VIO Inadequate procedures and survey techniques to detect a minimal amount of radioactivity before material unconditional releases from Ft. St. Vrain,
,_
t
. 50 267/9602-02 VIO Failure to Follow Scientific Ecology Group's quality assurance procedures i
,
'
.
.
.
-2-LIST OF ACRONYMS USED ALARA As Low As is Reasonably Achievable dpm Disintegrations Per Minute FSV Fort Saint Vrain PDR Public Document Room PSCo Public Service Company of Colorado
i l
l l