ML20206D230

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 870302-06
ML20206D230
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/07/1987
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20206D220 List:
References
50-267-87-07, 50-267-87-7, NUDOCS 8704130277
Download: ML20206D230 (1)


Text

. .

APPENDIX A NOTICE OF VIOLATION Public Service Company of Colorado Docket: 50-267/87-07 Fort St. Vrain Nuclear Generating Station License: DPR-34

-During an NRC inspection conducted on March 2-6, 1987, a violation of NRC requirements was identified. The violation involved the failure to sample and analyze liquid effluent prior to release. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1986), the violation is listed below:

Radioactive Liquid Effluent Release Technical Soecification 8.1.2.b.1 requires that before the release of radioactive liquid effluent, two representative samples of liquid effluent from the radioactive liquid waste system shall be analyzed for gross alpha activity, gross beta activity, principal gamma emitters, I-131, tritium, dissolved and entrained gases, and other radioisotopes of concern.

Contrary to the above, on February 7-8, 1987, approximately 2500 gallons of radioactive liquid effluent was released without two representative samples being obtained and analyzed before the release.

This is a Severity Level IV violation. (Supplement I)(267/8707-01)

Pursuant to the provisions of 10 CFR 2.201, Public Service Company of Colorado is hereby required to submit to this office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the reason for the violation if admitted, (2) the corrective steps which have been taken and the results achiev2d, (3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

Dated at Arlington, Texas this 7th day of April 1987 41 g h [38 7 O

--.