ML20245J572
| ML20245J572 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 08/10/1989 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20245J570 | List: |
| References | |
| 50-267-89-17, NUDOCS 8908180074 | |
| Download: ML20245J572 (1) | |
Text
,
.a e
e ig 4
-APPENDIX A
-NOTICE OF VIOLATION-Public Service Company of Colorado Docket:- 50-267-
- z. Fort St. Vrain Nuclear Generating Station License: DPR-34 During an inspection conducted on July 17-21, 1989, a violation of NRC requirements was identified. The violation involved the' failure to establish procedures for.the control oficalibrations and functional tests that affect safety-related instrumentation and controls.
In accordance with the1" General Statement of Policy and Procedure for NRC Enforcement Actions," 10'CFR Part 2 Appendix C'(1988), the violation is listed below:
. Technical Specification (TS) 7.4.a requires that written procedures shall be established and implemented covering the following activities:
Procedures recommended in Appendix A of Safety Guide 33, e
November 1972; and-Surveillance and test activities of safety-related equipment.
' Contrary to' the above, during the period of July 17-21,1989, procedures covering the following activities were not established:
Timely testing of the' Reactor Protection System (RPS) Startup Channel and Linear Power Channel trips and alarms following power reductions to a level where these channels are required. As a result of this deficiency, some testing of these channels was delayed for a time period that exceeded the required TS surveillance frequency; Periodic. test and calibration of the diesel engine overspeed trip for the diesel driven fire, pump; and Calibration of the emergency diesel generator (EDG) engine temperature gauges used to. determine EDG operability and for EDG operation.
This is a Severity Level IV violation.
(Supplements)(267/8917-01).
~
. Pursuant to the provisions ofl10 CFR 2.201, Public Service Company of Colorado is hereby required to submit to this office within 30 days of the date of the
-letter transmitting this Notice, a written statement or explanation in reply, including for each violation:
(1)'the reason for the violation if admitted,
- 2) the corrective steps which have been taken~and the results achieved.
- 3) the corrective steps which will be taken to avoid further violations, and
- 4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.
l!
l Dated at Arlington, Texas this
/g day of 1989 8908180074 890810 PDR ADOCK 05000267 O
PNU
_ _ _ _ _ _ _ _ _