ML20100G224: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS
| page count = 1
| page count = 1
| project = TAC:57423, TAC:57424, TAC:57425, TAC:57426, TAC:57427
| stage = Other
}}
}}



Latest revision as of 04:53, 24 September 2022

Proposed Tech Spec 3/4 8-4 Re Electrical Power Sys Surveillance Requirements
ML20100G224
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/29/1985
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20100G210 List:
References
TAC-57423, TAC-57424, TAC-57425, TAC-57426, TAC-57427, NUDOCS 8504080124
Download: ML20100G224 (1)


Text

-

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) c) Verifying that on the safety injection actuation signal, all diesel generator trips, except engine overspeed, generator differential current, voltage restraint overcurrent, and low lube oil pressure (2 out of 3) are automatically bypassed.

I

6. Verifying the diesel generator operates for160 minutes while loaded to 2 2750 kw.
7. Verifying that the auto-connected loads to each diesel ~

generator do not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating of 3000 kw.

8504000124 850329 PDR ADOCK 05000336 P PDR MILLSTONE - UNIT 2 3/48-4