MONTHYEARB11495, Application for Amend to License DPR-65,authorizing Rev to Tech Spec 3.7.5.1 Re Flood Level.Fee Paid1985-03-28028 March 1985 Application for Amend to License DPR-65,authorizing Rev to Tech Spec 3.7.5.1 Re Flood Level.Fee Paid Project stage: Request ML20112J2931985-03-28028 March 1985 Proposed Tech Spec 3.7.5.1 Re Flood Level & Operation of Svc Water Pump Motor Project stage: Other ML20100G7081985-03-29029 March 1985 Proposed Tech Spec Clarifying That During Type a Integrated Leak Rate Testing,Containment Gaseous & Particulate Radiation Monitors Not Required to Be Operational Project stage: Other B11493, Application for Amend to License DPR-65,revising Tech Specs to Clarify That Containment Gaseous & Particulate Radiation Monitors Not Required to Be Operable During Type a Integrated Leak Rate Testing.Fee Paid1985-03-29029 March 1985 Application for Amend to License DPR-65,revising Tech Specs to Clarify That Containment Gaseous & Particulate Radiation Monitors Not Required to Be Operable During Type a Integrated Leak Rate Testing.Fee Paid Project stage: Request B11499, Application for Amend to License DPR-65,deleting Footnotes from Tech Spec Sections 4.4.5.1.3 & 3.4.6.2 & Table 4.7-2 Re Cycle 5 Refueling Outage & Operation.Fee Paid1985-03-29029 March 1985 Application for Amend to License DPR-65,deleting Footnotes from Tech Spec Sections 4.4.5.1.3 & 3.4.6.2 & Table 4.7-2 Re Cycle 5 Refueling Outage & Operation.Fee Paid Project stage: Request B11492, Application for Amend to License DPR-65,deleting Tech Spec Diesel Generator Surveillance Requirement 4.8.1.1.2.c.5.d Per Generic Ltr 85-30.Fee Paid1985-03-29029 March 1985 Application for Amend to License DPR-65,deleting Tech Spec Diesel Generator Surveillance Requirement 4.8.1.1.2.c.5.d Per Generic Ltr 85-30.Fee Paid Project stage: Request ML20100G2241985-03-29029 March 1985 Proposed Tech Spec 3/4 8-4 Re Electrical Power Sys Surveillance Requirements Project stage: Other ML20100G4261985-03-31031 March 1985 Proposed Tech Spec Deleting cycle-specific Footnotes from Tech Spec Sections 4.4.5.1.3 & 3.4.6.2 & Table 4.7-2 Re Cycle 5 Refueling Outage & Operation Project stage: Other B11500, Application for Amend to License DPR-65,revising Tech Specs to Delete Ref to Physical Description of Trisodium Phosphate Dodecahydrate.Fee Paid1985-04-0404 April 1985 Application for Amend to License DPR-65,revising Tech Specs to Delete Ref to Physical Description of Trisodium Phosphate Dodecahydrate.Fee Paid Project stage: Request ML20100L1021985-04-0404 April 1985 Proposed Tech Specs Deleting Ref to Physical Description of Trisodium Phosphate Dodecahydrate Project stage: Other ML20133N9481985-08-0202 August 1985 Safety Evaluation Supporting Amend 101 to License DPR-65 Project stage: Approval ML20133N9371985-08-0202 August 1985 Amend 101 to License DPR-65,changing Tech Specs to Delete Ref to Station Emergency Procedure & Revise Surveillance Requirement to Make Diesel Generator Testing Consistent W/Requirements of Generic Ltr 83-30 Project stage: Other 1985-03-31
[Table View] |
Text
,
I l
Docket No. 50-336 Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specifications
- Flood Level 4
?
4 March,1985 B504050065 850328 PDR ADOCK 05000336 '
PDR
)
PLANT SYSTEMS 3/4.7.5 FLOOD LEVEL LIMITING CONDITION FOR OPERATION 3.7.5.1 At least one OPERABLE service water pump motor shall be protected against flooding to a minimum elevation of 28 feet Mean Sea Level USGS datum if either:
The water level, including wave crest height, is exceeding plant grade L.
level (14.0 feet Mean Sea Level USGS datum), or b.
Three or more of the following conditions are occurring simultaneously:
1.
The center of a storm, as determined by radar, reconnaissance, or forecasted track projection, is presently located within the critical area as defined on Figure 3.7-1.
2.
The projected track of a storm approaching the facility as determined by radar, reconnaissance, or forecasted track projection, lies between 1300 and 3500 3.
The central pressure of the storm is or is forecasted to be _
28.0 in. Hg; or the measured 15 minute average wind speed at nominal elevation 389' on the meteorological tower exceeds 60 mph.
4.
The 15 minute average wind direction at nominal elevation 389' on the meteorological tower is within the sector from 1500 clockwise to 3000 APPLICABILITY: ALL MODES ACTION:
With the water level exceeding either plant grade or with three or more of the above specified meteorological conditions occurring simultaneously, immediately initiate action to protect at least one service water pump motor against flooding to a minimum elevation of 28 feet; complete this protective action within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
MILLSTONE - UNIT 2 3/4 7-13