Docket No. 50-336 B17310 l
1 l
l 1
Millstone Nuclear Power Station, Unit No. 2 Change to Technical Specifications Bases Resolution of Miscellaneous Condition F;eports Marked Up Pages l
l l
l l
i l
l l.
t l
l l
July 1998 l'
9900070230 980730' PDR ADOCK 05000336 PM P
bIa- - * ^
~ sum "w, ws6 3/4.9 REFUELING OPERATIONS BASES 3/4.9.1 BORON CONCENTRATION The limitations on reactivity conditions
- 1) the reactor will remain suberitical during1,during REFUELING ensure that:
0RE ALTERATIONS, and
'w)ter volume having direct access to the reactor vessel. sufficient boron concentration 2
i a
These limitations are consistent with the initial conditions assumed for the boron dilution incident in the accident analyses
)
For the Cycle 13 mid-cycle core offload activities, the boron concentration [
of the water volumes in the steam generators and connecting piping may be as I
low as 1300 ppm.
During REFUELING and in the steam generators and connecting /or CORE ALTERATIONS, the water volumes piping are stagnant and do not readily mix with the water in the reactor vessel. The n ter volumes in the pressurizer and connecting piping, shutdown cooling system (including reactor vessel and connecting piping), and refueling pool shall be maiatained greater than 1950 ppm.
A boron dilution analysis has been performed which accounts for dilution of the shutdown cooling system with the water volumes from the steam generators and connecting piping. This analysis demonstrates that, in the unlikely event in which all of the water in the steam generators and connecting piping mixes with the water in the shutdown cooling system, the resulting shutdown cooling system boron concentration will remain greater than the required refueling boron k-concentration.
The surveillance requirement to verify that the boron concentration in the steam generators is greater than 1300 ppm prior to entering MODE 6 is consistent 1
with the assumptions of the boron dilution calculation. The sample points are only located on the cold leg side of the steam generators. These sample points are representative of the water volumes in the steam generators (both hot and cold legs) and their connecting piping, based on the fact that uniform mixing of these water volumes at a boron concentration of approximately 1320 ppm had occurred prior to shutting off the reactor coolant pumps.
In March 1996, the
-reactor coolant system was drained and subsequently refilled with water having a boron concentration greater than or equal to 1320 ppm. The boron concentration of the water.in the steam generators and connecting piping is greater than (J
1300 ppm.
3/4.9.2 INSTRUMENTATION The OPERABILITY of the source ran redundant monitoring capability is ava$e neutron flux monitcrs ensures that1able to detect c ity condition of the core.
3/4.9.3 DECAY TIME The minimum requirement for reactor suberiticality prior to movement of irradiated fuel ensures that sufficient time has elapsed to allow the radioac-tive decay of the short-lived fission products. This decay time is consistent with the assuinptions used in the accident analyses.
{lfLSTONE-UNIT 2 B 3/4~9-1 Amendment No. 77, J M ; J M ; k j
Insert B - Paae B3/4 9-1 Reactivity control in the water volume having direct access to the reactor vessel is i
achieved by determining boron concentration in the refueling canal. The refueling canal is defined as the entire length of pool stretching from refuel pool through transfer canal to spent fuel pool.
.h '
i Gohnmru 16 1 Goc 3/4;1 REACTIVITY CONTROL SYSTEMS 4
{
(
BASES l
3/4.1.1 BORATION CONTROL 3/4.1.1.1 and 3/4.1.1.2 SHbTDOWNMARGIN A sufficient SHUTDOWN MARGIN ensures that 1) the reactor can be made suberitical from all operating conditions, 2) the reactivity transients associated with postulated accident conditions are controllable within acceptable limits, and 3) the reactor will be maintained sufficiently subcritical to preclude inadvertent criticality in the shutdown condition.
l SHUTDOWN MARGIN requirements vary throughout core life as a function of fuel depletion, RCS boron concentration, and RCS T,. The most restrictive
{
condition. occurs at E0L, with T, at no load operating temperature, and is
)
associated with a postulated steam line break accident and resulting j
uncontrolled RCS cooldown.
In the analysis of this accident, the minimum SHUTDOWN MARGIN specified in the CORE OPERATING LIMITS REPORT is initially required to control the reactivity transient. Accordingly, the SHUTDOWN MARGIN required by Specification 3.1.1.1 is based upon this limiting condition and is i
consistent with FSAR accident analysis assumptions.
For earlier periods during the fuel cycle, this value is conservative. With T, g., 200*F, the reactivity transients resulting from any postulated accident are minimal and the reduced SHUTDOWN MARGIN specified in the CORE OPERATING LIMITS REPORT
)
provides adequate protection.
i i
3 /4.1.1.3 BORON DILUTION A%0 ADDITION A minimum flow rate of at least 1000 GPM provides adequate mixing, prevents stratification and ensures that reactivity changes will be gradual during b:r: =;sdrdie ebnaae ia l
the D= eta Ceehr.t System. This was done to prevent vortexing in the SDCS when in mid-loop operation, while being l M et consistent with boron dilution analysis assumptions.
A flow rate of at least 1000 GPM will circulate the full Reactor Coolant System volume in i
approximately 90 minutes. With the RCS in mid-loop operation, the Reactor Coolant System volume will circulate in approximately 25 minutes.
The reactivity change rate associated with bre., caccatrath; tv will be within the capability for operator recognition and control.
l 3/4.1.1.4 MODERATOR TEMPERATURE COEFFICIENT INTC)
The limitations on MTC are provided to ensure that the assumptions used in the accident and transient analyses remain valid through each fuel cycle. The surveillance requirements for measurement of the MTC during each fuel cycle are adequate to confirm the MTC value since this coefficient changes slowly due principally to the reduction in RCS boron concentration associated with fuel b~urnup. The confirmation that the measured MTC value is within its limit provides assurance that the coefficient will be maintained within acceptable values throughout each fuel cycle.
I MIgLSTONE-UNIT 2 B 3/4 1-1 A:,endment No. Up, JQ, //p
Jnsert A - Pace B3/41-1 reductions in Reactor Coolant System boron concentration l
l r
i l
l l
l l
L_._.._______.___
Q PLANT SYSTEMS May4k 1995 BASES A
3/4.7.1.4 ACTIVITY (Continued) of 10 CFR Part 100 limits in the event of a steam line rupture.
The dose calculations for an assumed steam line rupture include the effects of a coincident 1.0 GPM primary to secondary tube leak in the steam generator of the affected steam line and a concurrent loss of offsite electrical These values are cor.sistent with the assumptions used in the accident power.
analyses.
3/4.7.1.5 MAIN STEAM LINE ISOLATION VALVES The OPERABILITY of the main steam line isolation valves ensures that no more than one steam generator will' blowdown in the event of a steam line rupture.
This restriction is required to 1) minimize the -positive reactivity effects of the Reactor Coolant System cooldown associated with the blowdown, and 2) limit the pressure rise within containment in the event the steam line rupture occurs within containment. The OPERABILITY of the main steam isolation valves within the closure times of the surveillance requirements are consistent with the assumptions used in the accident analyses.
3/4.7.1.6 MAIN FEEDWATER ISOLATIOP, COMPONENTS (MFICs)
Feedwater-isolation response. time ensures a rapid isolation of feed flow to the steam generators via the feedwater regulatir.g valves, feedwater bypass valves, and as backup, feed pump discharge valves.
The response time includes signal generation time and valve stroke. Feed line block valves also receive a feedwater isolation signal since the steam line break accident analysis
}
credits them in prevention of feed line volume fitshing in some cases.
Meee
[
the blect vehe; ei = nui. 6..dii..d ith i;;1:tice. they ere r.et meir" to eper;te e; f::t :: th: S:1:ti;; ::lv:: :!thee MSI signal. ;nifhd. Feedwater pumps are assu;m;5 ;:1 r;;;rre +hs fer nir;; cr; :
ed to trip immediately with an 3/4.7.2 STEAM GENERATOR PRESSURE / TEMPERATURE LIMITATION The limitation on steam generator pressure and temperature ensures that the pressure induced stresses in the steam generators do not exceed the maximum allowable fr.acture toughness stress limits.
The limitations
{
.of 70*F and 200-psig are based on a steam generator RTuor of 50*F and are sufficient to prevent brittle fracture.
l 3/4.7.3 REACTOR BUILDING CLOSED COOLING WATER SYSTEM l
The OPERABILITY of the reactor butiding closed cooling water system ensures that sufficient cooling capacity is available for continued operation of vital components and Engineered Safety Feature equipment during normal and accident conditions.
The redundant cooling i
capacity of this system, assuming a single failure, is consistent with the assumptions used in the accident analyses.
MILLSTONE - UNIT 2 B 3/4 7-3 AmendmentNo.U,f'((
0143
SeptembeMr4996-(
PLANT SYSTEMS BASES 3/4.7.7 SEALED SOURCE CONTAMlHATION The limitations on sealed source removable contamination ensure that the total body or individual organ irradiation does not exceed allowable limits in the event of ingestion or inhalation of the source material.
The limitations on.
removable contamination for sources requiring leak testing, including alpha emitters, is based on 10 CFR 70.39(a)(3) limits for plutonium.
Leakageofsourcesl excluded from the requirements of this specification represent less than one maximum permissible body burden for total body irradiation if the source In Sed material is inhaled or ingested.
C, P
3/4.7.8 ' SNUBBERS I
All snubbers are required OPERABLE to ensure that the structural integrity of the reactor coolant system and all other safety related systems is maintained during and following a seismic or other event initiating dynamic l
loads.
Snubbers excluded from this inspection program are those instal *.ed on i
nonsafety-related systems and then only if their failure or failure of ',he system on which they are installed would have no adverse effect on any safety-related system.
A list of individual snubbers with detailed information of snubber location and size and of system affected shall be available at the plant in accordance t,
with Section 50.71(c) of 10 CFR Part 50.
The accessibility of each snubber shall be determined and approved by the Plant Operations Review Comittee.
.The determination shall be based upon the existing radiation levels and the expected time to perform
- a visual inspection in each snubber location as well as other factors associated with accessibility during plant operations (e.g., temperature, atmosphere, location, ete'.), and the recommendations of Regulatory Guide 8.8 i
and 8.10.. The addition or deletion cf any hydraulic or mechanic snubber shall be made in accordance with Section 50.59 of 10 CFR Part 50.
i 1
The visual inspection frequency is based upon maintaining a constant level of snubber protection to systems.
Therefore, the required inspection interval varies inversely with the observed snubber failures and is determined by the number of inoperable snubbers found during an inspection.
Inspections performed before that interval has elapsed may be used as a new reference point' to determine the next inspection.
However, the results of such early inspections performed before the original required time interval has elapsed (nominal time less 25%) may not be used to lengthen the required inspectton interval.
~
Any inspection whose results require a shorter inspection interval will override the previous schedule.
I MILLSTONE - UNIT 2 B 3/4 7-5 AmendmentHos.JJ.7J.JJ.JJJ.f3/
0206 L
Insert C-Paae B 3/4 7-5 Sealed sources are classified into three groups according to their use, with Surveillance Requirements commensurate with the probability of damage to a source in that group.
Those sources which are frequently handled are required to be tested more often than those which are not. Sealed sources which are continuously enclosed within a shielded mechanism (i.e. sealed sources within radiation monitoring or borort measuring devices) are considered to be stored and need not be tested unless they are removed from the shield mechanism.
l l
L I
I
'E!iERGENCY CORE COOLING SYSTENS b Nomdm *hb NoCA4 4
9 c..
BASES The purpose of the ECCS throttle valve surveillance requirements is to provide O
assurance that proper ECCS flows will be maintained in the event of a LOCA.
Maintenance of proper flow resistance and pressure drop in the piping system to each injection point is necessary to:
(1) prevent total pump flow from exceeding. runout conditions when the system is in its minimum resistance configuration, (2) provide the proper flow split between injection points in accordance with the assumptions used in the ECCS-LOCA analyses, and (3) provide an acceptable level of total ECCS flow to all injection points equal to or above that assumed in the ECCS-LOCA analyses.
Verification of the correct position for the mechanical and/or electrical valve stops can be performed by either of the following methods:
1.
Visualliy verify the valve opens to the designated throttled position; or 2.
Manually position the valve to ' the designated throttled position and verify that the valve does not move when the applicable valve control switch is placed to "OPEN."
In MODE 4 th automatic safety injection signal generated by low pressurizer pressure ano high containment pressure and the automatic sump recirculation actuation signal generation by low refueling water storage tank level are not required to be OPERABLE.
Automatic actuation in MODE 4 is not required because adequate time is available for plant operators to evaluate plant conditions and respond by manually operating engineered safety features components.
Since the manual actuation (trip pushbuttons) portion of the safety injection and sump recirculation actuation signal generation is regttired to L'. OPERABLE in MODE 4, the plant operators can use the manual trip pushbuttons to rapidly position all components to the required accident position.
Therefore, the safety injection and sump recirculation actuation trip pushbutton:; ratisfy the requirement for generation of safety injection and sump recirculation actuation signals in MODE 4.
Only one HPSI pump may be OPERABLE in MODE 4 with RCS temperatures less than or equal to 275'F due to the restricted relief capacity with Low-Temperature Overpressure Protection System.
To reduce shutdown risk by having additional pumping capacity readily available, a HPSI pump may be made inoperable but available at short notice by shutting its discharge valve with the key lock on the control panel.
1 The provision in Specification 3.5.3 that Specifications 3.0.4 and 4.0.4 are not applicable for entry into MODE 4 is provided to allow for connecting the HPSI pump breaker to the respective power supply or to remove the tag and open the discharge valve, and perform the subsequent testing necessary to declare the inoperable HPSI pump OPERABLE.
Specification 3.4.9.3 requires all HPSI pumps to be not capable of injecting into the RCS when RCS temperature is at or below 190*F.
Once RCS temperature is above 190*F one HPSI pump can be capable of injecting into the RCS.
However, sufficient time may not be available to ensure one HPSI pump is OPERABLE prior to entering MODE 4 as required by Specification 3.5.3.
Since Specifications 3.0.4 and 4.0.4 MILLSTONE - UNIT 2 B 3/4 5-2 Amendment No. (J. JJ7, J7J. 7JJ. 218 nos
- 7Jf,
EMERGENCY CORE COOLING SYSTEMS BASES prohibit a MODE change in this situation, this exemption will allow Millstone Unit No. 2 to enter MODE 4, take the steps necessary to make the HPSI pump capable of injecting into the RCS, and then declare the pump OPERABLE.
If it is necessary to use this exemption during plant heatup, the appropriate actico statement of Specification 3.5.3 should be ente.ed as soon as MODE 4 ~ it reached.
3/4.5.4 REFUELING WATER STORAGE TANK (RWST)
The OPERABILITY of the RWST as part of the ECCS ensures that a sufficient supply of borated water is available for injection by the ECCS in the event of
(
a LOCA. The limits on RWST minimum volume and boron concentration ensure that
- 1) sufficient water is available within containment to permit recirculation cooling flow to the core, and 2);the reactor will remain subcritical in the i
cold condition following mixing of the RWST and the RCS water volumes.with W cc-trol rrids-inserted-except-for-the-most-reactive control-assembly 4hu a assumptivus are-consistenLwith the-LDCA-analyses.
{
ctP te r A. LOC /l n
f r15fr l
l MILLSTONE - UNIT 2 B 3/4 5-2a AmendmentNo.f/
C396 u __ _
____.________________________._________._.._.._________.._______.___________J
i insert D-Paae B 3/4 5-2a Small break.LOCAs assume that all control rods are inserted, except for the control element assembly (CEA) of highest worth, which remains withdrawn from the core.
Large break LOCAs assume that all CEAs remain withdrawn from the core.
I l
1 i
t C_____
Jaeno y 1,-1956 l
INSTRUMENTATION BASES i
3/4.3.3.9 RADIOACTIVE LIQUID EFFLUENT INSTRUMENTATION The radioactive liquid effluent instrumentation is provided to monitor I
and control, as applicable, the releases of radioactive materials.in liquid effluents during actual or potential releases.
The alarm / trip setpoints for these instruments shall be. calculated in accordance with approved-methods in j
the ODCM to ensure that the alarm / trip will occur prior to exceeding the limits of 10 CFR Part 20.
The OPERABILITY and use of this instrumentation l
is consistent with the requirements of General Design Criteria 60 63 and 64
(
of Appendix A to 10 CFR Part 50.
and condensate polishing facility floor drains is not required due toMonitoring relatively low concentrations of radioactivity possible.
j j
3/4.3.3.10 RADIOACTIVE GASEOUS EFFLUENT INSTRUMENTATION The radioactive gaseous effluent instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in gaseous i
effluents during actual or potential releases.
The alarm / trip setpoints for these instruments shall be calculated in accordance with approved methods in the ODCM to ensure that the alarm / trip will occur prior to exceeding the limits of 10 CFR Part 20.
Thiu ins cie M an ninn wiudcs pwvisions-for morator4ng (oud c-ont-rellingWanncant"tions-of-pctest.ial-1-y-explosive-gas mis ter es--in-the-wa ste-gas-hol<l u p-system.
The OPERABILITY and use of thic instrumentation is ccasistent with the requirements of General Design Criteria
)
h5 erd
___,60,63 and 64 of Appendix A to 10 CFR Part 50.
f
__p There are a number of gaseous release points which could exhibit very low concentrations of radioactivity.
For all of these release paths, cak+21 ^- t---
pc x l. t_.- y dose consequences would be insignificant due to the inter-2 mittent nature of the release and/or the extremely low concentrations of radioactivity. Since it is not cost-beneficial (nor in many cases practical due to the nature of the release (steam) or the impossibility of detecting such low levels), to monitor these pathways, it has been determined that these f
{
release paths require no monitoring nor sampling.
Fevarley-them-n i en se_ piths-include -
I Terbir.c-belldius veutilatics, 2sesphc.-it steam-<lu=ps, steam generator safetv value, ceudeusace j
surge canis venu, sciueling-water s Lurage-tank-ventrr a nu m f5 vent +1ailva, sceam genes.Lus in.wdown steam-venter--and--Terry unr
+n "
m ausec
)
i i
i 1
MILLSTONE - UNIT 2 B 3/4 3-5 Amendment No. N
Insert E-Paae B 3/4 3-5 Two types cf radioactive gaseous effluent monitoring instrumentation, monitors and samplers, are being used at MP2 stack and MP1 main stack. Monitors have alarm / trip I
setpoints and are demonstrated operable by performing one or more of the following l
operations: CHANNEL CHECK, SOURCE CHECK, CHANNEL CALIBRATION, and l
CHANNEL FUNCTIONAL TEST.
Samplers are strictly collection devices made of
{
canisters and filters.
The CHANNEL CHECK surveillance requirements are met i
through (1) documented observation of the in-service rad monitor sample flow prior to
{
filter replacement; (2) documented replacement of in-line iodine and particulate filters; l
and (3) documented observation of samp's flow following the sampler return to service.
The flow indicator is the only indication available for comparison. These observations adequately provido assurance that the sampler is operating and is capable of performing its design function.
i l
I l
l j
i Docket No. 50-336 B17310 i
l l
t l
l l
l l
Millstone Nuclear Power Station, Unit No. 2 Change to Technical Specifications Bases Resolution of Miscellaneous Condition Reports l
Retyped Pages l
l I
l i
l July 1998 l
3/4.9 REFUELING OPERATIONS BASES l
.3/4.9.1 BORON CONCENTRATION The limitations on reactivity conditions during REFUELING ensure that:
- 1) the reactor will remain subcritical during CORE ALTERATIONS, and i
l
- 2) sufficient boron concentration is maintained for reactivity control in the water volume having direct access to the reactor vessel. These limitations are consistent with the initial conditions assumed for the boron dilution incident in the accident analyses.
Reactivity control in the water volume having direct access to the reactor vessel is achieved by determining boron concentration in the refueling canal. The refueling canal is defined as the entire length of pool stretching from refuel pool through transfer canal to spent fuel pool.
For the Cycle 13 mid-cycle core offload activities, the boron concentration of the water volumes in the steam generators and connecting piping may be as low as 1300 ppm. During REFUELING and/or CORE ALTERATIONS, the water volumes in the steam generators and' connecting piping are stagnant and de not readily mix with the water in the reactor vessel. The water volumes in the pressurizer and connecting pi in connecting piping, g, shutdown cooling system (including reactor vessel and and refueling pool shall be maintained greater than 1950 ppm.
A boron dilution analysis has been performed which accounts for dilution of tha shutdown cooling system with the water volumes from the steam generators and l
connecting piping.
This analysis demonstrates that, in the unlikely event in which all of the water in the steam generators and connecting piping mixes with the water in the shutdown cooling system, the resulting shutdown cooling system boron concentration will remain greater than the required refueling boron concentration.
The surveillance requirement to verify that the boron concentration in the steam generators is greater than 1300 ppm prior to entering MODE 6 is consistent with the assumptions of the boron dilution calculation. The samp1r points are only located on the cold leg side of the steam generators. These sample points are representative of the water volumes in the steam generators (both hot and cold legs) and their connecting piping, based on the fact that uniform mixing of these water volumes at a boron concentration of approximately 1320 ppm had occurred prior to shutting off the reactor coolant pumps.
In March 1996, the reactor coolant system was drained and subsequently refilled with water having a boron concentration greater than or equal to 1320 ppm. The boron concentration of the water in the steam generators and connecting piping is greater than 1300 ppm.
3/4.9.2 INSTRUMENTATION The OPERABILITY of the source range neutron flux monitors ensures that i
redundant monitoring capability is available to detect changes in the reactiv-ity condition of the core.
3/4.9.3 DECAY TIME The minimum requirement for reactor subcriticality prior to movement of irradiated fuel ensures that sufficient time has elapsed to allow the radioac-tive decay of the short-lived fission products. This decay time is consistent with the assumptions used in the accident analyses.
I HILLSTONE - UNIT 2 B 3/4 9-1 Amendment No. 77, M, #p, 7pf, 0386 i
3/4.1 REACTIVITY CONTROL SYSTEMS
, BASES 3/4.1.1 B0 RATION CONTRQL 3/4.1.1.1 and 3/4.1.1.2 SHUTDOWN MARGIN A sufficient SHUTDOWN MARGIN ensures that 1) the reactor can be made subcritical from all operating conditions, 2) the reactivity transients associated with postulated accident conditions are controllable within acceptable limits, and 3) the reactor will be maintained sufficiently subcritical to preclude inadvertent criticality in the shutdown condition.
SHUTDOWN MARGIN requirements vary throughout core life as a function of fuel depletion, RCS boron concentration, and RCS T.,.
The most restrictive condition occura at E0L, with T., at no load operating temperature, and is associated with a postulated steam line break accident and resulting uncontrolled RCS cooldown.
In the analysis of this accident, the minimum SHUTDOWN MARGIN specified in the CORE OPERATING LIMITS REPORT is initially required to control the reactivity transient. Accordingly, the SHUTDOWN MARGIN required by Specification 3.1.1.1 is based upon this limiting condition and is consistent with FSAR accident analysis assumptions.
For earlier periods during the fuel cycle, this value is conservative. With T., 1 200*F, the reactivity transients resulting from any postulated accident are minimal and the reduced SHUTDOWN MARGIN specified in the CORE OPERATING LIMITS REPORT provides adequate protection.
3/4.1.1.3 BORON DILUTION l
A minimum flow rate of at least 1000 GPM provides adequate mixing, prevents stratification and ensures that reactivity changes will be gradual during reductions in Reactor Coolant System boron concentration. This was done to l
prevent vortexing in the SDCS when in mid-loop operation, while being consistent with boron dilution analysis assumptions. A flow rate of at least 1000 GPM will circulate the full Reactor Coolant System volume in approximately 90 minutes. With the RCS in mid-loop operation, the Reactor Coolant System volume will circulate in approximately 25 minutes. The reactivity thange rate associated with reductions in Reactor Coolant System boronconcentrationwillbewithinthecapabilityforoperatorrecognitionandl control.
3/4.1.1.4 MODERATOR TEMPERATURE _CQfFFICIENT (MTC)
The limitations on MTC are provided to ensure that the assumptions used in the accident and transient anhlyses remain valid through each fuel cycle Tho surveillance requirements for measurement of the MTC during each fuel cycle are adequate to confirm the MTC value since this coefficient changes slowly due principally to the reduction in RCS boron concentration associated with fuel i
I burnup. The confirmation that the measured MTC value is wi;.hin its limit provides assurance that the coefficient will be maintained within acceptable l
values throughout each fuel cycle.
I MILLSTONE - UNIT 2 B 3/4 1-1 Amendment No. J77, JJ7, JpJ om i
1 1
PLANT SYSTEMS BASES 3/4.7.1.4 ACTIVITY (Continued) of 10 CFR Part 100 limits in the event of a steam line rupture.
The dose calculations for an assumed steam line repture include the effects of a coincident 1.0 GPM primary to secondary tube leak in the steam generator of the affected steam line and a concurrent loss of offsite electrical power. These values are consistent with the assumptions used in the accident analyses.
3/4.7.1.5 MAIN STEAM LINE ISOLATION VALVES The OPERABILITY of the main steam line isolation valves ensures that no more than one steam generator will blowdown in the event of a steam line rupture.
This restriction is~ required to 1) minimize the positive reactivity effects of the ' Reactor. Coolant System cooldown associated with the blowdown, and 2) limit the pressure rise within containment in the event the steam line rupture occurs within containment. The OPERABILITY of the main steam isolation valves within the closure times of the surveillance requirements are consistent with the assumptions used in the accident analyses.
3/4.7.I.6 MAIN FEEDWATER ISOLATION COMPONENTS (MFICs)
Feedwat /r isolation response time ensures a rapid isolation of feed flow to the steam generators via the feedwater regulating valves, feedwater bypass valves, and as backup, feed pump discharge valves. The response time includes signal generation time and valve stroke.
Feed line block valves also receive a feedwater. isolation signal since the steam line break accident analysis credits them in prevention of feed line volume flashing in some cases.
Feedwater pumps are assumed to trip immediately with an MSI signal.
3/4.7.2 STEAM GENERATOR PRESSURE / TEMPERATURE LIMITATION The limitation on steam generator pressure and temperature ensures that the pressure induced stresses in the steam generators do not exceed the maximua allowable fracture toughness stress limits.
The limitations of 70*F rnd 200-psig are based on a steam generator RTuor of 50*F j
and are :.ufficient to prevent brittle fracture.
l l
3/4.7.3 REACTOR BUILDING CLOSED COOLING WATER SYSTEM The OPERABILITY of the reactor building closed cooling water 1
system ensures that sufficient cooling capacity is available for continued operation of vitc1 ccep0nents and Engineered Safety Feature equipment during normal and accident conditions.
The redundant cooling capacity of this system, assuming a siagle failure, is consistent with l
the assumptions used in the accident analyses.
MILLSTONE - UNIT 2 8 3/4 7-3 Amendment No. 77, Jpp, 0308
PLANT SYSTEMS BASES 3/4.7.7 SEALED SOURCE CONTAMINATION The limitations on sealed source removable contamination ensure that the l
total body or individual organ irradiation does not exceed allowable limits in the event of ingestion or inhalation of the source material.
The limitations on removable contamination for sources requiring leak testing, including alpha emitters, is based on 10 CFR 70.39(a)(3) limits for plutonium.
Leakage of sources excluded from the requirements of this specification represent less than l
one maximum permissible body burden for total body irradiation if the source material is inhaled or ingested, i
Scaled sources are classified into three groups according to their use, with Surveillance Requirements commensurate with the probability of damage to a source in that group.
Those sources which are frequently handled are required to be i
tested more often than those which are not.
Sealed sources which are continuously enclosed within a shielded mechanism (i.e.,
sealed sources within radiation l
monitoring or boron measuring devices) are considered to be stored and need not be tested unless they are removed from the shield mechanism.
3/4.7.8 SNVBBERS All snubbers are required OPERABLE to ensure that the structural integrity of the reactor coolant system and all other safety related systems is maintained during and following a seismic or other event initiating dynamic loads.
Snubbers excluded from this inspection program are those installed on nonsafety-related systems and then only if their failure or failure of the system on which they are installed would have no adverse effect on any safety-related system.
A list of individual snubbers with detailed information of snubber location and size and of system affected shall be available at the plant in accordance with Section 50.71(c) of 10 CFR Part 50.
The accessibility of each snubber shall l
be determined and approved by the Plant Operations Review Committee.
The i
determination shall be based upon the existing radiation levels and the expected l
time to perform a visual inspection in each snubber location as well as other i
factors associated with accessibility during plant operations (e.g., temperature, atmosphere, location, etc.), and the recommendations of Regulatory Guide 8.8 and 8.10.
The addition t,i deletion of any hydraulic or mechanic snubber shall be made in accordance with Section 50.59 of 10 CFR Part 50.
l l
The visual inspection frequency is based upon maintaining a constant level l
of snubber protection to systems.
Therefore, the required inspection interval l
varit inversely with the observed snubber failures and is determined by the number of inoperable snubbers found during an inspection.
Inspections performed f
l before that interval has elapsed may be used as a new reference point to j
i determine the next inspection.
Ilowever, the results of such early inspections performed before the. original required time interval has elapsed (nominal time less 25%) may not be used to lengthen the required inspection interval.
Any inspection whose results require a shorter inspection interval will override the previous schedule.
?
MILLSTONE - UNIT 2 0 3/4 7-5 Arwendment Nos. JJ, 77, 77. JJJ.
oses
- 197,
i l
F ERGENCY CORE COOLING SYSTENS B:6ES l
prohibit a MODE change in this situation, this exemption will allow Millstone Unit No. 2 to enter MODE 4, take the steps necessary to make the HPSI puap capable of injecting into the RCS, and then declare the pump OPERABLE.
If it is necessary to use this exemption during plant heatup, the appropriate action statement of Specification 3.5.3 should be entered as soon as MODE 4 is reached.
3/4.5.4 REFUELING WATER STORAGE TANK (RWST) l The OPERABILITY of the RWST as part of the ECCS ensures that a sufficient supply of borated water is available for injection by the ECCS in the event of j
I a LOCA. The limits on RWST minimum volume and boron concentration ensure that J
1) sufficient water is available within containment to permit recirculation cooling flow to the core, and 2) after a LOCA the reactor will remain subcritical in the cold condition following mixing of the RWST and the RCS water volumes.
Small break LOCAs assume that all control rods are inserted, except for the control element assembly (CEA) of highest worth, which remains withdrawn from the core.
Large break LOCAs assume that all CEAs remain withdrawn from the core.
l l
l l
l l
MILLSTONE - UNIT 2 B 3/4 542a Amendment No. 7#
om
J
(
INSTRUMENTATION l
RACFR
. 3/4.3.3.9 Radioactive Licuid Effluent Instrumentation The radioactive liquid effluent instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in liquid effluents during actual or potential releases. The alarm / trip setpoints for these instruments shall be calculated in accordance with approved methods in the ODCM to ensure that the alarm / trip will occur prior to exceeding the limits of 10 CFR Part 20. The OPERABILITY and use of this instrumentation is consistent with the requirements of General Design Criteria 60, 63 and 64 of Appendix A to 10 CFR Part 50. Monitoring of the turbine building sumps and condensate polishing facility floor drains is not required due to j
relatively low concentrations of radioactivity possible.
3/4.3.3.10 Radioactive Gaseous Effluent Instrumentation 4
The radioactive gaseous effluent instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in gaseous effluents during actual or potential releases. The alarm / trip setpoints for these instruments shall be calculated in accordance with approved methods in the ODCM to ensure that the alarm / trip will occur prior to exceeding the limits of 10 CFR Part 20. The OPERABILITY and use of this instrumentation is l
consistent with the requirements of General Design Criteria 60, 63 and 64 of Appendix A to CFR Part 50.
Two types of radioactive gaseous effluent monitoring instrumentation, monitors and samplers, are being used at MP2 stack and MP1 main stack.
Monitors have alarm / trip setpoints and are demonstrated operable by performing one or more of the following operations: CHANNEL CHECK, 60VRCE CHECK, CHANNEL CALIBRATION, and CHANNEL FUNCTIONAL TEST.
Samplers are strictly collection devices made of canisters and filters. The CHANNEL CHECK surveillance requirements are met through (1) documented observation of the in-service rad monitor sample flow prior to filter replacement; (2) documented replacement of in-line iodine and particulate filters; and (3) documented observation of sample flow following the sampler return to service. The flow indicator is the only indication available for comparison. These observations adequately provide assurance that '.he sampler is operating and is capable of performing its design function.
There are a number of gaseous release points which could exhibit very low concentrations of radioactivity.
For all of these release paths, dose l
consequences would be insignificant due to the intermittent nature of the release and/or the extremely low concentrations of radioactivity. Since it is l
not cost-beneficial (nor in many cases practical due to the nature of the I
release (steam) or the impossibility of detecting such low levels), to mohitor l
these pathways, it Sas been determined that these release paths require no l
monitoring nor sampling.
I i
I k
MILLSTONE - UNIT 2 B 3/4 3-5 Amendment No. /9f, 0391 j
Docket No. 50-336 B17310 l-l l-l Millstone Nuclear Power Station, Unit No. 2 Change to Technical Specifications Bases Resolution of Miscellaneous Condition Reports
{
NNECO Comm.itments l
l July 1958
l U. S. Nucl rr R:gul: tory Commission B17310/Attrchm:nt 4/Page 1 Change to Technical Specifications Bases Resolution of Miscellaneous Condition Reports List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.
Please notify the Manager - Regulatory Compliance at Millstone Unit No. 2 of any questions regarding this document, or any associated regulatory commitments.
Commitment Committed Date or Outage i
NONE N/A i
c_
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _