B11493, Application for Amend to License DPR-65,revising Tech Specs to Clarify That Containment Gaseous & Particulate Radiation Monitors Not Required to Be Operable During Type a Integrated Leak Rate Testing.Fee Paid

From kanterella
Jump to navigation Jump to search

Application for Amend to License DPR-65,revising Tech Specs to Clarify That Containment Gaseous & Particulate Radiation Monitors Not Required to Be Operable During Type a Integrated Leak Rate Testing.Fee Paid
ML20100G705
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/29/1985
From: Counsil W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML20100G707 List:
References
B11493, TAC-57423, TAC-57424, TAC-57425, TAC-57426, TAC-57427, NUDOCS 8504080385
Download: ML20100G705 (2)


Text

o u l

General Offices

  • Seldon Street. Berlin, Connecticut va ccwcicur uma aae acap cow =

p O. BOX 270

. l

"'7 % ,"$ 7'~~

, HARTFORD, CONNECTICUT 06141-0270 k (203) 666-6911

' J .amm uruva amast nran e.m.w=a cow-co.-

, March 29,1985 Docket No. 50-336 B11493 Director of Nuclear Reactor Regulation Attn: Mr. James R. Miller, Chief Operating Reactors Branch #3 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specifications Radiation Monitoring Instrumentation Pursuant to 10 CFR 50.90, Northeast Nuclear Energy Company (NNECO) hereby proposes to amend its Operating License, DPR-65, by ir.corporating the attached proposed change into the Millstone Unit No. 2 Technical Specifications.

The proposed technical specification revision is provided as Attachment 1. This change incorporates a note onto page 3/4 3-27 to clarify that the containment gaseous and particulate radiation monitors are not required to be operable during Type "A" integrated leak rate testing.

The containment air radiation monitors cannot withstand the pressure generated during Type "A" integrated leak rate testing, however, there is no function for which the containment atmosphere monitors are required during Type "A" testing. The proposed change clarifies that the monitors are not in operation during Type "A" testing.

NNECO has reviewed the attached proposed change pursuant to 10 CFR 50.59 and has determined that it does not constitute an unreviewed safety question.

Specifically, the margins of safety as defined in the Technical Specification Bases are maintained. In addition, the probability of occurrence or the consequences of a previously analyzed accident have not been increased and the possibility for a new type of accident not previously evaluated has not been created. The proposed change allows the subject components to be inoperable only during a period of time when they are not utilized and thus the functional operation of the system is not affected.

NNECO has reviewed the proposed changes, in accordance with 10 CFR 50.92, and has concluded that they do not involve a significant hazards consideration.

The basis for this conclusion is that the criteria of 10 CFR 50.92(c) are not compromised, a conclusion which is supported by our determinations made pursuant to 10 CFR 50.59. Additionally, the Commission has provided guidance concerning the application of the standards in 10 CFR 50.92 by providing certain 8504080385 850329 PDR ADOCK 05000336 O N M {l 0 eg P pyg ,

t

\

} op ,1 <>

c .

examples (48 FR 14870, April 6,1983). One of these examples, (i), of actions not likely to involve a significant hazards consideration is a purely administrative change to technical specifications: for example, a change to achieve consistency

' thr.oughout the technical specifications, correction of an error, or a change in nomenclature. As there is no function for which the containment atmosphere

+ monitors are required during Type "A" testing, the proposed change is administrative in that it clarifies that the monitors are not used during Type "A" testing.

The Millstone Unit No. 2 Nuclear Review Board has reviewed and approved the

- attached proposed revision and has concurred with the above determinations.

In accordance with 10 CFR 50.91(b), NNECO is providing the State of Connecticut a copy of this proposed amendment.

Pursuant to the requirements of 10 CFR 170.12(c), enclosed with this amendment request is the application fee of $150.00.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY JT2//w W. G. Counsil Senior Vice~ President cc: Mr. Kevin McCarthy Directog, Radiation Control Unit Departrient of Environmental Protection Hartforii, CT 06116 i

STATE OF COhNECTICUT )

) ss. Berlin COUNTY OF HARTFORD )

Then personally appeared before me W. G. Counsil, who being duly sworn, did state that he is Senior Vice President of Northeast Nuclear Energy Company, Licensee herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the Licensee herein and that the statements contained in said information are true and correct to the best of his knowledge and belief.

Wut/nb Y potaryPup My Commission Expires f.krch 31,1934 II '