MONTHYEARB11495, Application for Amend to License DPR-65,authorizing Rev to Tech Spec 3.7.5.1 Re Flood Level.Fee Paid1985-03-28028 March 1985 Application for Amend to License DPR-65,authorizing Rev to Tech Spec 3.7.5.1 Re Flood Level.Fee Paid Project stage: Request ML20112J2931985-03-28028 March 1985 Proposed Tech Spec 3.7.5.1 Re Flood Level & Operation of Svc Water Pump Motor Project stage: Other ML20100G7081985-03-29029 March 1985 Proposed Tech Spec Clarifying That During Type a Integrated Leak Rate Testing,Containment Gaseous & Particulate Radiation Monitors Not Required to Be Operational Project stage: Other B11493, Application for Amend to License DPR-65,revising Tech Specs to Clarify That Containment Gaseous & Particulate Radiation Monitors Not Required to Be Operable During Type a Integrated Leak Rate Testing.Fee Paid1985-03-29029 March 1985 Application for Amend to License DPR-65,revising Tech Specs to Clarify That Containment Gaseous & Particulate Radiation Monitors Not Required to Be Operable During Type a Integrated Leak Rate Testing.Fee Paid Project stage: Request B11499, Application for Amend to License DPR-65,deleting Footnotes from Tech Spec Sections 4.4.5.1.3 & 3.4.6.2 & Table 4.7-2 Re Cycle 5 Refueling Outage & Operation.Fee Paid1985-03-29029 March 1985 Application for Amend to License DPR-65,deleting Footnotes from Tech Spec Sections 4.4.5.1.3 & 3.4.6.2 & Table 4.7-2 Re Cycle 5 Refueling Outage & Operation.Fee Paid Project stage: Request B11492, Application for Amend to License DPR-65,deleting Tech Spec Diesel Generator Surveillance Requirement 4.8.1.1.2.c.5.d Per Generic Ltr 85-30.Fee Paid1985-03-29029 March 1985 Application for Amend to License DPR-65,deleting Tech Spec Diesel Generator Surveillance Requirement 4.8.1.1.2.c.5.d Per Generic Ltr 85-30.Fee Paid Project stage: Request ML20100G2241985-03-29029 March 1985 Proposed Tech Spec 3/4 8-4 Re Electrical Power Sys Surveillance Requirements Project stage: Other ML20100G4261985-03-31031 March 1985 Proposed Tech Spec Deleting cycle-specific Footnotes from Tech Spec Sections 4.4.5.1.3 & 3.4.6.2 & Table 4.7-2 Re Cycle 5 Refueling Outage & Operation Project stage: Other B11500, Application for Amend to License DPR-65,revising Tech Specs to Delete Ref to Physical Description of Trisodium Phosphate Dodecahydrate.Fee Paid1985-04-0404 April 1985 Application for Amend to License DPR-65,revising Tech Specs to Delete Ref to Physical Description of Trisodium Phosphate Dodecahydrate.Fee Paid Project stage: Request ML20100L1021985-04-0404 April 1985 Proposed Tech Specs Deleting Ref to Physical Description of Trisodium Phosphate Dodecahydrate Project stage: Other ML20133N9481985-08-0202 August 1985 Safety Evaluation Supporting Amend 101 to License DPR-65 Project stage: Approval ML20133N9371985-08-0202 August 1985 Amend 101 to License DPR-65,changing Tech Specs to Delete Ref to Station Emergency Procedure & Revise Surveillance Requirement to Make Diesel Generator Testing Consistent W/Requirements of Generic Ltr 83-30 Project stage: Other 1985-03-31
[Table View] |
Text
(
6 e'
y s-s
'I Docket No. 50-336 1
=
Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specifications ECCS Subsystems l
April,1985 8504160371 850404 PDR ADOCK 05000336-p PDR L
I.
EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 10.
Verifying that the following valves are in the indicated position with power to the valve operator removed:
Valve Number Valve Function Valve Position 2-51-306 Shutdown Cooling Open Flow Control 2-SI-659 SRAS Recirc.
Open*
2-SI-660 SRAS Recirc.
Open*
2-CH-434 Thermal Bypass Closed *
By a visual inspection which verifies that no loose debris (rags, trash,-
clothing, etc.)is present in the containment which could be transported to the containment sump and cause restriction of the pump suctions during LOCA conditions. This visual inspection shall be performed:
1.
For all accessible areas of the containment prior to establishing CONTAINMENT INTEGRITY, and 2.
Of the areas affected within containment at the completion of containment entry when CONTAINMENT INTEGRITY is established.
c.
At least once per 18 months byt 1.
Verifying automatic iso)Ation of the shutdown cooling system from the Reactor Cool 6nt System when the Reactor Coolant System pressure is above 300 psia.
2.
A visual inspection of the containment sump and verifying that the subsystem suction inlets are not restricted by debris and that the sump components (trash racks, screens, etc.) show no evidence of structural di.} tress or corrosion, 3.
Verifying that a minimum total of 110 cubic feet of trisodium phosphate dodecahydrate (TSP)is contained within the TSP storage baskets.
4.
Verifying that when a representative sample of 0.35 1 05 lbs 0
of TSP from a TSP storage basket is submerged, without agitation,in 501 5 gallons of 180 1 100F borated water from the RWST, the pH of the mixed solution is raised to }6 within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
- To be closed prior to recirculation following LOCA.
- *2-CH-434, a manual valve, shall be locked closed.
MILLSTONE - UNIT 2 3/45-5 t