ML21124A123: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:May 04, 2021 MEMORANDUM TO:              Alan A. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects FROM:                        Necota L. Staples, Senior Project Engineer    /RA/
{{#Wiki_filter:}}
Reactor Projects Branch 2 Division of Reactor Projects
 
==SUBJECT:==
PUBLIC MEETING
 
==SUMMARY==
- JOSEPH M. FARLEY NUCLEAR PLANT UNITS 1 AND 2, EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2, DOCKET NO. 50-348, 50-364, 50-321, 50-366, MEETING NUMBER ML21117A030 On April 27, 2021, the Nuclear Regulatory Commission (NRC) conducted an online virtual meeting concerning Joseph M. Farley Nuclear Plant Units 1 and 2, and Edwin I. Hatch Nuclear Plant Units 1 and 2. The purpose of the meeting was to provide opportunities for the public to discuss the annual assessment for the period of January 1, 2020 - December 31, 2020.
In response to the COVID-19 coronavirus and updated Federal Government guidance on travel and social distancing, the meeting was held remotely through the Microsoft Teams application. The following documents related to the meeting are available in ADAMS: Meeting Notice (ML21117A030),
Joseph M. Farley Nuclear Plant Annual Assessment Letter (ML21062A001) and Edwin I. Hatch Nuclear Plant Annual Assessment Letter (ML21062A011), Assessment Meeting Presentation (ML21117A025).
The meeting was conducted from 4:00 PM to 5:00 PM eastern time. There were 30 attendees. In summary, the attendees consisted of representatives from the NRC, Southern Nuclear Company, U.S.
Environmental Protection Agency, State of Georgia, and members of the public. Enclosed are a list of attendees. NRC staff were available for questions for half an hour.
There was minimal interaction with the public which was consistent with the normal meetings conducted near the station. Additionally, the meeting was listed in the Public Meeting Feedback System under Meeting Code (20210429) and upon submittal of this memo there were no public responses to the meeting.
Docket Nos.: 50-321 and 50-366 License Nos.: DPR-57 and NPF-5 Docket Nos.: 50-348 and 50-364 License Nos.: NPF-2 and NPF-8 CONTACT:        Necota Staples, RII/DRP (404) 997-4644
 
ML21124A123 OFFICE      RII/DRP NAME        N. Staples DATE        05/04/2021 U.S. Nuclear Regulatory Commission - Annual Public Meeting Farley Nuclear Plant and Hatch Nuclear Plant April 27, 2021 ATTENDEE NAME                                          AFFLIATE Melanie H Brown                                        Member of Public Biko B. Freeman                                        Farley Lloyd Generette                                        EPA Region 4, GA Jeff Quinn                                            Member of Public Patricia Long                                          SNC James Eduardo Love                                    Hatch Mark Crompton                                          Member of Public David Matos                                            EPA Region 4, State of GA Adrienne R. Tickle                                    GPC Cornell Titus                                          Member of Public Greg Lloyd                                            Member of Public Jeffery A. Wilson                                      GPC Dave Gasperson                                        U.S. NRC John Hickman                                          U.S. NRC John Lamb                                              U.S. NRC John Pelchat                                          U.S. NRC Rich Smith                                            U.S. NRC Necota Staples                                        U.S. NRC Stephanie Devlin-Gill                                  U.S. NRC Roger Hannah                                          U.S. NRC Lynnea Williams                                        U.S. NRC Alan Blamey                                            U.S. NRC Peter Meier                                            U.S. NRC Sarah Temple                                          U.S. NRC Coleman Curran                                        U.S. NRC Enclosure}}

Revision as of 17:19, 17 January 2022

April 27, 2021, Public Meeting Summary Joseph M. Farley Nuclear Plant Units 1 and 2, Edwin I. Hatch Nuclear Plant Units 1 and 2, Docket No. 50-348, 50-364, 50-321, 50-366, Meeting Number ML21117A030
ML21124A123
Person / Time
Site: Hatch, Farley  Southern Nuclear icon.png
Issue date: 05/04/2021
From: Necota Staples
Division Reactor Projects II
To: Alan Blamey
Division Reactor Projects II
References
Download: ML21124A123 (3)


Text