ML20195E643: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:l
                                                                                              ~
F C.VLIli11                      '' 'NCFlI s UNIVE'lis18
  . m n . n . , ,, . i .u s . o - . si. . u. .
                                                    ~ ...  ..s      m ,, me,o      4~6%a..m ..
                                                                                                                      .      . c,a a ~ coe es S.FS. M,    .  /M                    scwoot or EhCINEEMMC AC APPUED SCIENC'E tos eCEtr.s. cAUFOR'4A 90034
  '~
Cee. .d..      d          CO WS      August 20, 1976                                f
_ ee;es get.. en ts N::: TO P MF to:.,: a s 5 m't SM '"                        n:e oo m;; g y, y r3VM Of 'I Y                                  lt. c.9 ,0 n : ) gi .. g g u n    .'n es:sv                                                  ,
Docket No. 50-142                j.
V. h. Ri::olo, Chief                                                                                [J Safeguards Branch v        ,.
U. S. Nuclear Regulatory Coc=ission                                                                  \t      ...,      7 Region S                                                                                              '\
Suite 202, Walnut Creek Pla:a 1990 N. California Blvd.                                                                                NQ)'
Walnut Creek, Calif. 94S96
 
==Dear Mr. Rizzolo:==
 
Oue to the sensitive nature of the contents of this letter, we request that this document be withheld from public disclosure pursuant to Section 2.790 of 10 CFR Part 2.
This letter concerns the special, unannounced, physical security inspection of the UCLA Training Reactor Facility by Ftr, it. D. Scht. ster, Region 5 on July 29 and 30,1976.
The Security Plan for this '. City is in the process of being revised                                      to Includeo in incorporate        all  previously          appi    .d changes    and new    modifications.
l these new modifications will be ways to reduce weaknesses and vulnerabilisier found during the inspection. The Security Plan will be submitted by September 30, 1976.                                                                                                                1 During a key inventory taken August 8,1975, it was determined by the Labor ~
atory Security Officer that one C-level key was lost and one B-level key was duplicated.
Contrary to our Security Plan, the lost C-level key is not regarded as a security-related key in the sense of 10 CFR 73. This will be reflected as a modification in the new Security Plan.
Tne duplicated key, a B-level type, was duplicated by the UCLA Pelice Dep artmen't . We are in agreement with them in the need to have keys a sailable in each patrol car to expediate their arrival at the Nuc.' ear Energy Laboratory in case of emergency. On August 16, 1976, the Police Department was verbally informed of the violation and anotner key inventory was s.ade by the Laboratory Security Officer. At that time, six more duplicated keys were found and were hence marked by          the Laboratory Security Officer. As a result, the Police Departnent assured the Laboratory Security Officer that no mort duplicated keys will be necessary and if a need arises for more duplication, they wi;l do it only witn prior approval from the Director of the Nuclear Energy Laborator7
                                                              ""W'MMIMum UOEE$$m                                                                                        ,
 
i The steps, wnich have been or will oe taken to correct the violation, tne results achieved and steps which will be taken to avoid furtner violations, aave oeen stated. T he date when full compliance will oe achieved is September                                                                              i 50, 197o.
Si
                                                                                    /
er          ,
c            Y' /?
L              Ah.Jn Ivan Catton, Director Nuclear Energy Laboratory IC/CEA/v1 cc:  R.R. O'Neill, Dean, School of Engineering and Applied Science R. A. hestr. ann, Associate Dean, School of Engineering and Applied Science H.V. Brown, Car. pus Safety Officer, UCLA C.E. Ashbaugh, Laboratory Security Officer, Nuclear Energy Laboratory l
1 l
l l
 
              ~
                                                                                                                                  } f.-.----___- _-
                                                                                                                                              ~
                    .                  t                                UNITED STATES                                                            . e
                                @* " 4 ,k                NUCLEAR REGULATORY COMMisslON                                                    4d    '
f REGION V 0    ,                              SWITE 292. W ALNUT C R E EK PLAZA 199 0 N. C ALIFO R NI A S OULEV A R O 8o,e e                      W ALNUT C AttK. C ALIPORNI A 94596 0CT 191977 Docket No. 50-142 The Regents of;the'Univeis'ity of California School of Engineering
                                  'Los Angeles, California 90024 Attention: Russel O'Neil. Dean of Engineering Gentlemen:
 
==Subject:==
NRC Inspection of Nuclear Energy Laboratory This letter refers to the inspection of your activities authorized under NRC License No. R-71 conducted by Messrs. W. P. Mortensen and R. Blackman or. September 21-22, 1977. It also refers to the discussion of our in-                                                              ,
spection findings held by the inspectors with Mr. I. Catton and members                                                            '
of his staff on September 22, 1977.                                                                                                I i                                    The inspection included examination of activities related to physical                                                              I protection against industrial sabotage and against theft of special nuclear material in accordance with applicable requirements of Title 10, i                                    Code of Federal Regulations, Part 73, "Physical Protection of Plants and Materials," your Security Plan, and license conditions pertaining to physical protection as described in the enclosed inspection report.
Within these areas, the inspection consisted of selective examinations of procedures and records, interviews with facility personnel and ob-3ervations by the inspectors.
Based on the results of this inspection, it appears that certain of your activities were not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A.                                                          '
The items of noncompliance are categorized into the level as described in our correspondence to you duted December 31, 1974.
This notice is sent to you pursuant to the provisions of Section 2.201, of the NRC's "Rules of Practice," Part 2. Title 10 Code of Federal Regulations. Section 2.201 requires you to submit to this $ fice.
t i _u <v  /                                                                                                                '
                      -f6 )'Hd,W76 9
(c2yd.
f f/4 S                  1
 
                                                ~
m CCT 191977 The Regents of tne University of California                                                    within twenty (20) days of your receipt of this notice, a written statement or explanation in reply including (1) corrective steps which have been taken by you and the results achieved; (2) corrective steps which will be taken to avoid furtner violations; and (3) the date when full compliance will be aghieved.
During this -inspection it was also found that onc of your activities appeared to devia'te from the generally accepted practices in the industry as set forth in the Notice of Deviation, enclosed herewith as Appendix B.
In your reply please include your coments concerning this item, a description of any steps that have been or will be taken to prevent recurrence, and the date all corrective actions or preventive measures were or will be completed.
In accordance with Section 2.790(d) of the NRC's "Rules of Practice,"                                                                  .
Part 2. Title 10, Code of Federal Regulations, documentation of findings                                                                !
of your control and accounting procedures for safeguarding special nuclear materials and your facility security procedures are exempt from disclnsure; therefore, Appendices A and B to this letter, the inspection report, and your response to the items listed in the appendices will not be placed in the Public Document Room and will receive limited distribution.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely.
                                                                                            /    i                n"C'>
LeRo              . Norderhaug, Actt1Eg Chief Safeguards Branch
 
==Enclosures:==
: l. Appendix A - Notice of Violation
: 2. Appendix B - Notice of Deviation
: 3. Inspection Report No. 50-142/77,-02 A
t se i - -i si
_ , _ _ _ _ , _ _  - . - - . - - ,    - - - - - - - - ~ - ' * ' " ' - ~ ' ' ' ' ' ' ' ~ ~ " ~
 
APPENDIX B University of California at Los Angeles                                        l i
School of Engineering Los Angeles, California 90024 Docket 50-142 License No. R-71                                                              l M        NOTICE OF DEVIATION Based on the results of an NRC inspection conducted during the period September 21-22, 1977, it appears that one of your activities deviated from generally accepted practices in the industry as indicated in the          ;
following notice.                                                              !
: 1. Regulatory Guide 5.12 states in part "Xey locks...on doors or gates      I to material access areas in protected and vital area perimeters and for access to vital equipment should provide a high degree of re-sistance to opening by force or tamper techniques. "                    )
1 U.S.N.R.C. Office of Inspection and Enforcement Circular 77-04          l states in part "Door locks must be of substantial construction tha'      1 their neutralization or circumvention by common burglary techniques      '
is precluded."                                                    ~
                                                                                          )
Contrary to the above, the inspector demonstrated on September 21, 1977 to the licensee that a reactor high bay door, could be opened using a shove knife technicue. The door thereby weakened the security provided by the substantial barrier wall.
l l
5 FS. Y. SE.
Copy        of '  copies    1
_l _ po2'S W                            ,
 
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION V Report No. 50-142/77-02 License No. R-71              Safeguards Group 11 Docket No. 50-142 Licensee:  The Regents of the. University of California School of Engineering Los Angeles, California 90024                ,
Facility Name: Nuclear Engergy Laboratory                                                                          :
Inspection at: University of California at Los Angeles l
inspection conducted:        September 21-22, 1977 Inspectors:        L ag m                  ,~,    .,t                          /d/M/77 W. P. Mortensen, Pffysical Protection Inspector                  0' ate' 51sned 1
Date signed    ,
l Date Signea Approved by:L.p h.  ~te  -        u            a                              /d / /4 [''77 AortgrnMS- Acting wet , dateguards tiranch                  Date Signed Sumary:
Unannounced Inspection on September 21-22, 1977 (Report No. 50-142/77-02                      '
Areas inspected:      Followup on previously identified items of noncompliance, essential equipment, security areas, security systems, organization,                              i access control, surveillance and procedures. The inspection was started                          I during regular working hours and involved 8 hours onsite by one MC inspector. The inspector was accompanied by a representative of The Office of Inspection and Enforcement. Headquarters, U.S.N.R.C., who conducted a program review.
Results: Of the eight areas inspected, two items of noncompliance were identified in two areas. The areas of noncompliance were security system's ', para. 5) and surveillance (para. 8). One deviation was identified in paragraph 5.                                      s-F5. S *l    2 C 'l copy    E      el          ceptes db pages 219 (2)
              .d J u d d d , W W T
                                      .    -    QTfjlf
 
                                                                                                                                                      )
i DETAILS
: 1. Persons Contacted                                                                                                                1
                    *0r. Ivan Catton, Director, Nuclear Energy Laboratory Dr. Neil C. Ostrander, Manager, Nuclear Er.ergy Laboratory
                    *Mr. "Chuck" Ashbaugh, Security Officer, Nsclear Energy Laboratory                                                                l Lt. Jim Kuhen, UCLA Police Department Mr. Bud Ennis, Supervising Locksmith UCLA Mr. Phil Arnold, Electrician, UCLA
                                          ..e
                    ' denotes those attending exit interview
: 2. Licensee Action on Previous Inspection Findings (closed) Noncompliance (142/76-01): Failure to take corrective action when keys to security locks were lost and duplicated without                                                              I authorization. The inspector found that written procedures now                                                                    I exist and approved key control practices are being followed to insure key system integrity.
: 3. Essential Equipment                                                                                                              l The licensee has designated the reactor controls, the reactor and the cooling system as essential equipment.
No items of noncompliance or deviations were identified.                                                        -
: 4. Security Areas The inspector examined the security barriers as they existed September 21, 1977 and found them to be as described in the licensee's security plan dated January 20, 1977 rs revised May 13, 1977 and August 24, 1977.
No items of noncompliance or deviations were identified.
: 5. Security Systems A.          The inspector tested the dead locking feature of the Russwin Mortise latenes installed on doors providing access to and within the Nuclear Energy Laboratory. In several of the locks it was noted the dead locking feature failed to operate. The inspector der.enstrated to licensee staff that the door from classroom 20                        into the reactor high bay, keyed to operate from ""' lev. key, could be opened using a small screwdriver as a shove knife.
h O  9  h
                    <,~~-------,-m        - - + - - , , , _ , . - . , ,            -      * - - , - . - --  , ,-  - -    -          - - - - p
 
    ,                                      2-1 Regulatory Guide 5.12 and The Office of Inspection and Enforcement Circular 77-04 indicate the accepted industrial practice of maintaining locking devices so that their circum-vention by common burglary techniques is precluded.
These findings represent a deviation.
B. The licensee has installed a Kidde Model KD 3 Ultrasonic Intrusion Alam. Through interview of the licensee's employees and direct observation, the inspector determined that the telephone"lines transmitting signals from the alarm system in the Nuclear Energy Laboratory to the UCLA Police Departinent passed through regular telephone junction boxes and frames.
In the junction boxes and frames, the alarm lines are identified by red rubber caps on the termi als. The inspector also observed that junction boxes through which the alam system lines traveled were not equipped with tamper indicating devices. j Neither line supervision nor "fail-safe" alam circuitry is incorporated to detect tampering or a break in the line.
The licensee's approved security plan states "The alam system registers a security violation. A signal is sent along an isolated tamper proof telephone line to the 24 hour manned      i Huneywell Alam Receiver WS40 B.D. located at the UCLA Police    i Station."                                                        1
                                                                                    \
These findings represent an item of noncompliance.
: 6. Organization The inspector reviewed the licensee's security organization and the relationship with local law enforcement authorities on September 22, 1977, and found it to be as described in the security plan.
l No items of noncompliance or deviations were identified.
: 7. Access Control The inspector examined key control procedures and personnel access to the security areas.
No items of noncompliance or deviations were identified.
F. Surveillance The licensee's approved security plan (part II, paragraph C2) 5tates "That during non-working hours, the lock and key system and the alam system provide the surveillance of security areas."
Part I paragraph B of the security plan states "Security Areas
 
3, require A level access or higher. These areas, the reactor room (1000) and the radio active storage room (within room 1540), are identified in figures 6 through 8."
The inspector tested the licensee's alarm system by having the licensee place the alarm system in a secure modo and establishing direct radio comunication with the UCLA police Alarm Station. The police alarm station was instructed to report incoming alarms for this test imediately. The inspector then entered the reactor high bay (room 1000), a security area. The inspector walked continuously within the' reactor room both upstairs and downstairs around the reactor without detection by the intrusion detector system. After approximately nine minutes while the inspector was touching the alarm control panel within the security area, the system indicated an alarm. Through interview of licensee staff, the inspector determined the alarm sensitivity had been decreased because of false alarms caused by wind drafts. The licensee increased the sensitivity of the alarm system and it was retested in the same manner by the inspector. With the increased sensitivity, the alarm system indicated intrusion by the inspector on the third step within the security area.,
These findings represent an item of noncompliance.
: 9. Procedures The inspector reviewed the licensee's procedures for response to detected unauthorized intrusions, security violations by authorized personnel, bomb threats, acts of civil disorder, security program review and key control.
No items c' noncompliance or deviations were identified.
: 10. Exit Interview The insper. tor met with licensee representatives (denoted in para-      .
graph 1) at the conclusion of the inspection on September 22, 1977.
The inspector sumerized the scope and findings of the inspection.
The licensee representatives made the following remarks in response to certain of the items discussed by the inspector:
Stated the discription of the alarm system transmission wires had been given to them by their installation personnel and they would check into it. (paragraph 5)
Acknowledged the problems with the dead latching feature of their locks and stating their locksmiths have bcen instructed to alleviate the problem. (paragraph 5)              ,
o Stated they would adjust the alarm system to a performance standard and inform NRC of that standard, and/or procehres to assure a constant effective level of sensitivity in the security intrusion alarm system. (paragraph                                ,
ee e
 
Vb
    *
* a p g M . .w M        ''4                                  UNITED STATES                                                                    !
* Ig                NUCLE AR REGULATORY COMMisslON                                          ,
g .]
3'bI g                          REGION V O
              ~ "                                  $UtTE 802. W ALNUT C MEEK PL A Z A
          '4, 'U
              *ese*
[                      1990 N. C ALIF OR NI A 00VLEV A a 0 W ALNUT C REEK. C ALIFOR NI A 94l96 I
DEC t 81977                                                                            l Occket Nos. 70-223
,                                          50-142 University of California Los Angeles, California 90024 Attention: Dr. Harold V. Brown Environmental Health and Safety Officer
: i.                                        l Gentlemen:                                                                                                                      l
 
==Subject:==
NRC Inspection This refers to the inspection conducted by Messrs. G. Hamada and A. Wieder of this office on December 5 and 6,1977 of activities authorized under NRC License Nos. SNM-974 ano R-71.                                      It also refers to the discussion of our inspection findings with members of your staff at tne conclusion                                                          I of the inspection.                                                                                            -
The areas examined during the inspection inel ad your program for con-trolling and accounting for special nuclear c verial pursuant to appli-cable provisions of Part 70, Title 10, Code o 'ederal Regulations, and specific requirements of NRC License Nos. SNM-W4 and R-71.                                          Within                    (
these areas, the inspection consisted of selective examinations of pro-                                                        l cedures and records, interviews with campus personnel and observations                                                          ;
by the inspectors.
l No items of noncompliance with NRC requirements were identified within the scope of this inspection.
In accordance with Section 2.790(d) of the NP.C's "Rules of Practice,"
Part 2 Title 10, Code of Federal Regulations, documentation of findings of your control and accounting procedures for safeguarding special nuclear materials are exempt from disclosure, therefore, tne inspection report will not be placed in the Public Document Room and will receive limited distribution.                                                                      .
s 9
iJco-    d.,
          ~99  v          h)W''/              V/'f T '                                                  ,
4
 
l-  ,
                      '                                                                                DEc4e197:
University of California                      2-Should you have any questions concerning this inspection, we will be glad to discuss them with you.
Sincerely.                                          l 2
L.    . Ndrde aug        iaf Safeguards Branen -
N
 
==Enclosure:==
 
IE Inspection Report Nos.
70-223/77-02 and 50-142/77-03                            g (IE-Y-208) cc: Professor Ivan Catton Director, tRelear Engineering Laboratory, UCLA e
e i                                                                                        -
                                                                                                          ,                          1
 
l 1
l U. S. NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT                                l REGION Y l
70-223/77-02 Report No. 50-142/77-03 (IE-V-208) 70-223                                SNM-974 Docket No.      50-142              License No.        R-71      Safeguards Group        2 Licensee:        University of California, Los onceles Los Angeles. California          90024 Facility Name:
L Inspection at:                                                                            ,
Inspection conducted:                December 5 - 6, 1977 V ' ' ' ' * '' . "' 'u                        ''/11 N/
Inspectors:          't-                    _
: u. Mamaca , Lnemi st/:. tat 15:1 clan                      Date Signec
                                  .  /lko                                  -
                                                                                          /?-fzJ b 7 IA. Wieder, 5afeguaros Auditor                                pateSignoc Approved by: - /                          .2.v            .e                  / l2.,h3 / 7 7 Date Signec        l
: 4. R.f o'rdeYhauGr, N
edWuards Branch
                                                                ~
Sirmary:
i Inspection on December 5-6, 1977 (Report No. 70-223/77-02 and
                  . 50-142/ 77-03 (IE-V-208))
Areas Inspected: The licensee was inspected for compliance with applicable sections of the regulations which cover material control and accounting requirements. These included Facility Organization and Operation, Measurement and Controls, Storage and Internal Control, Inventory, and Records and Reports. The inspection involved 16 inspector-hours onsite by two NRC inspectors.
Resul ts :                                                                              -
of the areas  Noinspected.
items of noncompliance or deviation F5 'I'Iwere
                                                                                      .. }51dentified in any Copy    5    of N    copies d . pages b        NY                          )~
 
OETAILS
: 1.      Persons Contacted
                  *J. Evraets, Radiological Safety Officer, EHS
                  'J. Hornor, Health Physicist C. E. Ashbaugn, III, Physical Security Officer A. Zane, Reactor Supervisor
* Denotes attendance at the exit interview.
: 2.      Facility Organization and Operation The facility was inspected for general compliance with facility organization criteria addressed in the approved license application                                                                                                        I statement. The inspection also included a review of authorized possession limits and autnorized uses of Sptcial Nuclear Material.
No items of noncompliance were identified.                                                                                                            .
: 3.      Measurement and Controls The inspection consisted of a review of nuclear material depletion and production data and the reporting of these data in the Material Status Reports.
No items of noncompliance were identified.
: 4.        Storage and Internal Control Inventory records maintained for in-reactor and storage were reviewed.
No items of noncompliance were identified.
          , 5.        Inventory An inventory of stored fresh fuel plates and scrap by serial number and weight was conducted.                        Spent fuel elements were piece counted
                -      and the core centent was accepted on the basis of a fuel bundle location chart. Plutonium-Berylium sources were identified by
  .                    serial number.
No items of noncompliance were identified.
 
A.
r
                                                                                                                                        ~
                                                            . . 2-l l
: 6. Records and Reports                                                                                                      l The licensee's nuclear material control and accounting records, reports and other documentation applicable to the period May 21, 1975 througn Septem:er 30, 1977 were reviewed for compliance witn the records and reports requirements of the regulations 4 No items of noncompliance were identified.
: 7. Exit Interview The inspection findings were discussed with representatives of the facility management.
L.
I                                                                                                                                    e O
e h
            - -          , - , . , . ------,..--.,__,---,c          ,an. , _ ~- , . . ,_. , , _ . . , - ~ , . , , - . - _ , , - -
 
                                                            '~
                                                                                                                ... * -v s        g pa e t C p,                                                                                                I l              ,.7                I'g              NUCLEAR REGULATORY COMMisslCN                                          "[
j.''                  j                                REGION V
                                                                                                                      ~
O,                    e.                  SUIT E 2 02, W ALNUT C R EE K PL A 2 A U
                ''g    *
                                  ,o                    19 90 N. C ALIF O R NI A sOuttVARD                        {g
                      *,,e*                            W ALNUT C RE EK C ALIFORNI A 94$94 DEC 181978 Docket No. 50-142 y o g == ,
The Regents of the University of California School of Engineering Los Angeles, California 90024 Attention:      Russell O'Neil Dean of Engineering Gentl emen:                                    , ,,                                            .
This under letter      refersNo.
NRC License    to R-71 the inspection conducted byof        your. gf' Mg$.*        'Mortensen ities      authorizedof this
      ,                  office on October 30-31, 1978. It also rtfers to the discussion of our inspection findings held by..the' inspector with Mr. N. Ostrander                                  '
and members of his staff on October 31, 1978.
The inspection included examination of activities related to physical protection against industrial sabotage and against theft of special nuclear material in accordance with applicable requirements of Title 10 Code of Federal Regulations, Part 73, "Physical Protection of Plants and Materials," your Security Plan, and license conditions pertaining to physical protection as described in the enclosed inspection report.
Within these areas, the inspection censisted of selective examinations of procedures and records, interviews with facility personnel and                                            -
observations by the inspector.
Within the scope of this inspection, no items of noncompliance were identified.
During this inspection it was found that certain of your activities appeared to deviate from your internal security procedures, and/or cormliteents you made to this office in your {{letter dated|date=December 21, 1977|text=letter dated December 21, 1977}}, as. set forth in the Notice of Deviation, enclosed herewith as Appendix A. Please reply within twenty (20) days of your receipt of g
                                . h$/(f '
M OO
 
University of California                    -2 ,            DEC 18197B                                                ;
this notice and coment concerning these items. Include a description                                                ,
of any steps that have been or will be taken to prevent recurrence, and the date all corrective actions or preventive measures were or will be completed.
In accordance Eith Section 2.790(d) of the NRC's "Rules of Practice,"                                                  '
Part 2, Title 10, Code.of Federal Regulations, documentation of find-ings of your contr'el and accounting procedures for safeguarding special                                              i nuclear materials are exempt from disclosure; therefore, the enclosure to this letter, the inspection report, and your response to the items listed in the enclosure to this letter will not be placed in the Public Document Room and will receive limited distribution.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
l Sincerely,                                                                l 1
                                                            //                        -
3jD
                                                                  /          :
L. o, erhau ,                                                        l Safeguards Branc                                      -
 
==Enclosures:==
: 1.        Appendix A - Notice of Deviation
: 2.          IE Inspection Report No.
50-142/78-03(IE-V-264)'                                                      .
e e
t
  '
* O-e  9 e e-ume gese e S                                ,
                                      - . - - - - , ,                                                          ---  +-,,------ -
 
l APPENDIX A '
The Regents of the University of California School of Engineering Los Angeles, California Docket No. 50-142                                                                                            .
License No. R-71 Notice of Deviation Based on the results of the NRC inspection conducted on October 30-31, 1978, it appears that certain of your activities appeared to deviate from your internal security procedures or ycur comitment contained in your letter to Region V, USNRC, dated December 21, 1977, as indicated below.
: 1.      The licensee stated in their letter to Region V, USNRC, dated December 21, 1977, Paragraph A.2, "An alam sensitivity pro-cedure is currently being formulated and will go into effect .
prior to January 20, 1978."          .
The inspector detemined through interview of licensee personnel on October 31, 1978, that the licensee has no+ yet prepared or imple ented an alarm sensitivity procedure.                                                      -
: 2. The licensee stated in their letter to Region V, USNRC, dated December 21,1977, Pat graph B.1, "In addition, to ensure that all doors / latching mechanisms are in proper work-ing order in the future, a monthly check on all doors will be made by the NEL Security Officer with any discrepancies taken care of imediately."
Contrary to the above, the inspector detemined through testing of the doors to the reactor high bay security area that the dead                                      -
locking feature on two doors failed to operate. The inspector reviewed records in the NEL showing that the maintenance on the malfunctiening locks had been requested in February, May and July 1978. At the time of the' inspection, the locks had not yet been repaired.                  -
s.rs.7f. DM
                    .                                                      Copy [ of I O                _ me, I      pages g a  a      I    L  _
f YI I Y NI
          'u v c7 V
: d.                                                                                                          l l
U. S. flVCLEAR REGULA ORY COMMISSION 0FFICE OF !!iSPECTION Ali0 E'iFORCEMEllT                                  l REGION,V Report No. 50-142/78-03 (IE-V-264) l l
Docket flo. 50-142                License No. R-71    Safeguards Group        2.<          l
                                .                                                                          1 Licensee:    University of California at Los Angeles                    ,
Los Angeles, California Facility Name:      UCLA Research Reactor Inspection at:      UCLA Campus (Argonaut - 100KW)
Inspection Conducted: October. 30-11,1J78 Inspectors:      'wo                        x                ' A //
                                                                            /
W. P. Fortensen, physicai Protection Inspector          Date Signed              j Date Signed Approved By: /it t-  f.            cc    t  ,v m          ,) k/ *if [7 [
Date Signed "L. hl tdtdkthauhChiftAfFas Branch Sumary:
                                                                                                        ~
Inspection on October 30-31,1978 (Report No. 50-142/78-03) 1 Areas Insoected: Routine, unannounced inspection.'of licensee action on previous inspection findings; licensee's approved security plan; protection                  I of StN; security organization; access control; alarm systems; keys, locks and combinations; comunciations system; surveillance; procedures; security program review; and protection against radiological sabotage.- The inspection involved 12 inspector-hours onsite by one inspector.
Results: Of the 11 areas inspected, no items of noncompliance or deviations were identified in 9 areas; two deviations were identified in two areas (Paragraphs 6 and 7).
t IE:V Fom 219 (1)
 
DETAILS' i
: 1.        persons Centacted                                                ,
Dr. Ivan Catton, Director, Nuclear Energy Laboratory
* Dr. Neil C. Ostrander, Manager, Nuclear Energy Laboratory
                                *Mr "Chuck" Ashbaugh, Security Officer, Nuclear Energy Laboratory Dr. Harold V. Brown, Environmental Health and Safety Officer Dr. John Everetts, Radiological Safety Officer Lt. G. J. Ares, UCLA Police Department                                                                            '
Mr. Phil Arnold, Electrician, UCLA
* Denotes those attending exit interview.
: 2.        Licensee Action on Previous Inspection Findings (Closed) Noncompliance (50-142/77-02): Lack of tampersafing on some alam lines.                      The inspector determined all alam line junc-tion boxes are now equipped with micro switches to detect tampering.
(0 pen) Noncumpliance (50-142/77-02): Alam sensitivity inadquate.
The licensee stated in their letter of response to the previous inspection findings from Dr. Catton to Mr. Norderhaug, dated Dec-
        ,                          e-ber 20, 1977, that, "An alam sensitivity procedure is currently being formulated and will go into effect prior to January 20, 1978.
The inspector determined that an alam sensitivity procedure has not yet been prepared, and the alarm sensitivity although improved over the findings of the previous inspection, will still not detect an intruder rior to the intruder reaching the reactor (approximately fifteen feet .
(0 pen) Deviation (50-142/77-02): Vulnerability of reactor high                                                                        !
bay locking mechnisms. The inspector determined through observa-                                                                        I tion and testing of the locking devices that astricals and cylinder                                                                    !
guard rings have been installed on all reactor high bay doors. It                                                                    -
was noted by the inspector that the dead locking feature of two high bay door locks failed to operate. Records maintained by the Nuclear Energy Laboratory show' that this malfunction was determined and reported to University maintenance for repair in February 1978 subsequent requests for repair were also made in May and July 1978.
The locks are not yet repaired.
: 3.        Security Plan _
The Security Plan for the UCLA Training Reactor Facility now consists of documents sutrnitted by UCLA letters dated June 20, 1975. July 15,1975, October 21, 1975, and April 1,1976, ex-cluding Appendix B to the {{letter dated|date=April 1, 1976|text=letter dated April 1,1976}} (Appendix B
          - .  . . _ . . - . . .                                                                                                                                .a.
                                                              --.-,,w                                      ----,,-m,- ,, ,.-,.>-,-,,-.,-.,-,,m---
                                                                                                                                      -              ,w~.--    - , -.,-
                          -w.-          e---------.,-,,--o          -
                                                                          ,m,, ,,,--,,,,,r,,,-,,,,7          ,
 
2 Q.
contains background inforration which is not part of the secur-ity plan), May 26,1976, June 9,1976, and August 3,1975. The foregoing documents are identified and approved as the licensee's security plan in a letter from NRR, dated September 13, 1976.
The licensee has submitted to licensing, a new security plan dated January 20, 1977, and three amendments to the January 1977 se~curity plan have also been submitted. The inspector              .
determined that NRR has not yet approved in writing the new security plan or amendments.
The licensee has designated the reactor and the cooling system as essential equipment in their approved security plan. All fuel storage areas and the reactor high bay are designated and controlled as security areas. The reactor control room is under lesser security controls, and is the subject of a current dialogue between the licensee and NRR.
The radioactive storage room is described in the approved security plan as, "located below ground level so that all outside walls are backed by earth fill. -The inside walls are two-foot-thick concrete block, and the two steel mesh doors provide the only access to the area. The inner door, fl, is backed by a steel plate and has two locks. One of the locks is keyed to "A" level, i                        the Master level, and the other lock is a Sargent and Greenleaf      .
combination padlock No. 8077A, which meets the specifications out-lined in AEC Regulatory Guide 5.12. The outer door #2 is keyed to "A" level . "
The inspector found the following conditions during a visual inspection of the radioactive storage room on 0:tober 31,1978.                    1
: a. The wall of the storage room adjacent to the stairwell is                    )
two foot thick from ground level to about eight feet. Above eight feet to the ceiling (estimated as sixteen feet by the            ~
inspector), it is approximately four inches thick standard plaster wall . The adjacent stairwell is protected by an ultrasonic intrusion alarm system.      l,
: b. A two foot high by three foot wide area above the inner door into the radioactive storage room is constructed of an expanded metal grill covered with 1/2 inch pressed board                    l with a total thickness of the wall slightly over a 1/2"                      l thick.                                                                      l 1
The interior walls are to be redescribed in knendment No. 4 to the licensee's security plan to be submitted to IRC November 30, 1978.
l l
 
                                    ~~                                                                                  __.
3
  ,d      ,
s                        .
: c. Tne inner door into the radioactive storage room is a standard hollow metal door secured with a six pin tumbler, naster keyed lockset and a standard duty hasp with a Sargent and Greenleaf combination padlock #8077A.
: 4. Protection e_f StN Tiie inspector detemined through interview of licensee employees that the licensee presently has in its possession 9.0 kg of Special Nuclear Material in the fom of 93% enriched uranium (fuel plates, fuel scraps and uranyl nitrate) and two 32 gm Pu - Be neutron sources.
The U-235 is located as follows: 3.6 kgs U-235 is in the reactor and 0.7 kg is in the radioactive storage pits, and 4.7 kgs is nonirradiated fuel stored in the radioactive storage room. The .7 kg of irradiated fuel in the storage pits is not self-protecting as defined by 10 CFR 73.6(b). The total non-exempt StN presently located at the Nuclear Energy Laboratory is 5.4 kg.
the licensee requested by letter to the On      September Department of Energy the irradiated              6,1978,(DOE),(Washington, fuel plates    .7 kg) to the DOE reprocessing plant                      D.C.,
in Idaho. DOE is presently reviewing their request.                              .
                                                                                                                                ~
i                  The licensee has not been asked by HRR (licensing) to provide the security stipulated in 10 CFR 73.50 or 10 CFR 73.60, nor                    -
is the licensee presently providing that level of security.
No items of noncompliance or deviations were identified.
: 5. Access Control The inspector examined the licensee's procedures and hardware used to control access to the Nuclear Energy Laboratory. The licensee is controlling access as indicated by the approved security plan except that the licensee has ten "A" level keys                                          -
instead of seven as indicated in the approved security plan.
NRR was notified by licensee {{letter dated|date=March 10, 1978|text=letter dated March 10,1978}}, that the nr.ber of "A" level keys had been increased to "no more than ten."          .
The licensee's new security plan, amendment three, submitted to NRR on March 10, 1978, Paragraph 1.A, states that the reactor control rc:m "becomes an 'A' level area (but non-alamed) dur-ing non-working hours. " Tha inspector detemined this has not f
                                                                                                          ;          ..s.
      ==-======.-==a                                                                                                              .
 
    )    .'
l yet been impimented. The reactor control room is currently keyed for "B" level access both during working and non-working hours. The new security plan has hot been approved in writing by NRR.
: 6. Alam Sistems                                                                    .
The licensee has installed a Kidde Model KD3 Ultrasonic Intrusion                    ~
alam system with sensors located in the reactor high bay, radio-active storage room and the stairwell adjacent to the radioactive storag'e room. The doors on the first and second floor of the stairwell are equipped with balanced magnetic switches. The double                        .
doors from the reactor high bay first floor to an alley outside                          l the Engineering Building are secured with a self contained local                          '
alarm / dead bolt panic lock. The doors also have magnetic switches                      :
(not balanced) tied into the alarm system and annunciating at the                        l campus police dispatchers office.
The inspector tested the licensee's alarm system in the reactor high-bay by having the licensee place the alarm system in a secure node and establishing direct radio communication with the UCLA                            l Police Alarm Station. The police alarm station was instructed to i                report incoming alanns for this test immediately. The inspector -
then entered the reactor high bay (room 1000), a security area.
On the first test, the inspector entered the high bay on the                            I se:end floor, at the control room door, and walked (downstairs) to the first floor before the alarm activated. During the second test, the inspector entered at the second floor, control room door walked to the top of the reactor, walked to the crane electrical power box on the opposite side of the high-bay, and was on the second floor catwalk opposite the control room before.an intrusion was signaled.
During the previous physical security inspection (50-142/77-02),                      -
conducted September 21-22, 1977, the licenree was cited when                            i the inspector walked continuously within the teactor highbay both upstairs and downstairs without detection for nine minutes.
The licensee stated in their letter to Region V, dated December 21, 1977, in response to that citation:
d
        '    O OO O9M$ 9                44
                                                          ,            -- - --                e---    -
 
g,    -                                                '"
                                                                                                                                        ~
                    "The reactor high bay sensitivity hroblem (too many false alarms) was in the process of being solved at the time of the inspection.
On September 22, 1977, during the Security Inspection, the alarm sensitivity was raised to a level ,such that the intrusion by the inspector was indicated on his third step into the security area.
An alarm sensitivity procedure is currently being fomulated and will go into effect prior to January 20, 1978."
Although the licensee corrected the sensttivity during the previous inspection..the licensee subsequently reduced the sensitivity because of a reoccurrence of false alarms. The inspector also de-temined through int.erview of licensee employees on October 31, 1978 that the licensee has not yet prepared or implemented an alam sensitivity procedure as committed to in their letter to Region V, dated December 21, 1977.
During an examination of the alarm system, the inspector noted that the licensee has installed the alam system so that an intruder would walk across the ultrasonic beam (least sensitive) rather than into/
away from the beam (most sensitive).
The sensitivity of the alarm system as detemined through testing by the inspector during the current inspection is improved over the                  -
previous inspection, however, the licensee has not yet taken action to insure the sensitivity of the alarm system will promptly and accurately detect an intruder in the reactor high bay. The finding by the inspector that the licensee has not prepared a procedure, nor placed it in effect prior to January 20, 1978, represents a deviation.
: 7.          Keys, Locks and Combinations The inspector examined keys, locks and combinations and related equipment used to control access to security areas. The licensee is using astricals and cylinder rings on all entry doors into the                                    .
reactor high bay. Within the reactor high bay, the controls for the overhead crane (necessary to gain access to the reactor core or fuel in storage pits) was secured with a Sargent and Greenleaf combination padlock #8077A.
The licensee is controlling the issue of keys to the Nuclear Energy Laboratory, and maintains records of key issue: An annual inventory of security keys is conducted by the HEL Security Officer. During the last inventory of keys, the Security Officer detemined that a . University employee tad misplaced his "B" level HEL access key on March 15, 1978. On October 5,1978, the licensee's security comittee reviewed the question of the misplaced "B" lev.e1 key t
w          .        .
t
 
6 e                                        l and determined that a rekeying was not necessary. This action is consistent with the licensee's procedure "NEL Lock and Key System Guidelines," dated December 10, 1978.
The licensee in response to the previous inspection (50-142/77-02)                                    ;
by letter to Region V, dated December 21, 1977, stated, in part, in                                  l Paragraph B3 1:
                            "Also, all latching mechanisms will be fixed by January 20, 1978, at which time a semi-annual complete lock check and pre-ventative maintenance program will be initiated by the key' shop.                                    i In addition, in order to ensure that all doors / latching rechanisms                                l are in proper working order in the future, a monthiy check on all                                    i doors will be made by the NEL Security Officer with any discre-pancies taken care of immediately. This will begin after Jan-uary 20,1978."                                                                                        l The inspector detemined by testing on October 31, 1978, that the dead locking feature of the reactor high-bay doors, that two of the doors did not deadlock when the doors were closed. The 11-censee (NEL) provided documentation that they had discovered the lock malfunction in February 1978 and had notified the University'.s Maintenance Department that the locks needed repair in February 1978, May 1978 and July 1978 and the locks have not yet been
  '                        repaired.                                                                      -
The finding by the inspector that the licensee has not ensured                                .
that all doors / latching mechanisms are in proper working order, reoresents a deviation from the licensee's commitment to Region V.
: 8.      Comunications The inspector examined the licensee's facilities for internal communication and communication with the cognizant local law                                        l enforcement agency.                                                                              -
No items of noncompliance or deviations were identified.
: 9.        Surveillance The inspector examined the licensee's practices and procedures for surveillance of security areas both during working hours and after normal working hours. The licensee's new security plan does not state what surveillance is provided during working hours, however, it states surveillance during non-wo. king hours is pro-vided by a security alarm annunciating at the UCLA Police Department.                      '-
f
 
g        .-
7 The inspector detemined through interview of licensee employees that surveillance of the 1 Je1 stored in the radioactin storage room is provided by the ul.;rasonic alarm system located in the room, and that the alarm only is put into access mode upon entry of an authorized individual into the rocm.
The reactor high-bay is placed in access mode each work day                        !
morning, and then returned to secure mode each evening. The                  .
i placing of the high-bay alann into access mode each work day                      1 is procedural and is not based on anticipated or scheduled activity within the high-bay security area. The noreal work day assurance of integrity of the reactor high-bay security area is provided by the locked doors into the high-bay, and student and staff activities within the Nuclear Energy                            i Laboratory,                                                                        i No items of noncompliance or deviations were identified.
: 10. Procedures                                                                            !
l The inspector detemined the licensee has procedures for reacting to unauthorized intr nions into security areas, bomb threats and acts of civil disorder. The licensee has no procedures for secur -
ity violations by authorized individuals.
No items of noncompliance or deviations were identified.              -
: 11. Security Program Review                          -
The inspector examined the licensee's program for review of the NEL security activities and procedures.
No items of noncompliance or deviations were identified.
: 12. protection Against Radiological Sabotage                                          .
The licensee's approved security plan describes controls on access to the reactor core, and except as noted elsedere in this report the licensee has provided the controls committed to in the approved security plan. The licensee has not been asked by NRR to search persons prior to entry into security areas, nor is the licensee performing searches of personnel or p*.ekages prior to entry in security areas.
No items of noncompliance or deviations were identified.
i                                                              -
                                                                                            .. ....-.-w..-
r
 
Q,    '''
                                                    . r.
o,
: 13. Exit Interview                                                                  l The inspector met with licensee representatives (denoted in Paragraph 1) at the conclusion of the inspection on October 31 1978. The inspector summarized the secpa and findings of the inspection. The licensee made no commitments as to corrective action proposed or planned for the deviations identified by the        '
inspector.
g e
D
                                                                    .l l
l I
0 t
me
 
      /f Os
                  *%'                              UNITED sT ATEs                        t-
* cf t_Jt s    3 e            NUCt. EAR REGUt. ATORY COMMf3SION                              //
=
        'p          [                    1990 C C      FORNI A SOULEVf. D                              -  b SUIT E 202, WALNUT CREE K PLAZ A 4,,4 , , , , , j                    W ALNUT CREE K. CALIF ORNI A tp4596
(
1 OCT 101979 l
                                                          ,                                                          1
                                                        '                                                            l Docket No. 50-142      .,        . '
c _ m, . . . ,                                i University of California Los Angeles School of Engineering Los Angeles, California 90024 Attention: Russell O'Neil Dean of Engineering -
1 l
Gentlemen:                                                                                            j
 
==Subject:==
NRC Inspection                                                              -
This letter refers to the inspection of your activities authorized under NRC License No. P.-71 conducted by Messrs. E. J. Power and L. W. Ivey of this office on September 24-25, 1979. It also refers to the discussion of our inspection findings held by the inspectors with Dr.1. Catton and Mr. C. Ashbaugh on September 25, 1979.
The inspection included examination of activities related to physical protection against industrial sabotage and as,ainst theft of special                                  i nuclear material in accordance with applicable requirements of Title 10                            . I Code of Federal Regulations. Part 73, "Physical Protection of Plants and                              !
Materials," your security plan, and license conditions pertaining to                                  .
physical protection as described in the enclosed inspection raport.
Within these areas, the inspection consisted of seleccive examinations                                l of procedures and records, interviews with facility personnel and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were obser s' In accordance with Section 2.790(d) of the NRC "Rules of Prc.ctice,"
Part 2. Title 10. Code of Federal Regulations, documentatios of the findings of your safeguards and security measures are exempt from public disclosure; therefore, the enclosed inspection report will not be placed in the Public Document Room.
L?'          .
t &)b(^ k -*                                                                                l e
 
i Viiiversity of California, Los Angeles                                                                                                                    IY        0 'W2 Should you have any questions concerning this letter, we will be glad to discuss them with you.                                                                                                                                                                                    I Sincerely,                    j
                                                                                                                      /      / ~j . . s                                                                                  :
l
                                                                                      .. ' : "                                    A) -( . . _'        .                                                                    ,
                                                                                                          /.*.LidoyR.Norderhaug. Chief                                            '
Safeguards Branch
 
==Enclosure:==
 
IE Inspection Report No. 50-142/79-03 (IE-V-340) i i
3 h
1 Y
e l
i i
I e
O 1                                                                                                                                                                                                          e i
4 I
I
                                                                                                          .,--,--n. nn,.,  ,. , , , , , , , , . , , , , ..---_v,.---,,~
                                                                                                                                                                      .. .          , - - , . . . , , . . ,  .-,---v .-..
 
i 0    dE iSPE D      h! gj'h
    ~
Region V Report f!o. 50-142/79-03 (IE-h340)            ,
Docket flo. 50-142    ,
Licensee:                                _ license No. R-71 University of California,ngeles                los A    -
Los Angeles. California                                                    Safeguards Group 90024                                                                  -
Facility Name:                                                                                                                i Inspection at:      . Nuclear Energy Laboratory                - __ _ ________ __ _
UCLA campus at Los Angeles Inspection Conducted:                                      . California September 24-25, 1979                                _.
Date of last Physical Security i                        -
nspection Visit:
Type of Inspection:                                                - Oc                          ._
tober
                                                                                    --    30-31                                            (
Inspertors:          4 Unannounced Physical Security                          1978 L ' . .~ , [- '                                            ' "'                                  _
gg.
E. J. Power. Physical Sec                                                                    --
                                                                                                                                    .~.(
                                    ^**                          y Inspector                          7
                                                                                                        - , j7 j              ,
L. W. Ive . Physical S'e, cup d I _ , h/
nspector be / f / Sj g
                                                /                                                              te $1gneo Approved by''                                                                                                                        .
                          .e Inspectionry:Summa /jl.hiNorcerhaug,W                , Sa eDuar s                e.-
rancP                      '
                                                                                                ~~~~'~l'ia~'ti-~5T          N Areas ins ected:                                                                                  gneo                ''
Access Centro Surveillance:l; Procedure Alam SystemsSecurtty Plan; Protection of Radiological Sabotage. s; Secu;rity Program RKeys, locks and Com The inspection involved 16 i                                eview; and Protection Against; Co                            .
Results:                            nspector hours                                                                .
Ho items of noncompliance                            w by t'.;o NRC Inspectofs  ,
r' onsite                                .
s."
ere identified.
O
                  #3r        ......            . - ...~                  .                                                        %*
y v w
                                                ~--_
                                                                                                        ''                      w
 
                                                                                              .                    l.. ec.
OETAILS
: 1. Persons Contacted
            *Dr. I. Catton, Director, Nuclear Energy Laboratcry
            *Mr. C..' Ashbaugn, Security Officer, Nuclear Energy Laboratory Lt. J. Ares, UCLA Police Department Sgt. W. Hansen? UCLA Police Department Mr. P. Arnold, Electrician, UCLA
            *Denot'es those attending exit interview.
E. Licensee Action on Previous Inspection Findings (Closed) Ncncompliance (50-142/77-02): Alarm sensi;ivity in-adequate. Several performance tests of the ultrasonic alarm system were conducted by the inspectors, and were found acceptable.
(Closed) Deviation (50-142/77-02): Vulnerability of reactor high bay locking nochanisms.                      The inspectors determined through observation that the Nuclear Energy Laboratory had installed astragals on the laboratory doors to which they committed in a letter from Dr. Catton to Mr. Norderhaug, Region V, NRC, which was dated January 18, 1979:
: 3. Exit Interview The inspectors met with licensee representatives (denoted in Para-graph 1) at the conclusion of the inspection on September 25, 1979.
The inspectors sumarized the scope and findings of the inspection.
: 4. MC 81405B - Security Plan No items of noncomplitnce were noted. The inspection results were                                                                        -
attained through:
: a. An onsite review of the physical security plan for the Nuclear Energy Laboratory at UCLA which was dated January 20, 1977 with four amendments.
: b. A walk-through tour observing the activities, operations and facilities of the laboratory which included the reactor and the reactor coolant system which were designated as essential equipment.
: c. Obscrvation and confirmation that the designated security areas within the laboratory as specified in their security plan were: the reactor room, also called the reactor high bay (Room 1000); the radioactive storage room (within Room 1540);
dnd the control room (Room 2001) during non-working hours at                                      .
the university.
    ,              ,.--,,--y  .      , , , - . , . _ _        ,    -  ,  , -- ,--- ,          , . - , - , - -      . . , , - . . - - , , - ,
 
The inspectors dip n N identify any measures which were different from those specified in their plan; the measures to which the licensee was committed were found to be adequate; there was no decrease in the effectiveness of their plan; and there were no additional findings which were considered a weakness in their security systems.
: 5. MC 814108 - Protection of SNM No iteas of noncompliance were noted. The N2L has in its possession approximately 8.3 kgs of SN?i 'in the form of 93% enriched U-235.
The SNM was settred in'accordance with their physical security plan in the following locations:
: a. There were approximately 3.6 kgs of CNM in the reactor core.
: b.      There were 4.6 kgs of non-irradicted ShM secured in the radio-active storage room.
: c. There were 0.7 kgs of irradiated SNM contained in the fuel storage pits in the reactor bay.
As indicated in the last security inspection report in 1978, the licensee has continued its coordination with the Deoartment of Energy to effect the transfer of 0.7 krs of irradia'.ed fuel, and          -
has kept NRR advised of these developments. Under the licensee's current plans, the irradiated fuel is scheduled to be transferred from the facility during December 1979.                                    -
: 6. MC 81415B - Security Organization No items of noncompliance were noted.            The inspectors determined that the licensee's security organization is as cescribed in their physical security plan. Through interviews and review of procedures, it was determined that the Director of the laboratory was responsible for the implementation and enforcement of the security plan with the security functions performed by the appointed Security Officer.
The security force for the laboratory is providad by the UCLA Police Department which was visited by the inspectors. The UCLA PD is composed of 57 sworn peace officers who operate on three shifts to provide coverage of the campus to include the Nuclear Energy Laboratory. These officers are individus11y armed with a minimum of a .38 caliber weapon and, when dispatched, they maintain comuni-cations with the police dispatcher and other officers with portable two-way radios or vehicle radios.          In their routine duties, the UCLA PD cm lucts daily, periodic, random patrols of the exterior of th facility. Response time from the UCLA PD to the laboratory is three to five minutes. The campus police have arrangements for assistance if needed with other local law enforcement agencies, e.g., Los Angeles Police Department (LAPD). The annualerequalifi-cation of the UCLA PD is scheduled to begin on or about October 1, 1979 and will include representatives of the LAPD. This annual re-qualification (or orientation) will be one to three hours in duration and cover radiation hazards, security alarms, tour of the physical -
layout, discussion of responses to alarms, etc.
 
    ,                                                                        3-
: 7.      MC 814208 - Access Control No items of noncompliance were noted. The results of the inspection were attained through;
: a.                        A review of the licensee's procedures used to control access to the Nuclear Energy Laboratory.
: b.                        ObservatiO3 of the iingress and egress of the staff, employees, students? and visitors to the facility during the period of the inspection.
: c.                        Observation that access controls have been implemented as described in the security plan to control personnel and vehicle' access to the essential equipment, security areas, and the facility, a nd these means are adequate.
: d.                          Interviews and review of precedures that visitors are identified, authorized for access, and escorted at the facility.
: e.                        A review of the visitor's register.
: f.                        Interviews of personnel and observation that individuals having access to the unirradiated SNM are visually searched upon departing from the SNM storage room, and the procedure is considered adequate.
: 8.      MC 81425B - Alam Systems No items of noncompliance were noted. The inspectors determined through interviews and observation that intrusion alarm devices (i.e., ultrasonic, magnetic door switches, and tamper) are installed, maintained, tested and operated in accordance with their physical security plan. The inspectors, in the company of the Security Officer and an alarm electrician, witnessed testing of several of these alarms.
Subsequently, during a visit to the UCLA campus police department during the inspection, the inspectors confirmed by observation and interview that the Nuclear Energy Laboratory alarm system terminates with an audio-visual display ir, a continuously manned disoatcher room of the police, and written proceaures are available for police response and actions upon receipt of an alarm.
: 9. MC 814308 - Keys, Locks and Combinations No items of noncompliance were identified. The procadures for keys, locks and combinations were reviewed and are in cofifonnance with the physica! security plan. The annual physical inventory of all keys was in the process of being accomplished at the time of the inspection, but had not beea completed. A random check of the locking hardware on the doors was accomplished and found to be
                                                                                                                                            ~
adequate.
                                                                                        - - , , - - - _ - -    --,.,--,n-. .,----- -  y,,.          -.
 
  .                                            4
    .~      .
: 10. MC 814358 - Comunications                                                                      l No items of noncompliance were identified. The Nuclear Energy                                l Laboratory utilizes the commercial telephone system for communi-cation on and off the cupus which is the primary means of contact with the campus police department. The UCLA police department operates its own radio network on a 24-hour basis with radio equipped automobiles and portable radios carried by the individual police officers %-      .
: 11. MC 814403 - Surveillance                                        -
No items of noncompli.?nce were identified. The inspectors determined that the surveillance of SNM, essential equipmeni . security areas, phyelcal barriers, and avenues of approach to security areas have                            1 been implemented as stated in their physical ser.urity plan.
: 12. MC 814453 - Procedures No items of noncompliance were identified. Through interviews and review of records, it was determined that Nuclear Energy Laboratory had procedures regarding unauthorized intrusions, security violatiens, bomb threats, and acts of civil disorder.
1
: 13. MC 814508 - Security Program Review                                                -
No items of noncompliance were identified. The last change, Amendment                        l No. 4 to the security plan was submitted to NRR by {{letter dated|date=November 30, 1978|text=letter dated November 30, 1978}}; however, it was determined through interview with the Security Officer that review of the plan is a continual process with notes maintained in the Security Log which was reviewed.
The licensee was presently in the process of evaluating their plan                          ,
in view of the upgrading of security requirements for non-power reactors per 10 CFR 73.47.
                                                                                                          ~
: 14. MC 81455 B - Protection Against Radiological Sabotage No items of noncompliance were identified. Protection against sabotage is of concern to the licensee and is primarily effected by the security consciousness of the laboratory personnel and ad-herence to established procedures and policies.
8
 
I
[5 Weev ,o                                                                            l3 g                              UNITED STATES                  ,
    !      .,    g                NvCLEAR REGULATORY CON, MISSION AEGION V o,          [                    1990 N. CAllFORNIA SOULEVARO
        ''s
        ,,,,e
[                      $UIT E 202, WALNUT CR E E K n'' AZA WALNUT CR EE K, CAllFORNI A Se594 Docket Nos.                        FE3 2 31980 50-142s Jniversity of California los Angeles, California 90024 l
Attention:    Dr. Harold V. Brown Environmental Health & Safety Officer Gentl enen:
 
==Subject:==
NRC Inspection This refers to the inspection conducted by Messrs. G. Hamada and A. Wieder of this office on February 11 and 12,1980 of activities authorized under NRC License Nos. SNM-974 and R-71. It also refers to the discussion of our inspection findings with members of your staff at the conclusion of the inspection.                                                                            i The areas examined during the inspection included your program for controll-ing and' accounting for special nuclear material pursuant to applicable pro-visions of Part 70, Title 10, Code of Federal Regulations, and specific re-quirements of NRC License Nos. SfM-974 and R-71. Within these areas, the inspection consisted of selective examinations of procedures and records,                  I interviews with campus personnel and observations by the inspectors.
No iters of noncompliance with NRC requirements were identified within the scope of this inspection.
In accordance with Section 2.790(d) of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, documentation of findings of your control and accounting procedures for safeguarding special nuclear materials are exempt from disclosure; therefore, the inspection report will not be placed in the Public Document Room and will receive limited distribution.
o n w cr r r/a mus
 
I University of California                                                                  IEB 2 31980 Should you have any ouestions                                        . . rning    is inspection, we will be glad to discuss them .th you.
Sincerely, i    fd        ;
s:
L. . Norderhaug      .
Safeguards Branc
 
==Enclosure:==
 
IE Inscection Report Nos.
70-223/80-01 & 50-142/80-01 (IE-V-359) cc w/ent:
Professor Ivan Catton Director, Nuclear Engineering Laboratory UCLA e
0 i
1 i
 
                                                                                        '; f '''
U.S. NUCLEAR REGULATORY COMMISSION CTFICE OF INSPECTION AND ENFORCEMENT Regicn v 70-223/80-01
    %: ort No.      50-ta2/80-01 (tE-V-369)
Oc c.:e t 'io. 70-223 & 50-142            License No. S?N.974 & 0-71    Safeguards Grcup  2 )
l Licensee:        University of Califor-ia, Los Acceles 1
Los Anceles_. California 90024                                                I Facility Nace:
Inscection at:
Inscection Conducted: February 11-12, 1980 Date of Last Material Centrol and Accounting inspection Visit: December 5-6, 1977
,  Tyoe of Inspection:        ' Pfterial Control and Accountino Inspe: tors:          _
G . f ma '
fa              M .<__            f[gsYM/
C    i t/Stati tici C/                      'Oate'Signec
                      ~      Il@~
(, Wieder, ' Auditor nn.x&                                A/d/n U                            ~0 ate'Signec Date Signec Eopreved :y:        .f        !          /< /      W                        %    92 L. R. Ncirdrndug, Cnief, Safeycs Brancn                      Date Sign (c Inspection Suc,ary:
Areas insoected: The licensee was inspected for compliance with applicable sections of the regulations. The inspection involved 18 insp3ctor-hours onsite by two NRC inspectors.
Results: No' items of noncompliance were identified ia the areas inspected.
                                      ,          .C Nfl& $f)
 
1 l
l 2 9.$('.' . fN REPORT DETAILS
                                                                    ~
                                                                                  - "C'"
                                                              ..... C . y .
: 1. Persens Contacted
        *C,  E. Ashbaugh,111, Physical Security Officer                                  J
        *0r.1. Ca tton, Director, N.E.L .
        *J. Evraets, Radiological Safety Officer                                        <
        'J. Hornor, Health Physicist                                                    l
        **i. Ostrander, Manager, N.E.L.                                                  )
        *0r. W. Wegst Director, Office of Research & Occucational Safety                <
A. Zane, Deactor Supervisor
        'Cenotes attendance at the exit interview.
: 2. Li.ersee Action on Previous Inspection Findinos                                  l There were no itees of noncompliance noted on the previous inspection.
(Recort 77-02,77-03)
: 3. Exit Interview The inspectors met with licensee representatives (denoted in Paragraph
: 1) at the conclusion of the inspection on February 12, 1980. The inspect-ors summarized the scope and findings of the inspection. Several items of interest were brought to the attention of the licensee.        It was pointed out that it would be desirable to have a more detailed written prdcedure for taking a physical inventery of all special nuclear na-terial (SMi) possessed by the licensee. With respect to the spent fuel bundles that are expected to be shipoed for reprocessing, it was suggested that the licensee formally request the recrocessor to obtain and sub-mit to the licensee a listing of the plate serial numbers comprising            l each bundle. This would help to resolve a longstanding uncertainty              I concerning the identity of fuel plates associated with fuel bundles.
While the total number of plates have been accounted for, the exact location of a given plate has remained unclear for 5 fuel buncles ever since a mixup occurred some 5-6 years ago.
4    Storace and Internal Control Records maintained for in-reactor and storage were reviewed.
No items of nonccmpliance were identified.
: 5. Inventory An inventory of stored fresh fuel bundles, by serial number, and scrao, by weight, was conducted. Spent fuel elements were identified by piece count at specific locations in the storage pits. The core content was
 
i                                    . ..
l l                                                                                                                                                                        !
l l
accepted on the basis of a fuel bundle location chart. Plutonium-                          '
Berylium sources were identit ted by serial number. Except for a small amount of buraup, the total 5:01 inventory has not changed since the                        ,
I last inspection.
The crulative burnup to January 1,1980 is approxinately 21.4 gms.                          i U-235. A conservative estimate of Pu-239 p: eduction to January 1,                        l 1980 is 0.013 g s, a non eportable cuantity.                                            j No items of ccnc0mpliance were identified.                                              J
: 6.                                Records and Recorts The licensee's special nuclear material accounting records, recorts and other documentation applicable to the period Cecember,1977 through February 11, 1960 were reviewed for compliance with the records and reports requirements of the regulations.
No items of noncompliance were identified.
l l
1 0
4 4
 
                                                                                        /$
[m          o g                              UNITED STATES NUCLEAR REGULATORY COMMISSION 3  .j ,~
i    /
            ,.(3    g c                              REGION V                                                                      l 0,            .f                      1450 MARI A LANE, sulTE 21o g . .v...
[/                      WALNUT CRE E K, CAltFORNI A 94596 jul 2 01983 1
1 Docket Nos. 701223 50-142                                              ,                                                j l
University of' California at Los Angeles 405 Hilgard Avenue                                                                                                    I Los Angeles, California 90024 Attention:      Dr. Russell O'Neil                                                                                    l Dean, School of Engineering                                                                            l Gentlemen:                                                                                                            )
 
==Subject:==
NRC Inspection Report Hodific: tion                                                                          l This refers to a modification of an inspe: tion report that was issued July 8,                                        l 1983 from this office. This inspection was conducted by Mr. Gilbert B. Nelson                                        I of this office on June 28, 1983, of activities authorized under NRC Licenst Nos. SNM-974 and R-71.      The modification is enclosed.
Should you have any questions concerning this modification, we would be glad                                          j to discuss them with you.                                                                                            l Sinetrely, I
(    /  >>
G' W 2
I s                                        oy R. Norderhaug, Chief                                        l Safeguards and Emergency Preparedness Branch
 
==Enclosure:==
 
Modification of Inspection Report Nos. 50-142/83-02 70-223/83-01 (IE-V-577) cc w/ enclosure:
Professor Ivan Catton Director, Nuclear Energy Laboratory
* UCLA Hs. Colleen P. Woodhead, ELD' Mr. Edward S. Christenbury, ELD 1
e D
pg s    np I.iit  a f//A M
 
2 Table I sumoarizes the physical inventory at UCLA TABLE I FSNM Physical Inventory UCLA as of June 28, 1980 License                                                              U-235 a                                                            y P
R-71 4921.13                                                            32 SNM-974                                                                    0                                                          32 1335-70                                                                  0                                                          32 Applying the exemption embodied in 10 CFR 873.67(b)(1)(ii), the 4921.13 g U-235 in NEL is an amount defined to be "special nuclear material of moderate strategic significance", under 10 CFR $ 73.2(x)(1).
e 1
* e t
y _
          ,, ___,7  _ _ . _ . - , . . . _ _ _ . _ . - _      , _ . _ _.  , , - ,    . . _ _ . , , . - . _ _ ,_..__.__...,_-i_..._.,-__, . ., , ,.          _ ,
 
I
          #o* *ecw''o, UNITED STATES
  ,    !~      ,.
f(                  NUCLEAR REGULATORY COMMISSION
        * .                                                  REGION V ot,h.          .f                          1450 M ARI A L ANE. sVITE 210
              ,e s....
f                        WALNUT CREEK CALIFORNIA S4596 IJUL 3          1933 Docket Nos.        70-223 50 ,142 University of California at Los Angeles 405 Hilgard Avenue Los Angeles, California 90024 Attention: Dr. Russell O'Neil Dean, School of Engineering Gentlemen:
 
==Subject:==
NRC Inspection This refers to the inspection conducted by Mr. G. B. Nelson of this office on June 28, 1983, of activities authorized under NRC License Nos. SNM-974 and ~
R-71. It also refers to the discussion of his inspection findings with members of your staff at the conclusion of the icspection.                              ,
The areas examined during the inspection included your program for controll-ing and accounting for special nuclear material pursuant to applicable provisions of Part 70, Title 10, Code of Federal Regulations, and specific requirements of NRC License Nos. SNM-974 and R-71.              Within these areas, the inspection consisted of the taking a physical inventory of SSNM at UCLA and observations by the inspector.
1 No items of noncompliance with NRC requirements were identified within the                i scope of this inspection.                                                                )
1 In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure              l will be placed in the NRC Public Document Room unless you notify this office, by telephone, within ten days of the date of this letter and submit written application to withhold information contained therein within thirty days of the date of this letter. Such application must be consistent with the requirements of 2.790(b)(1).
M O  '") '
                                                  ^
    /
 
University of California at Los Angeles                                      JUL 8  8 83 Should you have any questions concerning this inspection, we will be glad to discuss them with you.
Sincere s-  _!,>          -
L. R. Norderhaug, Chief Safeguards and Emergency Preparedness Branch
 
==Enclosure:==
 
Inspection Report Nos. 50-142/83-02 70-223/83-01 (IE-V-577) cc w/ enclosure:
Professor Ivan Catton Director, Nuclear Engineering Laboratory UCLA Ms. Colleen P. Woodhead, ELD Mr. Edward S. Christenbury, ELD                                                                          _
O I
 
t U. S. NUCLEAR REGULATORY COMMISSION                          l 0FFICE OF INSPECTION AND EhTORCEMENT                          '
l REGION V                                      l l
Report Nos.      50-142/83-02 (IE-V-577) 70-223/83-01 (IE-V-577)
Docket Nos.      50-142          License Nos. R-71                                ,
70-223                          Sht-974  Safeguards Group II      l Licensee:        University of California at Los Angeles
                        '405 Hilgard Avenue Los Angeles, California 90024 Facility Name:        Nuclear Energy Laboratory Inspection at:        UCLA Inspection Conducted:              June 28, 1983                                      ]
Da*.e of Last Material Control and Accounting Inspection: February 11-12, 1980 Type of Inspection:          Special Inspectors:                                                              ~ [~b
                        /G. B. Selson, Cb mist                                Date Signed Approved By:                                    e f      -
Date Signed
                                                              ~
LeRo) R.FNdrderbatig, Chief Safeguards and Emergency Preparedness Branch Inspection Sung ary:
Areas Inspected: Special inspection to physically inventory SSht at UCLA.
The inspection involved five inspector-hours onsite by one h7C inspector.
Results: No items of noncompliance were identified.
d t
h k/!7e / I"D                _z  1 9 sp i cruf w o                  3-
 
    =
  .                                                                                                        l l
l l
REPORT DETAILS
: 1. Persons Contacted
          *Dr. I . Catton, Director , KEL
          *C. E. Ashbaugh, Security Officer
          *J. E. McLaughlin, Radiation Safety Officer
          *A. Zane, Re. actor Supervisor N. Ostrander, Manager, NEL
          *J. J. Orr, Reactor Health Physicist
* Denotes those attending exit interview.                                                        l
: 2. Licensee etion on Previous Inspection Findings I
Not applicable.
1
: 3. Exit Interview The results of the inspection were presented to licensee personnel.
: 4. MC-85102B Material Control and Accourting (Reactor)                                            )
l Conducted a special inspection to physically inventory the SSNM at the ~                        !
Nuclear Energy Laboratory (NEL) and other locations of the University of                        !
California, Los Angeles.
The fresh fuel in the storage vault was physically inventoried by piece                        )
count of the nine assemblies and verification of serial number                                  )
identifications and location to records. The total weight of U-235 in                          )
this stratum is 1389.96 grams using the fuel fabricator's data.
1 The Argonaut Reactor core inventory was accepted by reference to source                        j documents. Core loading records indicate that the reactor contains                            !
3531.17 g of U-235. Total U-235 in NEL is 4921.13 grams, under License                      '
R-71.
I There is a Pu-Be neutron source in NEL that nominally contains 32g of Pu.                      1 This item was inventoried by serial number identification and detection of a neutron flux by a neutron source counter. The serial number is M-730. This source is used with suberitical assemblies for instructional purposes, and is possessed under License R-71.
The second Pu-Be neutron source is stored in the Cs-137 calibration source building. The source was inventoried by serial number verification, M-908, and detection of a neutron flux.      It is nominally contains 32g Pu and is possessed under SNM-974 license.
The third Pu-Be neutron source possessed under state licensee, 1335-70 is stored in the Van de Graaf f generator cage in Knudsen Hall under the custody of the Department of Physics. This item was inventoried by                            I tierial number verification and neutron flux detection. The serial number                    ;
is M-395, and contains a nominal 32g of Pu.                                                  j i
l l
0
 
2 Table I summarizes the physical inventory at UCLA.
l TABLE I                                    l l
SSNM Physical Inventory UCLA as of June 28, 1980 i
License                                            U-235 a              Pu_3 R-71                                                4921.13              32 SNM-974                                                0                32 1335-70                                                0                32 CA State Utilizing the formula in 10 CTR 73.60, the amount of GSNM is calculated to be (4921.13 g U-255) + 2.5(32 : Pu) = 5001.13 a for NEL. If the radioactive decay corrections for the plutonium isotopes (1) present in the Pu-Be neutron source are applied the total is 5000.57 g of SSNM. The                            ,
remaining Pu-Be sources, possessed undet licenses SNM-974 and CA State 1335-70, are stored at noncontiguous sites with respect to NEL and each other, and are therefore exempt under 10 CTR $ 73.67(b)(1)(ii).
I (1) Letter to R. Reyes, UCLA August 3,1982, from M. E. Anderson Monsanto, Mcund Facility tabulating isotopic populations on 1-1-60.                                l 1
A t
                        - - - - ,    _ . - . . - . . . . . . . . . _        . . . _ ,        ,  . - , - - - - .}}

Latest revision as of 12:03, 9 December 2021

Discusses Special,Unannounced,Physical Security Insp on 760729 & 30.Security Plan for Facility in Process of Being Revised to Incorporate All Previously Approved Changes & New Mods
ML20195E643
Person / Time
Site: 05000142
Issue date: 08/20/1976
From: Catton I
CALIFORNIA, UNIV. OF, LOS ANGELES, CA
To: Rizzolo V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20195E559 List:
References
FOIA-85-196 NUDOCS 8806240099
Download: ML20195E643 (2)


Text

l

~

F C.VLIli11 'NCFlI s UNIVE'lis18

. m n . n . , ,, . i .u s . o - . si. . u. .

~ ... ..s m ,, me,o 4~6%a..m ..

. . c,a a ~ coe es S.FS. M, . /M scwoot or EhCINEEMMC AC APPUED SCIENC'E tos eCEtr.s. cAUFOR'4A 90034

'~

Cee. .d.. d CO WS August 20, 1976 f

_ ee;es get.. en ts N::: TO P MF to:.,: a s 5 m't SM '" n:e oo m;; g y, y r3VM Of 'I Y lt. c.9 ,0 n : ) gi .. g g u n .'n es:sv ,

Docket No. 50-142 j.

V. h. Ri::olo, Chief [J Safeguards Branch v ,.

U. S. Nuclear Regulatory Coc=ission \t ..., 7 Region S '\

Suite 202, Walnut Creek Pla:a 1990 N. California Blvd. NQ)'

Walnut Creek, Calif. 94S96

Dear Mr. Rizzolo:

Oue to the sensitive nature of the contents of this letter, we request that this document be withheld from public disclosure pursuant to Section 2.790 of 10 CFR Part 2.

This letter concerns the special, unannounced, physical security inspection of the UCLA Training Reactor Facility by Ftr, it. D. Scht. ster, Region 5 on July 29 and 30,1976.

The Security Plan for this '. City is in the process of being revised to Includeo in incorporate all previously appi .d changes and new modifications.

l these new modifications will be ways to reduce weaknesses and vulnerabilisier found during the inspection. The Security Plan will be submitted by September 30, 1976. 1 During a key inventory taken August 8,1975, it was determined by the Labor ~

atory Security Officer that one C-level key was lost and one B-level key was duplicated.

Contrary to our Security Plan, the lost C-level key is not regarded as a security-related key in the sense of 10 CFR 73. This will be reflected as a modification in the new Security Plan.

Tne duplicated key, a B-level type, was duplicated by the UCLA Pelice Dep artmen't . We are in agreement with them in the need to have keys a sailable in each patrol car to expediate their arrival at the Nuc.' ear Energy Laboratory in case of emergency. On August 16, 1976, the Police Department was verbally informed of the violation and anotner key inventory was s.ade by the Laboratory Security Officer. At that time, six more duplicated keys were found and were hence marked by the Laboratory Security Officer. As a result, the Police Departnent assured the Laboratory Security Officer that no mort duplicated keys will be necessary and if a need arises for more duplication, they wi;l do it only witn prior approval from the Director of the Nuclear Energy Laborator7

""W'MMIMum UOEE$$m ,

i The steps, wnich have been or will oe taken to correct the violation, tne results achieved and steps which will be taken to avoid furtner violations, aave oeen stated. T he date when full compliance will oe achieved is September i 50, 197o.

Si

/

er ,

c Y' /?

L Ah.Jn Ivan Catton, Director Nuclear Energy Laboratory IC/CEA/v1 cc: R.R. O'Neill, Dean, School of Engineering and Applied Science R. A. hestr. ann, Associate Dean, School of Engineering and Applied Science H.V. Brown, Car. pus Safety Officer, UCLA C.E. Ashbaugh, Laboratory Security Officer, Nuclear Energy Laboratory l

1 l

l l

~

} f.-.----___- _-

~

. t UNITED STATES . e

@* " 4 ,k NUCLEAR REGULATORY COMMisslON 4d '

f REGION V 0 , SWITE 292. W ALNUT C R E EK PLAZA 199 0 N. C ALIFO R NI A S OULEV A R O 8o,e e W ALNUT C AttK. C ALIPORNI A 94596 0CT 191977 Docket No. 50-142 The Regents of;the'Univeis'ity of California School of Engineering

'Los Angeles, California 90024 Attention: Russel O'Neil. Dean of Engineering Gentlemen:

Subject:

NRC Inspection of Nuclear Energy Laboratory This letter refers to the inspection of your activities authorized under NRC License No. R-71 conducted by Messrs. W. P. Mortensen and R. Blackman or. September 21-22, 1977. It also refers to the discussion of our in- ,

spection findings held by the inspectors with Mr. I. Catton and members '

of his staff on September 22, 1977. I i The inspection included examination of activities related to physical I protection against industrial sabotage and against theft of special nuclear material in accordance with applicable requirements of Title 10, i Code of Federal Regulations, Part 73, "Physical Protection of Plants and Materials," your Security Plan, and license conditions pertaining to physical protection as described in the enclosed inspection report.

Within these areas, the inspection consisted of selective examinations of procedures and records, interviews with facility personnel and ob-3ervations by the inspectors.

Based on the results of this inspection, it appears that certain of your activities were not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A. '

The items of noncompliance are categorized into the level as described in our correspondence to you duted December 31, 1974.

This notice is sent to you pursuant to the provisions of Section 2.201, of the NRC's "Rules of Practice," Part 2. Title 10 Code of Federal Regulations. Section 2.201 requires you to submit to this $ fice.

t i _u <v / '

-f6 )'Hd,W76 9

(c2yd.

f f/4 S 1

~

m CCT 191977 The Regents of tne University of California within twenty (20) days of your receipt of this notice, a written statement or explanation in reply including (1) corrective steps which have been taken by you and the results achieved; (2) corrective steps which will be taken to avoid furtner violations; and (3) the date when full compliance will be aghieved.

During this -inspection it was also found that onc of your activities appeared to devia'te from the generally accepted practices in the industry as set forth in the Notice of Deviation, enclosed herewith as Appendix B.

In your reply please include your coments concerning this item, a description of any steps that have been or will be taken to prevent recurrence, and the date all corrective actions or preventive measures were or will be completed.

In accordance with Section 2.790(d) of the NRC's "Rules of Practice," .

Part 2. Title 10, Code of Federal Regulations, documentation of findings  !

of your control and accounting procedures for safeguarding special nuclear materials and your facility security procedures are exempt from disclnsure; therefore, Appendices A and B to this letter, the inspection report, and your response to the items listed in the appendices will not be placed in the Public Document Room and will receive limited distribution.

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely.

/ i n"C'>

LeRo . Norderhaug, Actt1Eg Chief Safeguards Branch

Enclosures:

l. Appendix A - Notice of Violation
2. Appendix B - Notice of Deviation
3. Inspection Report No. 50-142/77,-02 A

t se i - -i si

_ , _ _ _ _ , _ _ - . - - . - - , - - - - - - - - ~ - ' * ' " ' - ~ ' ' ' ' ' ' ' ~ ~ " ~

APPENDIX B University of California at Los Angeles l i

School of Engineering Los Angeles, California 90024 Docket 50-142 License No. R-71 l M NOTICE OF DEVIATION Based on the results of an NRC inspection conducted during the period September 21-22, 1977, it appears that one of your activities deviated from generally accepted practices in the industry as indicated in the  ;

following notice.  !

1. Regulatory Guide 5.12 states in part "Xey locks...on doors or gates I to material access areas in protected and vital area perimeters and for access to vital equipment should provide a high degree of re-sistance to opening by force or tamper techniques. " )

1 U.S.N.R.C. Office of Inspection and Enforcement Circular 77-04 l states in part "Door locks must be of substantial construction tha' 1 their neutralization or circumvention by common burglary techniques '

is precluded." ~

)

Contrary to the above, the inspector demonstrated on September 21, 1977 to the licensee that a reactor high bay door, could be opened using a shove knife technicue. The door thereby weakened the security provided by the substantial barrier wall.

l l

5 FS. Y. SE.

Copy of ' copies 1

_l _ po2'S W ,

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION V Report No. 50-142/77-02 License No. R-71 Safeguards Group 11 Docket No. 50-142 Licensee: The Regents of the. University of California School of Engineering Los Angeles, California 90024 ,

Facility Name: Nuclear Engergy Laboratory  :

Inspection at: University of California at Los Angeles l

inspection conducted: September 21-22, 1977 Inspectors: L ag m ,~, .,t /d/M/77 W. P. Mortensen, Pffysical Protection Inspector 0' ate' 51sned 1

Date signed ,

l Date Signea Approved by:L.p h. ~te - u a /d / /4 [77 AortgrnMS- Acting wet , dateguards tiranch Date Signed Sumary:

Unannounced Inspection on September 21-22, 1977 (Report No. 50-142/77-02 '

Areas inspected: Followup on previously identified items of noncompliance, essential equipment, security areas, security systems, organization, i access control, surveillance and procedures. The inspection was started I during regular working hours and involved 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> onsite by one MC inspector. The inspector was accompanied by a representative of The Office of Inspection and Enforcement. Headquarters, U.S.N.R.C., who conducted a program review.

Results: Of the eight areas inspected, two items of noncompliance were identified in two areas. The areas of noncompliance were security system's ', para. 5) and surveillance (para. 8). One deviation was identified in paragraph 5. s-F5. S *l 2 C 'l copy E el ceptes db pages 219 (2)

.d J u d d d , W W T

. - QTfjlf

)

i DETAILS

1. Persons Contacted 1
  • 0r. Ivan Catton, Director, Nuclear Energy Laboratory Dr. Neil C. Ostrander, Manager, Nuclear Er.ergy Laboratory
  • Mr. "Chuck" Ashbaugh, Security Officer, Nsclear Energy Laboratory l Lt. Jim Kuhen, UCLA Police Department Mr. Bud Ennis, Supervising Locksmith UCLA Mr. Phil Arnold, Electrician, UCLA

..e

' denotes those attending exit interview

2. Licensee Action on Previous Inspection Findings (closed) Noncompliance (142/76-01): Failure to take corrective action when keys to security locks were lost and duplicated without I authorization. The inspector found that written procedures now I exist and approved key control practices are being followed to insure key system integrity.
3. Essential Equipment l The licensee has designated the reactor controls, the reactor and the cooling system as essential equipment.

No items of noncompliance or deviations were identified. -

4. Security Areas The inspector examined the security barriers as they existed September 21, 1977 and found them to be as described in the licensee's security plan dated January 20, 1977 rs revised May 13, 1977 and August 24, 1977.

No items of noncompliance or deviations were identified.

5. Security Systems A. The inspector tested the dead locking feature of the Russwin Mortise latenes installed on doors providing access to and within the Nuclear Energy Laboratory. In several of the locks it was noted the dead locking feature failed to operate. The inspector der.enstrated to licensee staff that the door from classroom 20 into the reactor high bay, keyed to operate from ""' lev. key, could be opened using a small screwdriver as a shove knife.

h O 9 h

<,~~-------,-m - - + - - , , , _ , . - . , , - * - - , - . - -- , ,- - - - - - - - p

, 2-1 Regulatory Guide 5.12 and The Office of Inspection and Enforcement Circular 77-04 indicate the accepted industrial practice of maintaining locking devices so that their circum-vention by common burglary techniques is precluded.

These findings represent a deviation.

B. The licensee has installed a Kidde Model KD 3 Ultrasonic Intrusion Alam. Through interview of the licensee's employees and direct observation, the inspector determined that the telephone"lines transmitting signals from the alarm system in the Nuclear Energy Laboratory to the UCLA Police Departinent passed through regular telephone junction boxes and frames.

In the junction boxes and frames, the alarm lines are identified by red rubber caps on the termi als. The inspector also observed that junction boxes through which the alam system lines traveled were not equipped with tamper indicating devices. j Neither line supervision nor "fail-safe" alam circuitry is incorporated to detect tampering or a break in the line.

The licensee's approved security plan states "The alam system registers a security violation. A signal is sent along an isolated tamper proof telephone line to the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> manned i Huneywell Alam Receiver WS40 B.D. located at the UCLA Police i Station." 1

\

These findings represent an item of noncompliance.

6. Organization The inspector reviewed the licensee's security organization and the relationship with local law enforcement authorities on September 22, 1977, and found it to be as described in the security plan.

l No items of noncompliance or deviations were identified.

7. Access Control The inspector examined key control procedures and personnel access to the security areas.

No items of noncompliance or deviations were identified.

F. Surveillance The licensee's approved security plan (part II, paragraph C2) 5tates "That during non-working hours, the lock and key system and the alam system provide the surveillance of security areas."

Part I paragraph B of the security plan states "Security Areas

3, require A level access or higher. These areas, the reactor room (1000) and the radio active storage room (within room 1540), are identified in figures 6 through 8."

The inspector tested the licensee's alarm system by having the licensee place the alarm system in a secure modo and establishing direct radio comunication with the UCLA police Alarm Station. The police alarm station was instructed to report incoming alarms for this test imediately. The inspector then entered the reactor high bay (room 1000), a security area. The inspector walked continuously within the' reactor room both upstairs and downstairs around the reactor without detection by the intrusion detector system. After approximately nine minutes while the inspector was touching the alarm control panel within the security area, the system indicated an alarm. Through interview of licensee staff, the inspector determined the alarm sensitivity had been decreased because of false alarms caused by wind drafts. The licensee increased the sensitivity of the alarm system and it was retested in the same manner by the inspector. With the increased sensitivity, the alarm system indicated intrusion by the inspector on the third step within the security area.,

These findings represent an item of noncompliance.

9. Procedures The inspector reviewed the licensee's procedures for response to detected unauthorized intrusions, security violations by authorized personnel, bomb threats, acts of civil disorder, security program review and key control.

No items c' noncompliance or deviations were identified.

10. Exit Interview The insper. tor met with licensee representatives (denoted in para- .

graph 1) at the conclusion of the inspection on September 22, 1977.

The inspector sumerized the scope and findings of the inspection.

The licensee representatives made the following remarks in response to certain of the items discussed by the inspector:

Stated the discription of the alarm system transmission wires had been given to them by their installation personnel and they would check into it. (paragraph 5)

Acknowledged the problems with the dead latching feature of their locks and stating their locksmiths have bcen instructed to alleviate the problem. (paragraph 5) ,

o Stated they would adjust the alarm system to a performance standard and inform NRC of that standard, and/or procehres to assure a constant effective level of sensitivity in the security intrusion alarm system. (paragraph ,

ee e

Vb

  • a p g M . .w M 4 UNITED STATES  !
  • Ig NUCLE AR REGULATORY COMMisslON ,

g .]

3'bI g REGION V O

~ " $UtTE 802. W ALNUT C MEEK PL A Z A

'4, 'U

  • ese*

[ 1990 N. C ALIF OR NI A 00VLEV A a 0 W ALNUT C REEK. C ALIFOR NI A 94l96 I

DEC t 81977 l Occket Nos.70-223

, 50-142 University of California Los Angeles, California 90024 Attention: Dr. Harold V. Brown Environmental Health and Safety Officer

i. l Gentlemen: l

Subject:

NRC Inspection This refers to the inspection conducted by Messrs. G. Hamada and A. Wieder of this office on December 5 and 6,1977 of activities authorized under NRC License Nos. SNM-974 ano R-71. It also refers to the discussion of our inspection findings with members of your staff at tne conclusion I of the inspection. -

The areas examined during the inspection inel ad your program for con-trolling and accounting for special nuclear c verial pursuant to appli-cable provisions of Part 70, Title 10, Code o 'ederal Regulations, and specific requirements of NRC License Nos. SNM-W4 and R-71. Within (

these areas, the inspection consisted of selective examinations of pro- l cedures and records, interviews with campus personnel and observations  ;

by the inspectors.

l No items of noncompliance with NRC requirements were identified within the scope of this inspection.

In accordance with Section 2.790(d) of the NP.C's "Rules of Practice,"

Part 2 Title 10, Code of Federal Regulations, documentation of findings of your control and accounting procedures for safeguarding special nuclear materials are exempt from disclosure, therefore, tne inspection report will not be placed in the Public Document Room and will receive limited distribution. .

s 9

iJco- d.,

~99 v h)W/ V/'f T ' ,

4

l- ,

' DEc4e197:

University of California 2-Should you have any questions concerning this inspection, we will be glad to discuss them with you.

Sincerely. l 2

L. . Ndrde aug iaf Safeguards Branen -

N

Enclosure:

IE Inspection Report Nos.

70-223/77-02 and 50-142/77-03 g (IE-Y-208) cc: Professor Ivan Catton Director, tRelear Engineering Laboratory, UCLA e

e i -

, 1

l 1

l U. S. NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT l REGION Y l

70-223/77-02 Report No. 50-142/77-03 (IE-V-208)70-223 SNM-974 Docket No. 50-142 License No. R-71 Safeguards Group 2 Licensee: University of California, Los onceles Los Angeles. California 90024 Facility Name:

L Inspection at: ,

Inspection conducted: December 5 - 6, 1977 V ' ' ' ' * . "' 'u /11 N/

Inspectors: 't- _

u. Mamaca , Lnemi st/:. tat 15:1 clan Date Signec

. /lko -

/?-fzJ b 7 IA. Wieder, 5afeguaros Auditor pateSignoc Approved by: - / .2.v .e / l2.,h3 / 7 7 Date Signec l

4. R.f o'rdeYhauGr, N

edWuards Branch

~

Sirmary:

i Inspection on December 5-6, 1977 (Report No. 70-223/77-02 and

. 50-142/ 77-03 (IE-V-208))

Areas Inspected: The licensee was inspected for compliance with applicable sections of the regulations which cover material control and accounting requirements. These included Facility Organization and Operation, Measurement and Controls, Storage and Internal Control, Inventory, and Records and Reports. The inspection involved 16 inspector-hours onsite by two NRC inspectors.

Resul ts : -

of the areas Noinspected.

items of noncompliance or deviation F5 'I'Iwere

.. }51dentified in any Copy 5 of N copies d . pages b NY )~

OETAILS

1. Persons Contacted
  • J. Evraets, Radiological Safety Officer, EHS

'J. Hornor, Health Physicist C. E. Ashbaugn, III, Physical Security Officer A. Zane, Reactor Supervisor

  • Denotes attendance at the exit interview.
2. Facility Organization and Operation The facility was inspected for general compliance with facility organization criteria addressed in the approved license application I statement. The inspection also included a review of authorized possession limits and autnorized uses of Sptcial Nuclear Material.

No items of noncompliance were identified. .

3. Measurement and Controls The inspection consisted of a review of nuclear material depletion and production data and the reporting of these data in the Material Status Reports.

No items of noncompliance were identified.

4. Storage and Internal Control Inventory records maintained for in-reactor and storage were reviewed.

No items of noncompliance were identified.

, 5. Inventory An inventory of stored fresh fuel plates and scrap by serial number and weight was conducted. Spent fuel elements were piece counted

- and the core centent was accepted on the basis of a fuel bundle location chart. Plutonium-Berylium sources were identified by

. serial number.

No items of noncompliance were identified.

A.

r

~

. . 2-l l

6. Records and Reports l The licensee's nuclear material control and accounting records, reports and other documentation applicable to the period May 21, 1975 througn Septem:er 30, 1977 were reviewed for compliance witn the records and reports requirements of the regulations 4 No items of noncompliance were identified.
7. Exit Interview The inspection findings were discussed with representatives of the facility management.

L.

I e O

e h

- - , - , . , . ------,..--.,__,---,c ,an. , _ ~- , . . ,_. , , _ . . , - ~ , . , , - . - _ , , - -

'~

... * -v s g pa e t C p, I l ,.7 I'g NUCLEAR REGULATORY COMMisslCN "[

j. j REGION V

~

O, e. SUIT E 2 02, W ALNUT C R EE K PL A 2 A U

g *

,o 19 90 N. C ALIF O R NI A sOuttVARD {g

  • ,,e* W ALNUT C RE EK C ALIFORNI A 94$94 DEC 181978 Docket No. 50-142 y o g == ,

The Regents of the University of California School of Engineering Los Angeles, California 90024 Attention: Russell O'Neil Dean of Engineering Gentl emen: , ,, .

This under letter refersNo.

NRC License to R-71 the inspection conducted byof your. gf' Mg$.* 'Mortensen ities authorizedof this

, office on October 30-31, 1978. It also rtfers to the discussion of our inspection findings held by..the' inspector with Mr. N. Ostrander '

and members of his staff on October 31, 1978.

The inspection included examination of activities related to physical protection against industrial sabotage and against theft of special nuclear material in accordance with applicable requirements of Title 10 Code of Federal Regulations, Part 73, "Physical Protection of Plants and Materials," your Security Plan, and license conditions pertaining to physical protection as described in the enclosed inspection report.

Within these areas, the inspection censisted of selective examinations of procedures and records, interviews with facility personnel and -

observations by the inspector.

Within the scope of this inspection, no items of noncompliance were identified.

During this inspection it was found that certain of your activities appeared to deviate from your internal security procedures, and/or cormliteents you made to this office in your letter dated December 21, 1977, as. set forth in the Notice of Deviation, enclosed herewith as Appendix A. Please reply within twenty (20) days of your receipt of g

. h$/(f '

M OO

University of California -2 , DEC 18197B  ;

this notice and coment concerning these items. Include a description ,

of any steps that have been or will be taken to prevent recurrence, and the date all corrective actions or preventive measures were or will be completed.

In accordance Eith Section 2.790(d) of the NRC's "Rules of Practice," '

Part 2, Title 10, Code.of Federal Regulations, documentation of find-ings of your contr'el and accounting procedures for safeguarding special i nuclear materials are exempt from disclosure; therefore, the enclosure to this letter, the inspection report, and your response to the items listed in the enclosure to this letter will not be placed in the Public Document Room and will receive limited distribution.

Should you have any questions concerning this letter, we will be glad to discuss them with you.

l Sincerely, l 1

// -

3jD

/  :

L. o, erhau , l Safeguards Branc -

Enclosures:

1. Appendix A - Notice of Deviation
2. IE Inspection Report No.

50-142/78-03(IE-V-264)' .

e e

t

'

  • O-e 9 e e-ume gese e S ,

- . - - - - , , --- +-,,------ -

l APPENDIX A '

The Regents of the University of California School of Engineering Los Angeles, California Docket No. 50-142 .

License No. R-71 Notice of Deviation Based on the results of the NRC inspection conducted on October 30-31, 1978, it appears that certain of your activities appeared to deviate from your internal security procedures or ycur comitment contained in your letter to Region V, USNRC, dated December 21, 1977, as indicated below.

1. The licensee stated in their letter to Region V, USNRC, dated December 21, 1977, Paragraph A.2, "An alam sensitivity pro-cedure is currently being formulated and will go into effect .

prior to January 20, 1978." .

The inspector detemined through interview of licensee personnel on October 31, 1978, that the licensee has no+ yet prepared or imple ented an alarm sensitivity procedure. -

2. The licensee stated in their letter to Region V, USNRC, dated December 21,1977, Pat graph B.1, "In addition, to ensure that all doors / latching mechanisms are in proper work-ing order in the future, a monthly check on all doors will be made by the NEL Security Officer with any discrepancies taken care of imediately."

Contrary to the above, the inspector detemined through testing of the doors to the reactor high bay security area that the dead -

locking feature on two doors failed to operate. The inspector reviewed records in the NEL showing that the maintenance on the malfunctiening locks had been requested in February, May and July 1978. At the time of the' inspection, the locks had not yet been repaired. -

s.rs.7f. DM

. Copy [ of I O _ me, I pages g a a I L _

f YI I Y NI

'u v c7 V

d. l l

U. S. flVCLEAR REGULA ORY COMMISSION 0FFICE OF !!iSPECTION Ali0 E'iFORCEMEllT l REGION,V Report No. 50-142/78-03 (IE-V-264) l l

Docket flo. 50-142 License No. R-71 Safeguards Group 2.< l

. 1 Licensee: University of California at Los Angeles ,

Los Angeles, California Facility Name: UCLA Research Reactor Inspection at: UCLA Campus (Argonaut - 100KW)

Inspection Conducted: October. 30-11,1J78 Inspectors: 'wo x ' A //

/

W. P. Fortensen, physicai Protection Inspector Date Signed j Date Signed Approved By: /it t- f. cc t ,v m ,) k/ *if [7 [

Date Signed "L. hl tdtdkthauhChiftAfFas Branch Sumary:

~

Inspection on October 30-31,1978 (Report No. 50-142/78-03) 1 Areas Insoected: Routine, unannounced inspection.'of licensee action on previous inspection findings; licensee's approved security plan; protection I of StN; security organization; access control; alarm systems; keys, locks and combinations; comunciations system; surveillance; procedures; security program review; and protection against radiological sabotage.- The inspection involved 12 inspector-hours onsite by one inspector.

Results: Of the 11 areas inspected, no items of noncompliance or deviations were identified in 9 areas; two deviations were identified in two areas (Paragraphs 6 and 7).

t IE:V Fom 219 (1)

DETAILS' i

1. persons Centacted ,

Dr. Ivan Catton, Director, Nuclear Energy Laboratory

  • Dr. Neil C. Ostrander, Manager, Nuclear Energy Laboratory
  • Mr "Chuck" Ashbaugh, Security Officer, Nuclear Energy Laboratory Dr. Harold V. Brown, Environmental Health and Safety Officer Dr. John Everetts, Radiological Safety Officer Lt. G. J. Ares, UCLA Police Department '

Mr. Phil Arnold, Electrician, UCLA

  • Denotes those attending exit interview.
2. Licensee Action on Previous Inspection Findings (Closed) Noncompliance (50-142/77-02): Lack of tampersafing on some alam lines. The inspector determined all alam line junc-tion boxes are now equipped with micro switches to detect tampering.

(0 pen) Noncumpliance (50-142/77-02): Alam sensitivity inadquate.

The licensee stated in their letter of response to the previous inspection findings from Dr. Catton to Mr. Norderhaug, dated Dec-

, e-ber 20, 1977, that, "An alam sensitivity procedure is currently being formulated and will go into effect prior to January 20, 1978.

The inspector determined that an alam sensitivity procedure has not yet been prepared, and the alarm sensitivity although improved over the findings of the previous inspection, will still not detect an intruder rior to the intruder reaching the reactor (approximately fifteen feet .

(0 pen) Deviation (50-142/77-02): Vulnerability of reactor high  !

bay locking mechnisms. The inspector determined through observa- I tion and testing of the locking devices that astricals and cylinder  !

guard rings have been installed on all reactor high bay doors. It -

was noted by the inspector that the dead locking feature of two high bay door locks failed to operate. Records maintained by the Nuclear Energy Laboratory show' that this malfunction was determined and reported to University maintenance for repair in February 1978 subsequent requests for repair were also made in May and July 1978.

The locks are not yet repaired.

3. Security Plan _

The Security Plan for the UCLA Training Reactor Facility now consists of documents sutrnitted by UCLA letters dated June 20, 1975. July 15,1975, October 21, 1975, and April 1,1976, ex-cluding Appendix B to the letter dated April 1,1976 (Appendix B

- . . . _ . . - . . . .a.

--.-,,w ----,,-m,- ,, ,.-,.>-,-,,-.,-.,-,,m---

- ,w~.-- - , -.,-

-w.- e---------.,-,,--o -

,m,, ,,,--,,,,,r,,,-,,,,7 ,

2 Q.

contains background inforration which is not part of the secur-ity plan), May 26,1976, June 9,1976, and August 3,1975. The foregoing documents are identified and approved as the licensee's security plan in a letter from NRR, dated September 13, 1976.

The licensee has submitted to licensing, a new security plan dated January 20, 1977, and three amendments to the January 1977 se~curity plan have also been submitted. The inspector .

determined that NRR has not yet approved in writing the new security plan or amendments.

The licensee has designated the reactor and the cooling system as essential equipment in their approved security plan. All fuel storage areas and the reactor high bay are designated and controlled as security areas. The reactor control room is under lesser security controls, and is the subject of a current dialogue between the licensee and NRR.

The radioactive storage room is described in the approved security plan as, "located below ground level so that all outside walls are backed by earth fill. -The inside walls are two-foot-thick concrete block, and the two steel mesh doors provide the only access to the area. The inner door, fl, is backed by a steel plate and has two locks. One of the locks is keyed to "A" level, i the Master level, and the other lock is a Sargent and Greenleaf .

combination padlock No. 8077A, which meets the specifications out-lined in AEC Regulatory Guide 5.12. The outer door #2 is keyed to "A" level . "

The inspector found the following conditions during a visual inspection of the radioactive storage room on 0:tober 31,1978. 1

a. The wall of the storage room adjacent to the stairwell is )

two foot thick from ground level to about eight feet. Above eight feet to the ceiling (estimated as sixteen feet by the ~

inspector), it is approximately four inches thick standard plaster wall . The adjacent stairwell is protected by an ultrasonic intrusion alarm system. l,

b. A two foot high by three foot wide area above the inner door into the radioactive storage room is constructed of an expanded metal grill covered with 1/2 inch pressed board l with a total thickness of the wall slightly over a 1/2" l thick. l 1

The interior walls are to be redescribed in knendment No. 4 to the licensee's security plan to be submitted to IRC November 30, 1978.

l l

~~ __.

3

,d ,

s .

c. Tne inner door into the radioactive storage room is a standard hollow metal door secured with a six pin tumbler, naster keyed lockset and a standard duty hasp with a Sargent and Greenleaf combination padlock #8077A.
4. Protection e_f StN Tiie inspector detemined through interview of licensee employees that the licensee presently has in its possession 9.0 kg of Special Nuclear Material in the fom of 93% enriched uranium (fuel plates, fuel scraps and uranyl nitrate) and two 32 gm Pu - Be neutron sources.

The U-235 is located as follows: 3.6 kgs U-235 is in the reactor and 0.7 kg is in the radioactive storage pits, and 4.7 kgs is nonirradiated fuel stored in the radioactive storage room. The .7 kg of irradiated fuel in the storage pits is not self-protecting as defined by 10 CFR 73.6(b). The total non-exempt StN presently located at the Nuclear Energy Laboratory is 5.4 kg.

the licensee requested by letter to the On September Department of Energy the irradiated 6,1978,(DOE),(Washington, fuel plates .7 kg) to the DOE reprocessing plant D.C.,

in Idaho. DOE is presently reviewing their request. .

~

i The licensee has not been asked by HRR (licensing) to provide the security stipulated in 10 CFR 73.50 or 10 CFR 73.60, nor -

is the licensee presently providing that level of security.

No items of noncompliance or deviations were identified.

5. Access Control The inspector examined the licensee's procedures and hardware used to control access to the Nuclear Energy Laboratory. The licensee is controlling access as indicated by the approved security plan except that the licensee has ten "A" level keys -

instead of seven as indicated in the approved security plan.

NRR was notified by licensee letter dated March 10,1978, that the nr.ber of "A" level keys had been increased to "no more than ten." .

The licensee's new security plan, amendment three, submitted to NRR on March 10, 1978, Paragraph 1.A, states that the reactor control rc:m "becomes an 'A' level area (but non-alamed) dur-ing non-working hours. " Tha inspector detemined this has not f

..s.

==-======.-==a .

) .'

l yet been impimented. The reactor control room is currently keyed for "B" level access both during working and non-working hours. The new security plan has hot been approved in writing by NRR.

6. Alam Sistems .

The licensee has installed a Kidde Model KD3 Ultrasonic Intrusion ~

alam system with sensors located in the reactor high bay, radio-active storage room and the stairwell adjacent to the radioactive storag'e room. The doors on the first and second floor of the stairwell are equipped with balanced magnetic switches. The double .

doors from the reactor high bay first floor to an alley outside l the Engineering Building are secured with a self contained local '

alarm / dead bolt panic lock. The doors also have magnetic switches  :

(not balanced) tied into the alarm system and annunciating at the l campus police dispatchers office.

The inspector tested the licensee's alarm system in the reactor high-bay by having the licensee place the alarm system in a secure node and establishing direct radio communication with the UCLA l Police Alarm Station. The police alarm station was instructed to i report incoming alanns for this test immediately. The inspector -

then entered the reactor high bay (room 1000), a security area.

On the first test, the inspector entered the high bay on the I se:end floor, at the control room door, and walked (downstairs) to the first floor before the alarm activated. During the second test, the inspector entered at the second floor, control room door walked to the top of the reactor, walked to the crane electrical power box on the opposite side of the high-bay, and was on the second floor catwalk opposite the control room before.an intrusion was signaled.

During the previous physical security inspection (50-142/77-02), -

conducted September 21-22, 1977, the licenree was cited when i the inspector walked continuously within the teactor highbay both upstairs and downstairs without detection for nine minutes.

The licensee stated in their letter to Region V, dated December 21, 1977, in response to that citation:

d

' O OO O9M$ 9 44

, -- - -- e--- -

g, - '"

~

"The reactor high bay sensitivity hroblem (too many false alarms) was in the process of being solved at the time of the inspection.

On September 22, 1977, during the Security Inspection, the alarm sensitivity was raised to a level ,such that the intrusion by the inspector was indicated on his third step into the security area.

An alarm sensitivity procedure is currently being fomulated and will go into effect prior to January 20, 1978."

Although the licensee corrected the sensttivity during the previous inspection..the licensee subsequently reduced the sensitivity because of a reoccurrence of false alarms. The inspector also de-temined through int.erview of licensee employees on October 31, 1978 that the licensee has not yet prepared or implemented an alam sensitivity procedure as committed to in their letter to Region V, dated December 21, 1977.

During an examination of the alarm system, the inspector noted that the licensee has installed the alam system so that an intruder would walk across the ultrasonic beam (least sensitive) rather than into/

away from the beam (most sensitive).

The sensitivity of the alarm system as detemined through testing by the inspector during the current inspection is improved over the -

previous inspection, however, the licensee has not yet taken action to insure the sensitivity of the alarm system will promptly and accurately detect an intruder in the reactor high bay. The finding by the inspector that the licensee has not prepared a procedure, nor placed it in effect prior to January 20, 1978, represents a deviation.

7. Keys, Locks and Combinations The inspector examined keys, locks and combinations and related equipment used to control access to security areas. The licensee is using astricals and cylinder rings on all entry doors into the .

reactor high bay. Within the reactor high bay, the controls for the overhead crane (necessary to gain access to the reactor core or fuel in storage pits) was secured with a Sargent and Greenleaf combination padlock #8077A.

The licensee is controlling the issue of keys to the Nuclear Energy Laboratory, and maintains records of key issue: An annual inventory of security keys is conducted by the HEL Security Officer. During the last inventory of keys, the Security Officer detemined that a . University employee tad misplaced his "B" level HEL access key on March 15, 1978. On October 5,1978, the licensee's security comittee reviewed the question of the misplaced "B" lev.e1 key t

w . .

t

6 e l and determined that a rekeying was not necessary. This action is consistent with the licensee's procedure "NEL Lock and Key System Guidelines," dated December 10, 1978.

The licensee in response to the previous inspection (50-142/77-02)  ;

by letter to Region V, dated December 21, 1977, stated, in part, in l Paragraph B3 1:

"Also, all latching mechanisms will be fixed by January 20, 1978, at which time a semi-annual complete lock check and pre-ventative maintenance program will be initiated by the key' shop. i In addition, in order to ensure that all doors / latching rechanisms l are in proper working order in the future, a monthiy check on all i doors will be made by the NEL Security Officer with any discre-pancies taken care of immediately. This will begin after Jan-uary 20,1978." l The inspector detemined by testing on October 31, 1978, that the dead locking feature of the reactor high-bay doors, that two of the doors did not deadlock when the doors were closed. The 11-censee (NEL) provided documentation that they had discovered the lock malfunction in February 1978 and had notified the University'.s Maintenance Department that the locks needed repair in February 1978, May 1978 and July 1978 and the locks have not yet been

' repaired. -

The finding by the inspector that the licensee has not ensured .

that all doors / latching mechanisms are in proper working order, reoresents a deviation from the licensee's commitment to Region V.

8. Comunications The inspector examined the licensee's facilities for internal communication and communication with the cognizant local law l enforcement agency. -

No items of noncompliance or deviations were identified.

9. Surveillance The inspector examined the licensee's practices and procedures for surveillance of security areas both during working hours and after normal working hours. The licensee's new security plan does not state what surveillance is provided during working hours, however, it states surveillance during non-wo. king hours is pro-vided by a security alarm annunciating at the UCLA Police Department. '-

f

g .-

7 The inspector detemined through interview of licensee employees that surveillance of the 1 Je1 stored in the radioactin storage room is provided by the ul.;rasonic alarm system located in the room, and that the alarm only is put into access mode upon entry of an authorized individual into the rocm.

The reactor high-bay is placed in access mode each work day  !

morning, and then returned to secure mode each evening. The .

i placing of the high-bay alann into access mode each work day 1 is procedural and is not based on anticipated or scheduled activity within the high-bay security area. The noreal work day assurance of integrity of the reactor high-bay security area is provided by the locked doors into the high-bay, and student and staff activities within the Nuclear Energy i Laboratory, i No items of noncompliance or deviations were identified.

10. Procedures  !

l The inspector detemined the licensee has procedures for reacting to unauthorized intr nions into security areas, bomb threats and acts of civil disorder. The licensee has no procedures for secur -

ity violations by authorized individuals.

No items of noncompliance or deviations were identified. -

11. Security Program Review -

The inspector examined the licensee's program for review of the NEL security activities and procedures.

No items of noncompliance or deviations were identified.

12. protection Against Radiological Sabotage .

The licensee's approved security plan describes controls on access to the reactor core, and except as noted elsedere in this report the licensee has provided the controls committed to in the approved security plan. The licensee has not been asked by NRR to search persons prior to entry into security areas, nor is the licensee performing searches of personnel or p*.ekages prior to entry in security areas.

No items of noncompliance or deviations were identified.

i -

.. ....-.-w..-

r

Q,

. r.

o,

13. Exit Interview l The inspector met with licensee representatives (denoted in Paragraph 1) at the conclusion of the inspection on October 31 1978. The inspector summarized the secpa and findings of the inspection. The licensee made no commitments as to corrective action proposed or planned for the deviations identified by the '

inspector.

g e

D

.l l

l I

0 t

me

/f Os

  • %' UNITED sT ATEs t-
  • cf t_Jt s 3 e NUCt. EAR REGUt. ATORY COMMf3SION //

=

'p [ 1990 C C FORNI A SOULEVf. D - b SUIT E 202, WALNUT CREE K PLAZ A 4,,4 , , , , , j W ALNUT CREE K. CALIF ORNI A tp4596

(

1 OCT 101979 l

, 1

' l Docket No. 50-142 ., . '

c _ m, . . . , i University of California Los Angeles School of Engineering Los Angeles, California 90024 Attention: Russell O'Neil Dean of Engineering -

1 l

Gentlemen: j

Subject:

NRC Inspection -

This letter refers to the inspection of your activities authorized under NRC License No. P.-71 conducted by Messrs. E. J. Power and L. W. Ivey of this office on September 24-25, 1979. It also refers to the discussion of our inspection findings held by the inspectors with Dr.1. Catton and Mr. C. Ashbaugh on September 25, 1979.

The inspection included examination of activities related to physical protection against industrial sabotage and as,ainst theft of special i nuclear material in accordance with applicable requirements of Title 10 . I Code of Federal Regulations. Part 73, "Physical Protection of Plants and  !

Materials," your security plan, and license conditions pertaining to .

physical protection as described in the enclosed inspection raport.

Within these areas, the inspection consisted of seleccive examinations l of procedures and records, interviews with facility personnel and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were obser s' In accordance with Section 2.790(d) of the NRC "Rules of Prc.ctice,"

Part 2. Title 10. Code of Federal Regulations, documentatios of the findings of your safeguards and security measures are exempt from public disclosure; therefore, the enclosed inspection report will not be placed in the Public Document Room.

L?' .

t &)b(^ k -* l e

i Viiiversity of California, Los Angeles IY 0 'W2 Should you have any questions concerning this letter, we will be glad to discuss them with you. I Sincerely, j

/ / ~j . . s  :

l

.. ' : " A) -( . . _' . ,

/.*.LidoyR.Norderhaug. Chief '

Safeguards Branch

Enclosure:

IE Inspection Report No. 50-142/79-03 (IE-V-340) i i

3 h

1 Y

e l

i i

I e

O 1 e i

4 I

I

.,--,--n. nn,., ,. , , , , , , , , . , , , , ..---_v,.---,,~

.. . , - - , . . . , , . . , .-,---v .-..

i 0 dE iSPE D h! gj'h

~

Region V Report f!o. 50-142/79-03 (IE-h340) ,

Docket flo. 50-142 ,

Licensee: _ license No. R-71 University of California,ngeles los A -

Los Angeles. California Safeguards Group 90024 -

Facility Name: i Inspection at: . Nuclear Energy Laboratory - __ _ ________ __ _

UCLA campus at Los Angeles Inspection Conducted: . California September 24-25, 1979 _.

Date of last Physical Security i -

nspection Visit:

Type of Inspection: - Oc ._

tober

-- 30-31 (

Inspertors: 4 Unannounced Physical Security 1978 L ' . .~ , [- ' ' "' _

gg.

E. J. Power. Physical Sec --

.~.(

^** y Inspector 7

- , j7 j ,

L. W. Ive . Physical S'e, cup d I _ , h/

nspector be / f / Sj g

/ te $1gneo Approved by .

.e Inspectionry:Summa /jl.hiNorcerhaug,W , Sa eDuar s e.-

rancP '

~~~~'~l'ia~'ti-~5T N Areas ins ected: gneo

Access Centro Surveillance:l; Procedure Alam SystemsSecurtty Plan; Protection of Radiological Sabotage. s; Secu;rity Program RKeys, locks and Com The inspection involved 16 i eview; and Protection Against; Co .

Results: nspector hours .

Ho items of noncompliance w by t'.;o NRC Inspectofs ,

r' onsite .

s."

ere identified.

O

  1. 3r ...... . - ...~ .  %*

y v w

~--_

w

. l.. ec.

OETAILS

1. Persons Contacted
  • Dr. I. Catton, Director, Nuclear Energy Laboratcry
  • Mr. C..' Ashbaugn, Security Officer, Nuclear Energy Laboratory Lt. J. Ares, UCLA Police Department Sgt. W. Hansen? UCLA Police Department Mr. P. Arnold, Electrician, UCLA
  • Denot'es those attending exit interview.

E. Licensee Action on Previous Inspection Findings (Closed) Ncncompliance (50-142/77-02): Alarm sensi;ivity in-adequate. Several performance tests of the ultrasonic alarm system were conducted by the inspectors, and were found acceptable.

(Closed) Deviation (50-142/77-02): Vulnerability of reactor high bay locking nochanisms. The inspectors determined through observation that the Nuclear Energy Laboratory had installed astragals on the laboratory doors to which they committed in a letter from Dr. Catton to Mr. Norderhaug, Region V, NRC, which was dated January 18, 1979:

3. Exit Interview The inspectors met with licensee representatives (denoted in Para-graph 1) at the conclusion of the inspection on September 25, 1979.

The inspectors sumarized the scope and findings of the inspection.

4. MC 81405B - Security Plan No items of noncomplitnce were noted. The inspection results were -

attained through:

a. An onsite review of the physical security plan for the Nuclear Energy Laboratory at UCLA which was dated January 20, 1977 with four amendments.
b. A walk-through tour observing the activities, operations and facilities of the laboratory which included the reactor and the reactor coolant system which were designated as essential equipment.
c. Obscrvation and confirmation that the designated security areas within the laboratory as specified in their security plan were: the reactor room, also called the reactor high bay (Room 1000); the radioactive storage room (within Room 1540);

dnd the control room (Room 2001) during non-working hours at .

the university.

, ,.--,,--y . , , , - . , . _ _ , - , , -- ,--- , , . - , - , - - . . , , - . . - - , , - ,

The inspectors dip n N identify any measures which were different from those specified in their plan; the measures to which the licensee was committed were found to be adequate; there was no decrease in the effectiveness of their plan; and there were no additional findings which were considered a weakness in their security systems.

5. MC 814108 - Protection of SNM No iteas of noncompliance were noted. The N2L has in its possession approximately 8.3 kgs of SN?i 'in the form of 93% enriched U-235.

The SNM was settred in'accordance with their physical security plan in the following locations:

a. There were approximately 3.6 kgs of CNM in the reactor core.
b. There were 4.6 kgs of non-irradicted ShM secured in the radio-active storage room.
c. There were 0.7 kgs of irradiated SNM contained in the fuel storage pits in the reactor bay.

As indicated in the last security inspection report in 1978, the licensee has continued its coordination with the Deoartment of Energy to effect the transfer of 0.7 krs of irradia'.ed fuel, and -

has kept NRR advised of these developments. Under the licensee's current plans, the irradiated fuel is scheduled to be transferred from the facility during December 1979. -

6. MC 81415B - Security Organization No items of noncompliance were noted. The inspectors determined that the licensee's security organization is as cescribed in their physical security plan. Through interviews and review of procedures, it was determined that the Director of the laboratory was responsible for the implementation and enforcement of the security plan with the security functions performed by the appointed Security Officer.

The security force for the laboratory is providad by the UCLA Police Department which was visited by the inspectors. The UCLA PD is composed of 57 sworn peace officers who operate on three shifts to provide coverage of the campus to include the Nuclear Energy Laboratory. These officers are individus11y armed with a minimum of a .38 caliber weapon and, when dispatched, they maintain comuni-cations with the police dispatcher and other officers with portable two-way radios or vehicle radios. In their routine duties, the UCLA PD cm lucts daily, periodic, random patrols of the exterior of th facility. Response time from the UCLA PD to the laboratory is three to five minutes. The campus police have arrangements for assistance if needed with other local law enforcement agencies, e.g., Los Angeles Police Department (LAPD). The annualerequalifi-cation of the UCLA PD is scheduled to begin on or about October 1, 1979 and will include representatives of the LAPD. This annual re-qualification (or orientation) will be one to three hours in duration and cover radiation hazards, security alarms, tour of the physical -

layout, discussion of responses to alarms, etc.

, 3-

7. MC 814208 - Access Control No items of noncompliance were noted. The results of the inspection were attained through;
a. A review of the licensee's procedures used to control access to the Nuclear Energy Laboratory.
b. ObservatiO3 of the iingress and egress of the staff, employees, students? and visitors to the facility during the period of the inspection.
c. Observation that access controls have been implemented as described in the security plan to control personnel and vehicle' access to the essential equipment, security areas, and the facility, a nd these means are adequate.
d. Interviews and review of precedures that visitors are identified, authorized for access, and escorted at the facility.
e. A review of the visitor's register.
f. Interviews of personnel and observation that individuals having access to the unirradiated SNM are visually searched upon departing from the SNM storage room, and the procedure is considered adequate.
8. MC 81425B - Alam Systems No items of noncompliance were noted. The inspectors determined through interviews and observation that intrusion alarm devices (i.e., ultrasonic, magnetic door switches, and tamper) are installed, maintained, tested and operated in accordance with their physical security plan. The inspectors, in the company of the Security Officer and an alarm electrician, witnessed testing of several of these alarms.

Subsequently, during a visit to the UCLA campus police department during the inspection, the inspectors confirmed by observation and interview that the Nuclear Energy Laboratory alarm system terminates with an audio-visual display ir, a continuously manned disoatcher room of the police, and written proceaures are available for police response and actions upon receipt of an alarm.

9. MC 814308 - Keys, Locks and Combinations No items of noncompliance were identified. The procadures for keys, locks and combinations were reviewed and are in cofifonnance with the physica! security plan. The annual physical inventory of all keys was in the process of being accomplished at the time of the inspection, but had not beea completed. A random check of the locking hardware on the doors was accomplished and found to be

~

adequate.

- - , , - - - _ - - --,.,--,n-. .,----- - y,,. -.

. 4

.~ .

10. MC 814358 - Comunications l No items of noncompliance were identified. The Nuclear Energy l Laboratory utilizes the commercial telephone system for communi-cation on and off the cupus which is the primary means of contact with the campus police department. The UCLA police department operates its own radio network on a 24-hour basis with radio equipped automobiles and portable radios carried by the individual police officers %- .
11. MC 814403 - Surveillance -

No items of noncompli.?nce were identified. The inspectors determined that the surveillance of SNM, essential equipmeni . security areas, phyelcal barriers, and avenues of approach to security areas have 1 been implemented as stated in their physical ser.urity plan.

12. MC 814453 - Procedures No items of noncompliance were identified. Through interviews and review of records, it was determined that Nuclear Energy Laboratory had procedures regarding unauthorized intrusions, security violatiens, bomb threats, and acts of civil disorder.

1

13. MC 814508 - Security Program Review -

No items of noncompliance were identified. The last change, Amendment l No. 4 to the security plan was submitted to NRR by letter dated November 30, 1978; however, it was determined through interview with the Security Officer that review of the plan is a continual process with notes maintained in the Security Log which was reviewed.

The licensee was presently in the process of evaluating their plan ,

in view of the upgrading of security requirements for non-power reactors per 10 CFR 73.47.

~

14. MC 81455 B - Protection Against Radiological Sabotage No items of noncompliance were identified. Protection against sabotage is of concern to the licensee and is primarily effected by the security consciousness of the laboratory personnel and ad-herence to established procedures and policies.

8

I

[5 Weev ,o l3 g UNITED STATES ,

! ., g NvCLEAR REGULATORY CON, MISSION AEGION V o, [ 1990 N. CAllFORNIA SOULEVARO

s

,,,,e

[ $UIT E 202, WALNUT CR E E K n AZA WALNUT CR EE K, CAllFORNI A Se594 Docket Nos. FE3 2 31980 50-142s Jniversity of California los Angeles, California 90024 l

Attention: Dr. Harold V. Brown Environmental Health & Safety Officer Gentl enen:

Subject:

NRC Inspection This refers to the inspection conducted by Messrs. G. Hamada and A. Wieder of this office on February 11 and 12,1980 of activities authorized under NRC License Nos. SNM-974 and R-71. It also refers to the discussion of our inspection findings with members of your staff at the conclusion of the inspection. i The areas examined during the inspection included your program for controll-ing and' accounting for special nuclear material pursuant to applicable pro-visions of Part 70, Title 10, Code of Federal Regulations, and specific re-quirements of NRC License Nos. SfM-974 and R-71. Within these areas, the inspection consisted of selective examinations of procedures and records, I interviews with campus personnel and observations by the inspectors.

No iters of noncompliance with NRC requirements were identified within the scope of this inspection.

In accordance with Section 2.790(d) of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, documentation of findings of your control and accounting procedures for safeguarding special nuclear materials are exempt from disclosure; therefore, the inspection report will not be placed in the Public Document Room and will receive limited distribution.

o n w cr r r/a mus

I University of California IEB 2 31980 Should you have any ouestions . . rning is inspection, we will be glad to discuss them .th you.

Sincerely, i fd  ;

s:

L. . Norderhaug .

Safeguards Branc

Enclosure:

IE Inscection Report Nos.

70-223/80-01 & 50-142/80-01 (IE-V-359) cc w/ent:

Professor Ivan Catton Director, Nuclear Engineering Laboratory UCLA e

0 i

1 i

'; f

U.S. NUCLEAR REGULATORY COMMISSION CTFICE OF INSPECTION AND ENFORCEMENT Regicn v 70-223/80-01

%: ort No. 50-ta2/80-01 (tE-V-369)

Oc c.:e t 'io.70-223 & 50-142 License No. S?N.974 & 0-71 Safeguards Grcup 2 )

l Licensee: University of Califor-ia, Los Acceles 1

Los Anceles_. California 90024 I Facility Nace:

Inscection at:

Inscection Conducted: February 11-12, 1980 Date of Last Material Centrol and Accounting inspection Visit: December 5-6, 1977

, Tyoe of Inspection: ' Pfterial Control and Accountino Inspe: tors: _

G . f ma '

fa M .<__ f[gsYM/

C i t/Stati tici C/ 'Oate'Signec

~ Il@~

(, Wieder, ' Auditor nn.x& A/d/n U ~0 ate'Signec Date Signec Eopreved :y: .f  ! /< / W  % 92 L. R. Ncirdrndug, Cnief, Safeycs Brancn Date Sign (c Inspection Suc,ary:

Areas insoected: The licensee was inspected for compliance with applicable sections of the regulations. The inspection involved 18 insp3ctor-hours onsite by two NRC inspectors.

Results: No' items of noncompliance were identified ia the areas inspected.

, .C Nfl& $f)

1 l

l 2 9.$('.' . fN REPORT DETAILS

~

- "C'"

..... C . y .

1. Persens Contacted
  • C, E. Ashbaugh,111, Physical Security Officer J
  • 0r.1. Ca tton, Director, N.E.L .
  • J. Evraets, Radiological Safety Officer <

'J. Hornor, Health Physicist l

    • i. Ostrander, Manager, N.E.L. )
  • 0r. W. Wegst Director, Office of Research & Occucational Safety <

A. Zane, Deactor Supervisor

'Cenotes attendance at the exit interview.

2. Li.ersee Action on Previous Inspection Findinos l There were no itees of noncompliance noted on the previous inspection.

(Recort 77-02,77-03)

3. Exit Interview The inspectors met with licensee representatives (denoted in Paragraph
1) at the conclusion of the inspection on February 12, 1980. The inspect-ors summarized the scope and findings of the inspection. Several items of interest were brought to the attention of the licensee. It was pointed out that it would be desirable to have a more detailed written prdcedure for taking a physical inventery of all special nuclear na-terial (SMi) possessed by the licensee. With respect to the spent fuel bundles that are expected to be shipoed for reprocessing, it was suggested that the licensee formally request the recrocessor to obtain and sub-mit to the licensee a listing of the plate serial numbers comprising l each bundle. This would help to resolve a longstanding uncertainty I concerning the identity of fuel plates associated with fuel bundles.

While the total number of plates have been accounted for, the exact location of a given plate has remained unclear for 5 fuel buncles ever since a mixup occurred some 5-6 years ago.

4 Storace and Internal Control Records maintained for in-reactor and storage were reviewed.

No items of nonccmpliance were identified.

5. Inventory An inventory of stored fresh fuel bundles, by serial number, and scrao, by weight, was conducted. Spent fuel elements were identified by piece count at specific locations in the storage pits. The core content was

i . ..

l l  !

l l

accepted on the basis of a fuel bundle location chart. Plutonium- '

Berylium sources were identit ted by serial number. Except for a small amount of buraup, the total 5:01 inventory has not changed since the ,

I last inspection.

The crulative burnup to January 1,1980 is approxinately 21.4 gms. i U-235. A conservative estimate of Pu-239 p: eduction to January 1, l 1980 is 0.013 g s, a non eportable cuantity. j No items of ccnc0mpliance were identified. J

6. Records and Recorts The licensee's special nuclear material accounting records, recorts and other documentation applicable to the period Cecember,1977 through February 11, 1960 were reviewed for compliance with the records and reports requirements of the regulations.

No items of noncompliance were identified.

l l

1 0

4 4

/$

[m o g UNITED STATES NUCLEAR REGULATORY COMMISSION 3 .j ,~

i /

,.(3 g c REGION V l 0, .f 1450 MARI A LANE, sulTE 21o g . .v...

[/ WALNUT CRE E K, CAltFORNI A 94596 jul 2 01983 1

1 Docket Nos. 701223 50-142 , j l

University of' California at Los Angeles 405 Hilgard Avenue I Los Angeles, California 90024 Attention: Dr. Russell O'Neil l Dean, School of Engineering l Gentlemen: )

Subject:

NRC Inspection Report Hodific: tion l This refers to a modification of an inspe: tion report that was issued July 8, l 1983 from this office. This inspection was conducted by Mr. Gilbert B. Nelson I of this office on June 28, 1983, of activities authorized under NRC Licenst Nos. SNM-974 and R-71. The modification is enclosed.

Should you have any questions concerning this modification, we would be glad j to discuss them with you. l Sinetrely, I

( / >>

G' W 2

I s oy R. Norderhaug, Chief l Safeguards and Emergency Preparedness Branch

Enclosure:

Modification of Inspection Report Nos. 50-142/83-02 70-223/83-01 (IE-V-577) cc w/ enclosure:

Professor Ivan Catton Director, Nuclear Energy Laboratory

  • UCLA Hs. Colleen P. Woodhead, ELD' Mr. Edward S. Christenbury, ELD 1

e D

pg s np I.iit a f//A M

2 Table I sumoarizes the physical inventory at UCLA TABLE I FSNM Physical Inventory UCLA as of June 28, 1980 License U-235 a y P

R-71 4921.13 32 SNM-974 0 32 1335-70 0 32 Applying the exemption embodied in 10 CFR 873.67(b)(1)(ii), the 4921.13 g U-235 in NEL is an amount defined to be "special nuclear material of moderate strategic significance", under 10 CFR $ 73.2(x)(1).

e 1

  • e t

y _

,, ___,7 _ _ . _ . - , . . . _ _ _ . _ . - _ , _ . _ _. , , - , . . _ _ . , , . - . _ _ ,_..__.__...,_-i_..._.,-__, . ., , ,. _ ,

I

  1. o* *ecwo, UNITED STATES

,  !~ ,.

f( NUCLEAR REGULATORY COMMISSION

  • . REGION V ot,h. .f 1450 M ARI A L ANE. sVITE 210

,e s....

f WALNUT CREEK CALIFORNIA S4596 IJUL 3 1933 Docket Nos.70-223 50 ,142 University of California at Los Angeles 405 Hilgard Avenue Los Angeles, California 90024 Attention: Dr. Russell O'Neil Dean, School of Engineering Gentlemen:

Subject:

NRC Inspection This refers to the inspection conducted by Mr. G. B. Nelson of this office on June 28, 1983, of activities authorized under NRC License Nos. SNM-974 and ~

R-71. It also refers to the discussion of his inspection findings with members of your staff at the conclusion of the icspection. ,

The areas examined during the inspection included your program for controll-ing and accounting for special nuclear material pursuant to applicable provisions of Part 70, Title 10, Code of Federal Regulations, and specific requirements of NRC License Nos. SNM-974 and R-71. Within these areas, the inspection consisted of the taking a physical inventory of SSNM at UCLA and observations by the inspector.

1 No items of noncompliance with NRC requirements were identified within the i scope of this inspection. )

1 In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure l will be placed in the NRC Public Document Room unless you notify this office, by telephone, within ten days of the date of this letter and submit written application to withhold information contained therein within thirty days of the date of this letter. Such application must be consistent with the requirements of 2.790(b)(1).

M O '") '

^

/

University of California at Los Angeles JUL 8 8 83 Should you have any questions concerning this inspection, we will be glad to discuss them with you.

Sincere s- _!,> -

L. R. Norderhaug, Chief Safeguards and Emergency Preparedness Branch

Enclosure:

Inspection Report Nos. 50-142/83-02 70-223/83-01 (IE-V-577) cc w/ enclosure:

Professor Ivan Catton Director, Nuclear Engineering Laboratory UCLA Ms. Colleen P. Woodhead, ELD Mr. Edward S. Christenbury, ELD _

O I

t U. S. NUCLEAR REGULATORY COMMISSION l 0FFICE OF INSPECTION AND EhTORCEMENT '

l REGION V l l

Report Nos. 50-142/83-02 (IE-V-577) 70-223/83-01 (IE-V-577)

Docket Nos. 50-142 License Nos. R-71 ,70-223 Sht-974 Safeguards Group II l Licensee: University of California at Los Angeles

'405 Hilgard Avenue Los Angeles, California 90024 Facility Name: Nuclear Energy Laboratory Inspection at: UCLA Inspection Conducted: June 28, 1983 ]

Da*.e of Last Material Control and Accounting Inspection: February 11-12, 1980 Type of Inspection: Special Inspectors: ~ [~b

/G. B. Selson, Cb mist Date Signed Approved By: e f -

Date Signed

~

LeRo) R.FNdrderbatig, Chief Safeguards and Emergency Preparedness Branch Inspection Sung ary:

Areas Inspected: Special inspection to physically inventory SSht at UCLA.

The inspection involved five inspector-hours onsite by one h7C inspector.

Results: No items of noncompliance were identified.

d t

h k/!7e / I"D _z 1 9 sp i cruf w o 3-

=

. l l

l l

REPORT DETAILS

1. Persons Contacted
  • Dr. I . Catton, Director , KEL
  • C. E. Ashbaugh, Security Officer
  • J. E. McLaughlin, Radiation Safety Officer
  • A. Zane, Re. actor Supervisor N. Ostrander, Manager, NEL
  • J. J. Orr, Reactor Health Physicist
  • Denotes those attending exit interview. l
2. Licensee etion on Previous Inspection Findings I

Not applicable.

1

3. Exit Interview The results of the inspection were presented to licensee personnel.
4. MC-85102B Material Control and Accourting (Reactor) )

l Conducted a special inspection to physically inventory the SSNM at the ~  !

Nuclear Energy Laboratory (NEL) and other locations of the University of  !

California, Los Angeles.

The fresh fuel in the storage vault was physically inventoried by piece )

count of the nine assemblies and verification of serial number )

identifications and location to records. The total weight of U-235 in )

this stratum is 1389.96 grams using the fuel fabricator's data.

1 The Argonaut Reactor core inventory was accepted by reference to source j documents. Core loading records indicate that the reactor contains  !

3531.17 g of U-235. Total U-235 in NEL is 4921.13 grams, under License '

R-71.

I There is a Pu-Be neutron source in NEL that nominally contains 32g of Pu. 1 This item was inventoried by serial number identification and detection of a neutron flux by a neutron source counter. The serial number is M-730. This source is used with suberitical assemblies for instructional purposes, and is possessed under License R-71.

The second Pu-Be neutron source is stored in the Cs-137 calibration source building. The source was inventoried by serial number verification, M-908, and detection of a neutron flux. It is nominally contains 32g Pu and is possessed under SNM-974 license.

The third Pu-Be neutron source possessed under state licensee, 1335-70 is stored in the Van de Graaf f generator cage in Knudsen Hall under the custody of the Department of Physics. This item was inventoried by I tierial number verification and neutron flux detection. The serial number  ;

is M-395, and contains a nominal 32g of Pu. j i

l l

0

2 Table I summarizes the physical inventory at UCLA.

l TABLE I l l

SSNM Physical Inventory UCLA as of June 28, 1980 i

License U-235 a Pu_3 R-71 4921.13 32 SNM-974 0 32 1335-70 0 32 CA State Utilizing the formula in 10 CTR 73.60, the amount of GSNM is calculated to be (4921.13 g U-255) + 2.5(32 : Pu) = 5001.13 a for NEL. If the radioactive decay corrections for the plutonium isotopes (1) present in the Pu-Be neutron source are applied the total is 5000.57 g of SSNM. The ,

remaining Pu-Be sources, possessed undet licenses SNM-974 and CA State 1335-70, are stored at noncontiguous sites with respect to NEL and each other, and are therefore exempt under 10 CTR $ 73.67(b)(1)(ii).

I (1) Letter to R. Reyes, UCLA August 3,1982, from M. E. Anderson Monsanto, Mcund Facility tabulating isotopic populations on 1-1-60. l 1

A t

- - - - , _ . - . . - . . . . . . . . . _ . . . _ , , . - , - - - - .