__ __.

UCLA UNIVEllSITY OF CALIFOllNIA, LOS ANCEIES

['

l

)

totrit t 04us e inaw. tm 4w.r J4. assinstur e sam utao. 64h istavJun

(

/

64Ntastas4k4. sawtAr.ner CObikfUNITY $ Art:TY l RADIATION $AlUY l

Ilfas. WEST MEDICAt Itt'll. DING I

100311 CONTE AVENUE LoS ANCE115, CALIroftNIA lit 0241765 January 4,1993 hir. Alexander Adams Jr., Project hianager i

Standanlitation and Non Power Reactor Project Directorate Division of Nuclear Regulatory Conunission Washington, D.C, 20555

Subject:

Docket No. 50-142: Request for Release of the Fonner Reactor Facility to Rc! case for Unrestricted Use

Dear hir,

Adams:

The final deconunissioni.ig report is being submitted to the Nt. clear Regulatory Commission (NRC) as the culmination of the reactor deconnnissioning project that was initiated on June 14, 1984. The decommissioning pmject of the Argonaut reactor was approved as a two phase plan.

Under Phase 1, fuel c!cments and majority of highly activated reactor components and removchle shield blocks were disposed. The Phase I project was managed and perfonned by the health physics staff at the UCLA Rad!ation Safety Office (RSO).

Under Phase 11, the remaining reactor structure: monolith, remaining shield blocks, and plumbing wen:

disposed. A final survey was perfonned to demonstrate that the final decommissioning pmject has complied with the Court Order. While the RSO managed the project, the final decommissioning project was perfonned by a contractor, Nuclear Energy Services (NES) and by a radiological engineer, hir. Scott State, who was contracted to oversee the dayao-day decommissioning operations.

The project organizational chart is described in Figure 1 of the leport. A summary description of the Phase 11 decommissioning activities as well as the actual time line schedule, is described in Appendix A of the report.

The final smvey was perfonned by NES. The description of the survey procedures and results are summarized in the repon. The final survey included the following:

100% scan of all surfaces fixed contamination detennination of each grid removable contamination de'ennination of each grid dose rate measurements of the reactor room Door, lower walls, and process pit as well as floor areas of the other rooms.

All smears that were counted on Ludlum 2929 phoswich detector were less than minimum detectable activity (h1DA) while smears that were counted in the liquid scintillation counter had a highest reading 9301260084 930104 O

PDR ADOCK 05000142 M

p PDR 1 1

of $16 dpm/100 cm'. Since the ceilings and walls had the lowest potential for contamination / activation, the fixed contamination sutvey results were not included in this repon (only iI of 2510 measurements exceeded h1DA). The results of the fixed contamination of the Fuel Pit Storage were not included also because only I of 450 measurements exceeded h1DA. None of the above fixed contamination j

measurements exceeded twice the hiDA. The floor surveys were included since the floors had the highest potential for contamination / activation (40 of 1550 measurements exceeded h1DA). The maximum reading j

and average reading for fixed contamination of each grid are listed in Appendix C with prem/h reading at I meter.

While the summary of results of the surveys is presented in the Report, only Region V of the NRC on the distribution list is receiving three (3) copies of the complete NES final survey report and procedure as an attachment for their verification survey. Anyone on the distribution list may request a copy of the i

205 pages (double sided) survey report.

UCLA requests that the NRC review the document and schedule a verificatica survey to release the decommissioned reactor facility for unrestricted use.

I if there are any questions or clarifications that are needed, you may contact me at (310) 825 7147.

]

i icerely, p.

~

Joseph hl. Takahashi, C.ll.P.

'R'adiation Safety Officer / Owner's Representative Enclosure i

STATE OF CALIFORNIA i

COUNTY OF LOS ANGELES On January 5,1992, before me, the undersigned, a Notary Public in and for said County and State, personally appeared Joseph M. Takahashi, known to me to be the person whose name is subscribed to the within instrament and acknowledged to me that he executed the same.

!){( k/

/)M7

}/li Witness rny hand and official seal Notary Public in and'for said County and State

...j ecurA LY.NN R.iMER cc

,[

Notwy we<;oHornia Losustus county cc:

Distribution List Attached i

cc:

Department of Justice Roger Kohn. Esq.

Office of Atkinicy General 524 lith Street P.O. Box 944255 Manhattan Beach, CA 60266 Sacramento, CA 94244 2550 Robert M. Meyers California Department of Ilealth Services City Attorney Attn:

Chief. Environmental Radiation Lynn Natiboff Contral Unit Deputy City Attorney Radiological llealth Section 1685 Main St., Room 310 714 P Street. Room 498 Santa Monica, CA 9(M01 g

Sacramento, CA 95814 M

Vincent Sato Mr. Daniel liirsch Office of City Attorney c/o Federation of American Scientists 200 North Main Street 307 Massachusetts Avenue, NE City llall East, Room 1700 Washington, DC 20(K12 Los Angeles, CA 90012 Dr. Michael Granfield U.S. Nuclear Regulatory Commission Acting Administrative Vice Chancellor Region V University of California Olfice of Inspection & Enforcement 405 llilgard Avenue 1450 Maria Lane, Suite 210 2107 Murphy llall Walnut Creek, CA 94596 5368 Los Angeles, Ca 90024 Christine llelwick, Esq.

William E. Kastenberg, Itofessor Glen R. W(ols, Esq.

School of Engineering and Applied Sciences Office of General Counsel 5532 J Boeller llall 590 University llall University of California 2200 University Avenue Los Angeles, CA 'X)0241597 Derkeley, CA 94720 Lydia Kowalski. Administrative Officer Dean llaase.11 School of Engineestag and Applied Sciences 302 South Mansfield Ave.

7256 fhxiter llall Los Angele, CA 90036 University of California Los Angeles. CA 90024 1600 Committee to Bridge the Gap 1637 Butler Avenue, #203 William 11. Cormler Los Angehts, CA 90024 Director Capital Programs University of California Mr. John Day 405 liilgard Avenue 1022 Pera'ta Street Los Angeles, CA 90024 Albany, CA 94706 Mr. James R. Ilectan Director,!ociety Services American Nuclear Society 555 N. Kensington Avenue La Grange Park, IL 00525