Provides Correction to Second Paragraph of Page 1 of Final Rept of Confirmatory Survey of Boelter Reactor Facility for UCLA in Los Angeles,Ca
ML20057E281
Person / Time
Site: 05000142
Issue date: 09/17/1993
From: Ansari A
OAK RIDGE ASSOCIATED UNIVERSITIES
To: Cillis M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 9310080265
Download: ML20057E281 (1)


Text

.

OR1SE OAK p t[GE IN*5Y1TU TE F OR SCIE NC E AND FDUC AtsON September 17,1993 Mr. Michael Cillis U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368

SUBJECT:

FINAL REPORT OF CONFIRMATORY SURVEY OF THE BOELTER REACTOR FACILITY, UNIVERSITY OF CALIFORNIA,___

ova muconS, CALIFORNIAg- (Glh h bh k'?

)

N

,I

Dear Mr. Cilh.s:

I u_----

In the second paragraph on page 1 of the subject report, it is stated that the Nuclear Energy Services (NES) carried out the decommissioning activities in two phases. This statement is incorrect. Although the decommissioning activities were conducted in two phases, NES was involved only in the secono phase of the project. Phase I of the decommissioning which included removal of the reactor core moderator, graphite thermal column, fuel boxes, most of the concrete shield blocks, etc., was carried out internally by UCLA.

j If you have any questions, please contact me (615) 576-3355 or Michele 'Landis at (615) 576-2C08.

2 I

I Sincerely, 1

A if Armin J. Ansari Project Leader Environmental Survey and Site Assessment Program AJA:tte I

===:g j

cc-J. Reese, NRC Region V N

i D. Tiktinsky, NRC/6E6

]

T.

i T Me,-NRC-# MSS, AE4 7

J. Hickey, NRC/6H3

\\

j

\\

J. Swift, NRC/6H3

-j NRC/PMDA,6E6 J. Berger, ORISE/ESSAP M. Landis, ORISE/ESS AP File /210 D

,<rn 9310080265 930917 P o acx li7. OAK &!DGE, TENNESSEE 37831 0117

=

D'T PDR ADOCK 05000142 yq/

PDR,_.....a,,,d by od Radge AssmoW Unwersme br Ae U 5 Demmem d Energy

"