ML20198Q713: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 4
| page count = 4
| project = TAC:MA2182
| stage = Other
}}
}}



Latest revision as of 08:59, 8 December 2021

Forwards EA & Fonsi Re 960808 Application.Assessment Being Forwarded to Ofc of Fr for Publication
ML20198Q713
Person / Time
Site: Satsop
Issue date: 01/04/1999
From: Mendonca M
NRC (Affiliation Not Assigned)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20198Q717 List:
References
TAC-MA2182, NUDOCS 9901070382
Download: ML20198Q713 (4)


Text

_. .- _

t .

Mr. J. V. Parrish, CEO

, . Washington Public Power l Supply System Post Office Box 968 Richland,' WA 99352

SUBJECT:

WASHINGTON NUCLEAR PROJECT UNii' 3 (TAC NO. MA2182)

Dear Mr. Parrish:

Enclosed is a copy of the Environmental Assessment and Finding of No Significant impact related'to your application dated August 8,1996. The assessment is being forwarded to the Office of the Federal Register for publication.

Sincerely, Original signed by Paul Doyle for Marvin M. Mendonca, Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-508

Enclosure:

Environmental Assessment cc w/ encl: See next page DISTRIBUTION:

HARD COPY _

E-MAIL COPY Docket File 50 508 / 509 AAdams

' PUBLIC CBassett PDND r/f TBurdick DMatthews TDragoun SWeiss WEresian EHylton '

MMendonca SHolmes Pisaac j

PDoyle TMichaels /

TEssig 4

OGC (015-818) 7 TGwynn, RIV '

/

PDN -

- 'See previous uonc, rrence.

PDN PND ' A

)k p:0 OGC*

MMe do al P E t SWeiss J

ssig g AHodgdon l

n /25 /9 /%/M/98 IL/7 /98 Ul >7/98 L6 /98 12/22/98 OFFICIAL RECORD COPY DOCUMENT NAME: G:SECY OYLE\ ORDER.WPD pe) 9901070382 990104 pr-p r~~ I? Or ,~~, """~2Ow .I PDR ADOCK 05000500 E

~'". . s;,, L L_

A PDR ~

l

LO .-

lV ,

l January 4, 1999 ,

Mr. J. V. Parrish, CEO l Washington Public Power

Supply System Post Office Box 968 Rich land, WA 99352

SUBJECT:

WASHINGTON NUCLEAR PROJECT UNIT 3 (TAC NO. MA2182)

Dear Mr. Parrish:

Enclosed is a copy of the Environmec.tal Assessment and Finding of Ns Significant impact related to your application dated August 8,1996. The assessment is being forwarded to the Office of the Federal Register for publication.

Sincerely, Original signed by Paul Doyle for Marvin M. Mendonca, Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-508 j

Enclosure:

Environmental Asssssment r'r v//enci: See next page f ,ISTRIBUTION:

dARD COPY E-MAIL COPY  ;

Cocket File 50-508 / 509 AAdams PUBLIC CBatsett PDND r/f TBurdick l DMatthews TDragoun

~ SWeiss WEresian EHylton SHolmes MMendonca Pisaac PDoyle TMichaels l :TEssig l OGC (015-B18)

TGwynn, RIV

- h*See previous conc rrence.  !

j PONDiPh _JPDND:PM PND A  : b OGC*

i. MMerIdogca~iPDdv1b E tp:: SWeiss ssig AHodgdon

!? / S /98' /?.//~/98 (2 /lb /98 t?) 29/98 'ild /98 g 12/22/98 OFFICIAL RECORD COPY DOCUMENT NAME: G:SECY\DOYLE\ ORDER.WPD

, sf~REKy ,

  • A

.  % UNITED STATES

[

j NUCLEAR REGULATORY COMMISSION i WASHINGTON. D.C. 2065H001 i January 4, 1999

%o......#

I Mr. J. V. Parrish, CEO Washington Public Po'ver

{

Supply System  !

Post Office Box 968 i

Richland. WA 99352 I 1

SUBJECT:

WASHINGTON NUCLEAR PROJECT UNIT 3 (TAC NO. MA2182)

Dear Mr. Parrish:

Enclosed is a copy of the Environmental Assessment and Finding of No Significant impact related to your application dated August 8,1996. The assessment is being j forwarded to the Office of the Federal Register for publication.

Sincerely, l

/'.

i, j .., / .s * ' -4 Marvin M. Mendo ca, Senior droject Manager Non-Power Reactors and Dec$mmissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-508

Enclosure:

Environmental Assessment cc w/ encl: See next page i

+

b, Mr. J. V. Parrish WPPSS Nuclear Project No. 3 Washington Public Power Supply System (WNP-3) Docket No. 50-508 cc:

Mr. Paul R. Bemis Director of Regulatory

.& Industry Affairs-Washington Public Power Supply System Mail Drop PE20 P.O. Box 968 Richland, Washington 99352 Mr. G. E. C. Doupe', Esq.

Washington Pubiic Power Supply System Mail Drop 396 P.' O. Box 968

' Richland, Washington 99352-0968 Mr. Frederick S. Adair, Chairman Energy Facility Site Evaluation Council State of Washington

- P. O. Box 43172 Olympia, Washington 98504-3172 Mr. Eugene Rosolie Coalition for Safe Power Northwest Environmental Advocates -

133 South West 2nd, Suite 302 Portland, Oregon 97204

[ Regional Administrator Region IV U.S. Nuclear Regulatory Commission ,

611 Ryan Plaza Drive, Suite 400 '

- Arlington, Texas 76011-8064

. Mr. Douglas Coleman Washington Public Power Supply System Mail Drop PE20

. P. O. Box 968

. l,chland, Washington 99352