ML20215D862: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 5
| page count = 5
| project =
| stage = Other
}}
}}



Latest revision as of 04:08, 7 October 2021

Forwards Cost Analyses for OL Application Reviews for 850623-860621
ML20215D862
Person / Time
Site: Satsop, Washington Public Power Supply System
Issue date: 06/15/1987
From: Holloway C
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8706190168
Download: ML20215D862 (5)


Text

,

JUN 151987 Docket Nos. 50 460/508 Washington Public Power Supply System ATTN: Mr. G. C. Sorensen, Manager Regulatory Programs ,

P.O. Box 968 1 3000 George Washington Way Richland, WA 99352 ] ,

J Gentlemen:

Consistent with the requirements of 10 CFR 170.12(b), we have completed the cost analyses for the WNP-1 and WNP-3 operating license application reviews for the period June 23, 1985 through June 21, 19_86.

The costs through that period are $90,380 for WNP-1 and $135,950 for WNP-3. The enclosures give a breakdown of the review costs by program ,

offices. Within the next few days, you will be sent invoices for these amounts. When making payment, please make reference to the invoice numbers.

Sincerely, t?p @ c. c:xa ern s a a C. James Holloway, Jr., Chief License Fee Management Branch Division of Accounting and Finance Office of Administration and Resources Management

Enclosures:

Operating License Review Costs (4)

DISTRIBUTION w/encls:

PDR LFMB Reactor File LPDR DFioravante, PMSB LFMB A/M File MKaltman, PRAB RMDiggs RVillafranco, PMSB CJHolloway DWeiss Reg?DocketIFile ARM /DAF R/F DW/LT/WPPSS LFMB R/F (3) 0FFICE : ARM /LFMB A FMB  : ARM /LFMB/  :  :  :  :

......... : ...._..,.f[j p .f

3 ggs:.._ %. . J ....:............;............:............:

Rkd SURNAME :LTremper: :CJfig7)bway :  :  :  :

DATE :6/ /A_/__87 :6//6/87 7.(/87

6/ l)  :  :  :  :

8706190168 870615 PDR ADOCK 05000460 A PDR-

< a l

l N

/

A Washington Public Power Supply System' Operating License Review Costs From 6/23/85 Through 12/21/85 FACILITY:~ WNP-l' DOCKET NO.: 50-460

\

]

c I

l j

Costs Per Profess'ional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended ' Costs Costs Costs

1. , ' NRR $62 31 $1,922 $62,653 $64,575 -
2. IE-HQ 53 -- -- -- --
3. REGIONS 53 80 4,240 -: 4,240 4 ACRS 62 -- -- -- --
5. NMSS 58 -- -- -- --

TOTAL COST: $68,815 i

s i

l l

I i

Y l

a .

1 1

Washington Public Power Supply System 1 Operating License Review Costs'From 12/22/85 Through 6/21/86 FACILITY: WNP-1 DOCKET N0.: 50-460 l

I Costs Per Professional Program Office Professional ' Staff-Hours Staff-Hour' Contractual Total Review Staff-Hour Expended <

Costs Costs- Costs' l

1. HRR $62 283 $17,546 $1,872' $19,418
2. IE-HQ 53 7 371 --

371 j t

3. REGIONS 53 33.5 1,776 -- 1,776
4. ACRS 62 -- -- -- --
5. NMSS 58 -- -- -- --

1 TOTAL COST: $21,565 i

1 1

4 l

r a ..

Washington Public Power Supply System Operating License Review Costs From 6/23/85 Through 12/21/85 FACILITY: WNP-3 ,

DOCKET NO.: 50-508 Costs Per Professional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended -

__ Costs ,

Costs Costs

1. NRR $62 493 $30,566 $1,386 $31,952

]

2. 7. E-HQ 53 272 14,416 206 14,622 ll j
3. REGIONS 53 653 34,609 -- 34,609 i i
4. ACRS 62 -- -- -- -- 1
5. NMSS 58 -- -- -- --

1

$81,183 Less Credit - 174* l TOTAL COST: $81,009 oCredit given for 2.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (ACRS) billed on Invoice No. E0495 dated 3/12/86 (reference NRC letter dated 4/30/86, Diggs to Sorensen).

1 Washiagton Public Power Supply System

.0perating License Review Costs From 6/23/85 Through 12/21/85 l

FACILITY: WNP-3 {

'J 1

. DOCKET N0.i 50-508 l

Costs Per Professional-Program Office Professional Staff-Hours- Staff-Hour Contractual . Total Review Staff-Hour- Expended - Costs Costs Costs

1. NRR $62 108 $6,696- .$1,923 $8,619
2. IE-HQ 53 237 12,561 -- 12,561'
3. REGIONS 53 637 33,761 -- ~33,761-  !
4. ACRS 62 -- -- -- -.
5. NMSS 58 -- -- -- --

TOTAL COST: $54,941