ML20203F493: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:'
f . ..
APPENDIX A NOTICE OF VIOLATION Public Service Company of Colorado                  Docket: 50-267/86-09 Fort St. Vrain Nuclear Generating Station          License: DPR-34 During en NRC inspection conducted on March 31 through April 4,1986, one violation of NRC requirements was identified. The violation involved failure to follow procedures and failure to control design changes. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions,"
10 CFR Part 2, Appendix C (1985), the violations are listed below:
Failure to Have Document Control 10 CFR Part 50, Criterion VI, and the Fort St. Vrain approved Quality Assurance Plan require that measures be established to control the issuance of documents such as drawings, including changes thereto, for all activities that affect quality.
Contrary to the above, two schematic drawings (E - drawings), used by a technician to determine control _ circuit logic in accomplishment of maintenanceworkonStationServiceRequest(SSR) 86503939, were not up to date.
This is a Severity Level IV violation.    (SupplementI)(50-267/8609-01).
Pursuant to the provisions of 10 CFR 2.201, Public Service Company of Colorado is hereby required to submit to this office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the reason for the violations if admitted, (2) the corrective steps which have been taken and the results achieved, (3) the corrective steps which will be taken to avoid further violations, and (4) the date wh u full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.
Dated at Arlington, Texas, this 25th day of July 1986.
8607310094 e60725 7 PDR    ADOCK 0500 G}}

Latest revision as of 19:43, 31 December 2020

Notice of Violation from Insp on 860331-0404
ML20203F493
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/25/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20203F490 List:
References
50-267-86-09, 50-267-86-9, NUDOCS 8607310094
Download: ML20203F493 (1)


Text

'

f . ..

APPENDIX A NOTICE OF VIOLATION Public Service Company of Colorado Docket: 50-267/86-09 Fort St. Vrain Nuclear Generating Station License: DPR-34 During en NRC inspection conducted on March 31 through April 4,1986, one violation of NRC requirements was identified. The violation involved failure to follow procedures and failure to control design changes. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions,"

10 CFR Part 2, Appendix C (1985), the violations are listed below:

Failure to Have Document Control 10 CFR Part 50, Criterion VI, and the Fort St. Vrain approved Quality Assurance Plan require that measures be established to control the issuance of documents such as drawings, including changes thereto, for all activities that affect quality.

Contrary to the above, two schematic drawings (E - drawings), used by a technician to determine control _ circuit logic in accomplishment of maintenanceworkonStationServiceRequest(SSR) 86503939, were not up to date.

This is a Severity Level IV violation. (SupplementI)(50-267/8609-01).

Pursuant to the provisions of 10 CFR 2.201, Public Service Company of Colorado is hereby required to submit to this office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the reason for the violations if admitted, (2) the corrective steps which have been taken and the results achieved, (3) the corrective steps which will be taken to avoid further violations, and (4) the date wh u full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

Dated at Arlington, Texas, this 25th day of July 1986.

8607310094 e60725 7 PDR ADOCK 0500 G