Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML20149G902 | | | number = ML20197E624 |
| | issue date = 07/11/1997 | | | issue date = 12/19/1997 |
| | title = Ack Receipt of 970702 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-395/97-03 | | | title = Discusses Insp Rept 50-395/97-03 on 970602.NRC Exercising Enforcement Discretion for Lack of Safety Significance of Need for Exemption During Licensing Process |
| | author name = Belisle G | | | author name = Reyes L |
| | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) | | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| | addressee name = Taylor G | | | addressee name = Taylor G |
Line 10: |
Line 10: |
| | license number = | | | license number = |
| | contact person = | | | contact person = |
| | document report number = 50-395-97-03, 50-395-97-3, NUDOCS 9707240119 | | | document report number = EA-97-543, NUDOCS 9712300045 |
| | document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE | | | document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE |
| | page count = 2 | | | page count = 3 |
| }} | | }} |
|
| |
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:_ _ . _. . | | {{#Wiki_filter:** , |
| ,
| | l December 19, 1997 EA 97 543 South Carolina Electric & Gas Company ATTN: Mr. Gary Vice President. Nuclear Operations Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville. SC 29065 SUBJECT: EXERCISE OF ENFORCEMENT DISCRETION (NRC INTEGRATED INSPECTION REPORT NO. 50-395/97-03) |
| .o July 11, 1997 South Carolina Electric & Gas Company ATTN: Mr. Gary Vice President, Nuclear Operations Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065 l
| |
| SUBJECT: NRC INSPECTION REPORT NOS. 50 395/97-03 | |
|
| |
|
| ==Dear Mr. Taylor:== | | ==Dear Mr. Taylor:== |
| i Thank you for your response of July 2,1997, to our Notice of Violation, i issued on June 2, 1997, concerning activities conducted at your V. C. Summer l facility. We have evaluated your response and found that it meets the '
| | This refers to the inspection at your V. C. Sumer reactor facility described in the subject inspection Report issued on June 2. 1997. During this inspection. the NRC identified that the requirements of 10 CFR 70.24. |
| requirements of 10 CFR 2.201. We will examine the implementation of your ; | |
| corrective. actions during future inspections. '
| |
| We appreciate your cooperation in this matter.
| |
|
| |
|
| Sincerely, j
| | Criticality Accident Requirements, were not met. Since the NRC was generically reviewing industry's compliance with 10 CFR 70.24 requirements, this issue was dispositioned as an Unresolved item (URI 50-395/97003-06). The URI involved the failure to have in place either an adequate criticality monitoring system for storage and handling of new (non irradiated) fuel or an NRC approved exemption to the requirement. |
| Original signed by George A. Belisle George A. Belisle Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No. 50-395 License No. NPF 12 cc: R. J. White Nuclear Coordinator (Mail Code 802)
| |
| S.C. Public Service Authority Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065 J. B. Knotts, Jr., Esq.
| |
|
| |
|
| Winston & Strawn 1400 L Street, NW Washington,'D. C. 20005 3502 cc continued: See page 2 f O
| | 10 CFR 70.24 requires that each licensee authorized to possess more than a small amount of s)ecial nuclear material (SNM) maintain in each area in which such material is landled, used, or stored a criticality monitoring system which will energize clearly audible alarm signals if accidental criticality occurs. The purpose of 10 CFR 70.24 is to ensure that, if a criticality were to occur during the handling of SNM. personnel would be alerted to that fact and would take appropriate action. |
| 9707240119 970711 hk,kkkk .
| |
| .
| |
| , PDR ADOCK 05000395 P PDR ftOf
| |
|
| |
|
| - . .. . - - - - . .-
| | Most nuclear power plant licensees were granted exem)tions from 10 CFR 70.24 during the construction of their plants as part of tie Part 70 license issued to permit the receipt of the initial core. Generally, these exemptions were not explicitly renewed when the Part 50 operating license was issued, which contained the combined Part 50 and Part 70 authority, in August 1981, the Tennessee Valley Authority (TVA), in the course of reviewing the operating licenses for its Browns Ferry facilities, noted that the exemption to 10 CFR 70.24 that had been granted during the construction phase had not been explicitly granted in the operating license. By letters dated August 11, 1931, and August 31, 1987 TVA requested an exemption from 10 CFR 70.24. On May 11. 1988. NRC informed TVA that "the previously issued exemptions are still in effect even though the specific provitions of the Part 70 licenses were not incorporated into the Part 50 license " Notwithstanding the correspondence with TVA the NRC has determined that in cases where a licensee received the exemption as part of the Part 70 license issued during the construction phase, both the Part 70 and Part 50 licenses should be examined to determine the status of the exemption. The NRC view now is that unless a licensee's licensing basis specifies otherwise, an exemption expires gn s t OFFICIAt C0"Y I |
| *
| | I PDR ADOCK 05000395 G PDR g |
| , | |
|
| |
|
| SCE&G 2 cc: Continued Chairman Fairfield County Council P. O. Drawer 60 Winnsboro, SC 29180 | | . _ . _ - _ |
| ;
| | _. . _ _ _ _ _ - - _ - _ __ _ _ _ _ _ - _ _ . . |
| Virgil R. Autry, Director Radioactive Waste Management | | ___._ __ _.- , |
| !
| | .- .. |
| !
| | |
| Bureau of Solid and Hazardous Waste Management S. C. Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 R. M. Fowlkes. Manager Operations (Mail Code 303) | | SCE&G 2 with the expiration of the Part 70 license. The NRC intends to amend 10 CFR 70.24 to provide for administrative controls in lieu of criticality monitors. |
| South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P. O. Box 88 | | |
| ;
| | The NRC has concluded that your facility was in violation of 10 CFR 70.24. |
| Jenkinsville, SC 29065 April Rice, Manager | | |
| . Nuclear Licensing & Operating
| | Numerous other facilities have similar circumstances. The NRC has reconsidered this violation and concluded based on the information discussed above that, although a violation did exist, it is appropriate to exercise , |
| , Ex wrience (Mail Code 830)
| | enforcement discretion for Violations involving Special Circumstances in accordance with Section Vil B.6 of the " General Statement of Policy and Procedures for NRC Enforcement Actions" (Enforcement Policy). NUREG-1600. The bases for exercising this discretion are the lack of safety significance of |
| Sout1 Carolina Electric & Gas Company Virgil C. Summer Nuclear Station '
| | ' |
| P. O. Box 88 4 Jenkinsv111e, SC 29065' | | the failure to meet 10 CFR 70.24: the failure of the NRC staff to recognize the need for an exemption during the licensing process: the. prior NRC position on this matter documented in its letter of May 11, 1988. to TVA concerning the lack of a need for an exemption for the Browns Ferry plant: and finally, the NRC's intention to amend 10 CFR 70.24 through rulemaking to provide for administrative controls in lieu of criticality monitors. |
| (o -
| | |
| | Therefore, I have been authorized after consultation with the Director. Office-of Enforcement to exercise enforcement discretion and not issue a violation for this matter. |
| | |
| | No response to this letter is required. in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC Public Document Room. |
| | |
| | Sincerely |
| | . |
| | Orig signed by Luis A. Reyes Luis A. Reyes |
| | . Regional Administrator Docket Nos.: 50 395 s License Nos.: NPF-12 cc: R. J. White Nuclear Coordinator Mail Code 802 S.C. Public Service Authority Virgil C. Summer Nuclear Station P. O, Box 88 Jenkinsville, SC 29065 J. B. Knotts, Jr., Esq._ |
| | Winston and Strawn 1400 L Street, NW Washington D. C. 20005-3502 Chairman Fairfield County Council P. O. Box 60 Winnsboro. SC 29180 |
| | . - |
| | -. |
| | |
| | e - |
| | : |
| | SCE&G 3 Virgil R. Autry. Director I Radioactive Waste Mana9ement i Bureau of Solid and Hazardous . |
| | Waste Management S. C. Department of Health and Environmental Control 2600 Bull Street Columbia. SC 29201 R. M. Fowlkas. Manager Operations (Mail Code 303) |
| | South Carolina Electric & Gas Company Virgil C.. Summer Nuclear Station P. O. Box 88 . |
| | ! |
| | Jenkinsville. SC 29065 April Rice. Manager Nuclear Licensing Experience (Mail&CodeOperating) |
| | 830 Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville. SC 29065 |
| | , |
| Distribution: | | Distribution: |
| '
| | J. Lieberman. OE OE: EA File (B. Summers. OE) (2 Letterhead) |
| A. Johnson, NRR R. Gibbs, RII P. Fillion, RII D. Jones, RII | | L. Garner Rll A. Johnson. NRR R. Gibbs. RII P. Fillion. Ril D. Jones. Ril W. Stansberry. RIl R. Aiello. Ril PUBLIC NRC Resident inspector U.S. Nuclear Regulatory Commission |
| 'W. Stansberry, RII 4 R. Aiello, RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission
| | ' |
| . Route 1, Box 64 Jenkinsville, SC 29065 i
| | Route 1. Box 64 Jenkinsville. SC offlCE Ril:00P Ril:RCS/ All:00P , f DE slamatunt -s, M {f ,J{f( |
| * l'
| | mafEE Rumag lOW ~Aedlw% JJennead por EGN97-01T Dast -1U lii MT 1L% MT 1H Yt 47 12/ MT 1U MT 1U MT 1U MT fBPY? iMil MD (MR) ED YES (MD I YES MD YER MD YES ED YES ED V |
| OFFICE Rif:DRP RffiffCM SIGNATtRE # v'
| | .OtrICIAL REtone COPY - |
| (
| | pousqEst unhE[Ga\nPe5\mst-70.M |
| '
| |
| NAME LGarner alt DATE 07 / 1 / 97 07 / /_97 07 / / 97 07 / / 97 07 / / 97 07 / / 97
| |
| . COPY 7 [ES) NO YES [ND) YES NO YES NO YES NO YES N0 l UttICIAL(Rt. CORD COPY DOCUMitti NMIL: G:\5UM9703.RE5 i
| |
| :
| |
| }} | | }} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J3141999-10-15015 October 1999 Requests Emergency Publication of Document Entitled South Carolina Electric & Gas Co;Vc Summer Nuclear Station,Environ Assessment Transmitted on 991015 to Ofc of Fr for Publication ML20217J3281999-10-15015 October 1999 Forwards Copy of Environ Assessment & Finding of No Significant Impact Re Application for Exemption from Requiremets of 10CFR50,Section 50.60(a) for VC Summer Nuclear Station ML20217F8851999-10-0808 October 1999 Forwards Insp Rept 50-395/99-06 on 990801-0911.One Violation Occurred Being Treated as NCV RC-99-0192, Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models1999-09-28028 September 1999 Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models RC-99-0181, Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment1999-09-21021 September 1999 Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment ML20212C5091999-09-15015 September 1999 Forwards Anticipated Schedule for Operator Licensing Exams for Sce&G.Util Requests That NRC Prepare Exams on Encl RC-99-0184, Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety1999-09-15015 September 1999 Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20211Q8911999-09-0101 September 1999 Sumbits Summary of Training Managers Conference on Recent Changes to Operator Licensing Program.Meeting Covered Changes to Regulations,Exam Stds,New Insp Program & Other Training Issues.List of Attendees Encl RC-99-0177, Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.111999-08-31031 August 1999 Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.11 RC-99-0173, Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr1999-08-31031 August 1999 Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr ML20211L5181999-08-30030 August 1999 Forwards Insp Rept 50-395/99-05 on 990620-0731.One Violation Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20211H2481999-08-25025 August 1999 Forwards Four Controlled Copies of Amend 43 to Physcial Security Plan. Summary of Plan Changes, Are Included as Part of Each Controlled Copy.Encls Withheld Per 10CFR73.21 05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet1999-08-24024 August 1999 Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Completed RC-99-0171, Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors1999-08-23023 August 1999 Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors RC-99-0152, Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G1999-08-19019 August 1999 Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G RC-99-0164, Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d)1999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d) ML20210Q4851999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at VC Summer.Requests Info Re Individuals Who Will Take Exam,Personnel Who Will Have Access to Exam.Sample Registration Ltr Encl ML20210R5501999-08-0505 August 1999 Ack Receipt of 990707 Response to NCVs Identified on 990607 Re Activities Conducted at VC Summer.Informs That After Consideration of Basis for Denial of NCV 50-395/99-03, Concluded,For Reasons Stated,That NCV Occurred RC-99-0156, Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm1999-08-0404 August 1999 Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm RC-99-0147, Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-19881999-07-26026 July 1999 Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-1988 ML20210B7451999-07-22022 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1 & Rev 1,suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210E3771999-07-16016 July 1999 Forwards Insp Rept 50-395/99-04 on 990509-0619.One Violation Being Treated as Noncited Violation RC-99-0127, Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-021999-07-0707 July 1999 Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-02 RC-99-0129, Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist1999-07-0707 July 1999 Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist RC-99-0131, Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld1999-07-0707 July 1999 Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld ML20210B7111999-07-0606 July 1999 Provides Summary of 990701 Meeting with Sce&G in Atlanta, Georgia Re Recent Virgil C Summer Refueling Outage & Other Items of Interest.List of Meeting Attendees & Licensee Presentation Handouts Encl RC-99-0114, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation1999-06-30030 June 1999 Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation ML20195H5861999-06-0707 June 1999 Confirms 990604 Telcon Between J Proper & R Haag Re Meeting Scheduled for 990701 in Atlanta,Ga,To Discuss Plant Refueling Outage & Items of Interest ML20207H5241999-06-0707 June 1999 Forwards Insp Rept 50-395/99-03 on 990328-0508.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207D1881999-05-28028 May 1999 Informs That Effective 990524,K Cotton Assigned as Project Manager,Project Directorate II-1,for Virgil C Summer Nuclear Station 05000395/LER-1999-006, Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)1999-05-17017 May 1999 Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1) RC-99-0104, Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy1999-05-13013 May 1999 Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy RC-99-0105, Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station1999-05-13013 May 1999 Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station 05000395/LER-1999-005, Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components1999-05-12012 May 1999 Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components ML20206L5121999-05-11011 May 1999 Informs That NRC Reorganized,Effective 990328.Reorganization Chart Encl ML20206P5771999-05-0707 May 1999 Informs That During 980519 Telcon Between T Matlosz & G Hopper,Arrangements Were Made for Administration of Licensing Exam at Virgil C Summer Nuclear Station During Wk of 990927 RC-99-0080, Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective1999-05-0606 May 1999 Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective RC-99-0097, Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.111999-05-0606 May 1999 Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.11 RC-99-0092, Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI1999-05-0303 May 1999 Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI RC-99-0090, Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b1999-04-29029 April 1999 Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b ML20206E1681999-04-29029 April 1999 Informs That FERC & NRC Will Conduct Category I Svc Water Pond (Swp) Dam Insp at Facility on 990610 ML20206P5021999-04-26026 April 1999 Forwards Insp Rept 50-395/99-02 on 990214-0327.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR 05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl1999-04-12012 April 1999 Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl ML20205T2311999-04-0909 April 1999 Informs That on 990318,A Koon & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Schedules for Wk of 000807 for Approx Eight Candidates ML20205G4181999-04-0101 April 1999 Advises That 970725 Application & Affidavit Which Submitted, WCAP-14932, Probabilistic & Economic Evaluation of Reactor Vessel Closure Head Penetration Integrity for Plant, Will Be Withheld from Public Disclosure,Per 10CFR2.790(a)(4) RC-99-0078, Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e)1999-04-0101 April 1999 Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e) 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217J3141999-10-15015 October 1999 Requests Emergency Publication of Document Entitled South Carolina Electric & Gas Co;Vc Summer Nuclear Station,Environ Assessment Transmitted on 991015 to Ofc of Fr for Publication ML20217J3281999-10-15015 October 1999 Forwards Copy of Environ Assessment & Finding of No Significant Impact Re Application for Exemption from Requiremets of 10CFR50,Section 50.60(a) for VC Summer Nuclear Station ML20217F8851999-10-0808 October 1999 Forwards Insp Rept 50-395/99-06 on 990801-0911.One Violation Occurred Being Treated as NCV ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20211Q8911999-09-0101 September 1999 Sumbits Summary of Training Managers Conference on Recent Changes to Operator Licensing Program.Meeting Covered Changes to Regulations,Exam Stds,New Insp Program & Other Training Issues.List of Attendees Encl ML20211L5181999-08-30030 August 1999 Forwards Insp Rept 50-395/99-05 on 990620-0731.One Violation Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20210R5501999-08-0505 August 1999 Ack Receipt of 990707 Response to NCVs Identified on 990607 Re Activities Conducted at VC Summer.Informs That After Consideration of Basis for Denial of NCV 50-395/99-03, Concluded,For Reasons Stated,That NCV Occurred ML20210Q4851999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at VC Summer.Requests Info Re Individuals Who Will Take Exam,Personnel Who Will Have Access to Exam.Sample Registration Ltr Encl ML20210B7451999-07-22022 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1 & Rev 1,suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210E3771999-07-16016 July 1999 Forwards Insp Rept 50-395/99-04 on 990509-0619.One Violation Being Treated as Noncited Violation ML20210B7111999-07-0606 July 1999 Provides Summary of 990701 Meeting with Sce&G in Atlanta, Georgia Re Recent Virgil C Summer Refueling Outage & Other Items of Interest.List of Meeting Attendees & Licensee Presentation Handouts Encl ML20195H5861999-06-0707 June 1999 Confirms 990604 Telcon Between J Proper & R Haag Re Meeting Scheduled for 990701 in Atlanta,Ga,To Discuss Plant Refueling Outage & Items of Interest ML20207H5241999-06-0707 June 1999 Forwards Insp Rept 50-395/99-03 on 990328-0508.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207D1881999-05-28028 May 1999 Informs That Effective 990524,K Cotton Assigned as Project Manager,Project Directorate II-1,for Virgil C Summer Nuclear Station ML20206L5121999-05-11011 May 1999 Informs That NRC Reorganized,Effective 990328.Reorganization Chart Encl ML20206P5771999-05-0707 May 1999 Informs That During 980519 Telcon Between T Matlosz & G Hopper,Arrangements Were Made for Administration of Licensing Exam at Virgil C Summer Nuclear Station During Wk of 990927 ML20206E1681999-04-29029 April 1999 Informs That FERC & NRC Will Conduct Category I Svc Water Pond (Swp) Dam Insp at Facility on 990610 ML20206P5021999-04-26026 April 1999 Forwards Insp Rept 50-395/99-02 on 990214-0327.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML20205T2311999-04-0909 April 1999 Informs That on 990318,A Koon & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Schedules for Wk of 000807 for Approx Eight Candidates ML20205G4181999-04-0101 April 1999 Advises That 970725 Application & Affidavit Which Submitted, WCAP-14932, Probabilistic & Economic Evaluation of Reactor Vessel Closure Head Penetration Integrity for Plant, Will Be Withheld from Public Disclosure,Per 10CFR2.790(a)(4) ML20196K9771999-03-25025 March 1999 Refers to Open Meeting Conducted at Licensee Request at NRC Region II Offices in Atlanta,Ga on 990315 Re Upcoming April 1999 Refueling Outage,Back Leakage Into Residual Heat Removal Sys & Licensee Position on Hazard Barriers ML20205D7981999-03-23023 March 1999 Advises of NRC Planned Insp Effort Resulting from Summer Plant Performance Review for Period July 1998 Through Jan 1999.Historical Listing of Plant Issues & Details of NRC Insp Plan for Next Eight Months Encl ML20204J7201999-03-15015 March 1999 Forwards Insp Rept 50-395/99-01 on 990103-0213.No Violations Noted.Sce&G Conduct of Activities During Insp Period Generally Characterized by Safety Conscious Operations & Conservative Decision Making ML20207J0661999-03-0303 March 1999 Confirms 990226 Telephone Conversation Between a Rice & M Widman Re Meeting Scheduled for 990315.Purpose of Meeting Will Be to Discuss VC Summer Upcoming Refueling Outage & Items of Interest ML20203F4351999-02-12012 February 1999 Forwards SER Finding Licensee Adequately Addressed GL 96-05 Requested Actions & Have Acceptable Program to Periodically Verify safety-related MOV design-basis Capability at Virgil C Summer Nuclear Station ML20203G5751999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Ltr Indicating No Candidates or Ltr Listing Names of Candidates for Exam ML20203G4091999-02-0101 February 1999 Forwards Insp Rept 50-395/98-10 on 981122-990102.No Violations Noted.Licensee Conduct of Activities at VC Summer Facility Was Generally Characterized by Safety Conscious Operations & Conservative Decision Making ML20199J0571999-01-21021 January 1999 Forwards RAI Re 980918 Request for Amend to Plant Ts.Amend Would Incorporate New Best Estimate Analyze for Core Operations Core Power Distribution Monitoring & Support Sys Into Ts.Response Requested within 15 Days of Receipt of Ltr ML20199K0281999-01-13013 January 1999 Discusses NRC Organization Charts to Be Implemented by Region 2 on 990117.Forwards Organization Charts for Info ML20198Q7471999-01-0505 January 1999 Informs That 981204 Request to Extend RAI Response Period Re GL 97-01 to 990115 Has Been Accepted ML20199E5971998-12-23023 December 1998 Provides Summary of Training Manager Conference Conducted on 981105.Forwards Agenda,List of Attendees,Handouts & Preliminary Schedule for FY99 & FY00.Goal of Providing Open Forum of Operator Licensing Issues Met ML20198N8341998-12-21021 December 1998 Forwards Insp Rept 50-395/98-09 on 981011-1121 & NOV Re Failure to Follow Procedures During Snubber Testing ML20198F4181998-12-18018 December 1998 Forwards SER Granting Licensee 980513 Request for Approval to Temporarily Repair ASME Code Class 3 Piping at VC Summer Nuclear Station Pursuant to 10CFR50.55a(g)(6)(i) ML20198B7611998-12-0303 December 1998 Informs That on 981007,generic Fundamentals Exam Was Administered to 148 Candidates at 21 Facilities.Summary of Statistical Results of Exam Listed.Contents of Exam Along with Associated Input Data Needed for Updating Catalog Encl ML20196G0981998-12-0303 December 1998 Requests Proposed Alternatives to Confirm That Listed Structures Free from Gross Erosion or Other Effects That Could Impair Structures Stability,Per NRC Category I SW Pond Dam Insp ML20198A7711998-12-0202 December 1998 Advises of Planned Insp Effort Resulting from 981102 Insp Planning Meeting.Details of Insp Plan for Next 4 Months & Historical Listing of Plant Issues,Called Plant Issues Matrix Encl ML20196D5831998-11-12012 November 1998 Informs That on 981007,NRC Administered Gfes of Written Operator Licensing Examination.Copies of Both Forms of Exam Including Answer Keys,Grading Results for Facility & Copies of Indivividual Answer Sheets Encl.Without Encl ML20195E9761998-11-0909 November 1998 Forwards Insp Rept 50-395/98-08 on 980906-1010.No Violations Noted.Conduct of Activities at VC Summer Facility Was Generally Characterized by Safety Conscious Operations & Conservative Decision Making ML20155G4451998-11-0404 November 1998 Forwards Safety Evaluation Re Relief Request to ASME Code Case N-416-1,for Class 1,2 & 3 Piping & Components.Proposed Alternative with Addl Exams Proposed,In Lieu of Performing Sys Hydrostatic Test Provides Acceptable Level of Safety ML20154Q9451998-10-21021 October 1998 Forwards SE Re Approval to Use ASME Code Case N-498-1 for Periodic Hydrostatic Testing of ASME Class 3 Piping at Plant ML20155B8071998-10-0909 October 1998 Extends Invitation to Attend Training Managers Conference on 981105 in Atlanta,Georgia.Conference Designed to Inform Regional Training & Operations Mgt of Issues & Policies That Affect Licensing of Reactor Plant Operators ML20155B1561998-10-0505 October 1998 Forwards Insp Repts 50-395/98-07 on 980726-0905.No Violations Noted ML20239A3671998-09-24024 September 1998 Forwards Insp Rept 50-395/98-06 on 980628-0725.No Violations Noted.During Insp Period,Nrc Received Response to NOV 50-395/98002-01.Response Meets Requirements of 10CFR2.201 ML20151V1911998-09-0808 September 1998 Forwards Request for Addl Info Re GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations. Response Requested within 90 Days of Date of Ltr ML20153F0261998-09-0202 September 1998 Refers to Insp Rept 50-395/98-06 Issued on 980824.Ltr Transmitting Insp Rept Referred to Wrong Violation Number in Paragraph Three.Corrected Page with Violation Number 50-395/98004-01 Encl ML20151T9241998-08-27027 August 1998 Informs of Change Being Implemented by Region II Re Administrative Processing of Licensee Responses to Novs. Licensee NOV Responses Which Accept Violations & Require No Addl Communication to Be Ack in Cover Ltr of Next Insp Rept ML20239A4521998-08-26026 August 1998 Forwards SALP Insp Rept 50-395/98-99 for Period of 961027- 980725 1999-09-09
[Table view] |
Inspection Report - Summer - 1997003 |
---|
|
|
Text
l December 19, 1997 EA 97 543 South Carolina Electric & Gas Company ATTN: Mr. Gary Vice President. Nuclear Operations Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville. SC 29065 SUBJECT: EXERCISE OF ENFORCEMENT DISCRETION (NRC INTEGRATED INSPECTION REPORT NO. 50-395/97-03)
Dear Mr. Taylor:
This refers to the inspection at your V. C. Sumer reactor facility described in the subject inspection Report issued on June 2. 1997. During this inspection. the NRC identified that the requirements of 10 CFR 70.24.
Criticality Accident Requirements, were not met. Since the NRC was generically reviewing industry's compliance with 10 CFR 70.24 requirements, this issue was dispositioned as an Unresolved item (URI 50-395/97003-06). The URI involved the failure to have in place either an adequate criticality monitoring system for storage and handling of new (non irradiated) fuel or an NRC approved exemption to the requirement.
10 CFR 70.24 requires that each licensee authorized to possess more than a small amount of s)ecial nuclear material (SNM) maintain in each area in which such material is landled, used, or stored a criticality monitoring system which will energize clearly audible alarm signals if accidental criticality occurs. The purpose of 10 CFR 70.24 is to ensure that, if a criticality were to occur during the handling of SNM. personnel would be alerted to that fact and would take appropriate action.
Most nuclear power plant licensees were granted exem)tions from 10 CFR 70.24 during the construction of their plants as part of tie Part 70 license issued to permit the receipt of the initial core. Generally, these exemptions were not explicitly renewed when the Part 50 operating license was issued, which contained the combined Part 50 and Part 70 authority, in August 1981, the Tennessee Valley Authority (TVA), in the course of reviewing the operating licenses for its Browns Ferry facilities, noted that the exemption to 10 CFR 70.24 that had been granted during the construction phase had not been explicitly granted in the operating license. By letters dated August 11, 1931, and August 31, 1987 TVA requested an exemption from 10 CFR 70.24. On May 11. 1988. NRC informed TVA that "the previously issued exemptions are still in effect even though the specific provitions of the Part 70 licenses were not incorporated into the Part 50 license " Notwithstanding the correspondence with TVA the NRC has determined that in cases where a licensee received the exemption as part of the Part 70 license issued during the construction phase, both the Part 70 and Part 50 licenses should be examined to determine the status of the exemption. The NRC view now is that unless a licensee's licensing basis specifies otherwise, an exemption expires gn s t OFFICIAt C0"Y I
I PDR ADOCK 05000395 G PDR g
. _ . _ - _
_. . _ _ _ _ _ - - _ - _ __ _ _ _ _ _ - _ _ . .
___._ __ _.- ,
.- ..
SCE&G 2 with the expiration of the Part 70 license. The NRC intends to amend 10 CFR 70.24 to provide for administrative controls in lieu of criticality monitors.
The NRC has concluded that your facility was in violation of 10 CFR 70.24.
Numerous other facilities have similar circumstances. The NRC has reconsidered this violation and concluded based on the information discussed above that, although a violation did exist, it is appropriate to exercise ,
enforcement discretion for Violations involving Special Circumstances in accordance with Section Vil B.6 of the " General Statement of Policy and Procedures for NRC Enforcement Actions" (Enforcement Policy). NUREG-1600. The bases for exercising this discretion are the lack of safety significance of
'
the failure to meet 10 CFR 70.24: the failure of the NRC staff to recognize the need for an exemption during the licensing process: the. prior NRC position on this matter documented in its letter of May 11, 1988. to TVA concerning the lack of a need for an exemption for the Browns Ferry plant: and finally, the NRC's intention to amend 10 CFR 70.24 through rulemaking to provide for administrative controls in lieu of criticality monitors.
Therefore, I have been authorized after consultation with the Director. Office-of Enforcement to exercise enforcement discretion and not issue a violation for this matter.
No response to this letter is required. in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC Public Document Room.
Sincerely
.
Orig signed by Luis A. Reyes Luis A. Reyes
. Regional Administrator Docket Nos.: 50 395 s License Nos.: NPF-12 cc: R. J. White Nuclear Coordinator Mail Code 802 S.C. Public Service Authority Virgil C. Summer Nuclear Station P. O, Box 88 Jenkinsville, SC 29065 J. B. Knotts, Jr., Esq._
Winston and Strawn 1400 L Street, NW Washington D. C. 20005-3502 Chairman Fairfield County Council P. O. Box 60 Winnsboro. SC 29180
. -
-.
e -
SCE&G 3 Virgil R. Autry. Director I Radioactive Waste Mana9ement i Bureau of Solid and Hazardous .
Waste Management S. C. Department of Health and Environmental Control 2600 Bull Street Columbia. SC 29201 R. M. Fowlkas. Manager Operations (Mail Code 303)
South Carolina Electric & Gas Company Virgil C.. Summer Nuclear Station P. O. Box 88 .
!
Jenkinsville. SC 29065 April Rice. Manager Nuclear Licensing Experience (Mail&CodeOperating)
830 Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville. SC 29065
,
Distribution:
J. Lieberman. OE OE: EA File (B. Summers. OE) (2 Letterhead)
L. Garner Rll A. Johnson. NRR R. Gibbs. RII P. Fillion. Ril D. Jones. Ril W. Stansberry. RIl R. Aiello. Ril PUBLIC NRC Resident inspector U.S. Nuclear Regulatory Commission
'
Route 1. Box 64 Jenkinsville. SC offlCE Ril:00P Ril:RCS/ All:00P , f DE slamatunt -s, M {f ,J{f(
mafEE Rumag lOW ~Aedlw% JJennead por EGN97-01T Dast -1U lii MT 1L% MT 1H Yt 47 12/ MT 1U MT 1U MT 1U MT fBPY? iMil MD (MR) ED YES (MD I YES MD YER MD YES ED YES ED V
.OtrICIAL REtone COPY -
pousqEst unhE[Ga\nPe5\mst-70.M