ML19259C079: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:* | {{#Wiki_filter:* | ||
OPERATING DATA REPORT DOCKET NO. 50-334 DATE 6/6/79 : | OPERATING DATA REPORT DOCKET NO. 50-334 DATE 6/6/79 : | ||
COMPLETED BY D. H. Timko -- | COMPLETED BY D. H. Timko -- | ||
Line 25: | Line 24: | ||
: 1. Unit Name: Beaver Valley Power Station, Unit #1 Notes | : 1. Unit Name: Beaver Valley Power Station, Unit #1 Notes | ||
: 2. Reporting Period: if1 v . 1974 ~ | : 2. Reporting Period: if1 v . 1974 ~ | ||
: 3. Licensed Thermal Power (MWt): WO | : 3. Licensed Thermal Power (MWt): WO | ||
: 4. Nameplate Rating (Gross MWe): 923 | : 4. Nameplate Rating (Gross MWe): 923 | ||
Line 51: | Line 49: | ||
: 25. If Shur Down At End Of Report Period. Estimated Date of Startup: July 6, 1979 . | : 25. If Shur Down At End Of Report Period. Estimated Date of Startup: July 6, 1979 . | ||
: 26. Units in Test Status tPrior to Commercial Operation): Forecast Achieved INITIA L CRITICA LtTY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPER ATION N/A N/A 7906120328 2285 061 m) | : 26. Units in Test Status tPrior to Commercial Operation): Forecast Achieved INITIA L CRITICA LtTY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPER ATION N/A N/A 7906120328 2285 061 m) | ||
AVERAGE DAIL UNIT POWER LEVEL DOCKET NO. 50-334 LWIT BVPS Unit #1 DATE 6/6/79 .- | |||
DATE 6/6/79 | |||
COMPLETED BY D. R. Timko TELEPl!ONE 412-643-5023 | COMPLETED BY D. R. Timko TELEPl!ONE 412-643-5023 | ||
.. ~ | .. ~ | ||
MON 111 M3V- 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net ) | MON 111 M3V- 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net ) | ||
Line 63: | Line 57: | ||
0 0 39 4 0 0 20 S | 0 0 39 4 0 0 20 S | ||
0 0 21 6 | 0 0 21 6 | ||
0 0 22 | 0 0 22 1 0 y 0 8 0 ;4 0 9 0 25 0 0 0 10 -26 0 0 11 27 0 0 12 33 13 0 0 29 0 0 14 30 IS 0 3g 0 16 0 INSTRUCTIONS - | ||
1 0 y 0 8 0 ;4 0 9 0 25 0 0 0 10 -26 0 0 11 27 0 0 12 33 13 0 0 29 0 0 14 30 IS 0 3g 0 16 0 | |||
INSTRUCTIONS - | |||
On this format.!ist the average daily unit power lesel in MWe Net for each day in the reporting inonth. Cinnpute :o the nesrest whole megswatt. | On this format.!ist the average daily unit power lesel in MWe Net for each day in the reporting inonth. Cinnpute :o the nesrest whole megswatt. | ||
o""o a o r- 2285 062 mm | o""o a o r- 2285 062 mm | ||
~A oB Na[m , | ~A oB Na[m , | ||
DOCKET NO. 50-334 UNIT SilUTDOWNS AND POWER REDUCTIONS BVPS Unit al UNIT NAhlE DATE 6/6/79 REPORT AIONTil May, 1979 COhfPLETED ilY _D. R. Tirkn TELEPilONE 412-643-5023 | DOCKET NO. 50-334 UNIT SilUTDOWNS AND POWER REDUCTIONS BVPS Unit al UNIT NAhlE DATE 6/6/79 REPORT AIONTil May, 1979 COhfPLETED ilY _D. R. Tirkn TELEPilONE 412-643-5023 | ||
$d (M | $d (M | ||
Line 78: | Line 67: | ||
r | r | ||
'l 9 | 'l 9 | ||
.5 g 3 yYd Licensee jg h, Cause & Cenrectisc | .5 g 3 yYd Licensee jg h, Cause & Cenrectisc | ||
%. DJ'e i 3g j 255 Eveni 17 53 Attian to g | %. DJ'e i 3g j 255 Eveni 17 53 Attian to g | ||
* f~ es jgg Report s aO j' Prevens Recurrente | * f~ es jgg Report s aO j' Prevens Recurrente 0 | ||
74 12 790401 F 744.0 F 1 78-53 ZZ ZZZZZZ Reactor shutdovn for design review of M piping supports for Reactor Coolant b and various other Category I piping. | |||
.) | .) | ||
d. | d. | ||
D LJ'1 O | D LJ'1 O | ||
I 2 3 4 F: Forced Reason: Method: Exhibit G - Instintlions 5: Schedn!cd A.Eiguipment Failure (Explain) 141anual for Psepacation of Data D41aintenance of Test 241anual Serain. Entr> Sheets for Licensee C. Refueling '3.AutoinJtic Strain. Event Report ILER) fileINUREG D. Regulatory Restriction -l Other (Explain) 01611 1 Operator Training & License Examination f Adnunistrative 5 G Operational Leror li'xplain t Eslubit I Same* Source P)/77) Il Other ilSplain t i 1. ki | |||
I 2 3 4 | |||
F: Forced Reason: Method: Exhibit G - Instintlions 5: Schedn!cd A.Eiguipment Failure (Explain) 141anual for Psepacation of Data D41aintenance of Test 241anual Serain. Entr> Sheets for Licensee C. Refueling '3.AutoinJtic Strain. Event Report ILER) fileINUREG D. Regulatory Restriction -l Other (Explain) 01611 1 Operator Training & License Examination f Adnunistrative 5 G Operational Leror li'xplain t Eslubit I Same* Source P)/77) Il Other ilSplain t i 1. ki | |||
~ | ~ | ||
DUQUESNE LIGHT COMPANY Beaver Valley Power Station Narrative Summary Of Operating Experience - May, 1979 , | DUQUESNE LIGHT COMPANY Beaver Valley Power Station Narrative Summary Of Operating Experience - May, 1979 , | ||
'k | 'k | ||
~~ | ~~ | ||
Date Event May 1 to Station in Operational Mode 5 with Tavg between 100F and May 31 115F. The RCS level is being maintained at the elevation of the system cold leg pipe centerlines. . | Date Event May 1 to Station in Operational Mode 5 with Tavg between 100F and May 31 115F. The RCS level is being maintained at the elevation of the system cold leg pipe centerlines. . | ||
Major Safety Related Maintei.ance - May, 1979 | Major Safety Related Maintei.ance - May, 1979 | ||
: 1. Inspection and replacement, as required, of the reactor coolant pump seals along with continued installation of the new Reactor Coolant Pump Seal Maintenance System. | : 1. Inspection and replacement, as required, of the reactor coolant pump seals along with continued installation of the new Reactor Coolant Pump Seal Maintenance System. | ||
: 2. Installation of the high-density spent fuel racks was completed. Testing of the racks is in progress and is expected to be completed early in June. | : 2. Installation of the high-density spent fuel racks was completed. Testing of the racks is in progress and is expected to be completed early in June. | ||
: 3. Completed annual ISI inspection of relief valves. | : 3. Completed annual ISI inspection of relief valves. | ||
2285 064 6 | |||
2285 064 | |||
6 | |||
+ | + | ||
6 | 6 O | ||
e t | |||
t | |||
_- . -}} | _- . -}} |
Latest revision as of 08:02, 22 February 2020
ML19259C079 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 06/06/1979 |
From: | Timko D DUQUESNE LIGHT CO. |
To: | |
Shared Package | |
ML19259C076 | List: |
References | |
NUDOCS 7906120328 | |
Download: ML19259C079 (4) | |
Text
OPERATING DATA REPORT DOCKET NO. 50-334 DATE 6/6/79 :
COMPLETED BY D. H. Timko --
TELEPHONE. Ju 2-64 3-5'J2 3 #
OPERATING STATUS
- 1. Unit Name: Beaver Valley Power Station, Unit #1 Notes
- 2. Reporting Period: if1 v . 1974 ~
- 3. Licensed Thermal Power (MWt): WO
- 4. Nameplate Rating (Gross MWe): 923
- 5. Design Electrical Rating (Net MWe): 852
- 6. Maximum Dependable Capacity (Gross MWe): 845
- 7. Maximum Dependable Capacity (Net MWe): 817
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe): None
- 10. Reasons For Restrictions,if Any:. N/A This Month Yr..to.Date ~ Cumulative
- 11. Hours in Reporting Period 744 3,623 27,023
- 12. Number Of Hours Reactor Was Critical 0 1,166.61 11,362.68
- 13. Reactor Reserve Shutdown Hours 0 0 4.482.80
- 14. Hours Generator On Line 0 1.106.57 10,710.74
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Cross Thermal Energy Generated (MWH) 0 2,557,151.22 23,425,546.17
- 17. Gross Electrical Energy Generated (MWH) 0 834.600 7.173.14o
- 18. Net Electrical Energy Generated (MWH) 0 744,989 6,567,357
- 19. Unit Service Factor 0 30.5 43.9
- 20. Unit Availability Factor 0 30.5 43.9
- 21. Unit Capacity Factor (Using MDC Net) 0 26.2 37,5
- 22. Unit Capacity Factor (Using DER Net) 0 25.1 35.9
- 23. Unit Forced Outage Rate 100 69.5 46.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
September, 1979 - Major Modification and Refueling Outace
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup: July 6, 1979 .
- 26. Units in Test Status tPrior to Commercial Operation): Forecast Achieved INITIA L CRITICA LtTY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPER ATION N/A N/A 7906120328 2285 061 m)
AVERAGE DAIL UNIT POWER LEVEL DOCKET NO. 50-334 LWIT BVPS Unit #1 DATE 6/6/79 .-
COMPLETED BY D. R. Timko TELEPl!ONE 412-643-5023
.. ~
MON 111 M3V- 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net )
1 0 g7 0 2 0 0 18 3
0 0 39 4 0 0 20 S
0 0 21 6
0 0 22 1 0 y 0 8 0 ;4 0 9 0 25 0 0 0 10 -26 0 0 11 27 0 0 12 33 13 0 0 29 0 0 14 30 IS 0 3g 0 16 0 INSTRUCTIONS -
On this format.!ist the average daily unit power lesel in MWe Net for each day in the reporting inonth. Cinnpute :o the nesrest whole megswatt.
o""o a o r- 2285 062 mm
~A oB Na[m ,
DOCKET NO. 50-334 UNIT SilUTDOWNS AND POWER REDUCTIONS BVPS Unit al UNIT NAhlE DATE 6/6/79 REPORT AIONTil May, 1979 COhfPLETED ilY _D. R. Tirkn TELEPilONE 412-643-5023
$d (M
EwJ _ ~g -
r
'l 9
.5 g 3 yYd Licensee jg h, Cause & Cenrectisc
%. DJ'e i 3g j 255 Eveni 17 53 Attian to g
- f~ es jgg Report s aO j' Prevens Recurrente 0
74 12 790401 F 744.0 F 1 78-53 ZZ ZZZZZZ Reactor shutdovn for design review of M piping supports for Reactor Coolant b and various other Category I piping.
.)
d.
D LJ'1 O
I 2 3 4 F: Forced Reason: Method: Exhibit G - Instintlions 5: Schedn!cd A.Eiguipment Failure (Explain) 141anual for Psepacation of Data D41aintenance of Test 241anual Serain. Entr> Sheets for Licensee C. Refueling '3.AutoinJtic Strain. Event Report ILER) fileINUREG D. Regulatory Restriction -l Other (Explain) 01611 1 Operator Training & License Examination f Adnunistrative 5 G Operational Leror li'xplain t Eslubit I Same* Source P)/77) Il Other ilSplain t i 1. ki
~
DUQUESNE LIGHT COMPANY Beaver Valley Power Station Narrative Summary Of Operating Experience - May, 1979 ,
'k
~~
Date Event May 1 to Station in Operational Mode 5 with Tavg between 100F and May 31 115F. The RCS level is being maintained at the elevation of the system cold leg pipe centerlines. .
Major Safety Related Maintei.ance - May, 1979
- 1. Inspection and replacement, as required, of the reactor coolant pump seals along with continued installation of the new Reactor Coolant Pump Seal Maintenance System.
- 2. Installation of the high-density spent fuel racks was completed. Testing of the racks is in progress and is expected to be completed early in June.
- 3. Completed annual ISI inspection of relief valves.