ML19317E581: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:* | {{#Wiki_filter:* | ||
I* UNIT Oconte 3 DATE 11/6/75 DOCKET NO. 50-287 PREPARED BY E. D. Elakeman OPERATING STATUS ; | |||
I* UNIT Oconte 3 | |||
: 1. REPORTING PERIOD: October 1 THROUGH October 31. 1975 l | : 1. REPORTING PERIOD: October 1 THROUGH October 31. 1975 l | ||
GROSS HOURS IN REPORTING PERIOD: 745.00 l | GROSS HOURS IN REPORTING PERIOD: 745.00 l | ||
Line 38: | Line 36: | ||
: 14. UNIT SEAVICE FACTOR 59.2 73.2 71.9 | : 14. UNIT SEAVICE FACTOR 59.2 73.2 71.9 | ||
: 15. UNIT AVAILABILITY FACTOR 59.2 73.2 71.9 ; | : 15. UNIT AVAILABILITY FACTOR 59.2 73.2 71.9 ; | ||
: 16. UNIT CAPACITY FACTOR (Using Net 50.2 61.0 60.1 Capability) | : 16. UNIT CAPACITY FACTOR (Using Net 50.2 61.0 60.1 Capability) | ||
: 17. UNIT CAPACITY FACTOR * | : 17. UNIT CAPACITY FACTOR * | ||
(Using Design Mwe) 49.3 59.9 59.0 !< | (Using Design Mwe) 49.3 59.9 59.0 !< | ||
~ | ~ | ||
Line 47: | Line 43: | ||
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DUPATION OF EACH:) | : 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DUPATION OF EACH:) | ||
: 20. IF SHUTDOWN A' END OF REPORT PE310D, ESTIMATED DATE OF STARTUP: | : 20. IF SHUTDOWN A' END OF REPORT PE310D, ESTIMATED DATE OF STARTUP: | ||
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAI. X 100 UOURS IN REPORTING PERIOD REACTOR AVAILABILIIY FACTOR = HOURS REACTOR WAS AVAIIAr,LE TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE FACTOR = H0lfPS CD:ERATOR ON LINE MO HOURS IN REPORTING PERIOD | REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAI. X 100 UOURS IN REPORTING PERIOD REACTOR AVAILABILIIY FACTOR = HOURS REACTOR WAS AVAIIAr,LE TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE FACTOR = H0lfPS CD:ERATOR ON LINE MO HOURS IN REPORTING PERIOD UNIT AVAILABILITY FACTOR = 110URS UNIT WAS AVAll Atl.E TO CnNERATE X 100 HOURS IN REPukTING PERIOD | ||
= NET ELECTRICAL POWER GENERATED 7 Q l 8) 1 o UNIT CAPACITY FACTOR ~ | = NET ELECTRICAL POWER GENERATED 7 Q l 8) 1 o UNIT CAPACITY FACTOR ~ | ||
[Not C.spability or Design (Mwe-NcO.l XlRfiM A Rt:W . r N [ | [Not C.spability or Design (Mwe-NcO.l XlRfiM A Rt:W . r N [ | ||
PERIOD UNIT FORCED OUTACE RATE r FORCED OUTAGE HOURS X 100 HOURS GENEPATGR ON I.1NE + FORCED OUTAGE HOURS | PERIOD UNIT FORCED OUTACE RATE r FORCED OUTAGE HOURS X 100 HOURS GENEPATGR ON I.1NE + FORCED OUTAGE HOURS | ||
DdCKliT NO. 50-281 .' | DdCKliT NO. 50-281 .' | ||
UNIT SHUTDOWNS UNIT NAMii oconee Unit 3 | UNIT SHUTDOWNS UNIT NAMii oconee Unit 3 DATli 11/7/75 RIIPORT MONTil October TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS 19 751001 F 276.03 H 3 Continuation of previous outage. | ||
DATli 11/7/75 RIIPORT MONTil October TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS 19 751001 F 276.03 H 3 Continuation of previous outage. | |||
20 751014 F 28.1 G 3 Reactor trip on flux imbalance. | 20 751014 F 28.1 G 3 Reactor trip on flux imbalance. | ||
(1) REASON (2) METilOD A--EQUIPMENT F AILURE (EXPLAIN) 1 -M ANilAL | (1) REASON (2) METilOD A--EQUIPMENT F AILURE (EXPLAIN) 1 -M ANilAL | ||
' R - M AINT. OR TEST. 2-MANUAL ' | ' R - M AINT. OR TEST. 2-MANUAL ' | ||
C- RLI UL LING SCRAM D-REGULATORY RESTRICTION 3 - AUTOM ATIC E-OPER ATOR TRAINING AND SCRAM LICENSE EXAMINATION 1 - ADMINIST R ATIVE G- OPLR A TION AL I R ROR (IXPLAIN) | C- RLI UL LING SCRAM D-REGULATORY RESTRICTION 3 - AUTOM ATIC E-OPER ATOR TRAINING AND SCRAM LICENSE EXAMINATION 1 - ADMINIST R ATIVE G- OPLR A TION AL I R ROR (IXPLAIN) | ||
II -OillLR IEXPI.AIN) | II -OillLR IEXPI.AIN) | ||
==SUMMARY== | ==SUMMARY== | ||
Replaced and modified one RCP seal on outage 19. | Replaced and modified one RCP seal on outage 19. | ||
1 - | 1 - | ||
4 | 4 | ||
DOCKET NO. 50-287 UNIT oconee 3 DATE 11/7/75 AVERAGE DAILY UNIT POWER LEVEL MONTH. October. 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-nct) . | DOCKET NO. 50-287 UNIT oconee 3 DATE 11/7/75 AVERAGE DAILY UNIT POWER LEVEL MONTH. October. 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-nct) . | ||
17 660 1 _ | 17 660 1 _ | ||
18 751 2 | 18 751 2 | ||
794 3 | 794 3 | ||
19 20 790 4 | |||
19 | |||
20 790 4 | |||
795 5 | 795 5 | ||
21 | 21 | ||
- 803 J 6 22 803 7 | - 803 J 6 22 803 7 | ||
23 799 8 | 23 799 8 | ||
24 783 l 9 | 24 783 l 9 | ||
25 26 831 j 10 27 799 11 28 798 12 IL_4 628 29 798 13 530 30 801 14 | |||
25 | |||
26 831 j 10 | |||
27 799 11 28 798 12 IL_4 628 29 798 13 530 30 801 14 | |||
- 801 15 31 578 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month. | - 801 15 31 578 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month. | ||
Compute to the nearest whole megawatt. | Compute to the nearest whole megawatt. | ||
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100'~c line (or the restricted power lesel line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparer.t anomaly. | These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100'~c line (or the restricted power lesel line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparer.t anomaly. | ||
_}} | _}} |
Latest revision as of 18:09, 21 February 2020
ML19317E581 | |
Person / Time | |
---|---|
Site: | Oconee ![]() |
Issue date: | 11/06/1975 |
From: | Blakeman E DUKE POWER CO. |
To: | |
Shared Package | |
ML19317E577 | List: |
References | |
NUDOCS 7912180791 | |
Download: ML19317E581 (3) | |
Text
I* UNIT Oconte 3 DATE 11/6/75 DOCKET NO. 50-287 PREPARED BY E. D. Elakeman OPERATING STATUS ;
- 1. REPORTING PERIOD: October 1 THROUGH October 31. 1975 l
GROSS HOURS IN REPORTING PERIOD: 745.00 l
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net): 871
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) _ None
- 4. REASONS FOR RESTRICTION (IF ANY) .
i s Mond Year to Date Celathe
- 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 430.4 5518.2 5702.1
- 6. REACTOR RESERVE SHUTDOWN HOURS - - -
- 7. HOURS GENERATOR ON-LINE 440.9 5336.6 5519.4
- 8. UNIT RESERVE SHUTDOWN HOURS - - -
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 1007175 11922430 12367080
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 345940 4083390 4232304
- 11. NET ELECTRICAL ENEAGY GENERATED (MWH) 325943 3878353 4019489
- 12. REACTOR SERVICE FACTOR 64.5 75.6 74.3
- 13. REACTOR' AVAILABILITY FACTOR 59.2 79.6 78.0
- 14. UNIT SEAVICE FACTOR 59.2 73.2 71.9
- 15. UNIT AVAILABILITY FACTOR 59.2 73.2 71.9 ;
- 16. UNIT CAPACITY FACTOR (Using Net 50.2 61.0 60.1 Capability)
- 17. UNIT CAPACITY FACTOR *
(Using Design Mwe) 49.3 59.9 59.0 !<
~
- 13. UNIT FORCED OUTAGE RATE 40.8 14.3 13.9
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DUPATION OF EACH:)
- 20. IF SHUTDOWN A' END OF REPORT PE310D, ESTIMATED DATE OF STARTUP:
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAI. X 100 UOURS IN REPORTING PERIOD REACTOR AVAILABILIIY FACTOR = HOURS REACTOR WAS AVAIIAr,LE TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE FACTOR = H0lfPS CD:ERATOR ON LINE MO HOURS IN REPORTING PERIOD UNIT AVAILABILITY FACTOR = 110URS UNIT WAS AVAll Atl.E TO CnNERATE X 100 HOURS IN REPukTING PERIOD
= NET ELECTRICAL POWER GENERATED 7 Q l 8) 1 o UNIT CAPACITY FACTOR ~
[Not C.spability or Design (Mwe-NcO.l XlRfiM A Rt:W . r N [
PERIOD UNIT FORCED OUTACE RATE r FORCED OUTAGE HOURS X 100 HOURS GENEPATGR ON I.1NE + FORCED OUTAGE HOURS
DdCKliT NO. 50-281 .'
UNIT SHUTDOWNS UNIT NAMii oconee Unit 3 DATli 11/7/75 RIIPORT MONTil October TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS 19 751001 F 276.03 H 3 Continuation of previous outage.
20 751014 F 28.1 G 3 Reactor trip on flux imbalance.
(1) REASON (2) METilOD A--EQUIPMENT F AILURE (EXPLAIN) 1 -M ANilAL
' R - M AINT. OR TEST. 2-MANUAL '
C- RLI UL LING SCRAM D-REGULATORY RESTRICTION 3 - AUTOM ATIC E-OPER ATOR TRAINING AND SCRAM LICENSE EXAMINATION 1 - ADMINIST R ATIVE G- OPLR A TION AL I R ROR (IXPLAIN)
II -OillLR IEXPI.AIN)
SUMMARY
Replaced and modified one RCP seal on outage 19.
1 -
4
DOCKET NO. 50-287 UNIT oconee 3 DATE 11/7/75 AVERAGE DAILY UNIT POWER LEVEL MONTH. October. 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-nct) .
17 660 1 _
18 751 2
794 3
19 20 790 4
795 5
21
- 803 J 6 22 803 7
23 799 8
24 783 l 9
25 26 831 j 10 27 799 11 28 798 12 IL_4 628 29 798 13 530 30 801 14
- 801 15 31 578 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100'~c line (or the restricted power lesel line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparer.t anomaly.