ML11319A231: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11319A231
| number = ML11319A231
| issue date = 11/15/2011
| issue date = 11/15/2011
| title = 11/08/2011 Meeting Summary with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant Unit 2 Construction Project
| title = Meeting Summary with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant Unit 2 Construction Project
| author name = Haag R
| author name = Haag R
| author affiliation = NRC/RGN-II/DCP/CPB2
| author affiliation = NRC/RGN-II/DCP/CPB2
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:TVA November 15, 2011  
{{#Wiki_filter:UNITED STATES TVA                           NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 15, 2011 Mr. Michael D. Skaggs Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
 
Mr. Michael D. Skaggs Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801  


==SUBJECT:==
==SUBJECT:==
Line 23: Line 21:


==SUMMARY==
==SUMMARY==
FOR PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY ON WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION PROJECT
FOR PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY ON WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION PROJECT


==Dear Mr. Skaggs:==
==Dear Mr. Skaggs:==


This refers to the meeting conducted at our request at the Comfort Inn Hotel in Athens, TN on November 8 , 2011 at 1:00 p.m.
This refers to the meeting conducted at our request at the Comfort Inn Hotel in Athens, TN on November 8, 2011 at 1:00 p.m. The meeting's purpose was to give Tennessee Valley Authority (TVA) the opportunity to present their updated status of the Watts Bar Unit 2 construction project to the NRC.
The meeting's purpose was to give Tennessee Valley Authority (TVA) the opportunity to present their updated status of the Watts Bar Unit 2 construction project to the NRC.
On November 8, 2011, the NRCs Director of Construction Projects held a Category 1 meeting in which TVA provided a presentation about the current progress and scheduling plans for the Watts Bar Nuclear (WBN) Unit 2 construction project. The NRC staff presented information on the current status of the NRCs construction inspection program for WBN Unit 2. Additional topics related to the WBN Unit 2 construction project were discussed between the NRC and TVA. Following these presentations and discussions, members of the public had an opportunity to provide comments and ask questions. The agenda (Enclosure 1), the list of attendees (Enclosure 2), the TVA presentation material used for discussions (Enclosure 3), and the NRC presentation material used for discussions (Enclosure 4) are attached to this letter.
On November 8, 2011, the NRC's Director of Construction Projects held a Category 1 meeting in which TVA provided a presentation about the current progress and scheduling plans for the Watts Bar Nuclear (WBN) Unit 2 construction project. The NRC staff presented information on the current status of the NRC's construction inspection program for WBN Unit 2. Additional topics related to the WBN Unit 2 construction project were discussed between the NRC and TVA. Following these presentations and discussions, members of the public had an opportunity to provide comments and ask questions. The agenda (Enclosure 1), the list of attendees (Enclosure 2), the TVA presentation material used for discussions (Enclosure 3), and the NRC presentation material used for discussions (Enclosure 4) are attached to this letter.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257


TVA 2 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact Robert Haag at 404-997-4446
TVA                                         2 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact Robert Haag at 404-997-4446.
. Sincerely,  
Sincerely,
      /RA/ Robert C. Haag, Chief Construction Projects Branch 2 Division of Construction Projects
                                                /RA/
Robert C. Haag, Chief Construction Projects Branch 2 Division of Construction Projects


==Enclosures:==
==Enclosures:==
: 1. Agenda   2. List of Attendees
: 1. Agenda
: 3. Presentation - TVA Slides 4. Presentation - NRC Slides  
: 2. List of Attendees
 
: 3. Presentation - TVA Slides
ML11319A186____
: 4. Presentation - NRC Slides
O  SUNSI REVIEW COMPLETE TVA 3  cc w/encl:
Mr. Gordon P. Arent WBN Unit 2 Licensing Watts Bar Nuclear Plant P.O. Box 2000 Spring City, Tennessee 37381 Mr. David Stinson Vice President WBN Unit Two WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381
 
Ms. Donna Guinn, Manager Licensing and Industry Affairs WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. Preston D. Swafford Chief Nuclear Officer  and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Place Chattanooga, Tennessee 37402-2801 County Executive 375 Church Street Suite 215 Dayton, Tennessee 37321 Mr. Gregory A. Boerschig Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. T. J. Neissen General Manager Quality Assurance Nuclear Generation and Development and Construction 1101 Market Street Blue Ridge 3A Chattanooga, Tennessee 37402-2801 Mr. Joseph Shea Acting Vice President, Nuclear Licensing  Tennessee Valley Authority LP 4B 1101 Market Street Chattanooga, Tennessee 37402-2801


Mr. E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, Tennessee 37402 Mr. Lawrence E. Nanney, Director Tennessee Department of Environmental Health & Conservation Division of Radiological Health 3rd Floor, L&C Annex 401 Church Street Nashville, TN 37243-1532 Mr. D. E. Grissette Site Vice President WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 County Mayor P.O. Box 156 Decatur, Tennessee 37322 Ms. Ann P. Harris 341 Swing Loop Rockwood, TN 37854 TVA 4  cc email distribution w/encl:
ML11319A186____                O SUNSI REVIEW COMPLETE OFFICE            RII:DCP          RII:DCP SIGNATURE RCH            CJE NAME              RHaag            CEven DATE                  11/15/2011    11/ 14/2011 E-MAIL COPY?        YES        NO YES          NO TVA                                    3 cc w/encl:                              Mr. Joseph Shea Mr. Gordon P. Arent                      Acting Vice President, Nuclear Licensing WBN Unit 2 Licensing                    Tennessee Valley Authority Watts Bar Nuclear Plant                  LP 4B P.O. Box 2000                            1101 Market Street Spring City, Tennessee 37381            Chattanooga, Tennessee 37402-2801 Mr. David Stinson                        Mr. E. J. Vigluicci Vice President                          Assistant General Counsel WBN Unit Two                            Tennessee Valley Authority WBN Nuclear Plant                        6A West Tower Tennessee Valley Authority              400 West Summit Hill Drive P.O. Box 2000                            Knoxville, Tennessee 37402 Spring City, Tennessee 37381 Mr. Lawrence E. Nanney, Director Ms. Donna Guinn, Manager                Tennessee Department of Environmental Licensing and Industry Affairs            Health & Conservation WBN Nuclear Plant                        Division of Radiological Health Tennessee Valley Authority              3rd Floor, L&C Annex P.O. Box 2000                            401 Church Street Spring City, Tennessee 37381            Nashville, TN 37243-1532 Mr. Preston D. Swafford                  Mr. D. E. Grissette Chief Nuclear Officer                    Site Vice President and Executive Vice President            WBN Nuclear Plant Tennessee Valley Authority               Tennessee Valley Authority 3R Lookout Place                        P.O. Box 2000 1101 Market Place                        Spring City, Tennessee 37381 Chattanooga, Tennessee 37402-2801 County Mayor County Executive                        P.O. Box 156 375 Church Street                        Decatur, Tennessee 37322 Suite 215 Dayton, Tennessee 37321                  Ms. Ann P. Harris 341 Swing Loop Mr. Gregory A. Boerschig                Rockwood, TN 37854 Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. T. J. Neissen General Manager Quality Assurance Nuclear Generation and Development and Construction 1101 Market Street Blue Ridge 3A Chattanooga, Tennessee 37402-2801
Greg Scott Tennessee Valley Authority Electronic Mail Distribution


Watts Bar 2 Licensing Tennessee Valley Authority Electronic Mail Distribution  
TVA                          4 cc email distribution w/encl:
Greg Scott Tennessee Valley Authority Electronic Mail Distribution Watts Bar 2 Licensing Tennessee Valley Authority Electronic Mail Distribution


Letter to Michael D. Skaggs from Robert C. Haag dated November 15, 2011.  
Letter to Michael D. Skaggs from Robert C. Haag dated November 15, 2011.


==SUBJECT:==
==SUBJECT:==
Line 58: Line 51:


==SUMMARY==
==SUMMARY==
FOR PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY ON WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION PROJECT Distribution w/encl
FOR PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY ON WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION PROJECT Distribution w/encl:
: L. Raghavan, NRR S. Campbell, NRR P. Milano, NRR C. Evans, RII L. Douglas, RII EICS S. Shaeffer, RII DRP R. Monk, RII WBN Unit 1 SRI OE Mail (email address if applicable) PUBLIC NRO_cROP Resource}}
L. Raghavan, NRR S. Campbell, NRR P. Milano, NRR C. Evans, RII L. Douglas, RII EICS S. Shaeffer, RII DRP R. Monk, RII WBN Unit 1 SRI OE Mail (email address if applicable)
PUBLIC NRO_cROP Resource}}

Latest revision as of 21:13, 6 February 2020

Meeting Summary with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant Unit 2 Construction Project
ML11319A231
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 11/15/2011
From: Haag R
NRC/RGN-II/DCP/CPB2
To: Skaggs M
Tennessee Valley Authority
Haag R
References
Download: ML11319A231 (6)


Text

UNITED STATES TVA NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 15, 2011 Mr. Michael D. Skaggs Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

MEETING

SUMMARY

FOR PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY ON WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION PROJECT

Dear Mr. Skaggs:

This refers to the meeting conducted at our request at the Comfort Inn Hotel in Athens, TN on November 8, 2011 at 1:00 p.m. The meeting's purpose was to give Tennessee Valley Authority (TVA) the opportunity to present their updated status of the Watts Bar Unit 2 construction project to the NRC.

On November 8, 2011, the NRCs Director of Construction Projects held a Category 1 meeting in which TVA provided a presentation about the current progress and scheduling plans for the Watts Bar Nuclear (WBN) Unit 2 construction project. The NRC staff presented information on the current status of the NRCs construction inspection program for WBN Unit 2. Additional topics related to the WBN Unit 2 construction project were discussed between the NRC and TVA. Following these presentations and discussions, members of the public had an opportunity to provide comments and ask questions. The agenda (Enclosure 1), the list of attendees (Enclosure 2), the TVA presentation material used for discussions (Enclosure 3), and the NRC presentation material used for discussions (Enclosure 4) are attached to this letter.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

TVA 2 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact Robert Haag at 404-997-4446.

Sincerely,

/RA/

Robert C. Haag, Chief Construction Projects Branch 2 Division of Construction Projects

Enclosures:

1. Agenda
2. List of Attendees
3. Presentation - TVA Slides
4. Presentation - NRC Slides

ML11319A186____ O SUNSI REVIEW COMPLETE OFFICE RII:DCP RII:DCP SIGNATURE RCH CJE NAME RHaag CEven DATE 11/15/2011 11/ 14/2011 E-MAIL COPY? YES NO YES NO TVA 3 cc w/encl: Mr. Joseph Shea Mr. Gordon P. Arent Acting Vice President, Nuclear Licensing WBN Unit 2 Licensing Tennessee Valley Authority Watts Bar Nuclear Plant LP 4B P.O. Box 2000 1101 Market Street Spring City, Tennessee 37381 Chattanooga, Tennessee 37402-2801 Mr. David Stinson Mr. E. J. Vigluicci Vice President Assistant General Counsel WBN Unit Two Tennessee Valley Authority WBN Nuclear Plant 6A West Tower Tennessee Valley Authority 400 West Summit Hill Drive P.O. Box 2000 Knoxville, Tennessee 37402 Spring City, Tennessee 37381 Mr. Lawrence E. Nanney, Director Ms. Donna Guinn, Manager Tennessee Department of Environmental Licensing and Industry Affairs Health & Conservation WBN Nuclear Plant Division of Radiological Health Tennessee Valley Authority 3rd Floor, L&C Annex P.O. Box 2000 401 Church Street Spring City, Tennessee 37381 Nashville, TN 37243-1532 Mr. Preston D. Swafford Mr. D. E. Grissette Chief Nuclear Officer Site Vice President and Executive Vice President WBN Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 3R Lookout Place P.O. Box 2000 1101 Market Place Spring City, Tennessee 37381 Chattanooga, Tennessee 37402-2801 County Mayor County Executive P.O. Box 156 375 Church Street Decatur, Tennessee 37322 Suite 215 Dayton, Tennessee 37321 Ms. Ann P. Harris 341 Swing Loop Mr. Gregory A. Boerschig Rockwood, TN 37854 Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. T. J. Neissen General Manager Quality Assurance Nuclear Generation and Development and Construction 1101 Market Street Blue Ridge 3A Chattanooga, Tennessee 37402-2801

TVA 4 cc email distribution w/encl:

Greg Scott Tennessee Valley Authority Electronic Mail Distribution Watts Bar 2 Licensing Tennessee Valley Authority Electronic Mail Distribution

Letter to Michael D. Skaggs from Robert C. Haag dated November 15, 2011.

SUBJECT:

MEETING

SUMMARY

FOR PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY ON WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION PROJECT Distribution w/encl:

L. Raghavan, NRR S. Campbell, NRR P. Milano, NRR C. Evans, RII L. Douglas, RII EICS S. Shaeffer, RII DRP R. Monk, RII WBN Unit 1 SRI OE Mail (email address if applicable)

PUBLIC NRO_cROP Resource