|
|
(2 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 04/19/2012 | | | issue date = 04/19/2012 |
| | title = January 18, 2012, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Regarding Applicant Response Related to High-Strength Bolts, for the South Texas Project, Units 1 | | | title = January 18, 2012, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Regarding Applicant Response Related to High-Strength Bolts, for the South Texas Project, Units 1 |
| | author name = Daily J W | | | author name = Daily J |
| | author affiliation = NRC/NRR/DLR/RPB1 | | | author affiliation = NRC/NRR/DLR/RPB1 |
| | addressee name = | | | addressee name = |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 April 19, 2012 LICENSEE: | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 19, 2012 LICENSEE: STP Nuclear Operating Company FACILITY: South Texas Project |
| STP Nuclear Operating Company FACILITY: | |
| South Texas Project | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 18, 2012, BElWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND STP NUCLEAR OPERATING COMPANY, REGARDING THE APPLICANT'S RESPONSE RELATED TO HIGH-STRENGTH BOLTS, FOR THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC. NOS. ME4936 AND ME4937) . The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of STP Nuclear Operating Company (STPNOC or the applicant) held a telephone conference call on January 18, 2012, to discuss and clarify issues related to the applicant's response to Request for Additional Information (RAI) B2.1.7-3 regarding high-strength bolts, for the South Texas Project, Units 1 and 2, license renewal application. | | OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 18, 2012, BElWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND STP NUCLEAR OPERATING COMPANY, REGARDING THE APPLICANT'S RESPONSE RELATED TO HIGH-STRENGTH BOLTS, FOR THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC. |
| The telephone conference call was useful in clarifying the applicant's responses and identifying the staffs issues for the RAls. Enclosure 1 provides a listing of the participants and Enclosure 2 contains a listing of the issues discussed with the applicant. | | NOS. ME4936 AND ME4937) . |
| including a brief description of the status of the items. The applicant had an opportunity to comment on this summary. John Daily. Senior Project anager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 | | The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of STP Nuclear Operating Company (STPNOC or the applicant) held a telephone conference call on January 18, 2012, to discuss and clarify issues related to the applicant's response to Request for Additional Information (RAI) B2.1.7-3 regarding high-strength bolts, for the South Texas Project, Units 1 and 2, license renewal application. The telephone conference call was useful in clarifying the applicant's responses and identifying the staffs issues for the RAls. provides a listing of the participants and Enclosure 2 contains a listing of the issues discussed with the applicant. including a brief description of the status of the items. |
| | The applicant had an opportunity to comment on this summary. |
| | John Daily. Senior Project anager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
|
| |
|
| As stated cc wlencls: Listserv TELEPHONE CONFERENCE SOUTH TEXAS LICENSE RENEWAL LIST OF January 18, PARTICIPANTS AFFILIATIONS i John Daily Nuclear Regulatory Commission (NRC) Michelle Kichline NRC Angela Buford NRC I Alice Erickson NRC Abdul Sheikh NRC Arden Aldridge STP Nuclear Operating Company (STPNOC) Ken Taplett STPNOC Mike Garner STPNOC AI Saunders STARS Center of Business -Worley Parsons Jim Johnson STARS Center of Business -Worley Parsons Gary Warner STARS Center of Business -Worley Parsons ENCLOSURE CONFERENCE CALL WITH REGARDING APPLICANT RESPONSE RELATED TO HIGH-STRENGTH STP LICENSE RENEWAL January 18, The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Nuclear Operating Company (STPNOC or the applicant) held a telephone conference call January 18,2012, to discuss and clarify the applicant's response to Request for Information (RAI) B2.1. 7 -3 regarding high-strength bolts, related to the license application The participants indicated that the call was useful in clarifying the questions Issues and The staff and the applicant discussed the following Bolting Integrity RAI B2.1.7-3 The staff asked if there were any high-strength bolts greater than 1 inch diameter within the scope of the American Society for Mechanical Engineers (ASME) Section XI, Subsection IWE Program. STPNOC stated that there are no high-strength bolts greater than 1 inch diameter within the scope of the ASME Section XI, Subsection IWE Program. Regarding AMR items for high-strength bolts, the LRA states that the Bolting Integrity Program will manage cracking and loss of material. | | As stated cc wlencls: Listserv |
| Since the volumetric inspections were added to the Structures Monitoring and ASME Section XI, Subsection IWF Programs, why are there no aging management review (AMR) items for high-strength bolts that state that those programs will be used to manage cracking? STPNOC stated that the high-strength bolts being managed by the Structures Monitoring and ASME Section XI, Subsection IWF Programs were included in the AMR items for the structural supports and were not specifically called out in separate AMR items in the LRA. STPNOC also stated that the Bolting Integrity Program basis document was updated to point to the Structures Monitoring and ASME Section XI, Subsection IWF Programs for performance of the volumetric inspections to account for the high-strength steel bolting AMR items that state the Bolting Integrity Program will manage cracking. The staff asked what the frequency is for the volumetric inspections that were added to the Structures Monitoring and ASME Section XI, Subsection IWF Programs. STPNOC stated that the volumetric inspection frequencies are consistent with the other inspections in the respective programs. | | |
| | TELEPHONE CONFERENCE CALL SOUTH TEXAS PROJECT LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS January 18, 2012 PARTICIPANTS AFFILIATIONS i John Daily Nuclear Regulatory Commission (NRC) |
| | Michelle Kichline NRC Angela Buford NRC I Alice Erickson NRC Abdul Sheikh NRC Arden Aldridge STP Nuclear Operating Company (STPNOC) |
| | Ken Taplett STPNOC Mike Garner STPNOC STARS Center of Business - Worley AI Saunders Parsons STARS Center of Business - Worley Jim Johnson Parsons STARS Center of Business - Worley Gary Warner Parsons ENCLOSURE 1 |
| | |
| | CONFERENCE CALL WITH STPNOC REGARDING APPLICANT RESPONSE RELATED TO HIGH-STRENGTH BOLTS STP LICENSE RENEWAL APPLICATION January 18, 2012 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of STP Nuclear Operating Company (STPNOC or the applicant) held a telephone conference call on January 18,2012, to discuss and clarify the applicant's response to Request for Additional Information (RAI) B2.1. 7-3 regarding high-strength bolts, related to the license renewal application (LRA). |
| | The participants indicated that the call was useful in clarifying the questions discussed. |
| | Issues and discussions: |
| | The staff and the applicant discussed the following issues: |
| | Bolting Integrity RAI B2.1.7-3 Response: |
| | : 1) The staff asked if there were any high-strength bolts greater than 1 inch diameter within the scope of the American Society for Mechanical Engineers (ASME) Section XI, Subsection IWE Program. |
| | a) STPNOC stated that there are no high-strength bolts greater than 1 inch diameter within the scope of the ASME Section XI, Subsection IWE Program. |
| | : 2) Regarding AMR items for high-strength bolts, the LRA states that the Bolting Integrity Program will manage cracking and loss of material. Since the volumetric inspections were added to the Structures Monitoring and ASME Section XI, Subsection IWF Programs, why are there no aging management review (AMR) items for high-strength bolts that state that those programs will be used to manage cracking? |
| | a) STPNOC stated that the high-strength bolts being managed by the Structures Monitoring and ASME Section XI, Subsection IWF Programs were included in the AMR items for the structural supports and were not specifically called out in separate AMR items in the LRA. |
| | b) STPNOC also stated that the Bolting Integrity Program basis document was updated to point to the Structures Monitoring and ASME Section XI, Subsection IWF Programs for performance of the volumetric inspections to account for the high-strength steel bolting AMR items that state the Bolting Integrity Program will manage cracking. |
| | : 3) The staff asked what the frequency is for the volumetric inspections that were added to the Structures Monitoring and ASME Section XI, Subsection IWF Programs. |
| | a) STPNOC stated that the volumetric inspection frequencies are consistent with the other inspections in the respective programs. |
| ENCLOSURE 2 | | ENCLOSURE 2 |
| Indoor Air Draft RAI 3.0-1a: STPNOC requested clarification of whether the staff's concern with the definition of plant indoor air was for external surfaces exposed to plant indoor air or internal surfaces exposed to plant indoor air since the RAI referenced GALL Report items for both. The staff clarified that the concern is for both external and internal surfaces exposed to plant indoor air and whether or not moisture is expected for each AMR item with an environment of plant indoor air. | | |
| Memorandum to File from J. Daily dated April 19, 2012 | | -2 Indoor Air Draft RAI 3.0-1a: |
| | : 1) STPNOC requested clarification of whether the staff's concern with the definition of plant indoor air was for external surfaces exposed to plant indoor air or internal surfaces exposed to plant indoor air since the RAI referenced GALL Report items for both. |
| | a) The staff clarified that the concern is for both external and internal surfaces exposed to plant indoor air and whether or not moisture is expected for each AMR item with an environment of plant indoor air. |
| | |
| | Memorandum to File from J. Daily dated April 19, 2012 |
| | |
| | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF TELEPHONE CONFERENCE CALL HELD 01\1 JANUARY 18, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND STP NUCLEAR OPERATING COMPANY, REGARDING APPLICANT RESPONSE RELATED TO HIGH-STRENGTH BOLTS, FOR THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC. NOS. ME4936 AND ME4937) DISTRIBUTION: | | OF TELEPHONE CONFERENCE CALL HELD 01\1 JANUARY 18, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND STP NUCLEAR OPERATING COMPANY, REGARDING APPLICANT RESPONSE RELATED TO HIGH-STRENGTH BOLTS, FOR THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC. NOS. ME4936 AND ME4937) |
| E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource RidsOgcMailCenter JDaily TTran DMclntyre, OPA BSingal, DORL WWalker, RIV JDixon, RIV BTharakan, RIV WMaier, RIV VDricks, RIV NOKeefe, RIV AVegel, RIV GPick, RIV | | DISTRIBUTION: |
| | E-MAIL: |
| | PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource RidsOgcMailCenter JDaily TTran DMclntyre, OPA BSingal, DORL WWalker, RIV JDixon, RIV BTharakan, RIV WMaier, RIV VDricks, RIV NOKeefe, RIV AVegel, RIV GPick, RIV |
| | |
| | LICENSEE: STP Nuclear Operating Company FACILITY: South Texas Project |
|
| |
|
| STP Nuclear Operating Company South Texas Project
| | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 18, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND STP NUCLEAR OPERATING COMPANY, REGARDING THE APPLICANT'S RESPONSE RELATED TO HIGH-STRENGTH BOLTS, FOR THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC. NOS. ME4936 AND ME4937) The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of STP Nuclear Operating Company (STPNOC or the applicant) held a telephone conference call on January 18, 2012, to discuss and clarify issues related to the applicant's response to Request for Additional Information (RAI) B2.1.7-3 regarding high-strength bolts, for the South Texas Project, Units 1 and 2, license renewal application. | | OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 18, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND STP NUCLEAR OPERATING COMPANY, REGARDING THE APPLICANT'S RESPONSE RELATED TO HIGH-STRENGTH BOLTS, FOR THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC. |
| The telephone conference call was useful in clarifying the applicant's responses and identifying the staff's issues for the RAls. Enclosure 1 provides a listing of the participants and Enclosure 2 contains a listing of the issues discussed with the applicant, including a brief description of the status of the items. The applicant had an opportunity to comment on this summary. IRA! John Daily, Senior Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 | | NOS. ME4936 AND ME4937) |
| | The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of STP Nuclear Operating Company (STPNOC or the applicant) held a telephone conference call on January 18, 2012, to discuss and clarify issues related to the applicant's response to Request for Additional Information (RAI) B2.1.7-3 regarding high-strength bolts, for the South Texas Project, Units 1 and 2, license renewal application. The telephone conference call was useful in clarifying the applicant's responses and identifying the staff's issues for the RAls. provides a listing of the participants and Enclosure 2 contains a listing of the issues discussed with the applicant, including a brief description of the status of the items. |
| | The applicant had an opportunity to comment on this summary. |
| | IRA! |
| | John Daily, Senior Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
|
| |
|
| As stated cc w/encls: Listserv DISTRIBUTION: | | As stated cc w/encls: Listserv DISTRIBUTION: See next page ADAMS Accession No ... ML12067a127 PM:RPB1:DLR BC:RPB1 :DLR PM:RPB1 :DLR |
| See next page A D AMS Accession No . ML 12067a127 | | !OFFICE LA:RPB1 :DLR JDaily DMorey JDaily NAME YEdmonds DATE 04/6/12 04/11/12 04/13/12 04/19/12 OFFICIAL RECORD COpy}} |
| .. !OFFICE LA:RPB1 :DLR PM:RPB1:DLR BC:RPB1 :DLR PM:RPB1 :DLR NAME YEdmonds JDaily DMorey JDaily DATE ,-----... 04/6/12 04/11/12 04/13/12 04/19/12 OFFICIAL RECORD COpy}} | |
Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML110620203, ML11140A163, ML11224A265, ML11230A003, ML11318A121, ML11318A122, ML11318A123, ML11318A124, ML11318A125, ML11318A126, ML11318A127, ML11318A128, ML11318A129, ML11318A130, ML11318A131, ML11318A132, ML11318A133, ML11318A135, ML11318A136, ML11318A138, ML11318A139, ML11318A140, ML11318A141, ML11318A142, ML11318A143, ML11318A144, ML11318A145, ML11318A146, ML11318A147, ML11318A148, ML11318A149, ML11318A150, ML11318A151, ML11318A152, ML11318A153, ML11318A154, ML11318A155, ML11318A156, ML11318A157, ML11318A158, ML11318A159, ML11318A160, ML11318A161, ML11318A162, ML11318A163, ML11318A164, ML11318A165, ML11318A166, ML11318A167, ML11318A168... further results
|
MONTHYEARML1106202032011-03-17017 March 2011 License Renewal Application Online Reference Portal Project stage: Other ML1108907642011-04-14014 April 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application-Electrical Branch Scoping Project stage: RAI ML1108205792011-04-14014 April 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application -Section 2.4 Structural (TAC Nos. ME4936, ME4937) Project stage: RAI ML1108309782011-04-14014 April 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application, Fire Protection and Component Integrity (TAC Nos. ME4536 ME4637 Project stage: RAI NOC-AE-11002670, Response to Request for Additional Information for License Renewal Application2011-05-0505 May 2011 Response to Request for Additional Information for License Renewal Application Project stage: Response to RAI NOC-AE-11002672, Response to Request for Additional Information for Licence Renewal Application2011-05-12012 May 2011 Response to Request for Additional Information for Licence Renewal Application Project stage: Response to RAI ML11137A0922011-05-24024 May 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application Future Consideration of Operating Experience Project stage: RAI ML11140A1632011-06-0606 June 2011 Plan for the Aging Management Program Regulatory Audit Regarding the South Texas Project, Units 1 and 2 License Renewal Application Review (TAC Nos. ME4936 and ME4937) Project stage: Other NOC-AE-11002681, Amendment 2 to the License Renewal Application2011-06-16016 June 2011 Amendment 2 to the License Renewal Application Project stage: Other NOC-AE-11002683, Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937)2011-06-23023 June 2011 Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Response to RAI ML11154A0132011-07-0606 July 2011 Summary of Telephone Conference Call Held on May 23, 2011, Between the NRC and STPNOC, Concerning Requests for Additional Information Pertaining to the South Texas Project, LRA-Future Consideration of Operating Experience Project stage: RAI ML11166A2392011-07-12012 July 2011 Letter Request for Additional Information for South Texas Project Electric Generating Station, Units 1 and 2 License Renewal Application - Scoping and Screening Balance of Plant (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11201A0552011-07-28028 July 2011 Requests for Additional Information for the Review of the South Texas Project, License Renewal Application - Scoping and Screening Audit (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002702, Response to Request for Additional Information for the Review of the South Texas Project License Renewal Application2011-08-0909 August 2011 Response to Request for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: Response to RAI ML11214A0882011-08-15015 August 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Programs Audit, Plant Systems (TAC ME4936 and ME4937) Project stage: RAI ML11214A0052011-08-15015 August 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Programs Audit, Structures/Electrical (TAC ME4936 and ME4937) Project stage: RAI ML11214A0272011-08-15015 August 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Programs Audit, Reactor Systems (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002716, Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937)2011-08-18018 August 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937) Project stage: Response to RAI ML1123000162011-08-18018 August 2011 License Renewal - Errata in AMP RAI Package Project stage: RAI NOC-AE-11002714, Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937)2011-08-23023 August 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937) Project stage: Response to RAI ML11230A0032011-09-0606 September 2011 Scoping and Screening Audit Report Regarding the South Texas Project, Units 1 and 2 (TAC Nos. ME4936 and ME4937) Project stage: Other NOC-AE-11002730, Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937)2011-09-15015 September 2011 Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Response to RAI NOC-AE-11002731, Response to Requests for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937)2011-09-15015 September 2011 Response to Requests for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Response to RAI ML1124402012011-09-21021 September 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 2 (TAC Nos. ME4936, ME4937) Project stage: RAI ML11250A0432011-09-22022 September 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 1 (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11224A2652011-09-22022 September 2011 Aging Management Programs Audit Report Regarding the South Texas Project, Units 1 and 2, Station License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Other ML11258A1612011-09-22022 September 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 3 (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11272A1652011-10-0404 October 2011 Summary of Telephone Conference Call Held on September 28, 2011, Between the NRC and STP Nuclear Operating Company, Concerning Request for Additional Information Pertaining to the South Texas Project, LRA (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002732, Response to Requests for Additional Information for the License Renewal Application2011-10-10010 October 2011 Response to Requests for Additional Information for the License Renewal Application Project stage: Response to RAI ML11273A0172011-10-11011 October 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aging Management Review, Set 5 (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11273A0082011-10-11011 October 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aging Management Review, Set 4 (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002737, Supplement to License Renewal Application (TAC Nos. ME4936 and ME4937)2011-10-18018 October 2011 Supplement to License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Supplement ML11277A0472011-10-18018 October 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aging Management Program, Set 6 Project stage: RAI ML11305A0762011-10-25025 October 2011 Response to Requests for Additional Information for License Renewal Application (TAC ME4936 and ME4937) Project stage: Response to RAI NOC-AE-11002756, Contact Information Change, License Renewal Application (TAC ME4936 and ME4937)2011-10-26026 October 2011 Contact Information Change, License Renewal Application (TAC ME4936 and ME4937) Project stage: Other ML11318A1792011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F90021#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System Project stage: Other ML11318A1802011-11-0303 November 2011 Drawing No. LR-STP-WS-6R329F05048#1, Rev. 1, Piping and Instrumentation Diagram Solid Waste Processing System Project stage: Other ML11318A1762011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F05024#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System Project stage: Other ML11318A1652011-11-0303 November 2011 Drawing No. LR-STP-PS9Z329Z00047#1, Rev. 1, Piping and Instrumentation Diagram Primary Sampling System. Project stage: Other ML11318A1642011-11-0303 November 2011 Drawing No. LR-STP-PS-5Z329Z00045#2, Rev. 1, Piping & Instrumentation Diagram Primary Sampling System. Project stage: Other ML11318A1782011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F90021#1, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System Project stage: Other ML11318A1682011-11-0303 November 2011 Drawing No. LR-STP-RC-5R149F05004#2, Rev. 1, Piping and Instrumentation Diagram Acs Pressurizer Relief Tank. Project stage: Other ML11318A1722011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05022#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System. Project stage: Other ML11318A1702011-11-0303 November 2011 Drawing No. LR-STP-RM-5R279F05033#2, Rev. 1, Piping & Instrumentation Reactor Makeup Water System. Project stage: Other ML11318A1602011-11-0303 November 2011 Drawing No. LR-STP-IA-8Q119F05050#2, Rev. 1, Piping & Instrumentation Diagram Mechanical Aux. Building Instrument Air. Project stage: Other NOC-AE-11002749, Drawing No. LR-STP-SB-7S209F200032, Rev. 0, Piping and Instrumentation Diagram Steam Generator Blowdown System2011-11-0303 November 2011 Drawing No. LR-STP-SB-7S209F20003#2, Rev. 0, Piping and Instrumentation Diagram Steam Generator Blowdown System Project stage: Other ML11318A1742011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05027#2, Rev. 1, Piping & Instrumentation Diagram Auxiliary Steam and Condensate Return System (Lwps) Project stage: Other ML11318A1462011-11-0303 November 2011 Drawing LR-STP-ED-5Q069F05030 #2, Rev. 17, Piping & Instrumentation Diagram Radioactive Vent & Drain System Sump Pumps. Project stage: Other ML11318A1552011-11-0303 November 2011 Drawing No. LR-STP-FP-7Q272F00046, Rev. 1, Piping and Instrumentation Diagram Fire Protection Loop. Project stage: Other ML11318A1482011-11-0303 November 2011 Drawing No. LR-STP-ED-5Q069F90011#2, Revision 1, Piping & Instrumentation Diagram Radioactive Vent and Drain System Fuel Handling Building Gravity Drains. Project stage: Other 2011-06-16
[Table View] |
|
---|
Category:Conference/Symposium/Workshop Paper
MONTHYEARML22153A2942022-06-17017 June 2022 Richardsd-hv-th28 ML16074A0412016-03-14014 March 2016 Summary of a Call Held on March 10, 2016, between USNRC and STPNOC, Concerning the Staff's Upcoming Audit Regarding the Amp for the Loss Of Material Due to Selective of Al-Br Welds in the ECW System for the STP LRA (TAC Nos. ME4936 And ME4937) ML15308A0112015-11-30030 November 2015 Record of Conference Call on STP Request for Additional Information Set 34 ML12312A2342012-11-13013 November 2012 Memo to File Summary Verbal Authorization Provided on 11/6/12 for Relief Request RR-ENG-3-10, RPV Head Flange O-Ring Leakoff Lines NDE, Third 10-Year Inservice Inspection Interval ML12261A3012012-09-21021 September 2012 Notice of Forthcoming Public Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach ML12080A0422012-04-19019 April 2012 STP - Record of Conference Call-02062012 on NRC-Mgt Concerns on Open Items ML12067A1272012-04-19019 April 2012 January 18, 2012, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Regarding Applicant Response Related to High-Strength Bolts, for the South Texas Project, Units 1 ML12047A2852012-02-29029 February 2012 January 17, 2012, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission & STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project License Renewal ML1200901012012-01-10010 January 2012 Notice of Forthcoming Public Meeting Via Conference Call with South Texas Project Nuclear Operating Company ML11348A0392012-01-0404 January 2012 and 12/1/11, Summary of Telephone Conference Calls Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project LRA - Set 9 ML11335A0762011-12-0606 December 2011 Summary of Telephone Conference Call Held on November 17, 2011, Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Concerning Clarifications to Some Responses to Requests for Additional Information - South Tex ML11320A1162011-12-0505 December 2011 November 9, 2011, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project Units 1 and 2 ML1116402112011-06-24024 June 2011 Notice of Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 & 2 ML11143A1662011-06-17017 June 2011 May 18, 2011, Summary of Telephone Conference Call Held Between the NRC and STP, Concerning Request for Additional Information Pertaining to the STP, LRA - SAMA RAI ML1109404772011-04-22022 April 2011 03/29/11 & 03/31/11 Summary of Telephone Conference Calls Held Between NRC and STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project, Units 1 and 2 License Renewal Application ML0805902832008-03-0606 March 2008 02/19-02/21/2008 Nrc/Doe Workshop Presentation: Life Beyond 60 - Sheppard 2022-06-17
[Table view] Category:Meeting Summary
MONTHYEARML24120A2362024-05-0606 May 2024 Summary of March 25, 2024, Presubmittal Teleconference with STP Nuclear Operating Company to Discuss Changes to the Quality Assurance Plan for South Texas Project, Units 1 and 2 ML22252A0432022-09-12012 September 2022 Summary of August 31, 2022, Webinar with STP Nuclear Operating Company to Discuss a Proposed LAR to Revise the Dose Consequence Analysis for Main Steam Line Break and Locked Rotor Analysis Events for STP, Units 1 & 2 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21236A3082021-09-10010 September 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Moderator Temperature Coefficient Surveillance Requirements ML21222A1192021-08-12012 August 2021 Summary of Meeting with STP Nuclear Operating Company Regarding the License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirements for South Texas Project, Units 1 and 2 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML20279A8152020-10-20020 October 2020 Summary of September 14, 2020, Presubmittal Teleconference with STP Nuclear Operating Company Regarding the Proposed LAR to Revise the Moderator Temperature Coefficient Surveillance Requirement for South Texas Project, Units 1 and 2 (EPID L ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20163A5522020-06-12012 June 2020 Summary of April 21, 2020, Teleconference with STP Nuclear Operating Company to Discuss the License Amendment Request to Revise the Emergency Plan for South Texas Project, Units 1 and 2 ML20140A2612020-05-27027 May 2020 May 5, 2020, Summary of Teleconference with STP Nuclear Operating Company to Discuss a Proposed Exigent License Amendment Request to Revise the Pressure of the Safety Injection Accumulators for South Texas Project, Unit 1 ML20107J5482020-04-15015 April 2020 Teleconference Regarding NRC Observations on the March 30, 2020, License Amendment Request to Revise the Emergency Plan STP Nuclear Operation Company South Texas Project, Units 1 and 2, Dockets 50-498 and 50-499 ML20049A0572020-02-26026 February 2020 Summary of February 6, 2020, Meeting with STP Nuclear Operating Company to Discuss a Proposed License Amendment Request to Revise the Emergency Plan for South Texas Project, Units 1 and 2 (EPID L- 2020-LRM-0004) ML19350C5902019-12-17017 December 2019 12/3/19, Summary of Teleconference with STP Nuclear Operating Company to Discuss a Proposed License Amendment Request to Revise the Emergency Plan for South Texas Project, Units 1 and 2, ML19102A0162019-04-16016 April 2019 4/10/2019 Summary of Public Teleconference Regarding Potential Submission of a Relief Request to Allow Use of Carbon Fiber Reinforced Polymer for Selected Piping Repairs at South Texas, Units 1 and 2 ML17005A1002017-01-18018 January 2017 January 4, 2017, Summary of Meeting to Discussion Stp'S Response to Request for Additional Information the Revised Aluminum Bronze Selective Leaching Aging Management Program for All Potentially Susceptible Welds Throughout the Facility ML16279A3312016-10-27027 October 2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) ML16272A4362016-10-14014 October 2016 Summary of Public Preapplication Meeting with STP Nuclear Operating Company to Discuss Possible License Amendment Request to Modify Emergency Response Organization for South Texas Project, Units 1 and 2 ML16246A0222016-10-0505 October 2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items Related to Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400 - MF2409) ML16238A5272016-09-0101 September 2016 Summary of 7/28/16, Public Meeting with STP Nuclear Operating Company to Discuss the License Amendment and Exemption Requests to Use a Risk-Informed Approach to the Resolution of GSI-191 (CAC Nos. MF2400 - MF2409) ML16218A3672016-08-30030 August 2016 07/21/2016 Summary of Public Teleconference Meeting with STP Nuclear Operating Company Discussing Revisions to License Renewal Application Aluminum Bronze Selective Leaching Aging Management Program and Background Document ML16236A0322016-08-23023 August 2016 08/18/2016 Summary of Conference Call With STP Nuclear Operating Company Concerning the Aluminum Bronze Selective Leaching Aging Management Program in the South Texas Project, License Renewal Application ML16236A3042016-08-23023 August 2016 08/11/2016 Summary of Conference Call Between NRC and STP Nuclear Operating Company Concerning the 2016 Annual Update to the South Texas Project License Renewal Application ML16180A0142016-07-25025 July 2016 Summary of Meeting Discussion Between South Texas Project, Units 1 and 2, and NRC Staff Regarding the Revised Aluminum Bronze Selective Leaching Aging Management Program for All Potentially Susceptible Welds Throughout the Facility ML16190A0082016-07-13013 July 2016 Summary of 6/22/2016 Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) ML16188A0072016-07-0707 July 2016 Summary of Telecon Held on July 5, 2016 With STP Nuclear Operating Company, Concerning Additional Information Pertaining to the STP, License Renewal Application (TAC. Nos. ME4936, ME4937) ML16188A0112016-07-0707 July 2016 Summary of Telecon Held on July 5, 2016 With STP Nuclear Operating Company, Concerning Additional Information Pertaining to the STP, License Renewal Application (TAC Nos. ME4936, ME4937) ML16188A0092016-07-0707 July 2016 Summary of Telecon Held on July 5, 2016 with STP Nuclear Operating Company, Concerning Additional Information Pertaining to the STP, License Renewal Application (Tac. Nos. ME4936, ME4937) - Enclosure 1 ML16175A1082016-06-24024 June 2016 Summary of 4/21/2016 Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 ML16166A0272016-06-14014 June 2016 Summary of Telephone Conference Call Held on 06/08/2016, Between the USNRC and STP Nuclear Operating Company Response to Request for Additional Information B2.1.18-6 Pertaining to the South Texas Project License Renewal Application ML16092A0852016-04-13013 April 2016 3/17/2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2401-MF2409) ML16092A0442016-04-11011 April 2016 Summary of 3/3/2016 Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) ML16088A2432016-04-0101 April 2016 2/18/2016, Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) ML16081A2052016-03-24024 March 2016 Summary of Meeting with STP Nuclear Operating Company to Discuss Potential License Amendment Request for South Texas Project, Unit 1 Regarding Permanent Operation with 56 Control Rods ML16074A0412016-03-14014 March 2016 Summary of a Call Held on March 10, 2016, between USNRC and STPNOC, Concerning the Staff's Upcoming Audit Regarding the Amp for the Loss Of Material Due to Selective of Al-Br Welds in the ECW System for the STP LRA (TAC Nos. ME4936 And ME4937) ML16060A1272016-03-0707 March 2016 February 23, 2016, Summary of Conference Calls Held between NRC and STP Concerning Staff's Review of Submerged Closure Bolting Portion of 2014 Annual Update for STP License Renewal Application (TAC ME4936 And ME4937) ML16028A1522016-02-18018 February 2016 1/14/2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Modifications to the Licensee'S Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML16011A0612016-02-0202 February 2016 Summary of 10/1/15 Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (CAC MF ML16011A0702016-01-28028 January 2016 Summary of Preapplication Meeting with STP Nuclear Operating Company to Discuss Exigent License Amendment Request to Operate Following Removal of a D6 Control Rod at South Texas Project, Unit 1 ML16033A0072016-01-19019 January 2016 January 19, 2016, Summary of Public Meeting with STP to Discuss the Plant-Specific Aging Management Program, Selective Leaching of Aluminum Bronze, Associated with STP's License Renewal Application ML16013A0662016-01-14014 January 2016 Summary of 11/9 and 12/30/15 Conference Calls with STP Nuclear Operating Company to Discuss the Fall 2015 Steam Generator Tube Inspection Activities (CAC No. A11018) ML15308A0112015-11-30030 November 2015 Record of Conference Call on STP Request for Additional Information Set 34 ML15201A0032015-07-30030 July 2015 7/2/15 Summary of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 ML15177A1042015-07-21021 July 2015 4/22/2015 Summary of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 (TAC MF2400 t ML15177A2742015-07-21021 July 2015 5/6/2015 Summary of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 (TAC Nos. MF24 ML15180A2732015-07-15015 July 2015 6/3/2015 Summary of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 (TAC MF2400 to ML15139A3442015-06-11011 June 2015 Summary of Telephone Conference Call Held on May 12, 2015 Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Concerning Request for Additional Information, Set 31, Pertaining to the South Texas Project, Licens ML15103A0022015-05-13013 May 2015 Summary of 4/8/15 Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 ML15084A0032015-04-0606 April 2015 2/4/15 Summary of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 (TAC MF2400-MF24 ML15084A0042015-04-0101 April 2015 2/5/2015 Summary of Presubmittal Meeting with STP Nuclear Operating Company to Discuss Integrated Leak Rate Testing Program License Amendment Request for South Texas, Units 1 and 2 2024-05-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 19, 2012 LICENSEE: STP Nuclear Operating Company FACILITY: South Texas Project
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 18, 2012, BElWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND STP NUCLEAR OPERATING COMPANY, REGARDING THE APPLICANT'S RESPONSE RELATED TO HIGH-STRENGTH BOLTS, FOR THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC.
NOS. ME4936 AND ME4937) .
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of STP Nuclear Operating Company (STPNOC or the applicant) held a telephone conference call on January 18, 2012, to discuss and clarify issues related to the applicant's response to Request for Additional Information (RAI) B2.1.7-3 regarding high-strength bolts, for the South Texas Project, Units 1 and 2, license renewal application. The telephone conference call was useful in clarifying the applicant's responses and identifying the staffs issues for the RAls. provides a listing of the participants and Enclosure 2 contains a listing of the issues discussed with the applicant. including a brief description of the status of the items.
The applicant had an opportunity to comment on this summary.
John Daily. Senior Project anager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosures:
As stated cc wlencls: Listserv
TELEPHONE CONFERENCE CALL SOUTH TEXAS PROJECT LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS January 18, 2012 PARTICIPANTS AFFILIATIONS i John Daily Nuclear Regulatory Commission (NRC)
Michelle Kichline NRC Angela Buford NRC I Alice Erickson NRC Abdul Sheikh NRC Arden Aldridge STP Nuclear Operating Company (STPNOC)
Ken Taplett STPNOC Mike Garner STPNOC STARS Center of Business - Worley AI Saunders Parsons STARS Center of Business - Worley Jim Johnson Parsons STARS Center of Business - Worley Gary Warner Parsons ENCLOSURE 1
CONFERENCE CALL WITH STPNOC REGARDING APPLICANT RESPONSE RELATED TO HIGH-STRENGTH BOLTS STP LICENSE RENEWAL APPLICATION January 18, 2012 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of STP Nuclear Operating Company (STPNOC or the applicant) held a telephone conference call on January 18,2012, to discuss and clarify the applicant's response to Request for Additional Information (RAI) B2.1. 7-3 regarding high-strength bolts, related to the license renewal application (LRA).
The participants indicated that the call was useful in clarifying the questions discussed.
Issues and discussions:
The staff and the applicant discussed the following issues:
Bolting Integrity RAI B2.1.7-3 Response:
- 1) The staff asked if there were any high-strength bolts greater than 1 inch diameter within the scope of the American Society for Mechanical Engineers (ASME)Section XI, Subsection IWE Program.
a) STPNOC stated that there are no high-strength bolts greater than 1 inch diameter within the scope of the ASME Section XI, Subsection IWE Program.
- 2) Regarding AMR items for high-strength bolts, the LRA states that the Bolting Integrity Program will manage cracking and loss of material. Since the volumetric inspections were added to the Structures Monitoring and ASME Section XI, Subsection IWF Programs, why are there no aging management review (AMR) items for high-strength bolts that state that those programs will be used to manage cracking?
a) STPNOC stated that the high-strength bolts being managed by the Structures Monitoring and ASME Section XI, Subsection IWF Programs were included in the AMR items for the structural supports and were not specifically called out in separate AMR items in the LRA.
b) STPNOC also stated that the Bolting Integrity Program basis document was updated to point to the Structures Monitoring and ASME Section XI, Subsection IWF Programs for performance of the volumetric inspections to account for the high-strength steel bolting AMR items that state the Bolting Integrity Program will manage cracking.
- 3) The staff asked what the frequency is for the volumetric inspections that were added to the Structures Monitoring and ASME Section XI, Subsection IWF Programs.
a) STPNOC stated that the volumetric inspection frequencies are consistent with the other inspections in the respective programs.
ENCLOSURE 2
-2 Indoor Air Draft RAI 3.0-1a:
- 1) STPNOC requested clarification of whether the staff's concern with the definition of plant indoor air was for external surfaces exposed to plant indoor air or internal surfaces exposed to plant indoor air since the RAI referenced GALL Report items for both.
a) The staff clarified that the concern is for both external and internal surfaces exposed to plant indoor air and whether or not moisture is expected for each AMR item with an environment of plant indoor air.
Memorandum to File from J. Daily dated April 19, 2012
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD 01\1 JANUARY 18, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND STP NUCLEAR OPERATING COMPANY, REGARDING APPLICANT RESPONSE RELATED TO HIGH-STRENGTH BOLTS, FOR THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC. NOS. ME4936 AND ME4937)
DISTRIBUTION:
E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource RidsOgcMailCenter JDaily TTran DMclntyre, OPA BSingal, DORL WWalker, RIV JDixon, RIV BTharakan, RIV WMaier, RIV VDricks, RIV NOKeefe, RIV AVegel, RIV GPick, RIV
LICENSEE: STP Nuclear Operating Company FACILITY: South Texas Project
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 18, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND STP NUCLEAR OPERATING COMPANY, REGARDING THE APPLICANT'S RESPONSE RELATED TO HIGH-STRENGTH BOLTS, FOR THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC.
NOS. ME4936 AND ME4937)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of STP Nuclear Operating Company (STPNOC or the applicant) held a telephone conference call on January 18, 2012, to discuss and clarify issues related to the applicant's response to Request for Additional Information (RAI) B2.1.7-3 regarding high-strength bolts, for the South Texas Project, Units 1 and 2, license renewal application. The telephone conference call was useful in clarifying the applicant's responses and identifying the staff's issues for the RAls. provides a listing of the participants and Enclosure 2 contains a listing of the issues discussed with the applicant, including a brief description of the status of the items.
The applicant had an opportunity to comment on this summary.
IRA!
John Daily, Senior Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosures:
As stated cc w/encls: Listserv DISTRIBUTION: See next page ADAMS Accession No ... ML12067a127 PM:RPB1:DLR BC:RPB1 :DLR PM:RPB1 :DLR
!OFFICE LA:RPB1 :DLR JDaily DMorey JDaily NAME YEdmonds DATE 04/6/12 04/11/12 04/13/12 04/19/12 OFFICIAL RECORD COpy