Summary of March 25, 2024, Presubmittal Teleconference with STP Nuclear Operating Company to Discuss Changes to the Quality Assurance Plan for South Texas Project, Units 1 and 2
ML24120A236
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/06/2024
From: Byrd T
Plant Licensing Branch IV
To:
South Texas
Byrd, Thomas
Shared Package
ML24120A247 List:
References
EPID L-2024-LRM-0027
Download: ML24120A236 (1)


Text

May 6, 2024 LICENSEE:

STP Nuclear Operating Company FACILITY:

South Texas Project, Units 1 and 2

SUBJECT:

SUMMARY

OF MARCH 25, 2024, PRESUBMITTAL TELECONFERENCE WITH STP NUCLEAR OPERATING COMPANY TO DISCUSS CHANGES TO THE QUALITY ASSURANCE PLAN FOR SOUTH TEXAS PROJECT, UNITS 1 AND 2 (EPID L-2024-LRM-0027)

On March 25, 2024, an Observation public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of STP Nuclear Operating Company (the licensee) via teleconference. The purpose of this meeting was to discuss the licensee's planned submittal for South Texas Project, Units 1 and 2 (STP), concerning proposed changes to the licensees operations quality assurance (QA) plan. The meeting notice and agenda, dated December 4, 2023, are available in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession No. ML24066A031. Enclosed is a list of attendees at the meeting.

The licensee presented information (ML24080A129) discussing the planned submittal. The licensees presentation detailed the proposed change and summarized the necessary reasons for the requested change. This meeting primarily consisted of licensee detailing its plans to adopt QA definitions contained in NQA-1-1983, Condition Adverse to Quality, and Nuclear Energy Institute (NEI) 16-07, Improving the Effectiveness of Issue Resolution to Enhance Safety and Efficiency.

The NRC staff queried the licensee throughout the presentation to enhance its understanding of the planned submittal, including the following:

1.

The NRC staff discussed with the licensee the differences that would be applied to a condition adverse to quality (CAQ) versus a significant condition adverse to quality (SCAQ). The licensee stated that CAQ items would apply to structures, systems, and components; however, items related to a serious effect on nuclear safety would be defined as SCAQ. The licensee would document both types of conditions in STPs corrective action program (CAP).

2.

The NRC staff questioned how risk-significant non-safety related items would be treated with this proposed change to the QA plan. The licensee stated the classification of conditions not adverse to quality (CNAQ) would be applied to capture issues with these components in the CAP. The staff requested the licensee to include a discussion of this aspect in the submittal to facilitate its review.

No regulatory decisions were made as a result of this teleconference. No members of the public identified themselves on the teleconference. No Public Meeting Feedback forms were received.

Please direct any inquiries to me at 301-415-3719, or by email at Thomas.Byrd@nrc.gov.

/RA/

Thomas Byrd, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499

Enclosure:

List of Attendees cc: Listserv

Enclosure LIST OF ATTENDEES MARCH 25, 2024, PRE-APPLICATION TELECONFERENCE WITH STP NUCLEAR OPERATING COMPANY TO DISCUSS PROPOSED CHANGES TO THE QUALITY ASSURANCE PLAN FOR SOUTH TEXAS PROJECT, UNITS 1 AND 2 U.S. Nuclear Regulatory Commission Thomas Byrd NRR1/DORL2/LPL43/PM4 Samson Lee NRR/DORL/LPL4/PM Bobby Alekos NRR/DRO5/IQVB6/PM Deanna Zhang NRR/DRO/IQVB/Senior Reactor Operations Engineer Kerri Kavanagh NRR/DRO/IQVB/Branch Chief STP Nuclear Operating Company Drew Richards Regulatory Affairs Manager Michael Chandler Nuclear Oversight Manager Anthony Duke III Performance Improvement Supervisor Bobby Simpson Organizational Effectiveness Manager Wendy Brost Licensing Supervisor Christopher Warren Licensing Engineer Preston Williams Quality Supervisor Public None 1Office of Nuclear Reactor Regulation (NRR) 2Division of Operating Reactor Licensing (DORL) 3Plant Licensing Branch IV (LPL4) 4Project Manager (PM) 5Division of Reactor Oversight (DRO) 6Quality Assurance and Vendor Inspection Branch (IQVB)

Package: ML24120A247 Meeting Notice: ML24066A031 Meeting Summary: ML24120A236 Meeting Slides: ML24080A129

  • by email OFFICE NRR/DORL/LPL4/PM*

NRR/DORL/LPL4/LA*

NRR/DRO/IQVB/BC*

NAME TByrd PBlechman KKavanagh DATE 4/29/2024 5/2/2024 5/2/2024 OFFICE NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME JRankin TByrd DATE 05/06/2024 05/06/2024