ML12121A584: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12121A584
| number = ML12121A584
| issue date = 05/17/2012
| issue date = 05/17/2012
| title = 04/24/2012 Meeting Summary with Northern States Power Co, to Discuss the National Fire Protection Association Standard 805 (NFPA 805) License Amendment Request
| title = Meeting Summary with Northern States Power Co, to Discuss the National Fire Protection Association Standard 805 (NFPA 805) License Amendment Request
| author name = Wengert T J
| author name = Wengert T
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000282, 05000306
| docket = 05000282, 05000306
| license number = DPR-042, DPR-060
| license number = DPR-042, DPR-060
| contact person = Wengert T J
| contact person = Wengert T
| case reference number = TAC ME8277, TAC ME8278
| case reference number = TAC ME8277, TAC ME8278
| package number = ML12121A600
| package number = ML12121A600
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES "t"'o" NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:~p.~ REGu(                                    UNITED STATES
! WASHINGTON, D.C. 20555-0001  
  ~,>(j\;          "t"'o"                 NUCLEAR REGULATORY COMMISSION
<{ 0 :n : May 17, 2012 1-') ",0 ****1' Northern States Power Company -Minnesota Prairie Island Nuclear Generating Plant, Units 1 and 2  
<{
                        ~0                        WASHINGTON, D.C. 20555-0001
:n                       :
~,,#                                                      May 17, 2012 1-')           ",0
        ****1' LICENSEE:      Northern States Power Company - Minnesota FACILITY:      Prairie Island Nuclear Generating Plant, Units 1 and 2
 
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF APRIL 24,2012, PRE-APPLICATION MEETING TO DISCUSS THE NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (NFPA 805) LICENSE AMENDMENT REQUEST (TAC NOS. ME8277 AND ME8278) On April 24, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Northern States Power Company, a Minnesota corporation (NSPM, the licensee), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
OF APRIL 24,2012, PRE-APPLICATION MEETING TO DISCUSS THE NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (NFPA 805) LICENSE AMENDMENT REQUEST (TAC NOS. ME8277 AND ME8278)
The purpose of the meeting was to discuss NSPM's future National Fire Protection Association Standard 805 (NFPA 805) license amendment request (LAR) for Prairie Island Nuclear Generating Plant, Units 1 and 2. A notice for this meeting was issued on March 30, 2012, and is available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML 120870389.
On April 24, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Northern States Power Company, a Minnesota corporation (NSPM, the licensee), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss NSPM's future National Fire Protection Association Standard 805 (NFPA 805) license amendment request (LAR) for Prairie Island Nuclear Generating Plant, Units 1 and 2. A notice for this meeting was issued on March 30, 2012, and is available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML120870389. The licensee's meeting slides can be found in ADAMS Accession No. ML12115A311.
The licensee's meeting slides can be found in ADAMS Accession No. ML 12115A311.
The licensee's presentation to the NRC staff included a status and overview of the NFPA 805 transition project, including planned modifications, LAR implementation, the fire probabilistic risk assessment activities, and the project challenges.
The licensee's presentation to the NRC staff included a status and overview of the NFPA 805 transition project, including planned modifications, LAR implementation, the fire probabilistic risk assessment activities, and the project challenges.
The NRC staff queried the licensee and provided feedback throughout the presentation.
The NRC staff queried the licensee and provided feedback throughout the presentation. The licensee stated that the project is currently on schedule to submit the LAR by September 3D, 2012.
The licensee stated that the project is currently on schedule to submit the LAR by September 3D, 2012. Members of the public were not in attendance.
Members of the public were not in attendance. Public Meeting Feedback forms were not received. A list of attendees is included as an enclosure.
Public Meeting Feedback forms were not received.
 
A list of attendees is included as an enclosure.
                                              -2 Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov.
-2 Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov. Thomas se:Jr Project Plant Licensing Branch Division of Operating Reactor Office of Nuclear Reactor Docket Nos. 50-282 and  
                                          ~V~~~~
Thomas   J~gert,    se:Jr Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306


==Enclosure:==
==Enclosure:==
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATrENDEES APRIL 24.2012. PRE-APPLICATION MEETING WITH NORTHERN STATES POWER COMPANY - MINNESOTA PRAIRIE ISLAND NUCLEAR GENERATING PLANT FUTURE LICENSE AMENDMENT REQUEST FOR NFPA 805 TRANSITION NAME                                  ORGANIZATION M. Kelly                              Xcel Energy R. Rohrer                            Xcel Energy G. Eckholt                            Xcel Energy M. McKeown                            Xcel Energy C. Lane                              Xcel Energy A Hazelhoff                          Enercon (Xcel Energy)
A Klein                              NRC/NRR/DRAlAFPB P. Lain                              NRC/NRR/DRAlAFPB H. Barrett                            NRC/NRRlDRAlAFPB L. Fields                            NRC/NRRlDRAlAFPB C. Moulton                            NRC/NRRlDRAlAFPB G. Cooper                            NRC/NRRlDRAlAFPB D. Harrison                          NRC/NRRlDRAlAPLA S. Dinsmore                          NRC/NRR/DRAIAPLA D. O'Neal                            NRC/NRR/DRAIAPLA S. Garry                              NRC/NRR/DRAlAHPB C. Clemons                            NRC/NRR/DRAlAHPB I. Frankl                            NRC/NRR/DORL T. Wengert                            NRC/NRR/DORL H. Peterson*                          RIII/DRS
* Participated via teleconference ACRONYMS NRC          U.S. Nuclear Regulatory Commission NRR          Office of Nuclear Reactor Regulation Rill          Region III DORL          Division of Operating Reactor Licensing DRA          Division of Risk Assessment DRS          Division of Reactor Safety AFPB          Fire Protection Branch AHPB          Health Physics and Human Performance Branch APLA          Probabilistic Risk Assessment Licensing Branch Enclosure


List of cc w/encl: Distribution via LIST OF APRIL 24.2012. PRE-APPLICATION MEETING NORTHERN STATES POWER COMPANY -
                                                  - 2 Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov.
PRAIRIE ISLAND NUCLEAR GENERATING FUTURE LICENSE AMENDMENT REQUEST FOR NFPA 805 NAME ORGANIZATION M. Kelly Xcel Energy R. Rohrer Xcel Energy G. Eckholt Xcel Energy M. McKeown Xcel Energy C. Lane Xcel Energy A Hazelhoff Enercon (Xcel Energy) A Klein NRC/NRR/DRAlAFPB P. Lain NRC/NRR/DRAlAFPB H. Barrett NRC/NRRlDRAlAFPB L. Fields NRC/NRRlDRAlAFPB C. Moulton NRC/NRRlDRAlAFPB G. Cooper NRC/NRRlDRAlAFPB D. Harrison NRC/NRRlDRAlAPLA S. Dinsmore NRC/NRR/DRAIAPLA D. O'Neal NRC/NRR/DRAIAPLA S. Garry NRC/NRR/DRAlAHPB C. Clemons NRC/NRR/DRAlAHPB I. Frankl NRC/NRR/DORL T. Wengert NRC/NRR/DORL H. Peterson*
IRA!
RIII/DRS
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
* Participated via teleconference ACRONYMS NRC U.S. Nuclear Regulatory Commission NRR Office of Nuclear Reactor Regulation Rill Region III DORL Division of Operating Reactor Licensing DRA Division of Risk Assessment DRS Division of Reactor Safety AFPB Fire Protection Branch AHPB Health Physics and Human Performance Branch APLA Probabilistic Risk Assessment Licensing Branch Enclosure 
-Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov.
IRA! Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306  


==Enclosure:==
==Enclosure:==
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL3-1 R/F RidsRgn3MailCenter Resource RidsAcrsAcnw_MailCTR Resource TWertz, NRR . SWiliiams, EDO Region III RidsNrrDorlLpl3-1 Resource HBarrett, NRR CClemons, NRR RidsNrrPMPrairie Island Resource IFrankl, NRR LFields, NRR RidsNrrLABTully Resource SGarry, NRR AKlein. NRR RidsOgcRp Resource GCooper, NRR SDinsmore.
PUBLIC             LPL3-1 R/F         RidsRgn3MailCenter Resource RidsAcrsAcnw_MailCTR Resource         TWertz, NRR .                       SWiliiams, EDO Region III RidsNrrDorlLpl3-1 Resource           HBarrett, NRR                       CClemons, NRR RidsNrrPMPrairie Island Resource     IFrankl, NRR                       LFields, NRR RidsNrrLABTully Resource             SGarry, NRR                         AKlein. NRR RidsOgcRp Resource                   GCooper, NRR                       SDinsmore. NRR PLain, NRR                           CMoulton. NRR                       DO'Neal, NRR DHarrison, NRR                       HPeterson, Rill ADAMS Accession Nos.: PKG: ML12121A600                  Meeting Notice: ML120870389 Meetlng Summary: ML12121A584                            Srd I es: ML12115A311 OFFICE NRR/DORULPL3-1/PM NR R/DORULPL3-1/LA NRR/DRAlAFPB/BC                       NRR/DORULPL3-1/BC (A)
NRR PLain, NRR CMoulton.
NAME       TWengert             BTuily                   AKlein                 IFrankl DATE       05/11/12             05/03/12                 05/15112               05/17/12 OFFICIAL RECORD COpy}}
NRR DO'Neal, NRR DHarrison, NRR HPeterson, Rill ADAMS Accession Nos.: PKG: ML 12121A600 Meeting Notice: ML 120870389 M S ummary: M 8 Srd I es: ML12115A31 1 eetlng L 12121A5 4 OFFICE NRR/DORULPL3-1/PM NR R/DORULPL3-1/LA NRR/DRAlAFPB/BC NRR/DORULPL3-1/BC (A) NAME TWengert BTuily AKlein IFrankl DATE 05/11/12 05/03/12 05/15112 05/17/12 OFFICIAL RECORD COpy}}

Latest revision as of 15:53, 6 February 2020

Meeting Summary with Northern States Power Co, to Discuss the National Fire Protection Association Standard 805 (NFPA 805) License Amendment Request
ML12121A584
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 05/17/2012
From: Thomas Wengert
Plant Licensing Branch III
To:
Plant Licensing Branch III
Wengert T
Shared Package
ML12121A600 List:
References
TAC ME8277, TAC ME8278
Download: ML12121A584 (4)


Text

~p.~ REGu( UNITED STATES

~,>(j\; "t"'o" NUCLEAR REGULATORY COMMISSION

<{

~0 WASHINGTON, D.C. 20555-0001

n  :

~,,# May 17, 2012 1-') ",0

        • 1' LICENSEE: Northern States Power Company - Minnesota FACILITY: Prairie Island Nuclear Generating Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF APRIL 24,2012, PRE-APPLICATION MEETING TO DISCUSS THE NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (NFPA 805) LICENSE AMENDMENT REQUEST (TAC NOS. ME8277 AND ME8278)

On April 24, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Northern States Power Company, a Minnesota corporation (NSPM, the licensee), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss NSPM's future National Fire Protection Association Standard 805 (NFPA 805) license amendment request (LAR) for Prairie Island Nuclear Generating Plant, Units 1 and 2. A notice for this meeting was issued on March 30, 2012, and is available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML120870389. The licensee's meeting slides can be found in ADAMS Accession No. ML12115A311.

The licensee's presentation to the NRC staff included a status and overview of the NFPA 805 transition project, including planned modifications, LAR implementation, the fire probabilistic risk assessment activities, and the project challenges.

The NRC staff queried the licensee and provided feedback throughout the presentation. The licensee stated that the project is currently on schedule to submit the LAR by September 3D, 2012.

Members of the public were not in attendance. Public Meeting Feedback forms were not received. A list of attendees is included as an enclosure.

-2 Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov.

~V~~~~

Thomas J~gert, se:Jr Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

LIST OF ATrENDEES APRIL 24.2012. PRE-APPLICATION MEETING WITH NORTHERN STATES POWER COMPANY - MINNESOTA PRAIRIE ISLAND NUCLEAR GENERATING PLANT FUTURE LICENSE AMENDMENT REQUEST FOR NFPA 805 TRANSITION NAME ORGANIZATION M. Kelly Xcel Energy R. Rohrer Xcel Energy G. Eckholt Xcel Energy M. McKeown Xcel Energy C. Lane Xcel Energy A Hazelhoff Enercon (Xcel Energy)

A Klein NRC/NRR/DRAlAFPB P. Lain NRC/NRR/DRAlAFPB H. Barrett NRC/NRRlDRAlAFPB L. Fields NRC/NRRlDRAlAFPB C. Moulton NRC/NRRlDRAlAFPB G. Cooper NRC/NRRlDRAlAFPB D. Harrison NRC/NRRlDRAlAPLA S. Dinsmore NRC/NRR/DRAIAPLA D. O'Neal NRC/NRR/DRAIAPLA S. Garry NRC/NRR/DRAlAHPB C. Clemons NRC/NRR/DRAlAHPB I. Frankl NRC/NRR/DORL T. Wengert NRC/NRR/DORL H. Peterson* RIII/DRS

  • Participated via teleconference ACRONYMS NRC U.S. Nuclear Regulatory Commission NRR Office of Nuclear Reactor Regulation Rill Region III DORL Division of Operating Reactor Licensing DRA Division of Risk Assessment DRS Division of Reactor Safety AFPB Fire Protection Branch AHPB Health Physics and Human Performance Branch APLA Probabilistic Risk Assessment Licensing Branch Enclosure

- 2 Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov.

IRA!

Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL3-1 R/F RidsRgn3MailCenter Resource RidsAcrsAcnw_MailCTR Resource TWertz, NRR . SWiliiams, EDO Region III RidsNrrDorlLpl3-1 Resource HBarrett, NRR CClemons, NRR RidsNrrPMPrairie Island Resource IFrankl, NRR LFields, NRR RidsNrrLABTully Resource SGarry, NRR AKlein. NRR RidsOgcRp Resource GCooper, NRR SDinsmore. NRR PLain, NRR CMoulton. NRR DO'Neal, NRR DHarrison, NRR HPeterson, Rill ADAMS Accession Nos.: PKG: ML12121A600 Meeting Notice: ML120870389 Meetlng Summary: ML12121A584 Srd I es: ML12115A311 OFFICE NRR/DORULPL3-1/PM NR R/DORULPL3-1/LA NRR/DRAlAFPB/BC NRR/DORULPL3-1/BC (A)

NAME TWengert BTuily AKlein IFrankl DATE 05/11/12 05/03/12 05/15112 05/17/12 OFFICIAL RECORD COpy