Letter Sequence Request |
---|
|
|
MONTHYEARML1208703892012-03-30030 March 2012 Notice of Pre-Application Meeting with Xcel Energy Concerning Prairie Island Nuclear Generating Plant, Units 1 and 2, to Discuss Licensee'S Proposed NFPA 805, Performance Based Standard for Fire Protection for Light Weight Reactor ... Project stage: Meeting ML12115A3112012-04-24024 April 2012 Meeting Slides: 04/24/2012 Meeting with Xcel Energy NFPA 805 Presubmittal - Prairie Island Nuclear Generating Plant Project stage: Request ML12121A5842012-05-17017 May 2012 Meeting Summary with Northern States Power Co, to Discuss the National Fire Protection Association Standard 805 (NFPA 805) License Amendment Request Project stage: Meeting 2012-04-24
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24127A2402024-05-0707 May 2024 Presentation Slides for Prairie Island 2023 End-of-Cycle Meeting ML24029A0382024-01-31031 January 2024 January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions ML23168A0032023-06-20020 June 2023 Handout for 6/23/2023 Pre-Application Public Meeting with Prairie Island Nuclear Generating Plant to Revise ISFSI TS 4.4 for TN-40HT Casks ML23156A2602023-06-0505 June 2023 2022 Prairie Island End-of-Cycle Meeting Presentation ML23102A1752023-04-14014 April 2023 April 14, 2023 TS 3.7.8 LAR Pre-Submittal Meeting Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22048B1812022-02-18018 February 2022 Pre-Application Meeting for Prairie Island TS 5.6.6, PTLR, LAR ML21221A0202021-08-11011 August 2021 Nis Pr Bypass Test Panel License Amendment Request ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML19347B0722019-12-12012 December 2019 TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 ML19268A0422019-09-26026 September 2019 Pre-Application Meeting License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19210D4512019-07-22022 July 2019 Abeyance Seal Preapplication Meeting Slides ML18051A1752018-02-20020 February 2018 Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy 2/20/2018 ML17240A3382017-08-30030 August 2017 Non-Safety Related Digital Feedwater and Amsac/Dss Control Systems Replacement Project Presentation ML17198A2632017-07-17017 July 2017 Pre-Application Meeting ML17066A3732017-03-0909 March 2017 Spent Fuel Pool Criticality Technical Specification Changes Round 2 Request for Additional Information Public Meeting: March 9, 2017 ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML15140A3342015-05-13013 May 2015 Public Meeting 05132015 Licensee Slides Only ML15105A0372015-04-14014 April 2015 Xcel Energy Slide Presentation to Support Pre-Application Meeting on April 14, 2015, to Discuss Nuclear Fuel Design Transition to Include Integral Fuel Burnable Absorber (Ifba) at the Prairie Island Nuclear Generating Plant ML14323B0222014-11-19019 November 2014 Regcon, November 19-20, 2014: 03-Info-Session-2 Ronald Johnson - Tribal Perspective on Continued Storage ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14058A1732014-02-19019 February 2014 Diesel Generator Steady State Voltage and Frequency Limits - Prairie Island Nuclear Generating Plant Meeting February 19, 2014 ML13210A2012013-07-29029 July 2013 2012 End-of-Cycle Slides - Licensee ML13210A2002013-07-11011 July 2013 2012 End-of-Cycle Slides ML13056A0262013-02-25025 February 2013 Regulatory Conference Slide Presentation ML12340A5402012-12-0606 December 2012 Reactor Core Cooling & Heat Removal FLEX Strategy - Phase 1 ML12326A9712012-11-21021 November 2012 Encl 3 (Handouts - Public) to Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 ML12277A1762012-10-0404 October 2012 Steam Generator Replacement Presentation ML12275A4652012-09-27027 September 2012 Meeting September 27, 2012 - Handouts ML12275A3782012-09-27027 September 2012 Xcel Energy Prairie Island Nuclear Generating Plant Meeting Presentation, Diesel Generator Voltage and Frequency Limits. ML12205A2172012-07-23023 July 2012 NRC 2011 End-of-Cycle Slides ML12205A2202012-07-17017 July 2012 Licensee 2012 End-of-Cycle Slides ML12115A3112012-04-24024 April 2012 Meeting Slides: 04/24/2012 Meeting with Xcel Energy NFPA 805 Presubmittal - Prairie Island Nuclear Generating Plant ML1207904792012-03-14014 March 2012 March 14, 2012 Telecon Slides ML1122803892011-08-18018 August 2011 Pre-Application Meeting for Prairie Island Nuclear Generating Plant (Ping) Extended Power Uprate (EPU) ML1119903462011-07-28028 July 2011 Meeting Presentation, Prairie Island Nuclear Generating Plant - Failure to Maintain the Train a and B Direct Current Electrical Power Subsystems Operable ML1117804242011-06-22022 June 2011 June 22, 2011, Meeting Handout #1 - NRC Meeting Diesel Fuel Oil LAR for Prairie Island Ngp ML1120701572011-06-22022 June 2011 June 22, 2011, Meeting Handout #2 - Proposed Technical Specification Changes for Prairie Island Ngp Diesel Fuel Oil LAR ML1106600792011-03-0303 March 2011 March 3, 2011 Meeting Handouts - Revise Footnote in TS 3.8.1, Prairie Island Nuclear Generating Plant ML1034701142010-12-14014 December 2010 Excel Energy Slides for Public Meeting 12/14/2010 to Discuss Human Performance Issues ML1027802642010-10-0404 October 2010 Session 4 - Heather Westra Presentation at October 4, 2010, Public Meeting on Groundwater Protection ML1023805712010-08-25025 August 2010 Meeting Presentation Alternative Source Term Steam Generator Tube Rupture Margin to Overfill Evaluation - Prairie Island Nuclear Generating Plant ML1014502432010-05-26026 May 2010 Responses to Questions from the Prairie Island Indian Community Concerning Issues Related to Prairie Island Nuclear Generating Plant ML1012604192010-05-20020 May 2010 Meeting Presentation Prairie Island Annual Assessment Meeting - Reactor Oversight Program - 2009 ML1012503422010-05-0505 May 2010 Regulatory Conference Slides ML1015801072010-04-28028 April 2010 2R26 Outage, SG Tube Inspection Telecon Slides ML1010604782010-04-15015 April 2010 April 15, 2010, Meeting Slides - Pre-Application Meeting for Prairie Island Ngp Extended Power Uprate ML0932901282009-12-0101 December 2009 Licensee Slides for Public Meeting 2024-05-07
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24127A2402024-05-0707 May 2024 Presentation Slides for Prairie Island 2023 End-of-Cycle Meeting ML24059A4042024-03-0606 March 2024 March 6, 2023, Presubmittal Meeting for License Amendment Request to Modify Technical Specifications Definitions & Approve Plant-Specific Methods for Response Time Testing (EPID L-2024-LRM-0034) - Slides ML24029A0382024-01-31031 January 2024 January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions ML23168A0032023-06-20020 June 2023 Handout for 6/23/2023 Pre-Application Public Meeting with Prairie Island Nuclear Generating Plant to Revise ISFSI TS 4.4 for TN-40HT Casks ML23156A2602023-06-0505 June 2023 2022 Prairie Island End-of-Cycle Meeting Presentation ML23102A1752023-04-14014 April 2023 April 14, 2023 TS 3.7.8 LAR Pre-Submittal Meeting Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22048B1812022-02-18018 February 2022 Pre-Application Meeting for Prairie Island TS 5.6.6, PTLR, LAR ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21124A0652021-05-0606 May 2021 Xcel Energy Presentation for May 6, 2021 Public Meeting to Discuss 24-Month Cycles at Prairie Island Nuclear Generating Plant, Units 1 and 2 ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML20266F1052020-09-23023 September 2020 (PINGP) COVID-19 Exemption Request for the 2020 Biennial Emergency Preparedness Exercise ML20212L8622020-07-29029 July 2020 2019 Monticello and Prairie Island EOC Presentation from Webinar ML20098F0682020-04-0909 April 2020 Preapplication Teleconference Presentation: License Amendment Request to Adopt TSTF-569 ML20057D3082020-02-18018 February 2020 Slides Potential License Amendment to Remove Note from LCO 3.4.12 and LCO 3.4.13 ML19268A0422019-09-26026 September 2019 Pre-Application Meeting License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19210D4512019-07-22022 July 2019 Abeyance Seal Preapplication Meeting Slides ML19071A2782019-03-0707 March 2019 Enclosure 3: Meeting Slides (Summary of February 28, 2019, Public Meeting with Xcel Energy to Discuss Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI (W/Enclosures 1 and 2)) ML18162A0262018-06-12012 June 2018 License Amendment Request to Reclassify Certain Fuel Handling Equipment ML18051A1752018-02-20020 February 2018 Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy 2/20/2018 ML17240A3382017-08-30030 August 2017 Non-Safety Related Digital Feedwater and Amsac/Dss Control Systems Replacement Project Presentation ML17209A1192017-07-17017 July 2017 Summary of July 17, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Heavy Lifting Devices ML17198A2632017-07-17017 July 2017 Pre-Application Meeting ML17066A3732017-03-0909 March 2017 Spent Fuel Pool Criticality Technical Specification Changes Round 2 Request for Additional Information Public Meeting: March 9, 2017 ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML16280A0372016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711) - Figure 2 of 3 ML16280A0422016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711) - Figure 3 of 3 ML16280A0352016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711) - Figure 1 of 3 ML15140A3342015-05-13013 May 2015 Public Meeting 05132015 Licensee Slides Only ML15127A6562015-05-0707 May 2015 PI EOC Mtg NRC Slides ML15105A0372015-04-14014 April 2015 Xcel Energy Slide Presentation to Support Pre-Application Meeting on April 14, 2015, to Discuss Nuclear Fuel Design Transition to Include Integral Fuel Burnable Absorber (Ifba) at the Prairie Island Nuclear Generating Plant ML14323B0222014-11-19019 November 2014 Regcon, November 19-20, 2014: 03-Info-Session-2 Ronald Johnson - Tribal Perspective on Continued Storage ML14162A5202014-06-11011 June 2014 Slides: Prairie Island Independent Spent Fuel Storage Installation - License Renewal Application - Discussion of Requests for Additional Information, for June 16, 2014, Public Meeting ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14084A3242014-03-21021 March 2014 M140321: Slides - Presented by Multiple Participants at Commission Briefing on Waste Confidence Rulemaking ML13210A2012013-07-29029 July 2013 2012 End-of-Cycle Slides - Licensee ML13210A2002013-07-11011 July 2013 2012 End-of-Cycle Slides ML13056A0262013-02-25025 February 2013 Regulatory Conference Slide Presentation ML12340A5402012-12-0606 December 2012 Reactor Core Cooling & Heat Removal FLEX Strategy - Phase 1 ML12326A9712012-11-21021 November 2012 Encl 3 (Handouts - Public) to Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 ML12277A1762012-10-0404 October 2012 Steam Generator Replacement Presentation ML12275A3782012-09-27027 September 2012 Xcel Energy Prairie Island Nuclear Generating Plant Meeting Presentation, Diesel Generator Voltage and Frequency Limits. ML12205A2172012-07-23023 July 2012 NRC 2011 End-of-Cycle Slides ML12205A2202012-07-17017 July 2012 Licensee 2012 End-of-Cycle Slides ML12115A3112012-04-24024 April 2012 Meeting Slides: 04/24/2012 Meeting with Xcel Energy NFPA 805 Presubmittal - Prairie Island Nuclear Generating Plant ML1207904792012-03-14014 March 2012 March 14, 2012 Telecon Slides ML1122803892011-08-18018 August 2011 Pre-Application Meeting for Prairie Island Nuclear Generating Plant (Ping) Extended Power Uprate (EPU) ML1119903462011-07-28028 July 2011 Meeting Presentation, Prairie Island Nuclear Generating Plant - Failure to Maintain the Train a and B Direct Current Electrical Power Subsystems Operable ML1117804242011-06-22022 June 2011 June 22, 2011, Meeting Handout #1 - NRC Meeting Diesel Fuel Oil LAR for Prairie Island Ngp 2024-05-07
[Table view] |
Text
NFPA 805 LAR Pre-Submittal Meeting 1
Attendees Carl Lane Engineering Programs Manager Mark McKeown NFPA 805 Project Manager Rick Rohrer Manager of Fleet Program Engineering Michelle Kelly NFPA 805 Engineering Lead Gene Eckholt Manager of Nuclear Projects Licensing Amy Hazelhoff NFPA 805 Licensing Lead 2
Agenda Meeting Purpose NFPA 805 Schedule NFPA 805 Transition Project Overview LAR Transition Tasks NFPA 805 Modifications LAR Implementation Fire PRA Project Challenges
- Note - LAR is in development and technical information provided is preliminary 3
Meeting Purpose Discuss the PINGP NFPA 805 Transition Status Discuss project challenges Gain insights from NRC on NFPA 805 Transition 4
NFPA 805 Schedule
Background
Commitment letter submitted June 2011 LAR Staggered Approach FPRA Peer Review Scheduled to begin May 7, 2012 Commitment to submit LAR by September 30, 2012 Currently on schedule 5
NFPA 805 Transition Project Overview Overview of NFPA 805 LAR PINGP following Revision 1L of NEI 04-02 template LAR development and internal review activities are on-going Plant Operating Review Sub-Committee created 6 PORC Sub-COM reviews planned One PORC Sub-COM review completed Second PORC Sub-COM review scheduled for April 25, 2012 Additional four PORC Sub-COM reviews scheduled 6
NFPA 805 Transition Project Overview Fire Protection Program Transition License Condition being revised Technical Specification being revised Minor Administrative Change to TS Reviewing existing exemptions (Attachment K)
Expecting items for NRC approval (Attachment L)
Expecting items for clarification (Attachment T) 7
NFPA 805 Transition Project Overview NFPA 805 Chapter 3 Compliance Attachment A, Table B-1 (Fundamental FP Program Transition)
Compliance basis:
(95) Complies (6) Complies with Item for Implementation (11) Complies by previous NRC approval (7) Complies with use of EEEEs (1) Submit for NRC Approval (0) Complies with Clarification 8
NFPA 805 Transition Project Overview Nuclear Safety Capability Assessment Attachment B, Table B-2 Performed using NEI 00-01, Revision 1 Gap Analysis comparing to NEI 00-01, Revision 2 being performed Guidance required additional reviews to current Appendix R Analysis 9
NFPA 805 Transition Project Overview Non-Power Operations Review in progress using NEI 04-02, Rev 2 guidance and FAQ 07-0040 Work in progress for NPO model incorporation into SAFE/GENESIS Success paths have been identified Component list by key safety function High Risk Evolutions have been identified Plant Operating State Pinch Points identified Recommendations to manage Fire Risk 10
NFPA 805 Transition Project Overview Radioactive Release Report is complete, in final review using NEI 04-02, Rev 2 guidance and FAQ 09-0056 Plant evaluated on a fire area basis Credit engineering controls for gaseous and liquid effluents Pre-Fire plans and training material to be developed/revised to clarify monitoring and control requirements (S-3 items) 11
NFPA 805 Transition Project Overview Monitoring Program Following FAQ 10-0059, Rev 5 Scoping systems and components to be monitored based on results of FPRA and Defense-in-Depth analysis Required components to be added to Maintenance Rule Program 12
NFPA 805 Transition Project Overview Recovery Actions Review in progress using NEI 04-02, Rev 2 and FAQ 07-0030 Significantly reduced Recovery Actions
~50% Removed 13
NFPA 805 Transition Project Overview Fire Area Transition (Fire Area by Fire Area Report)
Attachment C, Table B-3 Review of EEEEs, including GL 86-10 evaluations and 13 exemptions was performed Of the current ~134 EEEEs, 62 EEEEs will be eliminated 9 Exemptions were eliminated Describes resolution of variances from deterministic requirements
~150 VFDRs 14
NFPA 805 Transition Project Overview Existing Licensing Actions Transition (Attachment K)
PINGP has total of 13 Appendix R exemptions 9 exemptions will be eliminated utilizing the Performance Based-Risk Informed compliance strategy 4 exemptions transition as compliant with 10 CFR 50.48(c) 15
NFPA 805 Transition Project Overview NFPA 805 Chapter 3 Approvals (Attachment L)
NFPA 805 Section 3.5.16 - Use of fire water system for other purposes not fire protection related 16
NFPA 805 Transition Project Overview Clarification of Prior NRC Approvals (Attachment T)
Use of exemption for Hi/Lo Pressure interface valves for multiple fire areas per original request Clarification of manual action to use breaker switch instead of removing fuses for PORVs 17
NFPA 805 Transition Project Overview NFPA 805 Major Modifications (Preliminary)
Install New Cables U1 Bus 16 New Cable OCT U2 Design (FA 58, Design (FA 20) 73, 66, 7, 59, 74)
Incipient Fire Detection Design Electrical Safeguards Bus Design (FA 18) (FA 20, 58, 73)
Fire Detection Code Compliance Fire Suppression Code Compliance Hot SD Panel Design (FA 31 & Suction Press Trip Charging Pumps
- 32) Install (FA 18)
Cable Wrap Design (FA 18) Cable Protection Install (FA 69) 18
NFPA 805 Transition Project Overview LAR Implementation Plans (Attachment S)
Table S-1 items - No completed modifications Table S-2 items - Requesting 2 full operating cycles post SE to implement modifications 2018 refueling outage for full mod implementation Table S-3 items - 6 months post SE to implement training/procedure changes
- Note - LAR implementation plans assume issuance of an SE within two years of submittal date (2014) 19
NFPA 805 Transition Project Overview Fire PRA FPRA built on high quality Internal Events Model Internal events model peer reviewed to RG 1.200 Internal flooding still being developed 20
NFPA 805 Transition Project Overview Status of FPRA Initial analysis complete Refined HRA and Fire Modeling in progress FPRA Peer Review Scheduled for May 7 - May 11 Findings and Observations expected ~June 2012 21
NFPA 805 Transition Project Overview FPRA Unique Approaches MSOs explicitly modeled using PRISM More rigorous than normal approach of expert team review Expert panel review was also done Use of Alternate Methods No alternate methods used in the PINGP FPRA 22
NFPA 805 Transition Project Overview Fire Modeling No deviations taken Using established methodologies NUREG-1805 Fire Dynamic Tools Spreadsheets FDS Limitations and cautions of the methodologies considered 23
Conclusion LAR submittal by 9/30/12 Challenges FPRA status Uncertainty in LAR Scope Evolving NRC expectations New expectations from November 2011 being addressed in LAR NFPA 805 LAR scope has been frozen Necessary to ensure LAR is completed by 9/30/12 Evaluation of OE continues, but may not be addressed in LAR 24
Questions and Discussion 25