ML12121A584: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML12121A584 | | number = ML12121A584 | ||
| issue date = 05/17/2012 | | issue date = 05/17/2012 | ||
| title = | | title = Meeting Summary with Northern States Power Co, to Discuss the National Fire Protection Association Standard 805 (NFPA 805) License Amendment Request | ||
| author name = Wengert T | | author name = Wengert T | ||
| author affiliation = NRC/NRR/DORL/LPLIII-1 | | author affiliation = NRC/NRR/DORL/LPLIII-1 | ||
Line 21: | Line 21: | ||
{{#Wiki_filter:~p.~ REGu( UNITED STATES | {{#Wiki_filter:~p.~ REGu( UNITED STATES | ||
~,>(j\; "t"'o" NUCLEAR REGULATORY COMMISSION | ~,>(j\; "t"'o" NUCLEAR REGULATORY COMMISSION | ||
<{ | <{ | ||
~0 WASHINGTON, D.C. 20555-0001 | ~0 WASHINGTON, D.C. 20555-0001 |
Latest revision as of 15:53, 6 February 2020
ML12121A584 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 05/17/2012 |
From: | Thomas Wengert Plant Licensing Branch III |
To: | Plant Licensing Branch III |
Wengert T | |
Shared Package | |
ML12121A600 | List: |
References | |
TAC ME8277, TAC ME8278 | |
Download: ML12121A584 (4) | |
Text
~p.~ REGu( UNITED STATES
~,>(j\; "t"'o" NUCLEAR REGULATORY COMMISSION
<{
~0 WASHINGTON, D.C. 20555-0001
- n :
~,,# May 17, 2012 1-') ",0
- 1' LICENSEE: Northern States Power Company - Minnesota FACILITY: Prairie Island Nuclear Generating Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF APRIL 24,2012, PRE-APPLICATION MEETING TO DISCUSS THE NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (NFPA 805) LICENSE AMENDMENT REQUEST (TAC NOS. ME8277 AND ME8278)
On April 24, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Northern States Power Company, a Minnesota corporation (NSPM, the licensee), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss NSPM's future National Fire Protection Association Standard 805 (NFPA 805) license amendment request (LAR) for Prairie Island Nuclear Generating Plant, Units 1 and 2. A notice for this meeting was issued on March 30, 2012, and is available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML120870389. The licensee's meeting slides can be found in ADAMS Accession No. ML12115A311.
The licensee's presentation to the NRC staff included a status and overview of the NFPA 805 transition project, including planned modifications, LAR implementation, the fire probabilistic risk assessment activities, and the project challenges.
The NRC staff queried the licensee and provided feedback throughout the presentation. The licensee stated that the project is currently on schedule to submit the LAR by September 3D, 2012.
Members of the public were not in attendance. Public Meeting Feedback forms were not received. A list of attendees is included as an enclosure.
-2 Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov.
~V~~~~
Thomas J~gert, se:Jr Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATrENDEES APRIL 24.2012. PRE-APPLICATION MEETING WITH NORTHERN STATES POWER COMPANY - MINNESOTA PRAIRIE ISLAND NUCLEAR GENERATING PLANT FUTURE LICENSE AMENDMENT REQUEST FOR NFPA 805 TRANSITION NAME ORGANIZATION M. Kelly Xcel Energy R. Rohrer Xcel Energy G. Eckholt Xcel Energy M. McKeown Xcel Energy C. Lane Xcel Energy A Hazelhoff Enercon (Xcel Energy)
A Klein NRC/NRR/DRAlAFPB P. Lain NRC/NRR/DRAlAFPB H. Barrett NRC/NRRlDRAlAFPB L. Fields NRC/NRRlDRAlAFPB C. Moulton NRC/NRRlDRAlAFPB G. Cooper NRC/NRRlDRAlAFPB D. Harrison NRC/NRRlDRAlAPLA S. Dinsmore NRC/NRR/DRAIAPLA D. O'Neal NRC/NRR/DRAIAPLA S. Garry NRC/NRR/DRAlAHPB C. Clemons NRC/NRR/DRAlAHPB I. Frankl NRC/NRR/DORL T. Wengert NRC/NRR/DORL H. Peterson* RIII/DRS
- Participated via teleconference ACRONYMS NRC U.S. Nuclear Regulatory Commission NRR Office of Nuclear Reactor Regulation Rill Region III DORL Division of Operating Reactor Licensing DRA Division of Risk Assessment DRS Division of Reactor Safety AFPB Fire Protection Branch AHPB Health Physics and Human Performance Branch APLA Probabilistic Risk Assessment Licensing Branch Enclosure
- 2 Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov.
IRA!
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL3-1 R/F RidsRgn3MailCenter Resource RidsAcrsAcnw_MailCTR Resource TWertz, NRR . SWiliiams, EDO Region III RidsNrrDorlLpl3-1 Resource HBarrett, NRR CClemons, NRR RidsNrrPMPrairie Island Resource IFrankl, NRR LFields, NRR RidsNrrLABTully Resource SGarry, NRR AKlein. NRR RidsOgcRp Resource GCooper, NRR SDinsmore. NRR PLain, NRR CMoulton. NRR DO'Neal, NRR DHarrison, NRR HPeterson, Rill ADAMS Accession Nos.: PKG: ML12121A600 Meeting Notice: ML120870389 Meetlng Summary: ML12121A584 Srd I es: ML12115A311 OFFICE NRR/DORULPL3-1/PM NR R/DORULPL3-1/LA NRR/DRAlAFPB/BC NRR/DORULPL3-1/BC (A)
NAME TWengert BTuily AKlein IFrankl DATE 05/11/12 05/03/12 05/15112 05/17/12 OFFICIAL RECORD COpy