| issue date = 06/08/1998
| issue date = 06/08/1998
| title = Part 21 Rept Re Receipt of Refurbished DB-25 Circuit Breaker W/Missing Part from W Replacement Components Svcs on 980608. Spare DB-25 Circuit Breaker Was Inspected,Tested & Installed to Restore B Swp to Svc
| title = Part 21 Rept Re Receipt of Refurbished DB-25 Circuit Breaker W/Missing Part from W Replacement Components Svcs on 980608. Spare DB-25 Circuit Breaker Was Inspected,Tested & Installed to Restore B Swp to Svc
| author name = WIDAY J A
| author name = Widay J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1REGULATOIINFORMATIONDISTRIBUTIOAOYSTEM(RIDE)ACCESSIONNBR:9806110219DOC.DATE:98/06/08NOTARIZED:NOFACIL:50-244RobertEmmetGinnaNuclearPlant,Unit1,RochesterGAUTH.NAME,AUTHORAFFILIATIONWIDAY,J.A.'ochesterGas5ElectricCorp.RECIP.NAMEsRECIPIENTAFFILIATIONNRC-NoDetailedAffiliationGivenDOCKET05000244
{{#Wiki_filter:CATEGORY 1 REGULATOI INFORMATION DISTRIBUTIOAOYSTEM (RIDE)
ACCESSION NBR:9806110219            DOC.DATE: 98/06/08 NOTARIZED: NO                      DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                      G 05000244 AUTH. NAME,           AUTHOR AFFILIATION WIDAY,J.A.'ochester                Gas 5 Electric Corp.
RECIP.NAME        s  RECIPIENT AFFILIATION NRC - No Detailed      Affiliation    Given


==SUBJECT:==
==SUBJECT:==
Part21reptrereceiptofrefurbishedDB-25circuitbreakerw/missingpartfromWReplacementComponentsSvcson98060DISTRIBUTIONCODE:IE19T'COPIESRECEIVED:LTR1ENCL1SIZE:TITLE:Part21Rept(50DKT)C'OTES:LicenseExpdateinaccordancewith10CFR2,2.109(9/19/72).05000244ERECIPIENTIDCODE/NAMEPD1-1PDINTERNA:FILECENTERDRPM/PECB/BRES/DET/EIBRGN2RGN4COPIESLTTRENCL111111111111RECIPIENTIDCODE/NAMEVISSING,G.NRR/DRPM/PECBPDRWARD,M.RGN1RGN3COPIESLTTRENCL11111111110EXTERNAL:INPORECORDCTRNRCPDR1111NOACSILVER,ENUDOCSFULLTXT1,111D0UNOTETOALLNRIDS"RECIPIENTS:PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATIONREMOVEDFROMDISTRIBUTIONLISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION,CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION415-2083FULLTEXTCONVERSIONREQUIREDTOTALNUMBEROFCOPIESREQUIRED:LTTR15ENCL15
Part 21 rept re receipt of refurbished DB-25 circuit breaker w/missing part from W Replacement Components Svcs on 98060                              C DISTRIBUTION CODE: IE19T 'COPIES RECEIVED:LTR                1  ENCL  1    SIZE:
~IP4i~/fJy.'iply~>>I.',~q*'p'ygit POWERREACTOREVENTNUMBER:34363FACILITY:GINNAUNIT:[1][][]RXTYPE:[1]W-2-LPNRCNOTIFIEDBY:WHITEHQOPSOFFICER:CHAUNCEYGOULDREGION:1STATE:NYNOTIFICATIONDATE:NOTIFICATIONTIME:EVENTDATE:EVENTTIME:LASTUPDATEDATE:06/08/9811:49[ET]06/08/9800:00[EDT]06/08/98UNSPECIFIEDPARAGRAPHEMERGENCYCLASS:NOTAPPLICABLE10CFRSECTION:CCCC21.21NOTIFICATXONSRICHARDBARKLEYHODGERDONRRUNITSCRAMCODERXCRITINITPWRINITRXMODECURRPWRCURRRXMODENY100POWEROPERATION100POWEROPERATIONEVENTTEXTTHISPART21INVOLVESRECEIVINGAREFURBISHEDDB-25CIRCUITBREAKERWITHAMISSINGPART.THELICENSEERECEIVEDAREFURBISHEDDB-25CIRCUITBREAKER(REFURBISHEDIN1992')FROMWESTINGHOUSEREPLACEMENTCOMPONENTSSERVICESIMONROEVILLEPATHEREFURBISHEDBREAKERWASRETURNEDTOTHELICENSEEWITHAMISSINGPININTHEOPERATINGMECHANISM.THEABSENCEOFTHXSPINISBELIEVEDTOHAVECONTRIBUTEDTOTHEFAILUREOFTHE"SWP1B"CIRCUITBREAKERTOCLOSEONAMANUALSIGNALFROMTHEMAINCONTROLBOARD.THISALSOIMPLIESTHATTHEPOTENTIALEXISTSFORTHEBREAKERNOTTOCLOSEONANAUTOMATICDEMANDANDTHEREFORENOTBEAVAXLABLETOPERFORMXTSSAFETYFUNCTIONS.THEREARE41PERMANENTLYXNSTALLEDDB-25BREAKERSINTHESCREENHOUSEANDTURBINEBUILDINGSATTHESXTE.ALLOFTHEREMAINXNGBREAKERSWEREVISUALLYINSPECTEDTOVERIFYTHEPININQUESTIONWASINSTALLED.NOOTHERBREAKERSWEREFOUNDTOBEMISSINGTHEPIN.THERESIDENTINSPECTORWASNOTIFIED.98061102i9980608PDRADOCK050002448PDR
TITLE: Part 21 Rept (50 DKT)
Exp date    in  accordance with 10CFR2,2.109(9/19/72)           . 05000244    'O E
RECIPIENT            COPIES              RECIPIENT            COPIES ID CODE/NAME          LTTR ENCL          ID CODE/NAME          LTTR ENCL PD1-1 PD                  1      1      VISSING,G.               1      1              0 INTERNA: FILE    CENTE              1      1      NRR/DRPM/PECB            1      1 R  DRPM/PECB/B          1      1      PDR WARD, M.             1      1 RES/DET/EIB              1      1      RGN1                      1      1 RGN2                      1      1      RGN3                      1      1 RGN4                      1      1 EXTERNAL: INPO RECORD CTR NRC PDR 1
1 1
1 NOAC SILVER,E NUDOCS FULL TXT 1,
1 1
1 D
0 U
NOTE TO ALL NRIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR              15    ENCL    15


CPV4'lROCHESTERGASANDELECTRlCCORPORATION88EASTAVENUE,JOS6PHA,WIOAYPhrsMonocotGbnoNuclearPkre4'i~3Q~....eWlROCHESTER,H.Y.14649-0001TCLKPHONKAREACCOKTM848'2700June8,1998U.S.NuclearRegulatoryCommissionOperationsCenterFacsimileNumber301-816-5151TelephoneNumber301-816-5100
                                      ~ IP 4 i~/ fJy.'i ply~>> I. ', ~ q*'p 'yg it
 
POWER REACTOR                                        EVENT NUMBER:  34363 FACILITY: GINNA                          REGION: 1  NOTIFICATION DATE: 06/08/98 UNIT:      [1] [ ] [ ]                  STATE: NY  NOTIFICATION TIME: 11:49 [ET]
RX TYPE: [1] W-2-LP                                  EVENT DATE:        06/08/98 EVENT TIME:        00:00[EDT]
NRC NOTIFIED BY: WHITE                              LAST UPDATE DATE:  06/08/98 HQ OPS  OFFICER:  CHAUNCEY GOULD NOTIFICATXONS EMERGENCY CLASS: NOT APPLICABLE 10 CFR SECTION:                                      RICHARD BARKLEY        RDO CCCC 21.21                UNSPECIFIED PARAGRAPH HODGE                  NRR UNIT  SCRAM CODE RX  CRIT INIT  PWR  INIT RX MODE    CURR PWR    CURR RX MODE N          Y      100      POWER OPERATION    100    POWER OPERATION EVENT TEXT THIS PART 21 INVOLVES RECEIVING A REFURBISHED DB-25 CIRCUIT BREAKER WITH A MISSING PART.
THE LICENSEE RECEIVED A REFURBISHED DB-25 CIRCUIT BREAKER(REFURBISHED IN 1992') FROM WESTINGHOUSE REPLACEMENT COMPONENTS SERVICESI MONROEVILLE PA THE REFURBISHED BREAKER WAS RETURNED TO THE LICENSEE WITH A MISSING PIN IN THE OPERATING MECHANISM. THE ABSENCE OF THXS PIN IS BELIEVED TO HAVE CONTRIBUTED TO THE FAILURE OF THE "SWP1B" CIRCUIT BREAKER TO CLOSE ON A MANUAL SIGNAL FROM THE MAIN CONTROL BOARD.      THIS ALSO IMPLIES THAT THE POTENTIAL EXISTS FOR THE BREAKER NOT TO CLOSE ON AN AUTOMATIC DEMAND AND THEREFORE NOT BE AVAXLABLE TO PERFORM XTS SAFETY FUNCTIONS.      THERE ARE 41 PERMANENTLY XNSTALLED DB-25 BREAKERS IN THE SCREEN HOUSE AND TURBINE BUILDINGS AT THE SXTE. ALL OF THE REMAINXNG BREAKERS WERE VISUALLY INSPECTED TO VERIFY THE PIN IN QUESTION WAS INSTALLED. NO OTHER BREAKERS WERE FOUND TO BE MISSING THE PIN.
THE RESIDENT INSPECTOR WAS NOTIFIED.
98061102i9 980608 PDR  ADOCK 05000244 8              PDR
 
CPV  4' l
4'i~3Q
                                                                                  ~....e Wl ROCHESTER GAS AND ELECTRlC CORPORATION    88 EASTA VENUE, ROCHESTER, H.Y. 14649-0001 JOS6PH A, WIOAY                                                              TCLKPHONK Phrs Monocot                                                          AREA CCOK TM 848'2700 Gbno Nuclear Pkre                                                June 8, 1998 U.S. Nuclear Regulatory Commission Operations Center Facsimile Number 301-816-5151 Telephone Number 301-816-5100


==Subject:==
==Subject:==
InitialNotificationof10CFRPart21DefectR.E.GinnaNuclearPowerPlantDocketNo.50-244Xnaccordancewith10CFRPart21,ReportingofDefectsandNoncompliance,Section21(d)(3)(i),whichrequires"Initialnotificationbyfacsimile",theenclosedinitialnotificationisprovided.Writtennotification,inaccordancewith10CFRPazt21,Section21(d)(3)(ii),willbeprovidedbyJuly2,1998.'erytrulyyours,a.dsehA.WidayEnclosures
Initial Notification of  10 CFR    Part  21  Defect R.E. Ginna Nuclear Power Plant Docket No. 50-244 Xn accordance  with 10 CFR Part 21, Reporting of Defects and Noncompliance,   Section 21 (d) (3) (i), which requires "Initial notification by facsimile", the enclosed initial notification is provided. Written notification, in accordance with 10 CFR Pazt 21, Section 21 (d) (3) (ii), will be provided by July 2, 1998.'ery truly      yours, a.d se h A. Widay Enclosures


Page1,10CFR21INITIALFACSIMILENOTIFXCATIONNAMEANDADDRESSOFTHEINDIVZDUALINFORMINGTHECOMMISSZONiNAME:ADDRESS:JosephA.WidayRochesterGasaElectric,Corporation89EastAvenueRochester,NewYork14649IDENTIFICATIONOFTHEFACILITY,THEACTIVITY,ORTHEBASXCCOMPONENTSUPPLXEDFORSUCHFACILXTYWHICHFAILSTOCOMPLYORCONTAINSADEFECTSThefacilityistheR.E.GinnaNuclearPowerPlant.ThebasiccomponentisaWestinghouseDB-25circuitbreaker.ThiscomponentwasinstalledatGinnaStatio'ninaClass1ESafetyRelated480VoltACbus.Thebreakerwasthepowersupplyfeedbreakerforthe"B"ServiceWaterPump(52/SWPlB).IDENTIFICATZONOFTHEFIRMCONSTRUCTINGTHEFACILITYORSUPPLYXNGTHEBASiCCOMPONENTWHICHFAILSTOCOMPLYORCONTAINSADEFECT:TheDB-25circuitbreakerwererefurbishedby:WestinghouseReplacementComponentServicesWestinghouseElectricCorporationNuclearServicesDivisionHaymakerandNorthernPikeRoadMonroeville,PA15146Thecurrentrefurbishmentsiteis:WestinghouseElectricCorporationAssembly5.TestFacilityCheswickSite2000CheswickAvenueCheswick,PA15024-1358NATUREOFTHEDEFECTORFAILURETOCOMPLYANDTHESAFETYHAZARDWHICHISCREATEDORCOULDBECREATEDBYSUCHDEFECTORFAILURETOCOMPLY:TherefurbishedDB-25circuitbreakerwasreturnedtoGinnaStationwithamissingpinintheoperatingmechanism.TheabsenceofthispinisbelievedtohavecontributedtothefailureoftheSWP1BcircuitbreakertocloseonamanualsignalfromtheMainControlBoard.Thisimpliesthatthepotentialexiststhatthebreakerwouldnotcloseonanautodemandandthereforenotbeavailabletoperformitssafetyfunction(s).
Page 1
0',
    ,10CFR21  INITIAL FACSIMILE NOTIFXCATION NAME AND ADDRESS      OF  THE  INDIVZDUAL INFORMING THE COMMISS ZON i NAME:     Joseph A. Widay ADDRESS:   Rochester Gas a Electric, Corporation 89 East Avenue Rochester, New York 14649 IDENTIFICATION OF THE FACILITY, THE ACTIVITY, OR THE BASXC COMPONENT SUPPLXED FOR SUCH FACILXTY WHICH FAILS TO COMPLY OR CONTAINS A DEFECTS The facility is    the R.E. Ginna Nuclear Power Plant. The basic DB-25 circuit breaker.
JVI'0CPUiPPVi4~~4~~~~~~~page2VI.'VII.THEDATEONWHICHTHEINFORMATIONOFSUCHDEFECTORFAILURETOCOMPLYWASOBTAINED~'TheinformationwasobtainedonMay3.3,1998.Anattemptwasmadetostartthe"B"ServiceWaterPumpduringtestinganditfailedtocloseonamanualsignalfromtheMainContxolBoard.Duringthetroubleshootingthemissingpartwasdiscovered..IHTHECASEOFABASICCOMPONENTWHICHCONTAINSADEFECTORFAILSTOCOMPLY,THENUMBERANDLOCATION.OFALLSUCHCOMPONENTSINUSEAT,SUPPLIEDFOR,ORBEINGSUPPLIEDFORGINNASTATXON-Thereareforty-one,permanentlyinstalledDB-25bxeakersintheScreenHouseandTurbineBuildingsatGinnaStation.Ofthese,elevenbxeakersaxeClasslESafetyRelated.THECORRECTIVEACTIONWHICHHASBEEN,ISBEING,ORWILLBETAKEN;THENAMEOFTHEINDIVIDUALORORGANIZATIONRESPONSIBLEFORTHEACTION;ANDTHELENGTHOFTIMETHATHASBEENORWILLBETAKENTOCOMPLETETHEACTION:AspareDB-25circuitbreakerwasinspected,testedandinstalledtorestorethe"B"ServiceWaterPumptoservice.AllofthexemainingDB-25breakerswerevisuallyinspectedtoverifythatthepininquestionwasinstalled.Nootherbreakerswerefoundtobemissingthepin.ANYADVICERELATEDTOTHEDEFECTORFAILURETOCOMPLYABOUTTHEFACILITY,ACTIVITY,ORBASICCOMPONENTTHATHASBEEN,ISBEINGSORWILLBEGIVENTOPURCHASERSORLXCENSEES:Bothin-serviceandreceiptinspectionscanverifythepresenceofthepininquestion.Xtshouldbenotedthatthe"B"ServiceHaterPumpbreakerwasrefurbishedin1992.TOTALP.83
component    is  a Westinghouse                            This component    was installed at Ginna Statio'n in a Class 1E Safety Related 480 Volt AC bus. The breaker was the power supply feed breaker for the "B" Service Water Pump (52/SWPlB).
IDENTIFICATZON OF THE FIRM CONSTRUCTING THE FACILITY OR SUPPLYXNG THE BASiC COMPONENT WHICH FAILS TO COMPLY OR CONTAINS A DEFECT:
The DB-25  circuit  breaker were refurbished by:
Westinghouse Replacement Component Services Westinghouse Electric Corporation Nuclear Services Division Haymaker and Northern Pike    Road Monroeville, PA 15146 The  current refurbishment site is:
Westinghouse Electric Corporation Assembly 5. Test Facility Cheswick Site 2000 Cheswick Avenue Cheswick, PA 15024-1358 NATURE OF THE DEFECT OR FAILURE TO COMPLY AND THE SAFETY HAZARD WHICH IS CREATED OR COULD BE CREATED BY SUCH DEFECT OR FAILURE TO COMPLY:
The  refurbished DB-25 circuit breaker was returned to Ginna Station with a missing pin in the operating mechanism. The absence of this pin is believed to have contributed to the failure of the SWP1B circuit breaker to close on a manual signal from the Main Control Board. This implies that the potential exists that the breaker would not close on an auto demand and therefore not be available to perform its safety function(s).


}}
0 ',
JVI'0 CPU iPPV  i4          4 ~ ~ ~ ~  ~ ~ ~
  ~
~
page 2 THE DATE ON WHICH THE INFORMATION OF          SUCH  DEFECT OR FAILURE TO COMPLY WAS OBTAINED~
The  information was obtained on May 3.3, 1998. An attempt was made  to start the "B" Service Water Pump during testing and it  failed to close on a manual signal from the Main Contxol Board. During the troubleshooting the missing part was discovered..
VI.          IH THE CASE OF A BASIC COMPONENT WHICH CONTAINS A DEFECT OR FAILS TO COMPLY, THE NUMBER AND LOCATION .OF ALL SUCH COMPONENTS IN USE AT, SUPPLIED FOR, OR BEING SUPPLIED FOR GINNA STATXON-There are forty-one, permanently installed DB-25 bxeakers in the Screen House and Turbine Buildings at Ginna Station. Of these, eleven bxeakers axe Class lE Safety Related.
            'VII .      THE CORRECTIVE ACTION WHICH HAS BEEN, IS BEING, OR WILL BE TAKEN; THE NAME OF THE INDIVIDUAL OR ORGANIZATION RESPONSIBLE FOR THE ACTION; AND THE LENGTH OF TIME THAT HAS BEEN OR WILL BE TAKEN TO COMPLETE THE ACTION:
A  spare  DB-25        circuit breaker was inspected, tested and installed to restore the "B" Service Water Pump to service.
All of the xemaining DB-25 breakers were visually inspected to verify that the pin in question was installed. No other breakers were found to be missing the pin.
ANY ADVICE RELATED TO THE DEFECT OR FAILURE TO COMPLY ABOUT THE FACILITY, ACTIVITY, OR BASIC COMPONENT THAT HAS BEEN, IS BEINGS OR WILL BE GIVEN TO PURCHASERS OR LXCENSEES:
Both in-service and receipt inspections can verify the presence of the pin in question.          Xt should be noted that the "B" Service Hater Pump breaker was refurbished in 1992.
TOTAL P.83}}

Latest revision as of 09:14, 4 February 2020

Part 21 Rept Re Receipt of Refurbished DB-25 Circuit Breaker W/Missing Part from W Replacement Components Svcs on 980608. Spare DB-25 Circuit Breaker Was Inspected,Tested & Installed to Restore B Swp to Svc
ML17265A318
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/08/1998
From: Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC
References
REF-PT21-98 NUDOCS 9806110219
Download: ML17265A318 (10)


Text

CATEGORY 1 REGULATOI INFORMATION DISTRIBUTIOAOYSTEM (RIDE)

ACCESSION NBR:9806110219 DOC.DATE: 98/06/08 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME, AUTHOR AFFILIATION WIDAY,J.A.'ochester Gas 5 Electric Corp.

RECIP.NAME s RECIPIENT AFFILIATION NRC - No Detailed Affiliation Given

SUBJECT:

Part 21 rept re receipt of refurbished DB-25 circuit breaker w/missing part from W Replacement Components Svcs on 98060 C DISTRIBUTION CODE: IE19T 'COPIES RECEIVED:LTR 1 ENCL 1 SIZE:

TITLE: Part 21 Rept (50 DKT)

Exp date in accordance with 10CFR2,2.109(9/19/72) . 05000244 'O E

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 VISSING,G. 1 1 0 INTERNA: FILE CENTE 1 1 NRR/DRPM/PECB 1 1 R DRPM/PECB/B 1 1 PDR WARD, M. 1 1 RES/DET/EIB 1 1 RGN1 1 1 RGN2 1 1 RGN3 1 1 RGN4 1 1 EXTERNAL: INPO RECORD CTR NRC PDR 1

1 1

1 NOAC SILVER,E NUDOCS FULL TXT 1,

1 1

1 D

0 U

NOTE TO ALL NRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15

~ IP 4 i~/ fJy.'i ply~>> I. ', ~ q*'p 'yg it

POWER REACTOR EVENT NUMBER: 34363 FACILITY: GINNA REGION: 1 NOTIFICATION DATE: 06/08/98 UNIT: [1] [ ] [ ] STATE: NY NOTIFICATION TIME: 11:49 [ET]

RX TYPE: [1] W-2-LP EVENT DATE: 06/08/98 EVENT TIME: 00:00[EDT]

NRC NOTIFIED BY: WHITE LAST UPDATE DATE: 06/08/98 HQ OPS OFFICER: CHAUNCEY GOULD NOTIFICATXONS EMERGENCY CLASS: NOT APPLICABLE 10 CFR SECTION: RICHARD BARKLEY RDO CCCC 21.21 UNSPECIFIED PARAGRAPH HODGE NRR UNIT SCRAM CODE RX CRIT INIT PWR INIT RX MODE CURR PWR CURR RX MODE N Y 100 POWER OPERATION 100 POWER OPERATION EVENT TEXT THIS PART 21 INVOLVES RECEIVING A REFURBISHED DB-25 CIRCUIT BREAKER WITH A MISSING PART.

THE LICENSEE RECEIVED A REFURBISHED DB-25 CIRCUIT BREAKER(REFURBISHED IN 1992') FROM WESTINGHOUSE REPLACEMENT COMPONENTS SERVICESI MONROEVILLE PA THE REFURBISHED BREAKER WAS RETURNED TO THE LICENSEE WITH A MISSING PIN IN THE OPERATING MECHANISM. THE ABSENCE OF THXS PIN IS BELIEVED TO HAVE CONTRIBUTED TO THE FAILURE OF THE "SWP1B" CIRCUIT BREAKER TO CLOSE ON A MANUAL SIGNAL FROM THE MAIN CONTROL BOARD. THIS ALSO IMPLIES THAT THE POTENTIAL EXISTS FOR THE BREAKER NOT TO CLOSE ON AN AUTOMATIC DEMAND AND THEREFORE NOT BE AVAXLABLE TO PERFORM XTS SAFETY FUNCTIONS. THERE ARE 41 PERMANENTLY XNSTALLED DB-25 BREAKERS IN THE SCREEN HOUSE AND TURBINE BUILDINGS AT THE SXTE. ALL OF THE REMAINXNG BREAKERS WERE VISUALLY INSPECTED TO VERIFY THE PIN IN QUESTION WAS INSTALLED. NO OTHER BREAKERS WERE FOUND TO BE MISSING THE PIN.

THE RESIDENT INSPECTOR WAS NOTIFIED.

98061102i9 980608 PDR ADOCK 05000244 8 PDR

CPV 4' l

4'i~3Q

~....e Wl ROCHESTER GAS AND ELECTRlC CORPORATION 88 EASTA VENUE, ROCHESTER, H.Y. 14649-0001 JOS6PH A, WIOAY TCLKPHONK Phrs Monocot AREA CCOK TM 848'2700 Gbno Nuclear Pkre June 8, 1998 U.S. Nuclear Regulatory Commission Operations Center Facsimile Number 301-816-5151 Telephone Number 301-816-5100

Subject:

Initial Notification of 10 CFR Part 21 Defect R.E. Ginna Nuclear Power Plant Docket No. 50-244 Xn accordance with 10 CFR Part 21, Reporting of Defects and Noncompliance, Section 21 (d) (3) (i), which requires "Initial notification by facsimile", the enclosed initial notification is provided. Written notification, in accordance with 10 CFR Pazt 21, Section 21 (d) (3) (ii), will be provided by July 2, 1998.'ery truly yours, a.d se h A. Widay Enclosures

Page 1

,10CFR21 INITIAL FACSIMILE NOTIFXCATION NAME AND ADDRESS OF THE INDIVZDUAL INFORMING THE COMMISS ZON i NAME: Joseph A. Widay ADDRESS: Rochester Gas a Electric, Corporation 89 East Avenue Rochester, New York 14649 IDENTIFICATION OF THE FACILITY, THE ACTIVITY, OR THE BASXC COMPONENT SUPPLXED FOR SUCH FACILXTY WHICH FAILS TO COMPLY OR CONTAINS A DEFECTS The facility is the R.E. Ginna Nuclear Power Plant. The basic DB-25 circuit breaker.

component is a Westinghouse This component was installed at Ginna Statio'n in a Class 1E Safety Related 480 Volt AC bus. The breaker was the power supply feed breaker for the "B" Service Water Pump (52/SWPlB).

IDENTIFICATZON OF THE FIRM CONSTRUCTING THE FACILITY OR SUPPLYXNG THE BASiC COMPONENT WHICH FAILS TO COMPLY OR CONTAINS A DEFECT:

The DB-25 circuit breaker were refurbished by:

Westinghouse Replacement Component Services Westinghouse Electric Corporation Nuclear Services Division Haymaker and Northern Pike Road Monroeville, PA 15146 The current refurbishment site is:

Westinghouse Electric Corporation Assembly 5. Test Facility Cheswick Site 2000 Cheswick Avenue Cheswick, PA 15024-1358 NATURE OF THE DEFECT OR FAILURE TO COMPLY AND THE SAFETY HAZARD WHICH IS CREATED OR COULD BE CREATED BY SUCH DEFECT OR FAILURE TO COMPLY:

The refurbished DB-25 circuit breaker was returned to Ginna Station with a missing pin in the operating mechanism. The absence of this pin is believed to have contributed to the failure of the SWP1B circuit breaker to close on a manual signal from the Main Control Board. This implies that the potential exists that the breaker would not close on an auto demand and therefore not be available to perform its safety function(s).

0 ',

JVI'0 CPU iPPV i4 4 ~ ~ ~ ~ ~ ~ ~

~

~

page 2 THE DATE ON WHICH THE INFORMATION OF SUCH DEFECT OR FAILURE TO COMPLY WAS OBTAINED~

The information was obtained on May 3.3, 1998. An attempt was made to start the "B" Service Water Pump during testing and it failed to close on a manual signal from the Main Contxol Board. During the troubleshooting the missing part was discovered..

VI. IH THE CASE OF A BASIC COMPONENT WHICH CONTAINS A DEFECT OR FAILS TO COMPLY, THE NUMBER AND LOCATION .OF ALL SUCH COMPONENTS IN USE AT, SUPPLIED FOR, OR BEING SUPPLIED FOR GINNA STATXON-There are forty-one, permanently installed DB-25 bxeakers in the Screen House and Turbine Buildings at Ginna Station. Of these, eleven bxeakers axe Class lE Safety Related.

'VII . THE CORRECTIVE ACTION WHICH HAS BEEN, IS BEING, OR WILL BE TAKEN; THE NAME OF THE INDIVIDUAL OR ORGANIZATION RESPONSIBLE FOR THE ACTION; AND THE LENGTH OF TIME THAT HAS BEEN OR WILL BE TAKEN TO COMPLETE THE ACTION:

A spare DB-25 circuit breaker was inspected, tested and installed to restore the "B" Service Water Pump to service.

All of the xemaining DB-25 breakers were visually inspected to verify that the pin in question was installed. No other breakers were found to be missing the pin.

ANY ADVICE RELATED TO THE DEFECT OR FAILURE TO COMPLY ABOUT THE FACILITY, ACTIVITY, OR BASIC COMPONENT THAT HAS BEEN, IS BEINGS OR WILL BE GIVEN TO PURCHASERS OR LXCENSEES:

Both in-service and receipt inspections can verify the presence of the pin in question. Xt should be noted that the "B" Service Hater Pump breaker was refurbished in 1992.

TOTAL P.83