| issue date = 04/30/1999
| issue date = 04/30/1999
| title = Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping
| title = Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping
| author name = ALEXANDER D B
| author name = Alexander D
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 22
| page count = 22
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULAT Y INFORMATION DISTRXBUTIOh SYSTEM (RIDS)ACCESSION NBR:9905050200 DOC.DATE: 99/04/30 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULAT     Y INFORMATION DISTRXBUTIOh SYSTEM (RIDS)
NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION ALEXANDER,D.B.
ACCESSION NBR:9905050200             DOC.DATE:   99/04/30     NOTARIZED: NO             DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                         05000400 AUTH. NAME             AUTHOR AFFILIATION ALEXANDER,D.B.
Carolina Power a Light Co.'~ner~(+~~~PO RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
RECIP.NAME Carolina Power     a Light Co.
RECIPIENT AFFILIATION
                                                                    '~ner~( +~~~ PO Records Management Branch (Document             Control Desk)


==SUBJECT:==
==SUBJECT:==
Forwards info requested in 990324 RAI as suppl to 9812123.o'pplication for amend to license NPF-63 for alternative plan C for spent fuel pool cooling a cleanup sys piping.C A DISTR1'BUTIQN CQDE: A001D CQP1ES RECEIVED:LTR 1 ENCL i S1EE: TITLE: OR Submittal:
Forwards       info requested in 990324 RAI as suppl to 9812123.
General Distribution T NOTES:Application for permit renewal filed.0500040(P RECIPIENT ID CODE/NAME LPD2-2 LA LAUFER,R.INTERNAL: ACRS NRR/DE/EMCB NRR/DSSA/SPLB NRR/SPSB JUNGPX OGC/HDS2 COPIES LTTR ENCL 1 1 1 1 1 1, 1 1 1 1 1 1 0 RECIPIENT ID CODE/NAME LPD2-2 PD<LE CENTER 0 NRR/DE/EMEB NRR/DSSA/SRXB NUDOCS-AB TRACT COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 EXTERNAL: NOAC 1 1 NRC PDR).o(~~i~(~4P.o t K4~g D N NOTE TO ALL NRIDSN RECIPIENTS PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED'TTR 14 ENCL 13 Carolina Power&Ught Company Harris Nuclear Plant P.O.Box 165 New Hill NC 27562 APR g0 Bgy SERIAL: HNP-99-069 United States Nuclear Regulatory Commission ATTENTION:
for amend to license NPF-63 for alternative plan                                 C o'pplication for spent fuel pool cooling a cleanup sys piping.
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION REGARDING THE ALTERNATIVE PLAN FOR SPENT FUEL POOL" COOLING AND CLEANUP SYSTEM PIPING  
i                                  A C
DISTR1'BUTIQN CQDE: A001D         CQP1ES   RECEIVED:LTR     1   ENCL       S1EE:
TITLE:   OR Submittal: General Distribution                                                                 T NOTES:Application for permit renewal filed.                                               0500040(P RECIPIENT             COPIES              RECIPIENT            COPIES ID  CODE/NAME          LTTR ENCL          ID CODE/NAME         LTTR ENCL LPD2-2 LA                 1      1      LPD2-2  PD              1      1 LAUFER,R.                         1 INTERNAL: ACRS                         1      1        <LE CENTER      0        1      1 NRR/DE/EMCB               1,     1       NRR/DE/EMEB               1      1 NRR/DSSA/SPLB              1     1       NRR/DSSA/SRXB            1     1 NRR/SPSB JUNGPX            1     1       NUDOCS-AB TRACT          1 OGC/HDS2                  1     0 EXTERNAL: NOAC                         1     1       NRC PDR D
                        ).o(~~           i~   ( ~4P.o     t   K4~g N
NOTE TO ALL NRIDSN RECIPIENTS PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES       REQUIRED'TTR           14   ENCL     13
 
Carolina Power & Ught Company Harris Nuclear Plant P.O. Box 165 New Hill NC 27562 SERIAL: HNP-99-069 APR  g0    Bgy United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 RESPONSE TO NRC REQUEST FOR ADDITIONALINFORMATION REGARDING THE ALTERNATIVEPLAN FOR SPENT FUEL POOL
  " COOLING AND CLEANUP SYSTEM PIPING


==Dear Sir or Madam:==
==Dear Sir or Madam:==
By letter dated March 24, 1999, the NRC requested additional information regarding the Harris Nuclear Plant (HNP)license amendment request to place spent fuel pools'C'nd'D'n service.Enclosure 8 of the HNP license amendment request (ref.SERIAL: HNP-98-188, dated December 23, 1998)provided a detailed description of the proposed alternatives to demonstrate compliance with ASME B&PV Code requirements for spent fuel pool cooling and cleanup system piping in accordance with 10 CFR 50.55a(a)(3)(i).
 
The NRC has determined that additional information is required to complete the review of the proposed alternative piping plan.Enclosed is the HNP response to the NRC request for additional information.
By letter dated March 24, 1999, the NRC requested additional information regarding the Harris Nuclear Plant (HNP) license amendment request to place spent fuel pools 'C'nd 'D'n service.
The enclosed information is provided as a supplement to our December 23, 1998 submittal and does not change our initial determination that the proposed license amendment represents a no significant hazards consideration.
Enclosure 8 of the HNP license amendment request (ref. SERIAL: HNP-98-188, dated December 23, 1998) provided a detailed description of the proposed alternatives to demonstrate compliance with ASME B&PV Code requirements for spent fuel pool cooling and cleanup system piping in accordance with 10 CFR 50.55a(a)(3)(i). The NRC has determined that additional information is required to complete the review of the proposed alternative piping plan. Enclosed is the HNP response to the NRC request for additional information. The enclosed information is provided as a supplement to our December 23, 1998 submittal and does not change our initial determination that the proposed license amendment represents a no significant hazards consideration.
Please refer any questions regarding the enclosed information to Mr.Steven Edwards at (919)362-2498.9905050200 990430 PDR ADOCK 05000400 P PDR Sincerely, Donna B.Alexander Manager, Regulatory Affairs Harris Nuclear Plant r/Pad/KWS/kws Enclosures 5413 Shearon Harris Road New Hill NC 0 4 (ijjj g Q rf lA Document Control Desk~SERIAL: HNP-99-069 Page 2 c: Mr.J.B.Brady, NRC Senior Resident Inspector (w/Enclosure 1)Mr.Mel Fry, N.C.DEHNR (w/Enclosure 1)Mr.R.J.Laufer, NRC Project Manager (w/all Enclosures)
Please refer any questions regarding the enclosed information to Mr. Steven Edwards at (919) 362-2498.
Mr.L.A.Reyes, NRC Regional Administrator (w/Enclosure 1)
Sincerely,                                /
r 9905050200 990430                                         Donna B. Alexander                        Pad/
PDR ADOCK 05000400       PDR Manager, Regulatory Affairs P                                                          Harris Nuclear Plant KWS/kws Enclosures 5413 Shearon Harris Road   New Hill NC
 
0 4 (ijjj g Q rf lA
 
Document Control Desk
~ SERIAL: HNP-99-069 Page 2 c:
Mr. J. B. Brady, NRC Senior Resident Inspector (w/ Enclosure 1)
Mr. Mel Fry, N.C. DEHNR (w/ Enclosure 1)
Mr. R. J. Laufer, NRC Project Manager (w/ all Enclosures)
Mr. L. A. Reyes, NRC Regional Administrator (w/ Enclosure 1)
 
Document Control Desk Serial: HNP-99-069 Page 3 bc: (w/o enclosures)
Document Control Desk Serial: HNP-99-069 Page 3 bc: (w/o enclosures)
Mr.K.B.Altman Mr.G.E.Attarian Mr.R.H.Bazemore Mr.S.R.Carr Mr.J.R.Caves Mr.H.K.Chernoff (RNP)Mr.B.H.Clark Mr.W.F.Conway Mr.G.W.Davis Mr.W.J.Dorman (BNP)Mr.R.S.Edwards Mr.R.J.Field Mr.K.N.Harris Ms.L N.Hartz Mr.W J.Hindman Mr.C.S.Hinnant Mr.W.D.Johnson Mr.G.J.Kline Ms.W.C.Langston (PE8cRAS File)Mr.R.D.Martin Mr.T.C.Morton Mr.J.H.O'eill, Jr.Mr.J.M.Taylor Nuclear Records Harris Licensing File Files: H-X-0511 H-X-0642   to Serial: HNP-99-069 Markups of Isometric drawings showing: (1)Piping Within Scope of Alternative Plan (28 sheets)(2)Continuance of Design and Construction (41 sheets), i.9905050200 J   to Serial: HNP-99-069 Page 1 of 13 Matrix of Construction Records Pertaining to Units 2&3 Spent Fuel Pool Cooling System 0
Mr. K. B. Altman         Ms. L N. Hartz Mr. G. E. Attarian       Mr. W J. Hindman Mr. R. H. Bazemore       Mr. C. S. Hinnant Mr. S. R. Carr           Mr. W. D. Johnson Mr. J. R. Caves         Mr. G. J. Kline Mr. H. K. Chernoff (RNP) Ms. W. C. Langston (PE8cRAS File)
Enclos o Serial: HNP-99-069 Page 2 of 13 Field Weld No.Access?Id of welded items?Weld documents available?
Mr. B. H. Clark          Mr. R. D. Martin Mr. W. F. Conway        Mr. T. C. Morton Mr. G. W. Davis          Mr. J. H. O'eill, Jr.
SpeciTied Filler Material ID/Documentation on hand/Alt.Verification Method Qual Record&: Welder ID NDE Records Hydrotcst Records Inspections completed (ANI/QC)2-SF-1-FW-1 2-SF-1-FW-2 Embedded Embedded No, but assured by piping installation, hydro and concrete pour procedure requirements No, but assured by pipmg installation, hydro and concrete pour pfoccdufc requirements No, but review of"Weld Documentation"contained in Hydro test rccofd No, but review of"Weld Documentation
Mr. W. J. Dorman (BNP)  Mr. J. M. Taylor Mr. R. S. Edwards        Nuclear Records Mr. R. J. Field          Harris Licensing File Mr. K. N. Harris         Files: H-X-0511 H-X-0642
" contained in Hydro test record~SFA 5.9/5.4 No~Assured by weld doc review in hydro records, site specification SS-021, procedural r uirements~SFA 5.9/5.4~No~Assured by weld doc review in hydro records, site specification SS-021, procedural uirements No, but assured by weld doc review in hydro records;program and procedural requirements No, but assured by weld doc review in hydro records;program and procedural requirements No, but assured by weld documentation review in hydro records, program and procedural requirements.
 
No, but assured by weld documentation review in hydro records, program and procedural requirements.
Enclosure 2 to Serial: HNP-99-069 Markups of Isometric drawings showing:
Yes Hydro-QC&ANI (ref.DDR 1347)(ref.DDR 1347)Yes Hydro-QC&ANI (ref.DDR 1347)(ref.DDR 1347)2-SF-1-FW-3 Yes, by inspection No~SFA 5.9/5.4~No~by alloy analyzer Yes B61, G97 Yes, by re-inspection.
(1) Piping Within Scope of Alternative Plan (28 sheets)
No 2-SF-1-FW-4 Embedded Yes, on one side (ref.D DR-1347).Also assured by piping installation, hydro and concrete pour procedure r uirements No, but review of"Weld Documentation
(2) Continuance of Design and Construction (41 sheets) i.9905050200
" contained in Hydro test fccofd SFA 5.9/5.4~No~Assured by weld doc review in hydro records, site specification SS-021, procedural requirements No, but assured by weld doc review in hydro records;program and procedural requirements No, but assured by weld documentation review in hydro records, program and procedural requirements.
 
Yes Hydro-QC&ANI (ref.DDR 1347)(ref.DDR 1347)
J to Serial: HNP-99-069 Page 1 of 13 Matrix of Construction Records Pertaining to Units 2 & 3 Spent Fuel Pool Cooling System
Enclos o Serial: HNP-99-069 Page 3 of 13 Field Weld No.Access?Id of welded items?Weld documents available?
 
Specified Filler Material ID/Documentation on hand/Alt.Verification Method Qual Record&Welder ID NDE Records Hydrotest Records Inspections completed (ANI/QC)2-SF-1-FW-5 Embedded Yes, WDR on hand (ref.DDR-1347)Also assured by piping installation, hydro and concrete pour procedure r uirements Yes, WDR on hand (ref.DDR-1347)~SFA 5.9/5.4~Yes, WDR on hand in DDR-1347~Not required Yes, in weld documentation (ref.DDR-1347)Yes, attested to in weld documentation.
0 Enclos       o Serial: HNP-99-069 Page 2 of 13 Field Weld     Access?     Id of welded     Weld     SpeciTied   Filler   Qual Record &:           NDE             Hydrotcst         Inspections No.                      items?      documents      Material ID/        Welder ID            Records              Records          completed available?  Documentation                                                                      (ANI/ QC) on hand/
Yes (ref.DDR 1347)Hydro-QC&ANI (ref.DDR 1347)weld documentation-QC&ANI (ref.DDR 1347)DDR-1347-QC&ANI 2-SF-1-FW-6 Yes Yes, by inspection No~SFA 5.9/5.4 Yes~No D41~by alloy analyzer Yes, by re-inspection.
Alt.Verification Method 2-SF-1-FW-1     Embedded   No, but       No, but review ~ SFA 5.9/5.4 No, but assured by     No, but assured by    Yes            Hydro -QC & ANI assured by    of "Weld            No            weld doc review in weld documentation    (ref. DDR 1347) (ref. DDR 1347) piping        Documentation  ~    Assured by    hydro records;    review in hydro installation, "contained in  weld doc         program and        records, program and hydro and      Hydro test    review in hydro   procedural        procedural concrete pour  rccofd        records, site     requirements      requirements.
No 2-SF-8-FW-65 Embedded 2-SF-8-FW-66 Embedded Yes, on one side by DDR-1387.Also assured by piping installation, concrete pour procedure r uirements Yes, on one side by DDR-1387 Also assured by piping installation, concrete pour procedure r uirements No No~SFA 5.9/5.4~No Assured by site specification SS-021, procedural requirements
procedure                    specification SS-requirements                  021, procedural r uirements 2-SF-1-FW-2    Embedded  No, but        No, but review ~ SFA 5.9/5.4      No, but assured by No, but assured by     Yes            Hydro -QC & ANI assured by    of "Weld      ~    No            weld doc review in weld documentation    (ref. DDR 1347) (ref. DDR 1347) pipmg        Documentation  ~    Assured by    hydro records;     review in hydro installation, " contained in  weld doc          program and        records, program and hydro and    Hydro test    review in hydro   procedural        procedural concrete pour record        records, site      requirements      requirements.
~SFA 5.9/5.4 No~Assured by site specification SS-021, procedural requirements No, but assured by weld program and procedural requirements No, but assured by weld program and procedural requirements No, but assured by program and procedural requirements.
pfoccdufc                    specification SS-requirements                021, procedural uirements 2-SF-1-FW-3                 Yes, by       No             ~   SFA 5.9/5.4   Yes               Yes, by re-inspection. No inspection                  ~    No            B61, G97
Will be subject to internal camera inspection No, but assured by program and procedural requirements.
                                                        ~    by alloy analyzer 2-SF-1-FW-4     Embedded   Yes, on one   No, but review      SFA 5.9/5.4  No, but assured by No, but assured by    Yes            Hydro -QC & ANI side (ref. of "Weld       ~ No               weld doc review in weld documentation    (ref. DDR 1347) (ref. DDR 1347)
Will be subject to internal camera inspection No No liner leak test-QC liner leak test-QC Enclos o Serial: HNP-99-069 Page 4 of 13 Field Weld No.Access?Id of welded items?Weld documents available?
D  DR-1347). Documentation  ~ Assured by       hydro records;    review in hydro Also assured  " contained in  weld doc          program and       records, program and by piping    Hydro test    review in hydro   procedural        procedural installation, fccofd        records, site      requirements      requirements.
SpeciTied Filler Material ID/Documentation on hand/Alt.Verification Method Qual Record R Welder ID NDE Records Hydrotest Records Inspections completed (ANI/QC)2-SF-70-FW-325 Yes, by inspection No~SFA 5.9/5.4 Yes~No Bj, D41~by alloy analyzer Yes by re-inspection No, will be hydro-tested by Mod 2-SF-72-FW-326 Yes, by inspection No~SFA 5.9/5.4 Yes~No E21~by alloy analyzer Yes by re-inspection No, will be hydro-tested by Mod 2-SF-72-FW-327 Yes, by inspection No~SFA 5.9/5.4 Yes~No E21, C97~by alloy analyzer Yes by re-inspection No, will be hydro-tested by Mod 2-SF-69-FW-328 Yes, by inspection No~SFA 5.9/5.4 Yes~No B61~by alloy analyzer Yes by re-inspection No, will be hydro-tested by Mod 2-SF-69-FW-329 Yes, by inspection No~SFA 5.9/5.4 Yes~No B61~by alloy analyzer Yes by re-inspection No, will be hydro-tested by Mod Enclos to Serial: HNP-99-069 Page 5 of 13 Field Weld No.2-SF-71-FW-329 Access?Id of welded items?Yes, by inspection
hydro and                   specification SS-concrete pour                021, procedural procedure                    requirements r uirements
%Veld documents available?
 
No Specified Filler Material ID/Documentation on hand/Alt.Verification Method~SFA 5.9/5.4~No~by alloy analyzer, cheinical analysis Qual Record&Welder ID Yes B7 NDE Records Yes by re-inspection Hydrotest Records No, will be hydro tested by Mod Inspections completed (ANI/QC)2-SF-30-FW-381 Yes Yes, by inspection No~SFA 5.9/5.4~No~by alloy analyzer Yes E21, C97 Yes by re-inspection No 2-SF-148-FW-382 Yes, by inspection No~SFA 5.9/5.4~No~by alloy analyzer Yes E21 Yes, by re-inspection.
Enclos        o Serial: HNP-99-069 Page 3 of 13 Field Weld     Access?     Id of welded     Weld   Specified Filler   Qual Record &             NDE             Hydrotest         Inspections No.                      items?      documents    Material ID/        Welder ID            Records              Records           completed available? Documentation                                                                      (ANI/ QC) on hand/
No 2-SF-149-FW-408 Embedded Yes (ref.DDR-829).Also assured by piping installation, hydro and concrete pour procedure requirements No, but have repair WDR on hand, also weld documentation review signoff in North New Fuel Pool Hydro Record,~SFA 5.9/5.4~Partial, WDR on hand for repair weld.~Assured by weld doc review in hydro records, site specification SS-021, procedural requirements.
Alt.Verification Method 2-SF-1-FW-5     Embedded   Yes, WDR on   Yes, WDR on  ~ SFA 5.9/5.4 Yes, in weld          Yes, attested to in    Yes            Hydro -QC & ANI hand (ref. hand (ref.   ~ Yes, WDR documentation            weld documentation.    (ref. DDR 1347) (ref. DDR 1347)
B61 (NCR W-207)Also repair WDR on hand (DDR 829)Yes, (full LP in DDR Yes, 829).Will besubject seeNorth New to internal camera Fuel Pool Hydro inspection Test Record.Hydro-QC&ANI Repair weld documentation
DDR-1347)      DDR-1347)          on hand in  (ref. DDR-1347)                                           weld documentation-Also assured                      DDR-1347                                                              QC & ANI by piping                  ~    Not                                                                  (ref. DDR 1347) installation,                    required                                                              DDR-1347 - QC &
-QC&, ANI NDE rpt.-QC A ANI (ref.DDR-829)DDR-829-QC k, ANI Enclos to Serial: HNP-99-069 Page 6 of 13 Field Weld No.2-SF-150-FW-412 2-SF-14-FW-424 2-SF-31-FW-426 Access?Yes Yes Id of welded items?Yes, by inspection Yes, by inspection Yes, by inspection Weld documents available?
hydro and                                                                                              ANI concrete pour procedure r uirements 2-SF-1-FW-6     Yes       Yes, by       No           ~     SFA 5.9/5.4 Yes               Yes, by re-inspection. No inspection                ~    No          D41
No No No Specified Filler Material ID/Documentation on hand/Alt.Verification Method SFA 5.9/5.4 No by alloy analyzer SFA 5.9/5.4 No by alloy anal zer SFA 5.9/5.4 No by alloy analyzer Qual Record&Welder ID Yes E21 Yes B61 Yes E21, C97 NDE Records Yes, by re-inspection.
                                                      ~    by alloy analyzer 2-SF-8-FW-65   Embedded   Yes, on one   No           ~     SFA 5.9/5.4 No, but assured by No, but assured by    No             liner leak test - QC side by DDR-               ~    No         weld program and   program and 1387. Also                      Assured by procedural        procedural assured by                 site            requirements      requirements. Will be piping                    specification SS-                    subject to internal installation,              021, procedural                      camera inspection concrete pour              requirements procedure r uirements 2-SF-8-FW-66    Embedded    Yes, on one  No          ~    SFA 5.9/5.4 No, but assured by No, but assured by    No             liner leak test - QC side by DDR-                     No         weld program and  program and 1387 Also                  ~    Assured by  procedural        procedural assured by                  site            requirements      requirements. Willbe piping                    specification SS-                    subject to internal installation,              021, procedural                      camera inspection concrete pour              requirements procedure r uirements
Yes by re-inspection Yes by re-inspection Hydrotcst Records No No, will be hydro tested by Mod No Inspections completed (ANI/QC)2-SF-35-FW-440 Yes, by inspection No SFA 5.9/5.4 No by alloy analyzer Yes E21 Yes by re-inspection No NDE rpt.-QC&ANI (ref.NCR WP-016)2-SF-37-FW-441 2-SF-16-FW-447 Yes, by inspection Yes, by inspection No No SFA 5.9/5.4 No by alloy analyzer SFA 5.9/5.4 No by alloy analyzer Yes E59, F60, E25, B47 Yes B61 Yes, by re-inspection.
 
Will also be subject to direct internal examination when adjacent strainer is disassembled.
Enclos      o Serial: HNP-99-069 Page 4 of 13 Field Weld    Access?    Id of welded     Weld     SpeciTied Filler Qual Record R          NDE        Hydrotest  Inspections No.                      items?    documents    Material ID/       Welder ID         Records       Records   completed available? Documentation                                                  (ANI/ QC) on hand/
Yes by re-inspection No, will be hydro tested by Mod No, will be hydro tested by Mod DDR-895-QC&ANI Enclos o Serial: HNP-99-069 Page 7 of 13 Field Weld No.2-SF-36-FW-448*See Note 2-SF-36-FW-449 2-SF-36-FW-450 Access?Id of welded items?Yes, by inspection Yes, by inspection Weld.documents available?
Alt.Verification Method 2-SF-70-FW-               Yes, by       No           ~ SFA 5.9/5.4 Yes               Yes              No, 325                      inspection                  ~ No             Bj, D41       by re-inspection willbe hydro-
No No Specified Filler Material ID/Documentation on hand/Alt.Verification Method SFA 5.9/5.4 No by alloy analyzer SFA 5.9/5.4 No by alloy analyzer 4 chemical analysis Qual Record&Welder ID Yes D41, B47 Yes B47 NDE Records Yes, by re-inspection.
                                                      ~ by alloy                                      tested by Mod analyzer 2-SF-72-FW-               Yes, by       No           ~ SFA 5.9/5.4   Yes           Yes              No, 326                        inspection                ~ No             E21           by re-inspection willbe hydro-
Will also be subject to direct internal examination when adjacent strainer is disassembled.
                                                      ~ by alloy                                      tested by Mod analyzer 2-SF-72-FW-               Yes, by       No           ~   SFA 5.9/5.4 Yes           Yes              No, 327                        inspection                ~   No           E21, C97       by re-inspection willbe hydro-
Yes, by re-inspection.
                                                      ~  by alloy                                    tested by Mod analyzer 2-SF-69-FW-               Yes, by       No           ~   SFA 5.9/5.4 Yes           Yes              No, 328                        inspection                ~   No           B61           by re-inspection will be hydro-
Will also be subject to direct internal examination when adjacent strainer is disassembled.
                                                      ~  by alloy                                    tested by Mod analyzer 2-SF-69-FW-               Yes, by       No           ~   SFA 5.9/5.4 Yes           Yes              No, 329                        inspection                ~   No          B61            by re-inspection will be hydro-
Hydrotest Records No, will be hydro tested by Mod No, will be hydro tested by Mod Inspections completed (ANI/QC)2-SF-38-FW-451 Yes, by inspection No SFA 5.9/5.4 No by alloy analyzer Bc chemical analysis Yes G1, B7 Yes, by re-inspection.
                                                      ~  by alloy                                    tested by Mod analyzer
Will also be subject to direct internal examination when adjacent strainer is disassembled.
 
No, will be hydro tested by Mod 2-SF-67-FW-452 Yes, by inspection No SFA 5.9/5.4 No by alloy analyzer Yes E21 Yes, by re-inspection.
Enclos       to Serial: HNP-99-069 Page 5 of 13 Field Weld     Access?     Id of welded     %Veld     Specified Filler   Qual Record &          NDE              Hydrotest        Inspections No.                        items?      documents      Material ID/       Welder ID          Records            Records          completed available?  Documentation                                                                 (ANI/ QC) on hand/
No 2-SF-68-FW-454 Yes, by inspection No SFA 5.9/5.4 No by alloy analyzer Yes C97, D87 Yes, by re-inspection.
Alt.Verification Method 2-SF-71-FW-                Yes, by        No              ~ SFA 5.9/5.4 Yes                Yes                    No, 329                          inspection                    ~ No             B7             by re-inspection       will be hydro
No Enclos to Serial: HNP-99-069 Page 8 of 13 Field Weld No.2-SF-143-FW-512 2-SF-143-FW-513 Access?Embedded Embedded Id of welded items?Assured by piping installation, hydro and concrete pour procedure requirements Assured by piping installation, hydro and concrete pour procedure requirements Weld documents available?
                                                          ~ by alloy                                              tested by Mod analyzer, cheinical analysis 2-SF-30-FW-     Yes         Yes, by       No             ~   SFA 5.9/5.4 Yes            Yes                    No 381                          inspection                    ~   No           E21, C97       by re-inspection
No, but WDR review signoff in North New Fuel Pool Hydro Record, No, but WDR review signoff in North New Fuel Pool Hydro Record, Specified Filler Material ID/Documentation on hand/Alt.Verification Method~SFA 5.9/5.4~No~Assured by weld doc review in hydro records, site specification SS-021, procedural r uirements~SFA 5.9/5.4~No~Assured by weld doc review in hydro records, site specification SS-021, procedural requirements Qual Record R Welder ID No, but assured by weld doc review in hydro records, program and procedural requirements No, but assured by weld doc review in hydro records, program and procedural requirements NDE Records No, but assured by weld documentation review in hydro records, program and procedural requirements.
                                                          ~    by alloy analyzer 2-SF-148-FW-                 Yes, by       No             ~   SFA 5.9/5.4 Yes             Yes, by re-inspection. No 382                          inspection                    ~    No          E21
No, but assured by weld documentation review in hydro records, program and procedural requirements.
                                                          ~    by alloy analyzer 2-SF-149-FW-     Embedded   Yes           No, but have    ~    SFA 5.9/5.4  B61 (NCR W-     Yes, (full LP in DDR  Yes,           Hydro -QC & ANI 408                          (ref. DDR-    repair WDR on   ~    Partial,    207)            829). Will besubject  seeNorth New    Repair weld 829). Also    hand, also weld     WDR on      Also repair WDR to internal camera    Fuel Pool Hydro documentation - QC &,
Hydrotest Records Yes, see North New Fuel Pool Hydro Test Record.Yes, see North New Fuel Pool Hydro Test Record.Inspections completed (ANI/QC)Hydro-QC&ANI Hydro-QC R ANI 2-SF-143-FW-514 Embedded Yes, ref.DDR-888 Also assured by piping installation, hydro and concrete pour procedure requirements No, but WDR review signoff in North New Fuel Pool Hydro Record,~SFA 5.9/5.4~No~Assured by weld doc review in hydro records, site specification SS-021, procedural requirements No, but assured by weld doc review in hydro records, program and procedural requirements No, but assured by weld documentation review in hydro records, program and procedural requirements Will be subject to internal camera inspection Yes, see North New Fuel Pool Hydro Test Record.Hydro-QC A ANI DDR-888 Enclos to Serial: HNP-99-069 Page 9 of 13 Field Weld No.2-SF-144-FW-515 Access?Embedded Id of welded items?Assured by piping installation, hydro and concrete pour procedure requirements Weld documents available?
assured by    documentation        hand for    on hand (DDR    inspection            Test Record. ANI piping        review signoff      repair weld. 829)                                                  NDE rpt. - QC A ANI installation, in North New    ~ Assured                                                               (ref. DDR-829) hydro and    Fuel Pool      by weld doc                                                              DDR-829 - QC k, ANI concrete pour Hydro Record,  review in hydro procedure                    records, site requirements                  specification SS-021, procedural requirements.
No, but WDR review signoff in North New Fuel Pool Hydro Record, Specified Filler Material ID/Documentation on hand/Alt.Verification Method~SFA 5.9/5.4~No~Assured by weld doc review in hydro records, site specification SS-021, procedural requirements Qual Record&Welder ID No, but assured by weld doc review in hydro records, program and procedural requirements NDE Records No, but assured by weld documentation review in hydro records, program and procedural requirements.
 
Will be subject to internal camera inspection Hydrotest Records Yes, see North New Fuel Pool Hydro Test Record.Inspections completed (ANI/QC)Hydro-QC&ANI 2-SF-144-FW-516 Embedded Yes, on one side, ref.DDR-869.Also assured by piping installation, hydro and concrete pour procedure requirements No, but WDR review signoff in North New Fuel Pool Hydro Record,~SFA 5.9/5.4~No~Assured by weld doc review in hydro records, site specification SS-021, procedural requirements No, but assured by weld doc review in hydro records, program and procedural requirements No, but assured by weld documentation review in hydro records, program and procedural requirements.
Enclos        to Serial: HNP-99-069 Page 6  of 13 Field Weld      Access?    Id of welded    Weld    Specified Filler  Qual Record &          NDE              Hydrotcst      Inspections No.                        items?    documents    Material ID/        Welder ID        Records              Records        completed available? Documentation                                                              (ANI/ QC) on hand/
Will be subject to internal camera inspection Yes, see North New Fuel Pool Hydro Test Record.Hydro-QC&ANI DDR-921-QC&ANI 2-SF-144-FW-517 Embedded Yes-ref DDR-869.Also assured by piping installation, hydro and concrete pour procedure requirements No, but WDR review signoff in North New Fuel Pool Hydro Record.~SFA 5.9/5.4~No~Assured by weld doc review in hydro records, site specification SS-021, procedural requirements No, but assured by weld doc review in hydro records, program and procedural requirements Yes, partial UT&LP performed under DDR-869.Also, assured by weld documentation review in hydro records, program and procedural requirements.
Alt.Verification Method 2-SF-150-FW-    Yes        Yes, by      No              SFA 5.9/5.4  Yes            Yes, by re-inspection. No 412                          inspection                     No          E21 by alloy analyzer 2-SF-14-FW-     Yes        Yes, by      No              SFA 5.9/5.4  Yes            Yes                    No, 424                          inspection                    No          B61            by re-inspection      will be hydro tested by Mod by alloy anal zer 2-SF-31-FW-                 Yes, by      No               SFA 5.9/5.4  Yes            Yes                    No 426                          inspection                    No          E21, C97      by re-inspection by alloy analyzer 2-SF-35-FW-                 Yes, by      No              SFA 5.9/5.4  Yes            Yes                    No            NDE rpt. - QC & ANI 440                          inspection                    No          E21            by re-inspection                    (ref. NCR WP-016) by alloy analyzer 2-SF-37-FW-                 Yes, by       No               SFA 5.9/5.4 Yes            Yes, by re-inspection. No, 441                          inspection                    No          E59, F60, E25, Willalso be subject to will be hydro by alloy     B47            direct internal        tested by Mod analyzer                   examination when adjacent strainer is disassembled.
Will be subject to internal camera ins ection Yes, see North New Fuel Pool Hydro Test Record.Also ref.DDR-869.Hydro-QC&ANI Repair weld documentation
2-SF-16-FW-                 Yes, by       No               SFA 5.9/5.4 Yes           Yes                   No,          DDR-895 - QC & ANI 447                         inspection                      No          B61            by re-inspection       willbe hydro by alloy                                          tested by Mod analyzer
-QC&ANI (ref.DDR-869)DDR-869-QC&ANI Enclos to Serial: HNP-99-069 Page 10 of 13 Field Weld No.Access?Id of welded items?Weld documents available?
 
Specified Filler Material ID/Documentation on hand/Alt.Verification Method Qual Record&Welder ID NDE Records Hydrotest Records Inspections completed (ANI/QC)2-SF-159-FW-518 2-SF-159-FW-519 Embedded Embedded Also assured by piping installation, hydro and concrete pour procedure requirements Yes, on one side (ref.NCR-85-1318, Also assured by piping installation, hydro and concrete pour procedure requirements No, but WDR review signoff in North New Fuel Pool Hydro Record No, but WDR review signoff in North New Fuel Pool Hydro Record~SFA 5.9/5.4~No~Assured by weld doc review in hydro records, site specification SS-021, procedural uirements SFA 5.9/5.4 No Assured by weld doc review in hydro records, site specification SS-021, procedural requirements No, but assured by weld doc review in hydro records, program and procedural requirements Yes, C-20 (see NCR W-103)No, but assured by weld documentation review in hydro records, program and procedural requirements No, but assured by weld documentation review in hydro records, program and procedural requirements Yes, Hydro-QC&ANI see North New Fuel Pool Hydro Test Record.Yes, Hydro-QC&ANI see North New NCR W-103-QC Fuel Pool Hydro Test Record.2-SF-71-FW-331 (Hanger Attach.Weld)Yes, by inspection No~SFA 5.9/5.4 Yes~No D75, E50, D69~by alloy analyzer Yes by re-inspection N/A (Hanger attachment weld)2-SF-71-FW-332 (Hanger Attach.Weld)Yes, by inspection No~SFA 5.9/5.4 Yes~No E50, D69~by alloy analyzer Yes by re-inspection N/A (Hanger attachment weld)
Enclos        o Serial: HNP-99-069 Page 7  of 13 Field Weld    Access?    Id of welded    Weld    Specified Filler  Qual Record &          NDE                Hydrotest Inspections No.                       items?    . documents  Material ID/        Welder ID          Records              Records  completed available? Documentation                                                        (ANI / QC) on hand/
Enclos to Serial: HNP-99-069 Page 11 of 13 Field Weld No.Access?Id of welded items?Weld documents available?
Alt.Verification Method 2-SF-36-FW-448
Specified Filler Material ID/Documentation on hand/Alt.Verification Method Qual Record R Welder ID NDE Records Hydrotest Records Inspections completed (ANI/QC)2-SF-71-FW-333 (Hanger Attach.Weld)Yes Yes, by inspection No SFA 5.9/5.4 Yes~No D69~by alloy analyzer Yes by re-inspection N/A (Hanger attachment weld)2-SF-71-FW-334 (Hanger Attach.Weld)2-SF-71-FW-335 (Hanger Attach.Weld)Yes Yes Yes, by inspection Yes, by inspection No No~SFA 5.9/5.4 Yes~No D75, E50, D69~by alloy analyzer~SFA 5.9/5.4 Ycs~No D69~by alloy analyzer Yes by re-inspection Yes by re-inspection N/A (Hanger attachment weld)N/A (Hanger attachment weld)2-SF-71-FW-336 (Hanger Attach.Weld)Yes, by inspection No~SFA 5.9/5.4 Yes~No D69~by alloy analyzer Yes by re-inspection N/A (Hanger attachment weld)2-SF-71-FW-337 (Hanger Attach.Weld)Yes, by inspection No~SFA 5.9/5.4 Yes~No E50, D69~by alloy analyzer Yes by re-inspection N/A (Hanger attachment weld)
* See Note 2-SF-36-FW-                Yes, by        No              SFA 5.9/5.4  Yes           Yes, by re-inspection. No, 449                        inspection                      No          D41, B47      Will also be subject to willbe hydro by alloy                    direct internal         tested by Mod analyzer                    examination when adjacent strainer is disassembled.
Enclos to Serial: HNP-99-069 Page 12 of 13 Field Weld No.Access?Id of welded items?Weld documents available?
2-SF-36-FW-                Yes, by        No              SFA 5.9/5.4  Yes            Yes, by re-inspection. No, 450                        inspection                      No          B47            Will also be subject to will be hydro by alloy                    direct internal        tested by Mod analyzer 4                  examination when chemical                    adjacent strainer is analysis                    disassembled.
Specified Filler Material ID/Documentation on hand/Alt.Verification Method Qual Record&Welder ID NDE Records Hydrotest Records Inspections completed (ANI/QC)2-SF-71-FW-338 (Hanger Attach.Weld)Yes, by inspection No~SFA 5.9/5.4 Yes~No D69~by alloy analyzer Yes by re-inspection N/A (Hanger attachment weld)2-SF-71-FW-339 (Hanger Attach.Weld)Yes, by inspection No~SFA 5.9/5.4 Yes~No D75, D69~by alloy analyzer Yes by re-inspection N/A (Hanger attachment weld)2-SF-71-FW-340 (Hanger Attach.Weld)Yes, by inspection No~SFA 5.9/5.4 Yes~No D75, E50, D69~by alloy analyzer Yes by re-inspection N/A (Hanger attachment weld)2-SF-71-FW-341 (Hanger Attach.Weld)Yes, by inspection No~SFA 5.9/5.4 Yes~No D75, E50, D69~by alloy analyzer Yes by re-inspection N/A (Hanger attachment weld)2-SF-71-FW-342 (Hanger Attach.Weld)Yes, by inspection No~SFA 5.9/5.4 Yes~No D75, D69~by alloy analyzer Yes by re-inspection N/A (Hanger attachment weld)
2-SF-38-FW-               Yes, by        No              SFA 5.9/5.4  Yes           Yes, by re-inspection. No, 451                        inspection                    No          G1, B7        Will also be subject to willbe hydro by alloy                   direct internal        tested by Mod analyzer Bc                examination when chemical                    adjacent strainer is analysis                    disassembled.
Enclos to Serial: HNP-99-069 Page 13 of 13 Field Weld No.2-CC-3-FW-207 Access?Id of welded items?No, but is accessible and will be visually verified.Weld documents available?
2-SF-67-FW-                Yes, by        No              SFA 5.9/5.4 Yes           Yes, by re-inspection. No 452                        inspection                    No          E21 by alloy analyzer 2-SF-68-FW-                Yes, by      No              SFA 5.9/5.4  Yes            Yes, by re-inspection. No 454                        inspection                    No          C97, D87 by alloy analyzer
No Specified Filler Material ID/Documentation on hand/Alt.Verification Method~SFA 5.18/5.1 No TBD by chemical analysis Qual Record&Welder ID Yes, K40 NDE Records Yes by re-inspection Hydrotest Records No, to be hydro tested by Mod Inspections completed (ANI/QC)2-CC-3-RV-208 No, but is accessible and will be visually verified No~SFA 5.18/5.1~No~TBD by chemical analysis Yes, Cl 1 Yes by re-inspection No, to be hydro tested by Mod 2-CC-3-FW-209 No, but is accessible and will be visually verified No~SFA 5.18/5.1~No~TBD by chemical analysis Yes, Bl Yes by re-inspection No, to be hydro tested by Mod Note": Field Weld 2-SF-FW-36-448 is a completed and stamped field weld, but will be cut out and replaced as it joins a section of piping which was affected by a pipe spool modification. to Serial: HNP-99-069 Metallurgy Unit Report for Spent Fuel Pool Weld Metal Composition Analysis}}
 
Enclos        to Serial: HNP-99-069 Page 8  of 13 Field Weld      Access?    Id of welded      Weld      Specified Filler    Qual Record R            NDE            Hydrotest        Inspections No.                      items?      documents      Material ID/        Welder ID            Records            Records          completed available?  Documentation                                                                  (ANI / QC) on hand/
Alt.Verification Method 2-SF-143-FW-     Embedded  Assured by   No, but WDR    ~ SFA 5.9/5.4 No, but assured by     No, but assured by  Yes,           Hydro -QC & ANI 512                        piping        review signoff ~ No             weld doc review in weld documentation  see North New installation, in North New  ~ Assured by hydro records,          review in hydro      Fuel Pool Hydro hydro and    Fuel Pool      weld doc        program and        records, program and Test Record.
concrete pour Hydro Record,  review in hydro  procedural        procedural procedure                    records, site    requirements      requirements.
requirements                specification SS-021, procedural r uirements 2-SF-143-FW-     Embedded  Assured by   No, but WDR    ~ SFA 5.9/5.4     No, but assured by No, but assured by  Yes,           Hydro -QC R ANI 513                        piping        review signoff ~ No             weld doc review in weld documentation  see North New installation, in North New  ~ Assured by      hydro records,    review in hydro      Fuel Pool Hydro hydro and     Fuel Pool      weld doc        program and        records, program and Test Record.
concrete pour Hydro Record,  review in hydro  procedural        procedural procedure                    records, site    requirements       requirements.
requirements                specification SS-021, procedural requirements 2-SF-143-FW-    Embedded  Yes, ref. No, but WDR   ~    SFA 5.9/5.4  No, but assured by No, but assured by  Yes,            Hydro -QC A ANI 514                        DDR-888      review signoff ~    No          weld doc review in weld documentation  see North New   DDR-888 Also assured  in North New  ~   Assured by   hydro records,    review in hydro      Fuel Pool Hydro by piping    Fuel Pool      weld doc        program and        records, program and Test Record.
installation, Hydro Record,  review in hydro  procedural        procedural hydro and                    records, site     requirements      requirements Willbe concrete pour                specification SS-                   subject to internal procedure                    021, procedural                     camera inspection requirements                requirements
 
Enclos        to Serial: HNP-99-069 Page 9 of 13 Field Weld      Access?    Id of welded      Weld      Specified Filler    Qual Record &            NDE            Hydrotest          Inspections No.                       items?      documents      Material ID/        Welder ID             Records          Records            completed available?  Documentation                                                                  (ANI / QC) on hand/
Alt.Verification Method 2-SF-144-FW-    Embedded  Assured by     No, but WDR    ~ SFA 5.9/5.4 No, but assured by No, but assured by       Yes,            Hydro -QC & ANI 515                        piping        review signoff ~ No              weld doc review in weld documentation   see North New installation,  in North New  ~ Assured by hydro records,          review in hydro      Fuel Pool Hydro hydro and      Fuel Pool      weld doc        program and        records, program and Test Record.
concrete pour  Hydro Record, review in hydro   procedural        procedural procedure                    records, site    requirements      requirements. Willbe requirements                  specification SS-                    subject to internal 021, procedural                      camera inspection requirements 2-SF-144-FW-    Embedded  Yes, on one    No, but WDR    ~    SFA 5.9/5.4  No, but assured by No, but assured by  Yes,            Hydro -QC & ANI 516                        side, ref. review signoff ~    No          weld doc review in weld documentation  see North New  DDR-921 - QC & ANI DDR-869.       in North New  ~    Assured by   hydro records,     review in hydro     Fuel Pool Hydro Also assured  Fuel Pool       weld doc         program and        records, program and Test Record.
by piping      Hydro Record, review in hydro   procedural        procedural installation,                 records, site    requirements      requirements. Willbe hydro and                    specification SS-                    subject to internal concrete pour                021, procedural                      camera inspection procedure                    requirements requirements 2-SF-144-FW-     Embedded  Yes - ref      No, but WDR   ~    SFA 5.9/5.4 No, but assured by Yes, partial UT & LP Yes,            Hydro -QC & ANI 517                        DDR-869.      review signoff ~    No           weld doc review in performed under      see North New  Repair weld Also assured  in North New  ~    Assured by  hydro records,     DDR-869. Also,      Fuel Pool Hydro documentation - QC &
by piping      Fuel Pool      weld doc        program and       assured by weld     Test Record. ANI installation, Hydro Record. review in hydro   procedural         documentation review Also ref. DDR-  (ref. DDR-869) hydro and                    records, site    requirements      in hydro records,   869.           DDR-869 - QC & ANI concrete pour                 specification SS-                    program and procedure                     021, procedural                      procedural requirements                 requirements                        requirements. Willbe subject to internal camera ins ection
 
Enclos        to Serial: HNP-99-069 Page 10  of 13 Field Weld      Access?    Id of welded      Weld      Specified Filler    Qual Record &             NDE            Hydrotest      Inspections No.                        items?      documents      Material ID/        Welder ID            Records            Records          completed available?  Documentation                                                                  (ANI / QC) on hand/
Alt.Verification Method 2-SF-159-FW-     Embedded   Also assured   No, but WDR   ~ SFA 5.9/5.4 No, but assured by No, but assured by       Yes,            Hydro -QC & ANI 518                        by piping      review signoff ~ No              weld doc review in weld documentation  see North New installation,  in North New  ~ Assured by hydro records,         review in hydro      Fuel Pool Hydro hydro and      Fuel Pool      weld doc        program and       records, program and Test Record.
concrete pour  Hydro Record  review in hydro   procedural        procedural procedure                    records, site    requirements      requirements requirements                 specification SS-021, procedural uirements 2-SF-159-FW-     Embedded  Yes, on one    No, but WDR        SFA 5.9/5.4  Yes, C-20          No, but assured by  Yes,            Hydro -QC & ANI 519                        side (ref. review signoff      No          (see NCR W-103)    weld documentation  see North New  NCR W-103 - QC NCR-85-1318,  in North New        Assured by                      review in hydro      Fuel Pool Hydro Also assured  Fuel Pool      weld doc                            records, program and Test Record.
by piping      Hydro Record  review in hydro                      procedural installation,                records, site                        requirements hydro and                    specification SS-concrete pour                021, procedural procedure                    requirements requirements 2-SF-71-FW-                 Yes, by       No            ~    SFA 5.9/5.4  Yes                Yes                 N/A (Hanger 331                          inspection                  ~    No          D75, E50, D69      by re-inspection    attachment (Hanger                                                  ~    by alloy                                            weld)
Attach. Weld)                                                  analyzer 2-SF-71-FW-                 Yes, by       No            ~    SFA 5.9/5.4 Yes                Yes                  N/A (Hanger 332 (Hanger                  inspection                  ~    No          E50, D69          by re-inspection    attachment Attach. Weld)                                            ~    by alloy                                            weld) analyzer
 
Enclos        to Serial: HNP-99-069 Page 11  of 13 Field Weld      Access?    Id of welded    Weld    Specified Filler  Qual Record R          NDE        Hydrotest Inspections No.                        items?    documents    Material ID/      Welder ID        Records        Records  completed available? Documentation                                                  (ANI/ QC) on hand/
Alt.Verification Method 2-SF-71-FW-      Yes        Yes, by       No               SFA 5.9/5.4  Yes            Yes             N/A (Hanger 333 (Hanger                inspection                  ~  No          D69            by re-inspection attachment Attach. Weld)                                          ~  by alloy                                    weld) analyzer 2-SF-71-FW-     Yes        Yes, by       No           ~   SFA 5.9/5.4 Yes           Yes              N/A (Hanger 334 (Hanger                inspection                  ~  No          D75, E50, D69 by re-inspection attachment Attach. Weld)                                          ~  by alloy                                    weld) analyzer 2-SF-71-FW-     Yes        Yes, by       No           ~   SFA 5.9/5.4 Ycs            Yes             N/A (Hanger 335 (Hanger                inspection                  ~  No          D69           by re-inspection attachment Attach. Weld)                                          ~  by alloy                                    weld) analyzer 2-SF-71-FW-                Yes, by        No           ~  SFA 5.9/5.4  Yes            Yes              N/A (Hanger 336 (Hanger                  inspection                ~  No          D69            by re-inspection attachment Attach. Weld)                                          ~  by alloy                                    weld) analyzer 2-SF-71-FW-                 Yes, by        No           ~  SFA 5.9/5.4 Yes           Yes              N/A (Hanger 337 (Hanger                  inspection                ~   No           E50, D69       by re-inspection attachment Attach. Weld)                                          ~  by alloy                                    weld) analyzer
 
Enclos        to Serial: HNP-99-069 Page 12  of 13 Field Weld      Access?    Id of welded    Weld     Specified Filler  Qual Record &          NDE        Hydrotest Inspections No.                       items?    documents    Material ID/       Welder ID        Records        Records  completed available? Documentation                                                  (ANI / QC) on hand/
Alt.Verification Method 2-SF-71-FW-                Yes, by       No          ~ SFA 5.9/5.4 Yes               Yes              N/A (Hanger 338 (Hanger                inspection                 ~ No            D69            by re-inspection attachment Attach. Weld)                                           ~ by alloy                                      weld) analyzer 2-SF-71-FW-                 Yes, by       No           ~ SFA 5.9/5.4   Yes           Yes              N/A (Hanger 339 (Hanger                inspection                  ~ No            D75, D69       by re-inspection attachment Attach. Weld)                                          ~ by alloy                                      weld) analyzer 2-SF-71-FW-                 Yes, by       No           ~   SFA 5.9/5.4 Yes           Yes              N/A (Hanger 340 (Hanger                inspection                  ~  No          D75, E50, D69 by re-inspection attachment Attach. Weld)                                          ~  by alloy                                    weld) analyzer 2-SF-71-FW-                Yes, by        No           ~  SFA 5.9/5.4  Yes            Yes              N/A (Hanger 341 (Hanger                  inspection                ~  No          D75, E50, D69  by re-inspection attachment Attach. Weld)                                          ~  by alloy                                    weld) analyzer 2-SF-71-FW-                 Yes, by       No           ~   SFA 5.9/5.4 Yes            Yes             N/A (Hanger 342 (Hanger                  inspection                ~   No           D75, D69       by re-inspection attachment Attach. Weld)                                          ~  by alloy                                    weld) analyzer
 
Enclos        to Serial: HNP-99-069 Page 13    of 13 Field Weld      Access?    Id of welded      Weld     Specified Filler  Qual Record &          NDE        Hydrotest Inspections No.                        items?      documents    Material ID/      Welder ID        Records        Records  completed available? Documentation                                                  (ANI/ QC) on hand/
Alt.Verification Method 2-CC-3-FW-                  No, but is      No          ~ SFA            Yes,          Yes             No, 207                          accessible and                  5.18/5.1    K40            by re-inspection to be hydro will be                        No                                          tested by Mod visually                        TBD by verified.                      chemical analysis 2-CC-3-RV-                   No, but is    No           ~   SFA         Yes,          Yes              No, 208                          accessible and                  5.18/5.1    Cl 1          by re-inspection to be hydro will be                    ~ No                                            tested by Mod visually                    ~ TBD by verified                        chemical analysis 2-CC-3-FW-                   No, but is    No          ~  SFA          Yes,           Yes              No, 209                          accessible and                  5.18/5.1    Bl            by re-inspection to be hydro willbe                      ~  No                                          tested by Mod visually                    ~  TBD by verified                        chemical analysis Note    ":
Field Weld 2-SF-FW-36-448 is a completed and stamped field weld, but willbe cut out and replaced as       it joins a section of piping which was affected by a pipe spool modification.
to Serial: HNP-99-069 Metallurgy Unit Report for Spent Fuel Pool Weld Metal Composition Analysis}}

Latest revision as of 20:36, 3 February 2020

Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping
ML18016A935
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/30/1999
From: Alexander D
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18016A936 List:
References
HNP-99-069, HNP-99-69, NUDOCS 9905050200
Download: ML18016A935 (22)


Text

CATEGORY 1 REGULAT Y INFORMATION DISTRXBUTIOh SYSTEM (RIDS)

ACCESSION NBR:9905050200 DOC.DATE: 99/04/30 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ALEXANDER,D.B.

RECIP.NAME Carolina Power a Light Co.

RECIPIENT AFFILIATION

'~ner~( +~~~ PO Records Management Branch (Document Control Desk)

SUBJECT:

Forwards info requested in 990324 RAI as suppl to 9812123.

for amend to license NPF-63 for alternative plan C o'pplication for spent fuel pool cooling a cleanup sys piping.

i A C

DISTR1'BUTIQN CQDE: A001D CQP1ES RECEIVED:LTR 1 ENCL S1EE:

TITLE: OR Submittal: General Distribution T NOTES:Application for permit renewal filed. 0500040(P RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD2-2 LA 1 1 LPD2-2 PD 1 1 LAUFER,R. 1 INTERNAL: ACRS 1 1 <LE CENTER 0 1 1 NRR/DE/EMCB 1, 1 NRR/DE/EMEB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NRR/SPSB JUNGPX 1 1 NUDOCS-AB TRACT 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR D

).o(~~ i~ ( ~4P.o t K4~g N

NOTE TO ALL NRIDSN RECIPIENTS PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED'TTR 14 ENCL 13

Carolina Power & Ught Company Harris Nuclear Plant P.O. Box 165 New Hill NC 27562 SERIAL: HNP-99-069 APR g0 Bgy United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 RESPONSE TO NRC REQUEST FOR ADDITIONALINFORMATION REGARDING THE ALTERNATIVEPLAN FOR SPENT FUEL POOL

" COOLING AND CLEANUP SYSTEM PIPING

Dear Sir or Madam:

By letter dated March 24, 1999, the NRC requested additional information regarding the Harris Nuclear Plant (HNP) license amendment request to place spent fuel pools 'C'nd 'D'n service.

Enclosure 8 of the HNP license amendment request (ref. SERIAL: HNP-98-188, dated December 23, 1998) provided a detailed description of the proposed alternatives to demonstrate compliance with ASME B&PV Code requirements for spent fuel pool cooling and cleanup system piping in accordance with 10 CFR 50.55a(a)(3)(i). The NRC has determined that additional information is required to complete the review of the proposed alternative piping plan. Enclosed is the HNP response to the NRC request for additional information. The enclosed information is provided as a supplement to our December 23, 1998 submittal and does not change our initial determination that the proposed license amendment represents a no significant hazards consideration.

Please refer any questions regarding the enclosed information to Mr. Steven Edwards at (919) 362-2498.

Sincerely, /

r 9905050200 990430 Donna B. Alexander Pad/

PDR ADOCK 05000400 PDR Manager, Regulatory Affairs P Harris Nuclear Plant KWS/kws Enclosures 5413 Shearon Harris Road New Hill NC

0 4 (ijjj g Q rf lA

Document Control Desk

~ SERIAL: HNP-99-069 Page 2 c:

Mr. J. B. Brady, NRC Senior Resident Inspector (w/ Enclosure 1)

Mr. Mel Fry, N.C. DEHNR (w/ Enclosure 1)

Mr. R. J. Laufer, NRC Project Manager (w/ all Enclosures)

Mr. L. A. Reyes, NRC Regional Administrator (w/ Enclosure 1)

Document Control Desk Serial: HNP-99-069 Page 3 bc: (w/o enclosures)

Mr. K. B. Altman Ms. L N. Hartz Mr. G. E. Attarian Mr. W J. Hindman Mr. R. H. Bazemore Mr. C. S. Hinnant Mr. S. R. Carr Mr. W. D. Johnson Mr. J. R. Caves Mr. G. J. Kline Mr. H. K. Chernoff (RNP) Ms. W. C. Langston (PE8cRAS File)

Mr. B. H. Clark Mr. R. D. Martin Mr. W. F. Conway Mr. T. C. Morton Mr. G. W. Davis Mr. J. H. O'eill, Jr.

Mr. W. J. Dorman (BNP) Mr. J. M. Taylor Mr. R. S. Edwards Nuclear Records Mr. R. J. Field Harris Licensing File Mr. K. N. Harris Files: H-X-0511 H-X-0642

Enclosure 2 to Serial: HNP-99-069 Markups of Isometric drawings showing:

(1) Piping Within Scope of Alternative Plan (28 sheets)

(2) Continuance of Design and Construction (41 sheets) i.9905050200

J to Serial: HNP-99-069 Page 1 of 13 Matrix of Construction Records Pertaining to Units 2 & 3 Spent Fuel Pool Cooling System

0 Enclos o Serial: HNP-99-069 Page 2 of 13 Field Weld Access? Id of welded Weld SpeciTied Filler Qual Record &: NDE Hydrotcst Inspections No. items? documents Material ID/ Welder ID Records Records completed available? Documentation (ANI/ QC) on hand/

Alt.Verification Method 2-SF-1-FW-1 Embedded No, but No, but review ~ SFA 5.9/5.4 No, but assured by No, but assured by Yes Hydro -QC & ANI assured by of "Weld No weld doc review in weld documentation (ref. DDR 1347) (ref. DDR 1347) piping Documentation ~ Assured by hydro records; review in hydro installation, "contained in weld doc program and records, program and hydro and Hydro test review in hydro procedural procedural concrete pour rccofd records, site requirements requirements.

procedure specification SS-requirements 021, procedural r uirements 2-SF-1-FW-2 Embedded No, but No, but review ~ SFA 5.9/5.4 No, but assured by No, but assured by Yes Hydro -QC & ANI assured by of "Weld ~ No weld doc review in weld documentation (ref. DDR 1347) (ref. DDR 1347) pipmg Documentation ~ Assured by hydro records; review in hydro installation, " contained in weld doc program and records, program and hydro and Hydro test review in hydro procedural procedural concrete pour record records, site requirements requirements.

pfoccdufc specification SS-requirements 021, procedural uirements 2-SF-1-FW-3 Yes, by No ~ SFA 5.9/5.4 Yes Yes, by re-inspection. No inspection ~ No B61, G97

~ by alloy analyzer 2-SF-1-FW-4 Embedded Yes, on one No, but review SFA 5.9/5.4 No, but assured by No, but assured by Yes Hydro -QC & ANI side (ref. of "Weld ~ No weld doc review in weld documentation (ref. DDR 1347) (ref. DDR 1347)

D DR-1347). Documentation ~ Assured by hydro records; review in hydro Also assured " contained in weld doc program and records, program and by piping Hydro test review in hydro procedural procedural installation, fccofd records, site requirements requirements.

hydro and specification SS-concrete pour 021, procedural procedure requirements r uirements

Enclos o Serial: HNP-99-069 Page 3 of 13 Field Weld Access? Id of welded Weld Specified Filler Qual Record & NDE Hydrotest Inspections No. items? documents Material ID/ Welder ID Records Records completed available? Documentation (ANI/ QC) on hand/

Alt.Verification Method 2-SF-1-FW-5 Embedded Yes, WDR on Yes, WDR on ~ SFA 5.9/5.4 Yes, in weld Yes, attested to in Yes Hydro -QC & ANI hand (ref. hand (ref. ~ Yes, WDR documentation weld documentation. (ref. DDR 1347) (ref. DDR 1347)

DDR-1347) DDR-1347) on hand in (ref. DDR-1347) weld documentation-Also assured DDR-1347 QC & ANI by piping ~ Not (ref. DDR 1347) installation, required DDR-1347 - QC &

hydro and ANI concrete pour procedure r uirements 2-SF-1-FW-6 Yes Yes, by No ~ SFA 5.9/5.4 Yes Yes, by re-inspection. No inspection ~ No D41

~ by alloy analyzer 2-SF-8-FW-65 Embedded Yes, on one No ~ SFA 5.9/5.4 No, but assured by No, but assured by No liner leak test - QC side by DDR- ~ No weld program and program and 1387. Also Assured by procedural procedural assured by site requirements requirements. Will be piping specification SS- subject to internal installation, 021, procedural camera inspection concrete pour requirements procedure r uirements 2-SF-8-FW-66 Embedded Yes, on one No ~ SFA 5.9/5.4 No, but assured by No, but assured by No liner leak test - QC side by DDR- No weld program and program and 1387 Also ~ Assured by procedural procedural assured by site requirements requirements. Willbe piping specification SS- subject to internal installation, 021, procedural camera inspection concrete pour requirements procedure r uirements

Enclos o Serial: HNP-99-069 Page 4 of 13 Field Weld Access? Id of welded Weld SpeciTied Filler Qual Record R NDE Hydrotest Inspections No. items? documents Material ID/ Welder ID Records Records completed available? Documentation (ANI/ QC) on hand/

Alt.Verification Method 2-SF-70-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes No, 325 inspection ~ No Bj, D41 by re-inspection willbe hydro-

~ by alloy tested by Mod analyzer 2-SF-72-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes No, 326 inspection ~ No E21 by re-inspection willbe hydro-

~ by alloy tested by Mod analyzer 2-SF-72-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes No, 327 inspection ~ No E21, C97 by re-inspection willbe hydro-

~ by alloy tested by Mod analyzer 2-SF-69-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes No, 328 inspection ~ No B61 by re-inspection will be hydro-

~ by alloy tested by Mod analyzer 2-SF-69-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes No, 329 inspection ~ No B61 by re-inspection will be hydro-

~ by alloy tested by Mod analyzer

Enclos to Serial: HNP-99-069 Page 5 of 13 Field Weld Access? Id of welded %Veld Specified Filler Qual Record & NDE Hydrotest Inspections No. items? documents Material ID/ Welder ID Records Records completed available? Documentation (ANI/ QC) on hand/

Alt.Verification Method 2-SF-71-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes No, 329 inspection ~ No B7 by re-inspection will be hydro

~ by alloy tested by Mod analyzer, cheinical analysis 2-SF-30-FW- Yes Yes, by No ~ SFA 5.9/5.4 Yes Yes No 381 inspection ~ No E21, C97 by re-inspection

~ by alloy analyzer 2-SF-148-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes, by re-inspection. No 382 inspection ~ No E21

~ by alloy analyzer 2-SF-149-FW- Embedded Yes No, but have ~ SFA 5.9/5.4 B61 (NCR W- Yes, (full LP in DDR Yes, Hydro -QC & ANI 408 (ref. DDR- repair WDR on ~ Partial, 207) 829). Will besubject seeNorth New Repair weld 829). Also hand, also weld WDR on Also repair WDR to internal camera Fuel Pool Hydro documentation - QC &,

assured by documentation hand for on hand (DDR inspection Test Record. ANI piping review signoff repair weld. 829) NDE rpt. - QC A ANI installation, in North New ~ Assured (ref. DDR-829) hydro and Fuel Pool by weld doc DDR-829 - QC k, ANI concrete pour Hydro Record, review in hydro procedure records, site requirements specification SS-021, procedural requirements.

Enclos to Serial: HNP-99-069 Page 6 of 13 Field Weld Access? Id of welded Weld Specified Filler Qual Record & NDE Hydrotcst Inspections No. items? documents Material ID/ Welder ID Records Records completed available? Documentation (ANI/ QC) on hand/

Alt.Verification Method 2-SF-150-FW- Yes Yes, by No SFA 5.9/5.4 Yes Yes, by re-inspection. No 412 inspection No E21 by alloy analyzer 2-SF-14-FW- Yes Yes, by No SFA 5.9/5.4 Yes Yes No, 424 inspection No B61 by re-inspection will be hydro tested by Mod by alloy anal zer 2-SF-31-FW- Yes, by No SFA 5.9/5.4 Yes Yes No 426 inspection No E21, C97 by re-inspection by alloy analyzer 2-SF-35-FW- Yes, by No SFA 5.9/5.4 Yes Yes No NDE rpt. - QC & ANI 440 inspection No E21 by re-inspection (ref. NCR WP-016) by alloy analyzer 2-SF-37-FW- Yes, by No SFA 5.9/5.4 Yes Yes, by re-inspection. No, 441 inspection No E59, F60, E25, Willalso be subject to will be hydro by alloy B47 direct internal tested by Mod analyzer examination when adjacent strainer is disassembled.

2-SF-16-FW- Yes, by No SFA 5.9/5.4 Yes Yes No, DDR-895 - QC & ANI 447 inspection No B61 by re-inspection willbe hydro by alloy tested by Mod analyzer

Enclos o Serial: HNP-99-069 Page 7 of 13 Field Weld Access? Id of welded Weld Specified Filler Qual Record & NDE Hydrotest Inspections No. items? . documents Material ID/ Welder ID Records Records completed available? Documentation (ANI / QC) on hand/

Alt.Verification Method 2-SF-36-FW-448

  • See Note 2-SF-36-FW- Yes, by No SFA 5.9/5.4 Yes Yes, by re-inspection. No, 449 inspection No D41, B47 Will also be subject to willbe hydro by alloy direct internal tested by Mod analyzer examination when adjacent strainer is disassembled.

2-SF-36-FW- Yes, by No SFA 5.9/5.4 Yes Yes, by re-inspection. No, 450 inspection No B47 Will also be subject to will be hydro by alloy direct internal tested by Mod analyzer 4 examination when chemical adjacent strainer is analysis disassembled.

2-SF-38-FW- Yes, by No SFA 5.9/5.4 Yes Yes, by re-inspection. No, 451 inspection No G1, B7 Will also be subject to willbe hydro by alloy direct internal tested by Mod analyzer Bc examination when chemical adjacent strainer is analysis disassembled.

2-SF-67-FW- Yes, by No SFA 5.9/5.4 Yes Yes, by re-inspection. No 452 inspection No E21 by alloy analyzer 2-SF-68-FW- Yes, by No SFA 5.9/5.4 Yes Yes, by re-inspection. No 454 inspection No C97, D87 by alloy analyzer

Enclos to Serial: HNP-99-069 Page 8 of 13 Field Weld Access? Id of welded Weld Specified Filler Qual Record R NDE Hydrotest Inspections No. items? documents Material ID/ Welder ID Records Records completed available? Documentation (ANI / QC) on hand/

Alt.Verification Method 2-SF-143-FW- Embedded Assured by No, but WDR ~ SFA 5.9/5.4 No, but assured by No, but assured by Yes, Hydro -QC & ANI 512 piping review signoff ~ No weld doc review in weld documentation see North New installation, in North New ~ Assured by hydro records, review in hydro Fuel Pool Hydro hydro and Fuel Pool weld doc program and records, program and Test Record.

concrete pour Hydro Record, review in hydro procedural procedural procedure records, site requirements requirements.

requirements specification SS-021, procedural r uirements 2-SF-143-FW- Embedded Assured by No, but WDR ~ SFA 5.9/5.4 No, but assured by No, but assured by Yes, Hydro -QC R ANI 513 piping review signoff ~ No weld doc review in weld documentation see North New installation, in North New ~ Assured by hydro records, review in hydro Fuel Pool Hydro hydro and Fuel Pool weld doc program and records, program and Test Record.

concrete pour Hydro Record, review in hydro procedural procedural procedure records, site requirements requirements.

requirements specification SS-021, procedural requirements 2-SF-143-FW- Embedded Yes, ref. No, but WDR ~ SFA 5.9/5.4 No, but assured by No, but assured by Yes, Hydro -QC A ANI 514 DDR-888 review signoff ~ No weld doc review in weld documentation see North New DDR-888 Also assured in North New ~ Assured by hydro records, review in hydro Fuel Pool Hydro by piping Fuel Pool weld doc program and records, program and Test Record.

installation, Hydro Record, review in hydro procedural procedural hydro and records, site requirements requirements Willbe concrete pour specification SS- subject to internal procedure 021, procedural camera inspection requirements requirements

Enclos to Serial: HNP-99-069 Page 9 of 13 Field Weld Access? Id of welded Weld Specified Filler Qual Record & NDE Hydrotest Inspections No. items? documents Material ID/ Welder ID Records Records completed available? Documentation (ANI / QC) on hand/

Alt.Verification Method 2-SF-144-FW- Embedded Assured by No, but WDR ~ SFA 5.9/5.4 No, but assured by No, but assured by Yes, Hydro -QC & ANI 515 piping review signoff ~ No weld doc review in weld documentation see North New installation, in North New ~ Assured by hydro records, review in hydro Fuel Pool Hydro hydro and Fuel Pool weld doc program and records, program and Test Record.

concrete pour Hydro Record, review in hydro procedural procedural procedure records, site requirements requirements. Willbe requirements specification SS- subject to internal 021, procedural camera inspection requirements 2-SF-144-FW- Embedded Yes, on one No, but WDR ~ SFA 5.9/5.4 No, but assured by No, but assured by Yes, Hydro -QC & ANI 516 side, ref. review signoff ~ No weld doc review in weld documentation see North New DDR-921 - QC & ANI DDR-869. in North New ~ Assured by hydro records, review in hydro Fuel Pool Hydro Also assured Fuel Pool weld doc program and records, program and Test Record.

by piping Hydro Record, review in hydro procedural procedural installation, records, site requirements requirements. Willbe hydro and specification SS- subject to internal concrete pour 021, procedural camera inspection procedure requirements requirements 2-SF-144-FW- Embedded Yes - ref No, but WDR ~ SFA 5.9/5.4 No, but assured by Yes, partial UT & LP Yes, Hydro -QC & ANI 517 DDR-869. review signoff ~ No weld doc review in performed under see North New Repair weld Also assured in North New ~ Assured by hydro records, DDR-869. Also, Fuel Pool Hydro documentation - QC &

by piping Fuel Pool weld doc program and assured by weld Test Record. ANI installation, Hydro Record. review in hydro procedural documentation review Also ref. DDR- (ref. DDR-869) hydro and records, site requirements in hydro records, 869. DDR-869 - QC & ANI concrete pour specification SS- program and procedure 021, procedural procedural requirements requirements requirements. Willbe subject to internal camera ins ection

Enclos to Serial: HNP-99-069 Page 10 of 13 Field Weld Access? Id of welded Weld Specified Filler Qual Record & NDE Hydrotest Inspections No. items? documents Material ID/ Welder ID Records Records completed available? Documentation (ANI / QC) on hand/

Alt.Verification Method 2-SF-159-FW- Embedded Also assured No, but WDR ~ SFA 5.9/5.4 No, but assured by No, but assured by Yes, Hydro -QC & ANI 518 by piping review signoff ~ No weld doc review in weld documentation see North New installation, in North New ~ Assured by hydro records, review in hydro Fuel Pool Hydro hydro and Fuel Pool weld doc program and records, program and Test Record.

concrete pour Hydro Record review in hydro procedural procedural procedure records, site requirements requirements requirements specification SS-021, procedural uirements 2-SF-159-FW- Embedded Yes, on one No, but WDR SFA 5.9/5.4 Yes, C-20 No, but assured by Yes, Hydro -QC & ANI 519 side (ref. review signoff No (see NCR W-103) weld documentation see North New NCR W-103 - QC NCR-85-1318, in North New Assured by review in hydro Fuel Pool Hydro Also assured Fuel Pool weld doc records, program and Test Record.

by piping Hydro Record review in hydro procedural installation, records, site requirements hydro and specification SS-concrete pour 021, procedural procedure requirements requirements 2-SF-71-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes N/A (Hanger 331 inspection ~ No D75, E50, D69 by re-inspection attachment (Hanger ~ by alloy weld)

Attach. Weld) analyzer 2-SF-71-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes N/A (Hanger 332 (Hanger inspection ~ No E50, D69 by re-inspection attachment Attach. Weld) ~ by alloy weld) analyzer

Enclos to Serial: HNP-99-069 Page 11 of 13 Field Weld Access? Id of welded Weld Specified Filler Qual Record R NDE Hydrotest Inspections No. items? documents Material ID/ Welder ID Records Records completed available? Documentation (ANI/ QC) on hand/

Alt.Verification Method 2-SF-71-FW- Yes Yes, by No SFA 5.9/5.4 Yes Yes N/A (Hanger 333 (Hanger inspection ~ No D69 by re-inspection attachment Attach. Weld) ~ by alloy weld) analyzer 2-SF-71-FW- Yes Yes, by No ~ SFA 5.9/5.4 Yes Yes N/A (Hanger 334 (Hanger inspection ~ No D75, E50, D69 by re-inspection attachment Attach. Weld) ~ by alloy weld) analyzer 2-SF-71-FW- Yes Yes, by No ~ SFA 5.9/5.4 Ycs Yes N/A (Hanger 335 (Hanger inspection ~ No D69 by re-inspection attachment Attach. Weld) ~ by alloy weld) analyzer 2-SF-71-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes N/A (Hanger 336 (Hanger inspection ~ No D69 by re-inspection attachment Attach. Weld) ~ by alloy weld) analyzer 2-SF-71-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes N/A (Hanger 337 (Hanger inspection ~ No E50, D69 by re-inspection attachment Attach. Weld) ~ by alloy weld) analyzer

Enclos to Serial: HNP-99-069 Page 12 of 13 Field Weld Access? Id of welded Weld Specified Filler Qual Record & NDE Hydrotest Inspections No. items? documents Material ID/ Welder ID Records Records completed available? Documentation (ANI / QC) on hand/

Alt.Verification Method 2-SF-71-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes N/A (Hanger 338 (Hanger inspection ~ No D69 by re-inspection attachment Attach. Weld) ~ by alloy weld) analyzer 2-SF-71-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes N/A (Hanger 339 (Hanger inspection ~ No D75, D69 by re-inspection attachment Attach. Weld) ~ by alloy weld) analyzer 2-SF-71-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes N/A (Hanger 340 (Hanger inspection ~ No D75, E50, D69 by re-inspection attachment Attach. Weld) ~ by alloy weld) analyzer 2-SF-71-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes N/A (Hanger 341 (Hanger inspection ~ No D75, E50, D69 by re-inspection attachment Attach. Weld) ~ by alloy weld) analyzer 2-SF-71-FW- Yes, by No ~ SFA 5.9/5.4 Yes Yes N/A (Hanger 342 (Hanger inspection ~ No D75, D69 by re-inspection attachment Attach. Weld) ~ by alloy weld) analyzer

Enclos to Serial: HNP-99-069 Page 13 of 13 Field Weld Access? Id of welded Weld Specified Filler Qual Record & NDE Hydrotest Inspections No. items? documents Material ID/ Welder ID Records Records completed available? Documentation (ANI/ QC) on hand/

Alt.Verification Method 2-CC-3-FW- No, but is No ~ SFA Yes, Yes No, 207 accessible and 5.18/5.1 K40 by re-inspection to be hydro will be No tested by Mod visually TBD by verified. chemical analysis 2-CC-3-RV- No, but is No ~ SFA Yes, Yes No, 208 accessible and 5.18/5.1 Cl 1 by re-inspection to be hydro will be ~ No tested by Mod visually ~ TBD by verified chemical analysis 2-CC-3-FW- No, but is No ~ SFA Yes, Yes No, 209 accessible and 5.18/5.1 Bl by re-inspection to be hydro willbe ~ No tested by Mod visually ~ TBD by verified chemical analysis Note ":

Field Weld 2-SF-FW-36-448 is a completed and stamped field weld, but willbe cut out and replaced as it joins a section of piping which was affected by a pipe spool modification.

to Serial: HNP-99-069 Metallurgy Unit Report for Spent Fuel Pool Weld Metal Composition Analysis