=Text=
{{#Wiki_filter:V
              ~1 4pv',
es f P
g;o Hive Mille Point U~B 2 DEC 1984 850ii7 850i250085 05000410 PDR ADOGK        eOR R
, I DECEMBER  1984 PROJECT  REPORT TABLE OF CONTENTS PAGE I EXECUTIVE
==SUMMARY==
II  MILESTONE STATUS              6-7 III  CONSTRUCTION                  8-23 IV  ENGINEERING                  24-'33 V HORKFORCE LEVELS            34-41 V I QUALITY ASSURANCE            42-48 V II  CONTRACT ADMINISTRATION      49-50 VIII  STARTUP 8 TEST              51-55 IX  COST                        56-60 X RECORDS MANAGEMENT          61-64 XI  LICENSING                    65-68
1 A. Project Director 1l The  Project this period earned        0.8% to- end 1984  at a cumulative 83.49 percent    complete.      The earning of 0.8%, for thi s month against a planned percent complete of progress of 1.19% was disappointing.              It should be recognized that this reporting period included Thanksgiving week and even though the Project anticipated some loss of production, the loss was more sever e than expected.              Anticipated construction turnovers to Preliminary Test did not materialize, and lack of testing progress contributed to .this month's shortfall.                The Project has established a "War Room" to be used as a focal point for rapid elimination of restraints which are holding up system completion and release.
The    Project i s estimating that the Integrated Flush/RPV Hydro Milestone is currently 2 - 3 weeks behind schedule.            Due to the close coordination and cooperation between Construction and Startup and Test, required work activities are proceeding at a rate which provides encouragement that the start of the Integrated Systems Flush can still be accom lished on schedule.
Johnson    Control  s  producti on impro ved si gni fi cantly during December while L. K. Comstock's    positive conduit and conduit support production continued. In general, SWEC force account work continues to support Project pri ori ties.        ITT Grinnel 1 pl armed production fell bel ow expectation.      The  shift    from bulk construction to that work required to support the Startup and Test schedule intensified this month.
The  Project awaits the INPO final report to be released in January 1985. The Project will be in position to respond to the INPO audit evaluation in a rapid and positive manner.
The  NRC  completed    its  Construction  Team Inspection (CTI)  on December 14th. Initial indications give cause to appraise the inspection as a positive indication of Project improvements since the CAT. The Project is currently awaiting the issuance by the NRC of the final inspection report.
Engineering demonstrated        good progress  in the Equipment gualification, Design Verification and Licensing efforts.                Continued  engineering schedule adherence is anticipated.
The  Project  expended    $ 674.7  million of the $ 675.0 million forecasted for  1984. A  reevaluation    of the required cash flow for 1985 i s underway.
In general 1984 was a year of tremendous Project challenges:                  the Project moved from bulk construction to near term intensified support of the turnover process; the assignment of a new management team; and the development of corrective actions required by the CAT audit. It is satisfying that the actions taken in the area of quality including establishment of new programs such as the gPMP and equality First Program appear to have been successful.
The    Project    realizes that the plan of 1985 is achievable but difficult. The Project Director believes the management team has the capability to drive the Project to this schedule as all Project resources are organized to support and sustain the Startup and Test p'o gram.
EXECUTIVE
==SUMMARY==
B. Mana  er Quali      Assurance  - Projects The  review of In-Place safety related items, materials, components, etc., that have been accepted by the contractor's QC organization has been    completed.      The results      are presently being evaluated by Engineering and QA.
The Independent    Assessment  Team  has completed its review of completed CAT Action Plans, NRC deficiencies identified        in  the SALP Report, and NMPC/Contractor      identified deficiencies.        The    final Report is expected to be issued in early 1985.
The  NRC  Construction    Team    Inspection was concluded on December 16, 1984. The Team Leader presented the preliminary finding at the exit meeting. Thirteen open items were identified with two preliminarily classified as violations. The potential violations relate to storage and maintenance      and a welding deficiency in an instrument tube support. The  final  report is due in January or early February .
PROJECT PERCENT COMPLETE SUNNARY TABLE DEC 84 tACTUAL PERCENT      ss PLANNED PERCENTs ATE    16-Der-84              sPERCENT    t  ITEN              CONPLETE                    COMPLETE I
sQF TOTALsPERCENT                                                              I (PROJECT    tCONPLETEs        CUMN      INC    s  t  CUMM        INC I          I I
1    ENERGI ZAT ION 4160 V        a ~ 49/    98. 37/e I      2. 45%    0.00/'            ~ 45/t      00/I
: 0. 46/    0.00/          0. 53/t    0.00/
i  2 DIESEL GENXREL. TEST            0 63/      73 56%t
                                                      ~                              t I                        t
                                        ~
INT. FLUSHXRPV HYDRO        17. 09%      88. 19/t      15.07/    0. 12/s 15. 32/t t              0. 39%  s 4 T GLINT VAC PULL                    50/    82 ~ 41/I      2.88/      .00/st 2 89/s  ~        0. Oi / t 5    VENTILATION                  3s 95/      74. 56/s        2. 95/    0.02/tt 2. 95/t            0. 00%
i                                                      97/t                0.00/st 0. 14%>>                00/
6    INTEGRATED LEAK RATE          0. 24/      56 ~            0. 14/                                        I 7    RADWASTE SYSTEN              l. 34/      70. 29/s        0. 94/    0.01%  t  s  0. 93%s    0.00/t 8    FUEL RECEIPT                  0 75/
                                        ~        58. 25%t        0. 44/      .00/t    t  0 ~ 44%t    0.00/s 01/    71  16/t      2. 14/    0.01/          2 ~ 15/s    0.00%s t        LOSS QF POWER/ECCS                          ~                              t  s 10    FUEL  LOAD                        50/    66 68/t
                                                      ~            1. 67/  0.01/I      t  1 ~ 64/s    0. 01% t 11 FUEL LOAD TO C.O.                0. 50/      0. 00%t        0. OOX    0  00/t'      0. 00/.  '  0.00/t iII.
I SUBTOTAL                          00/t    80. 94/t      29. 14/  t 0.17%t      s  29 ~ 44/  I I
0.41/      t I
I            I          I  I I            I I            I          I  I I            I          I I              I            I CONSTRUCTION CONM.                                  I            I          I I              I I
I I            I          I I              I I            I          I I              I            I L  1    PIPING                      10 ~ 45/          79/s      9 ~ BOI t 0.11/t      t  9~  80/ t,. 0. 10/ t 2 ELECTRICAL                      7. 63%      86. 1 1/  t    6.57/  t 0. 12Xt    t  6. 59/s 0. 14/,t I 5 C                        0 ~ 99/    71. 36/t        0. 71Xt,  0.05/s      t  0 70/s      0.04/      t 4 HVAC                            0. 83/      90. 68%s        0. 75%  s 0.01/s      s  0. 75'/  s  0.01/t 5 CIVIL                          13. 10/    100. 00/t      13. 10/ t  0.00/s      s 13. 10/s    0.00/',
i        SUBTOTAL III.STARTUP
      ~          u~. TEST COMN.
00/t 00%t I
I I
: 93. 73/
12.00%t t
I I
I 30 '3/s 0.60/t I
I I
0 ~ 29/t 0.03/t I I I I I I s
t 30.
F 94,%
00/s I
I t
I 0.29/t 0.17%t I
I I
I            I            I          I I              I            I I            I            I          I  I            I            I V. ENGINEERING
    ~                                          I            I            I I
I I I I I
I I
I I            I I I              I            I I            I            I 1 DESIGN VERIFICATION            0. 54/t    53. 33/        0. 29/',  0.03/        t  0.33/t      0.03/t t
s                        s 2 EQUIP. QUAL IF I CAT ION        0  25/t    86. 80%        0.22%t    0.01/s          0.23/t      0. 01/    I
                                                                    '7/s
                                        ~                  s                            s LICENSING                    0. 56%>>    84.11/t        0        0.01/    t  t  0.48/s      0.01/      t 4 SUPPORT OF STARTUP                  38%s                    0. 29/  t  .00/  t t    0.31/s      0. 01/    s 5 BAL QF ENGINEERING              18. 27%t    96.39/t        17.61/  t 0. 11/ << 17.83/s            0.12%t SUBTOTAL                    20.00%t I
94.40/,'  '8.88/        0.16/t  I I t 19. 18/    t I
0 '8/s    I I            I                        I I              I            I 5.00/    t  72. 28/  s    3. 61/    0.13/t  I t
I
: 3. 41/    s I
: 0. 12/    t I
I            I I  I            I            I I            I
: 21. RECORDS TURNOVER                  1.00/  t  33. 00/        0. 33/    0.01/t      t  0.40/t      0.02/t I I TQ PPF                                                                      I I I I I I TOTAL                      100.00/t                    83.49/s    0.80%tt 84. 37/          t 1.19/s I I I I
PROJECT PERCENT COMPLETE N.M.P.$ 2 1 00%
98%
96%
94%
hl    92%
I-90%
0 88%
O      86%
  . 84%
                    -ACTU 82%
80%
78%
Aug.84 Dec.84  Apr.85 Aug.85  Dec.85 Apr.86 Aug.86 Dec.86
1984                                          1985                                            1986 JUL AUG SEP    OCT NOV DEC JAN FEB MAR APR MAY JUN            JUL  AUG SEP  OCT'OV      DEC JAN FEB MAR                OCT STARTUP                                                                                                                                                        SCHEDULED TESTING                                                                                                                                MILESTONE              COMPLETION 4 I60
: 1)  4160 V                    21 AUG    84 I    I                                                                                                                          ENERGIZA TION
: 2) DIESEL GENERATORS            6 APR 85 I
I I                                                                                                    3) INTEGRATED FLUSH/'1 MAR 85 STARTUP TESTING-TURBINE GENERATOR hTJLESTONE                                                                  RPV HYDRO                  1 APR    85 I
                                                                                                          ')                      4) TURBINE GENERATOR          12 SEP    85 I
I VACUUM PULL CONSTRUCTION COMPLETE TURBINE I                      5) .VENTILATION              14  NOV 85 I
STARTUPI TESTING-DIESEL I          GENERATOR MILESTONE                                                COMP                                    6) INTEGRATED LEAK              6 DEC    85 TESTING          I                          RATE TEST
                                                                                  'l  FOR  ECCS/'OP CONST COMPL            I                                                                                                      7) RADWASTE SYSTEM            20 OCT 85 DIESEL CREATOR I            J                                                    I I                                                    I    9      6            IO              11
: 8) FUEL RECEIPT                7 NOV    85 POWER                AND TRANSFER I                COLD STARTUP TESTING-                                                    FUNCTIONAL ASCENSION INTEGRATED FLUSH          COMPLETE NSSS STARTUP TESTING                  TESTNG        TESTING          9) LOSS OF                      8 NOV 85 POWER/'CCS I                                                  C~
CONST COMPL FLUSH PATH SYS'IEMS        CONSTRUCTION COMPLETE TEST NG                                            10) FUEL LOAD                24 FEB 86 FCR CRT
: 11)  FUFL LOAD TO C.O.          1  OCT 86 I    STARTUP TESTING-RADWASTE hhILESTON LEGEND I.
CONST COhTR. RADWASTE SYSTEMS I
0        PRELIMINARY TESTING Q        CONSTRUCTION STARTUP TESTING-FUEL RECEiPT W.ESTONE CRITICAL PATH CONST COMPL FUEL HANDLING                                                                                STATUS AS OF        DEC 17, 1984 5                                        MILESTONE
==SUMMARY==
SCHEDULE l    STARTUP TESTING-VENTILATION MILESTONE NIAGARA MOHAWK POWER CORPORATION I
STONE  84 WEBSTER ENGINEERING CORP.
CONST COMPI. HVAC STSTEMS J.O. 12187 REVISIONS JUL    AUG SEP  OCT NOV DEC JAN F B MAR APR MAY JUN            JUL AUG SEP    OCT NOV DEC JAN FEB MAR                    OCT                                      ORIGINAL 1984                                            1985                                            1986                                                I5 OCT 84
II. MILESTONE SCHEDULE STATUS Project Controls is currently developing a computerized (Project/2) Project Schedule consisting of all the Project Milestone      Schedules,      and    it will depict their interrelationships.      This will enable the Project to assess more easily a potential impact on the overall project caused by any current deviation from the schedule.
A. Energization    4160V The 4160V    milestone is essentially complete with the exception of the High Pressure        Core Spray (HPCS) related switchgear.
This switchgear is scheduled to be energized the first week in January 1985.      Testing of other electrical di stribution i s being prioritized and energized to support the Startup & Test program.
B. Diesel Generators Release    of the Standby Diesel Generator &#xb9;1 and associated systems    in the West Bay is well under way. HVAC, fire detection and protection have been released to Startup &
Test. The breaker portion and air start systems are in the turnover signoff process.            The fuel    portion has minimal instrumentation and electrical remaining and is estimated to turnover on 12/26. The Middle Bay (Standby Diesel &#xb9;3) has approximately 3 weeks of work remaining.              The completion of the    air gap setting restrains Large Bore Pipe and instrumentation completion and has a estimated completion date of 1/2/85. With respect to the High Pressure Core Spray Diesel  Generator, the primary emphasis has been placed on Diesel    Generators    1    &  3, where outstanding        electrical modifications are being completed.            There  are  approximately eight weeks of work remaining with an estimated completion date of February 28th.
C. Integrated Flush/RPV Hydro Startup    &  Test is    prioritizing work with Construction to expedite    the rel ease    of systems to support the Integrated Flush/RPV Hydro    effort. The work scope of RPV Hydro has been identified to Construction and an integrated Project Plan has been  developed and distributed for use.          The integrated Flush milestone      is 2-3 weeks behind schedule due to late Construction releases although the February 25, 1985, date for the start of the Integrated Systems Flush is still achievable.
Fourteen    (14)  additional    flush paths    ("B" releases)    were turned over in December.
1.001A Main Steam System This flush path currently is showing 8 weeks negative.            A  work around plan is being studied, source documents are                being verified,  and a walkdown    is being  done.
31.001A Residual  Heat Removal System Projected completion for the entire flush path is currently 1/20/85; however, the compl eti on of work required for the suppressi on pool    fill wi1 1    support the schedule.        The completion of this flush path  will  support  integrated flush.
Turbine Generator The completion of the General Electric Turbine Generator work has been integrated into the Startup Plan and is being closely monitored by General Electric, Construction, and Startup Test. The Turbine Generator Milestone remains on schedule.
All of the 7 releases            scheduled    to date have been accomplished. The  lube oil flush was completed during December,  and  G.E. is restoring the system to enable centerline completion.
III. CONSTRUCTION A. General During December, efforts 'focused upon completion of construction work  for the suppression pool      fill along with work required to release the Emergency Core Cooling Systems for initial testing.
craft  manpower  continued  to be directed toward near
                                                                            'ignificant term system    releases. In a  number  of areas, non-manual support became a limiting factor in work completion.        The "War Room" was established to provide a focal point for identification and elimination of restrai nts which are holding up system completion and release. Integration of contractor and SWEC engineering was initiated to provide better support to field 'efforts.
SWEC PLAN VS ACT S EI  PIPE 90 818 7 80 70
                                      -ACT 60 Oc  50
<U 40 I-30 MONTH            TO DATE 20                      TY    UR        TY lan        3,900    4.95    64,966    4.95 10      ctual      3,859    6.71    64,308    5.28 0
26                        52                    26 1984                  1985
SWEC PLAN VS ACT
          .S 8 PIPE SPTS  (4x)(POS) 140 5 14 13 R PLAN
    '12 10 N~m                                    -ACT(TO 4x) 0c    8
~m Z3    7 Oo MONTH.          TO DATE TY      UR        TY      UR lan          913    40.41  8,458    40.41 casual      967    46.38  8 378    42 26                      52          13          26 1984                1985 10
ITT PLAN VS ACT L B PIPE SPTS (4x)(POS) 18 17                              -ACT(TO 4x) 16 gUl 15 0
14 lan tual l
268 184 MONTH 179.93 441.6 9
16,848 16,912 TO DATE 179.93 226.42 12 13  26                              13        26 1984              1985
ITT PLAN VS, ACT L B WELDS 26 25 R  PLAN-
                                  -ACT 23
: 0) 22 gC
: 00)  21 2O 19 MONTH            TO DATE TY      UR lan        330  25.86  23,475    25.'86 ctual      196  53.80  23,275    27.62 17 16 26                    52        13          26 1984          1985 12
ITT PLAN VS ACT S  EI PIPE SPTS (4x)(POS) 17 16345 16                              R PlAN-
                                    -ACT (TO 4x) 14 gC Og 13 12 MONTH            TO DATE QTY      UR        TY      UR lan          213  53.89    15,224    53.89 tual        157  58.37    15,098    52.90 10 26          39        52                    26 1984              1985 13
LKC PLAN VS ACT cowoutT                    942230 950 900 850 800 750 BCKLG-0~~o 700 650 MONTH            TO DATE 600                                          9 lan.'tual 26,000    1.10    819,532  1.10 20,889    1.27    812,676  1.07 500                                TTT]
52        13        26 1984              1985 14
LKC PLAN VS ACT CONDUIT SPTS                45640 46 40
                              -ACT Z~ 32 gO
  ~o    BCKLG-28 26 MONTH          TO DATE 22 lan      1,400  17.18    36;686  17.18 20                    1,617  18.99    36,901  16.57 ctua1 18 16 13  26                52                  26 1984                1985
LKC PLAN VS ACT SCHEDULED CABLE PULLING 7065660 R  PLAN-
                    -ACT BCKLG MONTH          TO DATE TY    UR        TY    UR lan    172,000    0.12  5,565,799 0.12 ctual  1 5 120    0.1    5 592 679 0.12 26                                  26      39 1984              1985 16
LKC. PLAN VS ACT UNSCHEDULED CABLE PULLlNG 2.7 2.6 MONTH          TO DATE      2473198 2.5            TY    UR      TY      UR 2.4 lan    100,000  0.07 1,435,220  0.07 ct:tI&l  52 957  0.07 1 404 342 2.3 2.2 2.1 2
1.9 o 18 1.7 1.6 1.5 1.4                                  -ACT 1.3 1.2 0.9 26                52          26      39 1984              1985.
LKC PLAN            V.S    ACT CABLE TERM 300 277401 280 260 240 220 R PLAN 200 180 z~ 160 Og
  <4O BCKLG-120 100 80 MONTH            TO DATE 60 TY      UR 40          lan      12,000    0.96    163,895  0.96 ctual    9 946    0.96    160 226  1.01 20 13  26                52                  26 1984                  1985 18
JCI PLAN VS ACT SEISMlc SPTS.
5.5 4.5                            R PLA
                                  -ACT 3.5 I-2.5 MONTH ~          TO DATE TY    UR          TY      UR lhn          240  67.78    3,733    67.78 1.5        ctusl        267  69.61    3,750    65.26 13  26      39                                26 1984                  1985 19
JCI PLAN VS ACT INST. TUBING 250 240                                                234360 230 220 210 200                                R PLA 190 180 170                                -ACT
<o I- m 160 Ov  150 QO
<P  140 130 120 110 100                          MONTH            TO DATE TY      UR        TY    UR 90                                      166,440    1.73 lan      9,200    1. 73 80          ctual    10,974    2.07      169,138    1.93 70 60 13  26                    52                    26 1984                        1985 20
III CONSTRUCTION  (Continued)
B. Contractor Performance SWEC  Force Account In general,      SWEC  Force    Account work continues to support Project priorities. Small bore pipe and small bore hangers and equipment completion continued to proceed with near term releases    requiring  a large proportion of available manpower.
Mechanical Equi ment Erection A  limited amount of equipment remains to be installed. Major ef forts for the peri od focused upon final al i gnment of critical pumps.
Cat II and III Hanger      Completion Production continued below planned            levels but in support of system p ri ori  tie s.
Small Bore Pi e and Su        orts Both small bore pipe and hangers proceeded below the revised planned production.          Improvement was noted on small bore hanger production due to the shift of forces from CAT II 8            III Large Bore Hanger Completion.
Preventative Maintenance Planned      maintenance      requirements      and    inspections  were performed this period and no significant problems                    were identified.
Painting SWEC  continued to perform painting under Force Account on an interim basi s.        A final deci sion for this contract has not been made.
: 2. ITT Grinnell During December, work proceeded              bel ow pl armed production 1 evel s. Del ays were experienced        on  system rel ease due to problems with root valve planner packages.                This problem has now been    resolved.
: 3. L. K. Comstock L. K. Comstock's          positive conduit and conduit support production continued. Pulling of unscheduled cable diminished as security duct banks neared completion while scheduled cable pul 1 s i ncreased.      Uni t  rates i ncreased sl i ghtly duri ng the peri od.
Cable termination remained          below target, although the current production rate satisfies Project requirements.
21
III CONSTRUCTION  (Continued)
Increased        requirements          in    system      completion          f shi ted a significant portion of L.K.                Comstocks labor toward near term work. During December,              added emphasis was also required in the Primary Containment.                Unit rate performance        was    impacted by these changes.
GE-PGCC Separation        rework      was    completed      in    December    1984. The relatively large number of phase 3D modifications included in the NSSS/BIP program, plus other mandatory BOP and NSSS changes      identified in phase 3E 8 3F are extending the completion of the          PGCC Modification Program through the first quarter of 1985; however, the program does support Startup 8 Test requirements.
: 5. Johnson Controls Johnson      Control s      production        improved      significantly during December.
J A    number    of steps      have    been    taken    to fur ther impr ove JCI efforts. These include integration of SWEC and JCI field engineering forces, increased use of compression fitting on CAT II seismic installation and approval for JCI to install root valves previously included in ITT Grinnell scope.
: 6. Schneider Power Cor oration Additional focus continued                  on  the  Pr imary Containment      HVAC installations with a second                shift    implemented. A major push was made during December                  to complete the HVAC above the refueling    floor    in  the  Secondary      Containment.
: 7. Insulation Contracts (Various)
Schedule      slippages      in piping systems release continued to restrain      insulation.          An      evaluation was requested              for completion next month to clarify work available to Keasbey.
: 8. Reactor Controls Inc. (NSSS)
In general,        the    Reci rcul ation      System    and  Control    Rod  Dr i ve installations are          proceeding on schedule.            Internal    activity on  the  RPV  remains about four weeks behind schedule.
9    Walsh    Construction Walsh    began demobilization.                Effective 12/17/84,        all direct work was transferred to SWEC              for completion.
: 10. Grinnell Fire Protection Work    continued in the Reactor Building and yard areas on Water spray and C02 systems.          No major problemsduring the period.
22
III CONSTRUCTION  (Continued)
C. Construction  Com letion During December,    a  number of changes in the turnover process were made. A  new    construction    procedure governing construction requirements during the turnover/release process was generated to comply with Startup 8 Test requirements          established in their procedures {SAPs). In addition, the "Mar Room" was established to provide    added    focus    to    critical work and restraints.
23
IV. ENGINEERING Design    verification    and  licensing proceeded        on schedule    this  month.
Significant progress          has    also been    made  in the equipment qualification ef fort.
A  number    of activi ties in the bal ance of Engineering                  and support of start-up areas      improved;      however,    total  schedul e  recovery has not yet been achieved.
A. DESIGN VERIFICATION
: l. As-Built Stress Reconciliation Engineering efforts are on schedule with 45 packages scheduled and completed.          This effort has encompassed 338 pipe support reconciliations requiring 3 modifications                and 6 new supports.
Reanalysis to minimize hardware impacts                    has eliminated 27 potential modifications.
A    detailed        schedule      .for as-built package submittals, consistent with the integrated flush schedule, has been developed        by      Construction      Planning.        A    corresponding Engineering Work Plan,was issued on December 21, 1984,                          and will  be incorporated into the January 1985 Report.                        'I As  indicated    on the schedule        (Attachment 1),"the receipt of AX as-builts      is slightly        behind the workaround plan with 135 packages being submitted as of November 30, 1984.                        However, since the remaining 10 were received on December 7, 1984, no impact to the Engineering Work Plan is anticipated.
IV  En  ineeri n    (Continued)
: 2. Final Structural Load Veri fication Load  verification activities for the entire Control Building framing,      connections        and  embedment    pl ates    have    now    been completed with no modifications required.
Main  ef forts      have  -
been concentrated      on Primary      Containment steel  framing,      liner and Control Buil ding frame            steel. The hardware      fixes      required in the Primary Containment are significantly less than originally anticipated. In order to minimize modifications, reanalysis was performed on the steel framing for Elev. 222 and 247 and has reduced the number of fixes required from 78 to 22. As a result of this effort, 49 cal cul ati ons have been compl eted compared to 52 schedul ed (Attachment 2). Three activities fell behind schedule because of the reiterations which were done to minimize hardware fixes are Primary Containment Elev. 278 beam design, and Primary Containment Elev. 261 beam design, and connection design.
These three activities should be completed by the end of December.
24
B. Equipment    l}uglification This    effort  remains behind schedule        primarily      due  to delayed vendor document submittal s.
A  summary    of equipment schedul      ed for qual if ication vs compl eted qualification      is  attached. Attachment      3 provides status of SWEC equipment requiring        qualification.      As  indicated,      this activity is approximately      1  month  behind  schedule      but  recovering.        Attachment 4 shows the status of          GE-NSSS    equipment      requiring      qualification      as originally scheduled and          with    a  recovery    schedule.      The  recovery schedule indicates          essentially      complete    recovery      by  the end    of March, 1985.
Increased engineeri ng efforts supported by extensive expediting of vendors is leading to a satisfactory recovery, clearly supportive of the requirement to be 85'X complete by April 1985.
C. Su    ort of Start-U
: 1.      Spare Parts The    issuance      of purchase        orders      for spare parts is approximately 5 weeks        behind    schedule.      The effort is behind schedule due to a manpower shortage.              Additional      engineers are currently being added to the spare                      parts    group.      It is currently anticipated that with            the  manpower      being    added    in January and the usage of overtime,                    the    schedule    will    be recovered by March 30, 1985.
: 2.      Pre-op Test Procedure Submittal s To  date,  SWEC  Engineering    has  reviewed    all but    two procedures that  have been submitted.        This  effort    has been    rescheduled to coincide with the latest        start-up    schedule.      Although    ahead of schedule on a quantitative          basis,  the  issuance    of  NMPC  drafts is sixteen    weeks behind schedule.
D,, Set Points The scheduled number of systems to be issued for December 1, 1984, was      160; 147 systems        were completed.            The    remaining effort primarily includes cleaning up            documentation      and  verifying    existing calculations. The set point            information      is  currently    available    and will be provided to Start-Up            personnel      via    Set  Point  data    sheets, specifications, etc.
The  final documentation/calculations            will  be completed      by March 31, 1985, E. PSIO's 21  of  28  scheduled    P&ID's have been issued as of November 31, 1984.      An    additional PAID was issued ahead of the specific schedule.      All 28 of the systems scheduled through November will be issued by January      l.
25
F. ECN  Incorporation ECN'    are    incorporated approximately 4 weeks into the ori ginal before the turnover FSK ',dates.
LSK and  ESK Si gni fi cant progress    has  been  made    to issue these documents to support the previous      turnover schedule; however, as a result of the new turnover schedule,            several      pre-op    dates      have    changed      and engineering will revise its schedule accordingly.
Of the 6    specific FSK systems that were scheduled to be issued by November    31, 1984, 5 were,issued.              Of tHe 10 LSK/ESK systems, 9 were completed.        The one delinquent system was in signout at the time of this report.
Additionally, 63 FSK systems were recently updated in accordance with the previous turnover schedule. A small number of systems may require a second update because of the new turnover dates.
Balance    of  En  ineerin
: 1. Digital Radiation Monitorin            System This system        was    originally      scheduled    to be delivered by October 1984,        but current projections        indicate    that delivery will occur in March of 1985.
This system is behind schedule due to documentation and equipment qualification problems.                The vendor (Kaman)            is currently working to a best effort workaround plan. All documentation        and    delivery problems are expected to be resolved by mid March, 1985. During November, Kaman submitted equipment qualification documentation for 44 of 45 components and      demonstrated      system    operability by completing the integrated system test.
: 2. Small Bore Pi e and Tube This    activity is behind schedule. An increase in the ACN incorporation activity hindered the issuance of new design.
lilith the addition of manpower and extended worki ng hours, a workaround plan is in place to be back on schedule by the end of January 1985. A priority has been placed on systems.
associated with the integrated flush.
26
: 3. ~iSI        d1 As  of November 30, 1984, 84 drawings were                      required  for construction. They consist of the following:
2    -  'El ectri cal    wi ri ng    and    termi nat i on drawings; reschedul ed for        December    i ssue    due  to 1 ack of vendor details.
1  - Yessel drawing for lifting rig, aux wrench scheduled for issue in December, 9 - Power drawings (2-EP 8 7-EM) with expected issue in December 57  - Small    Bore drawi ngs,      including neutron monitoring.
Scheduled completion        is January    31, 1985.
: 4. E&DCR  and ACN  Status The  current    status    is provided      on    attachments    5  and. 6.
27
SCHEDULE                                                ATTACHMENT  1 350                                                                                                      20 300                              R ECEIPT                                            /'
REQUIRED CWORK- AROUND                                      /
PLAN                                            /
                                                                                        /
250                                          II                              /
                                                                                    /  N-5 N                                                  4 MONTHS                      SCHEDULE X                                                                      /                                        z I 200                                                              /
: 4.                                                                /
O                                                                /                                              O
                                                                    /                                            10 LLI 150                                                      /                                                  Q)
                                                                /
D 100                                            ~ ~/
                                                            /;
E N G IN E E R IN G C 0 MPL E T ION 50 ACTUAL JUL AUG  SEP  OCT NOV  DEC  JAN  FEB    MAR    APR    MAY JUN          JUL  AUG SEP OCT  NOV 1984                                                      1985 o ACTUAL RECEIPT FOR NOVEMBER INCLUDES 41 INCOMPLETE AS-BUILTS.
:.C'. MAAFI MUFHt RPHAP
ATTACHMENT 2 STRUCTURAL FINAL LOAD VERIFICATION STATUS 150 140 130 120 110 100 SCHEDULED COMPLETE 90 It 80
  ~  70 60 Kl So                                                          PLANNED  52 D 40                                                          ACTUAL  49 ASOF DEC. 3, 1964 30 20                                ACTUAL COMPLETED 10 0
M A M J  J      A S  0  N  D  J    F  M  A    M  J  J  A    S  0  N 1984                                1985 M W W W          &&M &              W M M          &    W    &&M            W M M
NUMBER OF COMPONENTS                                                                ATTACHMENT 3
(          )
SWEC TARGET PLAN                          1E (EIOP        Bc SEISMIC)      Ql  TOTAL WAS 3085 11r84 ACTUAL'200 COMPLETION PROJECTION 3100                                                                      100    COM L RGET PLAN            (319  )
3000 2900 85  COM LET 2800                              (  14) 2700 2600 0
2500 0                                                    ~(24  0) 2400 2300 (222 2200 AC UAL
                                                    ~ 2150 2100 (2092 2000                          ~(20  0) 1900 (192        )
1800 1700 1600 7r84 er84 9r94 10r84 11r84 12re4 1r85 2r85 3r85 4r85 5r85 6r85 7r85 8r85 9r85 10r8511rS5 12r85 n r. unnci  t tLscur.@nuns
ATTACHMEN:  4 QUALIFICATION PLAN NSSS EQUIPMENT 900 800'00 I
I I
I I
I I
I 600 500                          I I
I O                              I I
UJ                          I I
D                          I 400 IJJ O                        I I
I I
I I
300
                                                            ---------w ORIGINAL
                                                                    ~
                                                          ~                      SCHEDULE REVISED SCHEDULE
                                                          ~                (11/27/84) 200 ACTUAL COV~.ET~
100 OCT NOV DEC              JAN FEB MAR    APR'AY    JUN  JUL AUG SEP  OCT NOV DEC 1984                                            1985 NMEHGRPH01                                              31
E8cDCR    STATUS                        ~ARPHMPPF  5 ~
8000 7500 CONSTRUCTION 7000                                                              WORK ITEMS E&DCR S 6500                                                            ~ CAT  I AWAITING QC VERIFICATION 6000            5908 EBcDCR S AV/AITING 5484                                  E N GINE E R (NG 5500                                                              DISPOSITION 5000      4864 4
h3 45oo 4148 L  4ooo 3500
>  3OOO 2500 2000 1679
                        ~
1967 1862 1472 1500    0 1000        859  864 7an O
500 A    S    0    N    0  J F M A  M  J  J A S 0  N D J F  M    A    M    J J A S  0 1984                        't985                            1986
ACN STATUS                              ATTACHMENT 6 8000 7500 CONSTRUCTION 7000                                                            WORK ITEMS 6500                                                            CAT I ACNS
                                                        ~-  -o AWAITING OC VERIFICATION 6000 5721 5500    5390 5000
<  4500    4722
~  4000 W 3500 E) 3000 2500 2000            ie>9  >949 154O 1500 1384 1000 500 0
A    S  0    N  0    J F M A M  J  J A S 0 N    D J F  M  A  M  J  J  A . S  0 w      8    m m                    1QQP
I I
I
a MONTHLY STATUS OF                                    1985 ENGINEERING WORK PLAN 1984                                                                                                                                                                      1985                                                                                                          1986 JUN              WL                AUG                  SEP                    OCT                NOV              DEC            'AN                  FEB            MAR            APR          MAY              JUN          JUL          AUG          SEP          OCT            NOV          DEC            JAN          FEB          MAR          A Noe OO          Otstf                                                            ~ I                                      '1  c              I TSA(c 5155)(04 5 r)                                                                                                                                                                                                                            (5) DIT DIOS, TFSIIK)            'cvfvl'1 'To      Tsa                                                                    LC II '1LLOCD                                                        SSCIL XSLVLD                        CDHVILSIDA IHCI'aSOV CS)IC SIC(TT ANALV5 1\
(I)octo                                                                                          S) Ital 1SSVC DCS              IS)TICO                      1talvf        TD      scs                                    l FS)ltlaO          XSSVC TCS              (S)tcl5 l(ttokT                                      lla
      "(CKS                                        eas
~,
(Lese'll plat ea
                                                                              ~ laavL        Io IV ~ saa vv                      M via 5&#xc3;C(ccucAL          To CDN) CSOL TIDOH
                                                                                  .L    Lalaaa\ Lo ov ~
F)(45 )ADDS.
                                                      ~a Isavv ~ aaaaa val              ~IJ I'acvvvLI avs LvesvATL
                                                                  ~I  as      sa 14  flat              Ial ~ l\a                                    Ct) IVT            (f)    eeaest Iae fess                                    (Nant              classis                                                                                  (41 oei4
('llllas        aaavahsavu              Deals                                ~ astf aspv        Avs Dlaveshf Ial ~ ls ~                        l Iu fes Ivsal ~ I ~ I(e4k acaeaf fevac Iusaels                          cttattes ~
COLO((DC '1CCCOL                                                        ot Al aaavl at vvaases                                  RI fo lahasv tfsssvc cpasvlt Fcl(C )AOSL
                                                                                                                                ~ II~
I ~ 1 aeu M'Ile~              Ilssol ~
4 'I Saavf        ~ Dfa Cl thill        Iaaaaa cllallt I~ leleIL                                              Irma                                                    Delf (I) sett                                            ~ 1st    f                                  I                                                          l
                                                                                                                                                                                                                        ~ vetoes s4 L CN
                                                                                                                                                                                                                                                      ~ ef vl Isof ~ loess Cupel aeVC CVT>> csaesaal 'sasf Dttaaatpvs                                              rcel  ash              aattea lveaaf Sea                          Aaaaalal                      Auavf            I O((A'1'LON                I Iassaesal AID svvoaTvv                      aeeata>>                                                                                                                                                              ~ ava TS LACKOLCT STUDY                                                                                                                                                  vvavasvlppv              'ksvssfa (Llse ~
(al scca                                    Dlslc aa    Ivaoaalaoal Lv falaef tsllLL                  1 Lvsasavaas            cuva p'T    isla            ~
(valet 'NN>>a awava uaefltela vae Tt(N0CIL                                            I N sls    ~ eea  a    alas  ~      lola slat        caaaa              as so assv1    ~
CSTTDI(T Cts(TCCC                                                      covg I~ seaeaea~p        ~ MCI vacassl        aa    M casova aaa      faasva Iaaaaoal              aa                        S(vcsstsr      TCCVISCS    Ill(th la        \I                                                      ssaIc '10  s(otc thoolrcc(LTIDN I\I II'lI
                                                                                                              ~
essa soa                              AL(tvv (Nasa                cvpell            us  ant CSI  vt                  Ivasaef Daeasavc          vsaavsfvv                                    ~ es Ca)ILA 4ssvel                                    Iwsavf Daaassvs svaaasva                        taalaaalatva(4)I
                                                ~ vawf havsapv                                  I I ls Vau. SVAVISII Iaa'at          jl'las            Tel lisps                                    salsa, svesasavs            caauhaalovl            '4 ~  t                                                        tu as I It I I (4                                                          'fftv 4
    , C)CO((0                                                                            ( ~ spe    ~                            asatavlsov Dt                              ovva                                                                                                                          ca I eol ~
I  A IT tate La DLTCDIIATF                                                                                                                                                    (L)4              tvao                                                                                                                                                                                                                  I tsCCCCS          Toll)'T SCCUO 155 SO(OLDS)LS                                                                                                                              "'7                        , Cela l
tt        (l)11          (s) I ~              (LNI                    Is') aa          Cl) ID                Cgao              4 NOO Os'Ht (AU I
0440      (41LCD          I 114  CD            cn4to                  INLCD              naLID                Isle    to        I ~ )I So          cs)vso              '
I      Cll cs'5 l  ~ 4114'Ll      (Q Lste          os LSL      ao Ie' I    JV Lsl        OC L SS avv I e~                                                                                                                                                                                                                                                                                I (a)OII (      I~ 1 1
Destt I oastea ofeap    sl ~ Italo vsoatt4 51 ~    ct 5'I'I        4 fell                IVLCS                  cssst            coTLS              choco              44'TDI            ~ 1000        Co'111          Dt D(D ~      .COTCI                                                                                                      ~ aaoafoaf,  Ifatf1 as at ot jot(DC
                                                                                                                                                                                                                                                                                                                                              ~ vf oon    clef aaaaaao cvafaecaa
                                                                                                                                                                                                                                                                                                                                              ~A  vl ataa foeavesoat aoaafof opec        (ale)                    CAlcetf j(4      'Sall 01500      LS  400                              Altos                  oecos            rc TIT                cv54 5            loses                                              Ctfoh          LITTD        dc OCT          DIDCS    ~    Co.hes      oaha'      gales            c(JIODD
                                                                                                    'ao
                                ~    sv)  ft          Us fo                  TIIA
                                                                                                  ~
OIDO              40>>      'rtt (A'100 (CID 1
Weto              Ctrts            r)DT            ct At            Cvas        ~nt              CDPL          Csvg                      Colas                        rttp'          4            ~ CSIN                        CDIto heoc  0'IT reaa  ol ~
cvt f1      OIC11          ct 111                Dct 10                                                                                                                                                                                                                                                                                                      als Sa htIDC
( SL) OC, (A')
siss
                                                                                                                                                                                                                                      ~  sa
                                                                                                            )
atf ~      4 ATIS          raas                                          ro sa ol ~
I is) ss          Inta                  Wl ~  '
I illa            CQTI                Isl                tilts              (vseta          Diva          o)IL CA)st          Ca)'  '
CN a ~              toes      Io)        (a) so(sos            (4 IS (441 I
      'oot CALLS OAT CON (1) 1511            (s')                cssoht)          Il)LTSS          4155L5          (L)LITI        INLS)S CAV i(stot(($ (Scot)                                                                                                                      (hl)401j hsst
  '    4 ~
(5) 051
                                                                                                                                    ~
(I) vsse SHILL 5)OD((                                                          tlTNLC.                                                                                                )lltssc)S Illoh Scott INQICASC (St IDDrf, 4OCCOC() Z)CSCOD (el  1  htf          (A110$
(1)      CST                ts tt          0'IIIDT          S)TILL        Cpaooa (to(ICITSD CA)SI)
TUDINL                                                                                                                                                    'cvTDULC'tvelfD evoo Dvr 14 tcotr evchfoc/
(A') Csl              (A ISST I                                                                                                                                                    I SOUDDNS 141( S                        (5) CS            (S H                (5) IS                  (Sue              (LlS5                                  (list                                  raapvt                It/N ar
  'TDK DDTa CNST
                                                                                                                                                                                                ~  pe 4    o woaveeo Aaataeos TSSUC                          (A)N L            {A)II(              (A)11                  (A)51              caa    hf"          (II Dh ~
CalS                  (I) 0            CI)ss              calls        (n 1 1          (nso          cs)hv        Is) 5r          llacef        INTI        (S)01                          DS 100 ltsh
                                                                                                                                                                                                                                              'T LFSKO                                                                                                                                                                                                                                                                                                                  SCTLDIILT TILTISLD ~            TD  Dhrrort (a) 5    (tl          O)C  P)          I                                                                                                                                                                  NSTT TAL'or Lceasousc LDH 4                                                                                                    Iss  0              Cnlb              caltv              cuhc          (lish            ulth          cllho        Isll lts        <<L1151      Isl los      (I) tao    cs115$            Csl 1 ss
          'TOSKL
                                                                                                                        ~r (A)1 IT>            OcnI(IT)
                                                                                                                                                                                                                                                                                                                                                              ~GE N LATCK Lstatass Lsao
                                                                                                                                                                                                                                                                                                                                                    ~ Cvlt414 DD, DO'La                                                                                                      La 4DCL                                                                                                                                                                                                                      (L)sh OSC ~ DS0 Svess      t                                                                                                    It C IDCICL (T osc(STANDIIC)
CA'I uses. LCTDAL DID CIC ~                                                                                                                                                                                                                                                                                                                            ot Kasssvass                      'lofAL
            . ILLNL ADSINC KNI                                                                                          LAI'LIL b) I/4                                        Cl) Stet TVCD 0 I
TIT CA                          5 I
DA, DDSL                                                                          CVLNCC CONLTOL DCACS 5)CSICN ICL'ISCW                                  Dr ISWCC ( J, (LC.            C Cut                                                                              Da                                                                                                                  e DSS    ~ O'5 4
                                                                                  ~ ATCCCC C            CNCA        111VC DCN            10 D.C. Cl)nns                          ~          (OS  r  DX ~ ')
P                                                                    SHEET NO.'I OF 3
          '0 Lvvv av                                                                        vtc        csvsvLTANTTNIATC                    vcvscw 5 Tsctoct                                                                                                                                                                                            1()SS ENGINEERING VIORK PLAN ro4 Too ~
              ~ tverap                                                                                                                                                Uacsvcfcsalte          TOIC        IICCLIICCD IADDS tscc Lvfolsashsv)              taa  Daeecsecv                ~
4 lvcwols                'To saaaLL      Docs csecavvan              0                                                                                                                                          STATUS AS OF                    30 NOV'84                  NMP2 CHOC PLANt(ING DEPT.
aa
                                                                                                                                                                                                                                            ~
                                                                                                                                                                                                                                                                                                                                                                                ~ I sg sN
Ml ~ ~ ~ ~ ~ ~ ~ ~ ~~                                      RM tg C~
                'A"t t ~,p wh$ ,y, c INK'% fib'            ~u tti"'4> ~
li >. 'p h.q                          p l.
g;e Pl 4 V
C
MONTHLY STATUS OF 1985 ENGINEERING WORK PLAN 1984                                                                                                                                                                                        1965                                                                                                          1986 bSSC IUOT)() N JUN                JUL                  AUG                SEP                  OCT                      NOV                    DEC                  JAN                FEB              MAR                APR              MAY          JUN            JUL            AUG          SEP            OCT          NOV        DEC          JAN        FEB          MAR I'
Alss                  CL)sl              (L)CO              (Qc'1                (1)t5                  IQCO                        (Qlr                Als ~          Il)at            (Lla>>              CLSTO          CL'itl        <Sit>>        ($ 151            (\'iLL      SQS 1        ($1>>1 T.DS
                                      'I        CAI sl                It<it              /A)sa            wsl      (sol      (Alto      (cll        (A)ts      (c)I AS T)L)LLT 01 ZD ~                                    CAT CA.
ST EELS                                                                                                                    A)0                  ()) C            .          ($ 15              (SII              ($ ) 1~        (Slgo            LC<<loi/LC IICV<lc'        ll/Oa
          )I(cga<cali)co)
(~  lit    Sl (ICLS DATA Tsgat)
                                                                                                                                        'I                  VCO Og)OILITTAL CI)  )                (%)  tl              A)SD                      /O) AS                AICO          (%171              (L)  gt          (Q logo        (1) It(      (S') Itt        dl  SOS        (Ql'SI        (S 1$ 1      f)s <$ 0 O(t<CSDLC              '10 7gCELCCT alt/ rtt CA)M A7)              IN<1 ($ 1)                                                                                                                                                                                                                          CLVSSCTS
                ~ C SIOC DP SC<<CDOLC' (QA                    Cil 7                Alll                      (S) SO              (TIES            (LICD          (1'I')7              CQSC          IQIO>>        Ia)ltt          A)g'S't          (S)ltl      ()'sns      ($)i'$1      A'II ) 0 CLLSC tlgat.
CCCVICII)                                                                                                        (A)I (sv)              ff)s) ($ 71 TCSO(a Ca</OISQ)                                                                                        DIO                P)si                    flats                      OILS rrococctscggr                                                                                                                                                                                asvc oao                qTTE ~ re Ovtcvacl (I<DO      tt 5 SSIIC 0 I (LOLCC(
osg
                                                                                                                        'Sli 1 a%hi ) <%aevi                                                      ( ~ 'l I/st v/      I sees% A u>>aso>>s/                            anc wl4assas<V                                IIELOLVE                        ~ actl tac aloac                                                                                    gas      ~
TA<vi1              awso ss ~ .            aves>>at<oh%                        wlc<cnaosa gpss<Tata ~                  'To    <<ate'1)        5/I VALVCS
                                                                                                                        />>two                                    I fsaVls            .    (Ill/i            I gtlssg 2 UIC))ocaoc                                                                              la'lt/la I<<tao<a/E<vpo s<<s a'<<                        ~ iu Isa<a Dion ca<its
                                                                                                                                                                              <WS        ~ <14'I ~
I'os/n Shut    %<>>AT ~
Ca)  Lh OCSSA)OCS u                                                                                          Lat %<A/so Ca<La~I I\)'I/la ns VAL u                                                                                                                Vt s/1                                                                                                                                                        ta>>A attila%a Vise%    O>>il. Stot                                                                                                                                          ~ aitwol                      SSSALSLW hei C)QCIC                                                                                    nso/1          soph      Ivhv<<os Mw<<os svn                                                        Cail/sl IKLI<<gals<i            I%i%/s u'            Iua/s        (veto>><<tl aaa/s                            A'ihs ~
                                                                                                                                %%                              tsaitu%            <<<<sass ov'1                          %a >>L toa                    i<as%%a          1<<ta<T                      AL\te>>L<      st%essa  Io<<<<as<T ~
VALVCS r so) 11                  lieve su<L'1
                                        'aia ~ lass%/
p toss%op I\I  I/aa      I'ai      )%%VI gtlol/V                                                                                                                                    0/I7/      55              at<a  ADA. 1st            CD<<I<sac SLDC.        '7/0 CC <CO($ VALVE          s\ v uw'sha                ss'I s/st
                                                                ~
                                                                            ~ SA ~  aaa    asti< ~ /1 1\< A aa                  '  I>>a<A tulsa>> Aaa vavsvat oe<aatocs                                                                hl ~ ss ~ tsvt,aat,pvc,avc,4<co                          aoL Lls              Tvato<<r    'OLOA      T/0 Et u      Of tk4TO CS                                                                                                                                                                                                                                                '        AO ~    saa          ta>>sAE'I Co>>sat>>tits<I 1/0 K
I'oils I          <tl ~ ts'1                                                                                                                                                                      ~ Stt <to<a    AOS
                                                                                                                                                                                                                                                                                    ~
I''            %ego A aacv egal Awe%La 7 Tt 0
                                ~ n<
                                              ~ M <>>    1<1% ~
I' IS S<a              I ~ I ~ / Scion
                                                                                                                                                                                                                                                                                    ~
TSO(s C
                                %4>>O oaoaa Oh'tie>>a LVK                                              a                                                                                                                                                                                                                                                                                                                  s
          ~ C)LCT OAT QQ Pouts                                      >>AI\.east%A cu va                          ola/<1 sua<<stt                    list uta<<
7CASX SUL 7<ETC)L            ~ h)la'1 fl) 1/IO                                                          'oh              aha.
                                                                                            ~~
sstI    ~ . O~O'1 0)CID (t)447                                  ~ s>>sotav      go<as<<
I
                                                                                                                          '1I                                  I le)sot) AS)    t                                                                                                                      (S)st ~ sl I
SCAL      7VATCO                                                                        V/lail I Iso~      'lliL <AWT.
sot'Ll                                      A<I 5 CSSV(ATC(C                                                  ~ %ass<<    'll'il(11 I/ao Tl(lr Qaa        <<t s(h  fel ~ sh Tog(DIQC              ~ Aa      \ ou    (ai ~ sit
                                                          ~ a<<loss TKvr (l<>><<aotse I gol  sl/ ~ T
                                                                                                                                '%/I ~
a 111 Tr(AS)tllQT Mal SWC CLODS.          s
                                        'i 'ati
                                                                                                                                                                                    ~  M eaa ot 14 T SC CVICC                                                              tAME ~ <aoasgail <<va sais'<LA                                                                  (altc/ ~
st<<<%<aha/atua aaeltoaslsa at>>a (ca                                saa <a>>la ava Casu%LIE <u<O/C ~
VEATCK 0(L            IQV<<SeS ~ Cn>> CC>>%) (1)a/A I<I<I%V<< %Peso 0 S<aa<<%(vaeataoaVuht< ~
SI A<%<ICCL
              ~ CODS.            taocvar.tao(rota caoiv                      vlsvl        ALT>>a<VOL                                          ( ~ 'll/IC 7  T' I
I'l /s'C aavs'4/I\wc LVS ei ~ I ~ L Leos              I (o) s/guar (11 IL/~
                                                                                                                                                                    >>t/ I ov us o
                                                                                                          ~ uvsa                                                                ~ su<tao>>ac N 'ID                                                  a<<go>>cvoassavi/                                                                                        Its<a o<settsu<r cv< ~
4        OT. (f)7                                              ~ >>saa 0/ass<, Last Io                vva
                                                                                                                              ~ VSV    I ~
                                                                                                                                            ~
                                                                                    ~ ii a/co                                                  I
                                                                        \ I'A a<I Cl TW< IASV
                                                                              ~
oaoste eis ss Tia'Louis O'Sh/I ~
osu.awe<%sot< aoaae wva>>>>LP)st/so 1>>
VALVC
                  'DODV Cog(C 05)0 IL
                                                                <sight tsl <<ate sau>>A
                                                                                          ~ usa
                                                                                                      ~
                                                                                                    <<%A<
plast<
g>>
Aa'Wl
                                                                                                                                      <<%<L<<4L Ctl ss/      ~
uveoaE
                                                                                                                                                                                                    ~  <4w\%4/ jsaaaasao ts>>w
                                                                                                                                                                                                    <I I /'    5 I
I CCTCEIC (Allo<~
waa  os<<A<Os<<
1<14< <<auSSSS <I          I 1 /o s                                                          to C/a                      l>>LTKS.
ao Tusta'      Sa                          I%i u/I I                                                            /e.                    ~ C TV<<l0 C 1 s
f1l a/s ~
ACT))ATOE                                                            CAI ~  Iu                                          avalgslsl/1                              0) I/I~
los% os<<'h                      (%1<< /n
                ~aDS.                                                                                                          I ass  aa e<<A As<< ss usa n s/I u<<uh I Dsw'll                                        0 l </I ~
1                                                                                                                              gaaao Aa sva<<as              avv uae I'
CCO              AI li              fsiao                A)no              C'Qno                CQ CAT                  ($)tss                  I117%0                                                                                  a P< ~            gu  CT                fa)71              Io)AT          (a)at            'f$      05                    Cal      sit CPS              IQO                  fQtl                  CS)AT                      (SICC                CS)05          A'I<05          It)<1$            CQI$ 5          tQC'15        gagi 5        <%1515          <QSSO
(~ I ~                    ff) Cs                fa s
A<sf)()E)0 0(((S                                                                                                                                                                                      (110          (1 II            (c) s.                            (C) C        ($ 1'5          (Clt          f L'lI<    (11<5        (Qto Q 0 Sita 0<CO (Df S'(STCIE)                                                                                                                                                                                                                                                                                                                                                                                                      lo fA'I 15 Sgtf 0 CT                                                                  AID                A) tOO                                        C)l 100                                                        ($ )it40 SKSC4CWET Qsg CS) AOO                                          A)ECO                (\)SODO                          A)IAOO              (DSCOO        (S)SSOO        CS)COOO        (S)C(40        (S)ttoo                                                                                        I, (ICCS LLLO()                                                                                                                                                                                                                                                                                                                                                                                                        o, rtoaCSL)                                                                                    IAI<15                        cu      nt                                                                                                                                                                                                                                                                          ~ I    ~
I r()STOAT los(                                                                                                                                        (S    0                    (Q I                A)S          (S)5                A) 0              OQ<1          Alla          (Q<7          At tD            Altt
          /Og /CT SLS I
girt    To)TTIICLC                                                                                                        (7) 0                                            (L') ES                              (Slat l (STEAa)T SIOCL CLVO                                        fo)      7                                    (S)1>>                              ('S)50          (QI 0            (S)01          CSI IOO      fQ ISO          ftl<') ~    fal<5<        (O'I Il 7  (S) <70        ($1 1oa V AS VCAOIU(01)
LEGEND gal 0/ls                          (a)      v/)0 I~ so/t                ~ <<M last.unu                        1 I I I/
1<CCIECC Isfg(T                                                                                              <Asi ~
                                                                                                                        >>s s<<s<<ai sow aoo/av 4-          C            ~
tsuwaas<<T                                                                                                      ( ~ I es ~                              ~ Oslo ia10 y
      'EAL))atioa
                                                                                                                    ~                        4                                                                  111                        ~ ~ *1    <<st  ~ ash>> qua<to                                                                                                          A'ILA (a<O    CQ<>>
ffi Cssu.<ava        ~        CML ~ CILIAL
                                                                                                                                                                                                                                                                                                                                                                            ~ >> co<ac<Ala      I            OI tsi.
CAT    Jt    OVCO CAT 1                              LA(( IC
        %<AC)CD 4 5) Q
                                                                                                                                                                                            <ao      svs au                          <<su us>>a/lsgv</s
                                                                                                                                                                                                  ~
eswosauwI os                                                                ~
                                                                                                                                              ~I                              ~        AA    ~        iota goose>>                                                                    ~  ~
                                                                                                            <~ I ~ Co        aus>>a I  s
        )CODD%4(e
                                                            ~ <<tsw        ssv>>
I su <<ps I                      C>>u~~(
                                                                                                                                                                                              'w oa                                                                                                                                                                                            SHEET NQ2 OF 3 tv ))i Al 7 TS Q                                    ~        ~                                          ~        ~ >>K <<<<S          AOW                          s ss eo    <<oa          ~      u    '                                                                                                                                                                                                              i ~
CCSOU)7 QQS I                                                                                                                                                                    0                                                                                        19SS ENGINEERING WORK PLAN P                                                                                                                      CI d o>>AA. Lha            I ~ aust          IA      ~    sw    I>>                                                                                                                                                                                                                                                            I t<<wss        ~
c                                                                                                                                                                                                          STATUS AS OF                3D NDV'84                NMP2 CHOC PLANNING DEPT.              I; QQ Q
        ~I aw ~ ~ ~ ~ ~  ms am I~
r~~,
E ~              k
                                      , Ih
                                      <<8 la v~
                                  ~ %
4          \tv ma                            m m                                                              &w                                                              sa                    m m m                                                              aa          .m m m m                                                    aa              m tc Lt s
MONTHLY STATUS QF 1985 ENGINEERING WORK PLAN 5984                                                                                                                                                                                              1985                                                                                        1986 JUN                      JUL                    AUG                  SEP                      OCT                      NOV                    OEC                    JAN                FEB              MAR          APR            MAY              JUN                JUL          AUG          SEP          OC  NOV  DEC          JAN            FE B        MAR DTSCR')rl)ON w    ~ svss Isa            ~  s ~ ~s    ~,s          so,        4        I        ~        ~  N    r sear        rs ~ sails Trsssrt Ll Isvws swat Nstv ~ Lea                                It    av ILL                                              Is gsn  sti ~
AF'sooA I
Ia\ te            II ~ otclii f'4 evrla
                                                                                                ~ sos        4                        ~                                                                                                            ~ I~  oe erosive    LNVHLra 0 4(551 A
sisgla        Arsltpas wwvv ~ stAI              g                                                                                                                                      4t oavna ooo Plot,c \I.                gast ~ ss I
CO Sri f1>T LIC            4~    ~ ~~    v    ~          v      ~    1st \ vs er ~ wp                    ~                  \    ~ ~    4 ~4            ea c                          (al      s~ t                                        ~ I Doeeoa      ASNVA <<Svo ~ W I~ I Mat I f ~ s vl 4 VNL oarlvaac                                                                                                              41  tasvi ~ svaeovla leis        aoo 4 ~ vooov's'n I sgs ~ saic eeoc                              I'ss sir CV  ail ~
                                                                                                                                                                                    ~
                                                                                                                                                                                      'vr ML m (s  I 1st f                                          I hst    ~  e                        gas    4  s I
                                                    ~  aisata 0            s    oeveaeav                'I  ~ Nisacl Livitel                                                    Naos,rh 1                        Vol(l 5>>esse({<<svc, ID clatR(rilit scoots)ICA)isic rasss DSCITAL a ~
s D
s            i sir as Nos'ls
                                                                                          ~
                                                                                            ~                                        ~ ~  i                                    I                                      4 soon\ Aoovvonaas1ORLLOIVI ()pcu Dsscsincessasaisi tg ~ et lvv          gas  aiot                  I                                      wl ooslti '10 onsf Tsss svsltw, RA 5l ATIOsl                        ~      I st sat rsracvsan tva                      tevl      erat    css    cngavsa'Hi                      ~ I IAOLATosllu4                                                                                                                                                              4 I
DOT            cs)sss                  (s)stv                  (s)ss'5                (Slits                  (5) l54                  (5's    lao 0 sl1' Lg                o luis (A>I'51                CAII44                  {assai            Caa)5(sal) {IVSLS(roD CAaoifcsot>
4 CONTROL                                  g)s 5 ~                C.illa                  cs)  5$              (1) 5 ~                  (S) 5t                (S) 51                  (1'I VS                    (Sl CS
            ~ Auel DLLI'Ve        4 th      PL)I              P 111                    I AILI              (A151            {AI)o (55) (4)'55 ($ 51 (als1 cst)
(tl 1S Ol st                                      (Sltf                (11'IS                {014 ~                    {1155                  (Silo 5              (f)55 (Slat (f)LI          (Ill (1'l 1I 0
IS)tp (fl)S          (g)T)
CONTROL rauci.                                                                                                                                                                                                                                                            )
I N(tssf I(AC IONS Call ~                    I*'IfLs                  (4'It'I              CA))0              (alas                          (41    5'I            (as(SS SIRC DLTC{710eg                          Clsto                                                                                                                      ( ~ I I)                (4 1 to                  (f )tl r AL>CL De 1.'s'V '4 Tile'5      IV1              ga'I so                    calli                4)st                  (as 10                    CLO    so              (4)l t)
I t NILC                                                      IVS(04(o                Iuto,aoo (Sitllpo                                (S)teoop              (5 tie)00                      s TCoufluc (ACT IVC'I                                                        Lasto ~ Ol            Co(ROD                {Al (0154                  (4)    tlt50 (A),tl+TS 4
CATLCL        rulL                                              IS) IOstt            I  Il0~ ('0          (Dtr.t{O                    (11'll(00              CS)leooo                ($ )41100
            'T)CKCTS (AC'tlVS)                                                      IA)(0 Dos            (Ai(0,144              {alto      1) ~          (ARL      loo          tatsj 555 Ig    f R)so 'lo              sls')ST        ())IT(v                  lsltoso              (')its)5            ls) l)00                    LossooO                  (1) tos.o                (1)        tso          (1) 400 sr    Lou DIAT5 a)s))I          Ca>sligo                  (Al Ioal            <Allo)t                  (41      IIOO              CA'I  t150 {4~ ttOO cas saa LOS tD
                                                                      ~  aesvav        ~  cava    rvna COWll t CAT. 5 t uct4c DLLT 'tAACD4(o SII4AL IOA)S                            (51 sa                    (1141                  I1'ill                fii11                      fists                                                                    (5)LS          (S)TI            (S>OS        (S)T ~          ())IOS            (S)ssl          (5)ut      (1) St)    (5 I 5 0 VLICLT)(A)LOtg IA  III            I A 1 s sr              I"1(D                IAI>s                  {4>)aou (4)ot (44) (A)LT (41) lti tis                coasts LLLO              ~
Ilsv 0~ ssgse          4\L tvaasa svs wv LL~ I Iss  lrDMoar oe ~ vus        gu en
                                                                                                                                                                                                                                                                                    ~ Nssv alL    vsta        Ivor ~ Lutose
                                                                                                                                                                                                                                                                                                                          ~ I tvsv
          't ILOCSsaa sgl                                                                                                                                                                                          Aea Lssvvi 14os          .
SLATS                                                                                                                                                                                      ( ~ 'I si ~ aaN Lssaa            wsa 441 wasLsa\v bat                    I11 ~ i'lo
                                                                                                                                                                                                                                                                        ~
VCRtS(A)5114 Ia'I Stir                                                                                                                                                                  VP I)R Dtlltguc)                                                                                                                                                                          ~ Lgoaroaae            cgvsaa\Nsvt                                                            ~ 11 gosvis I                                                                                                                                                                          Nassvevsovs                oa gas.l        rsasroaeol      asst 'Lvss ~ sva!
n                                                                                                                      (Cg      0              (5) 0                  (ss 0                    (s)ID                  Alto          (seto            cs'I)to        gsl4to          cis ~ 10          Is'ssco        (ssssD I
DC I v 4 Ice                            I== =Alta stofo,s.c>>.ulv                                                                                              (Alo        'tcr.so to        (A)so (OO I (LIogt                    h)140                  hlo40          hl ~ 1P          Iaatlp (14 sa                                            gsvao                                                                                                                    CuttO DODD.                                      tavasv            Avotstlfals
        ~ sow sasaas)T
                                            ~ ao      cv<<~4
                                                                                        &#xb9; owv/s csl\sslso
                                                                  ~ risers test Io
( ~ Issi  ~
la I Issi saswv at Cas    50 cwvs t rc 4550(ILS) (Alltl {ttO) u tl'DA 1{Ala OAS{00')            ~  14 Lis I>>      S Ntu ~ eovol
                                                    ~ St/ia a    ttoLuauls O  laoueoRD4c asI ass f~ st                Lvaewv gen av tsNI                                                          Cal    Sli ~  S l
TVOST.RS (S>{R(gg
        'Llue CARLING                                                                                                      ~  4  ail                al ~        t    \svaot              oat                              0 1sii IVIAL'I4 IS hs vs  r aoassoa
                                                                                                                                                                                                                          -              Dva ~ vs Ctl aiil avaoas{
                                                                                                                                                                                                                                                              ~isas ILSonr Ll.AK                                                                                                                    Matc ctaiva ovs oo la{les ~ Ivs Lsa.to 4 ac\p ovst II                e  L    4      Vosv DettCT) 0 1)                                                                                                                                                                                                    N CI) Lgrf (1)      i ~              1144 I swvaa'                      IILTou                                      '
el ia4 CASLVI              (Llaitr                {1)SOie                              (1
                                                                                                                                                                  ~    i saiaa aNtc LLL caoi Data eaaa                                                            var              stavvslavvoH I
: 2) 0 0                                                                                                                                            ses (isla  n rico      ssov Nos vsse                ~s        vvivsvaw              evT A
I I                                                                  calais (1st Deva eecaaac            Acvsssv          'T                                                          I 2                                                                                Nels\silos aat tasVIL ge lan (Lloilr                                                      I\)S'1 el J
4 1    I%II Lpssv              a  I ~ Lc giloiro (DILLIAtslsvs ALL east soot, Lest easoigo ooowcs ~ LLLT plslisf NS'5'5                                                  Iisois ~ 44 Avvl I\I~ I ~ s ratsNLHH Lsasa. 1)stir (euott tst A)                                                ( ~ 'lai ~                      vs ~ scs s Ltasosae Decisis                              ploroaaa                    (t)tis ~
loe  ~                        vasvll Loot                  ~ ItaL ~ Lsa gassaov                          51\Vv ei'll ~
air 4a1 vi IAP                                                                              'I oisila (Viols ~            ~ \ls    ~ Lt  IHa Noa              ~    Aa 4(eros                  1II ~ i1s
              'Dot                  104,          (llsfl                    (llss')                (1)1 55                ISlel,o                (S)(O'5                  (4)                    (1)tao                  (1)l'>S        Il')504          CLI SIP        (Sl Sff llfARDussau) Ll AtlN IT ILS              (ass  tv        ( ~ I sos                  ( ~ >Is)            lassos            (oivl Iia5)                  cavu (I'1$) (astca ((151 40          45  ~
rts              (11 11                    (5) IS                I Lit I                (51( I                  (1)  tt                (5)                      (1)54                  (5) 5 ~          (5) 5 5          CS)SD          (Sl SS          h) 51 (4>V              (Ai1                      0 ) 15              calls                    Ias      rl            (41 I'I                  (A)I 45 sa SWCC            h)5              (1'll                    (5'so                colls                (5)st'sits                                        (s) t.                  CS) 5 I                  ls)  '
co'154          (s) 54        h)ss          cslso              {Sl 1 rase      W g        setto RT 5      (AI5                (ia 4                    Cal 4              (41 so                  (As      15              (A)    It              (A) 10 e
E J>tvcces            ~ . hits          -(s)to                4 fi'lta                    cssTS'(o)s'7                                  '(s'115                (5)l S~                  (S) '54                  IS'1545        (SISS'1          CSlttS        IS)C  'll      C)etta              gi'I 1 ~ 0 CVAllt(LD                                                                                                                                                                                                                                                                                                                                                                          Lttasva Live Dc Atr)R)5 (AI~                                                I ~ I IS            IA))~                  cas      St              (A')    50            (41                                                                                                                                                                                                  agecoost01 g)s)T                                      cssaS                IS)54 fL)'I~    gssot  huv DfCC                                                                                                                                                                                                                                                                                                                                                                s
                ~ {SVICLI 4 VODATC        Sara I            CAILS                      (41  os            (e,lao J as ca'I                    (41 41                (Al                                                                                                                                                                                                              {aS  tCaa cvn  Acsvsa                cvn Aglvai ts          CS)    t'5                (1) ts              (O'I Ss                                                                                                                                                                                                                                                                    os Lciaorssa        4          I Ol 4'1 Tla(4ussL s                                                                                                                                                                                                                                                                                                                                                                    I 4 utfoRA)avC A)                ll          (altS                    CAS  I~              CA'Itt                                                                                                                                                                                                                                                                                        I I) 2            VCNDOII, SLS(a            CSS51>>                    {51504                CSV I ~              Ia)s      '
                                                                                                                                        ~          IS)L1\                (SIS 00 0
DOCO PLS)IT R
i            1(LV1%'Ill    (4)'Sfl          (A154C                    (4'I S15                LA)554                fal V)t                    0) 051                (AI                                                                                                                                ts'E. SQRT rf{&#xb9;RA)IL(ACT)VITTL'\CES)DT
    ~
I ~ 144        lsSVI      fio        Pie)
                    ~ LOOTL                      Siss ig ~              neogeaaevagevno                      rvor sLOuso TSD I'li ~                                                              atl)A lo eel ever uctus                                                                                                                                                                          loao D'tfsuslsou
          ~ 5 oi>I rsR(T J
r                        I                                                                        Ioo, A(ssvslt Dtsctspssou                                                                                                                                                              Qs AI H I~ ssi/I                    (s oe via so aapane ~
illais ~              hlagt svaN 0 is+ astir                                          aaa      lovts ~ sf J                                                                                                                                                    Qt      CL>A)I(I(atlou Rttw)uo)R)u LI                                                            ~
SHEET NO.3 OF 3 f
n n <0 2)ICSCL uS) lr sctNT                      ~ s  ~  lo        ive ge eve ~                                                    ao,toswos
                                                                                                                                        ~ Otssteot saasl
                                                                                                                                                        ~ SSSSS Lsvstoal 14'sa LL~
rla Dias ctvvas D vrn ss  ~
I    ~, lgai lao rNVVSVr S L.etaaag avsseow Assets Ha
                                                                                                                                                                                                                              ~
eaton I pi ~ ( 4 4LD'1)
                                                                                                                                                                                                                                                                  >o                                              QS Qa DI4kft Docusstutallou A504>LLIOL(LT)os PLANS
                                                                                                                                                                                                                                                                                                                                                                                    )985      ENG)NEERING WOR>I PLAN v CSNCRRSIC                                                                                                            (LS    Vr ~                                      I                  ~S    Vis          gas                    I~ I  it                                                                Dotuvseul    LTLON                                              57(fe 5 fg(55)(t UC%5DRC (Dtr(OS(DR 4
cr caor rosa opcoatsova ccvtf ~
I I                                                                                                                                                          STATUS AS OF        3O NOV'84        NMP2 CHOC PLANNING DEPT.
CQ r
m m m m m m m m m m w am &m m m w m aw I1 O'-
I g g  I
* I-
                      /
                                        )t ~I rg
WORKFORCE LEVELS The  Site Staffing is    shown  on the    following table  and  presented    on a weekly  basi s on  addi tional    tabl es. The SWEC  non-manual    staf fi ng, regardless of location,    is also presented.
34
DECEMBER  SITE AVERAGE STAFFING (PAYROLL) t 1ANUAL      NON-MANUAL            TOTAL COST REIMBURSABLE            P          A    P          A        P          A SWEC                        1516      2161  1020    1053      2536      3214 Walsn                        382        129    37      15      419      144 LKComstock                  731        740  100        99      831      839 ITT Grinnell                949        990  307      439    1256      1429 SMS                            83          0    5        0        88        0 JCI                          306    . 312  110      126      '416      438 Schneider                    150        151    19      19      169      170 Painting                    120          0    10        0      130          0 Subtotal                    4237      4483  1608    1751      5845      6234 Hard Money Al 1                              186              46                232 GE/NSSS                                                  72                  72 NMPC                                                    633                633 TOTAL                            4669            2502                7171 Note:
(1) Excludes  CHOC paid site assigned personnel.
(2) NMPC includes  MAC, NYSEG, RG5E and  Central Hudson.
35
                )Mn f  cv'r                  ManuaL Manpaner I  Po I'a    I'ral (rung'Ja ~e>>r'arAH>>
O<<NOL1 fr fg 8'$5% F >$
roll                onB u sr t>>
g j,oo 2A 2ooo Lloo So@                                                                                                                o Ct OO
~+  MOO I
L5OO L'ILL        I'I      L%o iL'A                                                          L      s l'fOO      P q      Lo                                                                  I'Lafa I
800                              VJl 7OO                                  Pl QCO 5'OO CYCLO                                                                                                        'ILC Boo                                                                                                                              I 2CLO  $                                                                                                                  L%L I.CO                                                                                                              Nl.
l~                    BT                                I 25      IPPW ll00                        Loaf IPPP IPB4 IOOO    IP55 lo5$                                                            P2o BOO
~ ~
TOO S2I I"          Pol                BP3      S      528 8H                                                                        ?45 2%'3$
                                                                                                            +        1+          ~'L1 300 PCLO E                                                    IPB    I oo      llo      IIO IOO IPO BB PB          loo      IS            IPT      IPB    III    log      Ill          [OIL    0    O 0
9OO                                                                                                                      C4L fN                                            IH A9              t42                        gyp          ~      ianna      $5)
Ioo 0
I55      IS~                                                    lfl ey        I55      I5B I52 I55      I55 I55 I55 I
I54 I33 IBX      I4g I+2 I42 I@
                                                                                                                  ~
LNo I E'1 Lg I
                                                                                                                                        '5aLCP    LSI.
I'5 zo2          UL      L'Lg        L'L1      LaLt,  L'L't ajaoo 15I                  XBP                    A7 '244            XN glg clP~jIOO                                                                                  saaavnaa
                                                                                          >>satanas oa 47f3 473'5IO                                                    44 4434 44~ L<P 4445 'IL 1 See        "'~1 QoL Nag g;
                      !  ~    'r(d  nr>>    Var>>oatra Jdl/                                                      36
Nonrnanual Man Outer                              JC Null )
may                    jUn8                  JU    g  QLfg,              98                'ace.                          dec.
4/so                                                              v/sr      o    ef      </v    Ql                                            IO P/17      g  I        O/g$    C  S                7    7+    4/o    0/I7 f550 I SOP                                                                              II55 n50 f200
                                                                                          ~u 1193 IC3$
ICW II5    117 11+      1L II                                                                            <5(
ll50                                    Ilk'~f4                                                                        Ifn t~
IICO IIPO IO50    1011 l~  l09t f000 050 l50 IOO 50  4l  41          It      ~ Ao        ~
40                    40 I Co      I 0                                                                      40      4o                                                  'LG      '4 HOP 850 500                                                                                          -
475 4CI 455                                    45I I                                                  444 451 45l 450                                                                                                    44I
~
W 1
4'":                                                                    .
            >50 41          300
~ A        NO NO I50 IO    IOT      IOO        toe      foi    IH      IO5      IP5      l07      IPS      OP IPO 50 5< too IOI                                                      fg      IP5                        55 III      IOO cf 50 0
5    5    5 5      5 8      s                                  5  555 59'5 855 44 In RO O'
f50                                                                                                IOI      fPI      f04 17.3    L7C IPX      IPI gg        4l 5I 94
  ~Q        IOO 35 32.
OC IOg    lol                        IOX, LL) 5P                  to I50 IOO 50                                                                                      Xl        CO
: 17. 15  l5    n    IG    <I  14    11    Ib 0                                                                        2I      Al l50              II4                              II5 IIX                    117 I OP        III      IIV        Ia ~to            ~
IIS a          50 I                            kf      43 5500 5000 NOO 5XO 2ooz                                      f993
                                                                                        <d37 N                +5 W5                  nu'4XS            'L5$
f500                  gg          IAI5    l555        8'I7 l9l9                                      IO    r  f595    e  I~~
IOOO 7/C5~ 1/SO OVI%&hfArlAYA'07 AVAICASCO'
                                  +'Pig/jVSt/g 'Fdt I)/CCCIPEu (DAMN'4 7/S/Sg)~ N WWW @~gym                                        ~ gg. gr g OaCy (sr~zP 6-a Py)
O CXCCCIPC$ BC4 CIIIOC 37
December  16, 1984                            SWEC STAFF I NG REPORT                          Page    1  of 2 CHOC LOCATED                            SITE LOCATED            TOTAL Department                ~Oen  F i I I ed Tota I              Open    Fi I I ed Total Open  Filled        Total MANAGEMENT                                                          0      15      15            17          17 PROJECT  CONTROLS                    16      16                            56      64            72          80 Planning                        10      10                            37      43            47          53 Hanagement    Systems                                                    4        4              4          4 Cost                                                                  15      17            21              CO Pl SITE ENGINEERING                                                  32      485      517  32      485          517 ADVISORY OPERATIONS                  34      35                  10      136      146            170        181 PGCC Startup  6 Test                34      35                    8>>4 2      22      24 122 22 148 24 157 PROJECT  ENGINEERING      24      464      488                                          24      464        488 CONSTRUCTION                                                        32      218      250  32      218        250 CCCP                                                          0        7        7    0          7          7 Safety                                                        0        10      10    0        10          10 System Turnover                                                6      40      46    6      40          46 Construction Groups                                          26      161      187  26      161        187
December  16, 1984                          SWEC STAFFING REPORT                        Page 2    of 2 CHOC LOCATED                      SITE LOCATED            TOTAL Department                  Open  Filled  Total              Open  Filled  Total Open  F i I I ed    Tota I ADMINISTRATIVE SERVICES              55        57                16    252    268  18      307          325 Project Administration                                                            0          1          1 Office Services                                              0      7        7  0          7          7 Project Records Admin.          1        3                2      14      16  4        15          19 Document Control                32        32                10    153      163  10      185          195 Information Systems            21        21                3      23      26  3        44          47 Accounting                                                    0      25      25  0        25          25 Time  Office                                                1      15      16  1        15          16 First  Aid                                                  o      8        8  o          8          8 Training                                                    0      7        7  0          7          7 CONTRACTS 8 MATERIALS                                                    6O      63            65          68 Contracts                                                            9      10              9        10 Materials                                                          23      23            23          23 Purchasing                                                          12      12            16          16 Expediting                                                          16      18            17          19 QA/QC                          0                                  25    282      307  25      286          311 QA                                                          3      24      27  3        28          31 QC                                                          22    258      28O  22      258          28O LABOR RELATIONS/PERSONNEL GRAND TOTAL                  27    580      6O7              127    1511    1638  154    2091        2245
SWEC ENGINEERING AND DESIGN PERSONNEL (SEG + CHOC)
PLANNED ACTUAL VARIANCE DECEMBER      876    8/6 1500 1400 1300
    +1200 zw  1100
    ~1000 zO 900
    ~ 800 o 700
    ~ 600 I
    ~ 500
    + 400 300 200 100 JFMAM J JASOND  J F MAM J    JASOND JFMAM J JASO 1984              1985              1986
                                ~
o- -m KEY PLANNED 0 ACTIIAL C,G, MODEL: NMBFGRPH06              40
SWEC ENGINEERING AND DESIGN MANHOURS (SEG + CHOC)
PLANNED    ACTUAL    VARIANCE DECEMBER  146,909    146,709            (x1,000,000)
CUMULATIVE 12,507,302 12,493,253 t14,049) 14.0 13.8 13.6 13.4
: 13. 2 4J
        '3.0 12,8 12.6 D
12 4~
O
: 12. 2 M
12.0 Q
11.8 11.6 11.4 11.2
: 11. 0 10.8 10 '
10.4 JFMAMJ JASONO JFMAMJ JASONOJFMAMJ JASO 1984                1985                  1986 NOTE:
4  DECEMBER ACTUALS PROJECTED.
C.G. MODEL: NMBFGRPH12
                                      ~
o-- ~
KEY PLANNED s ACTUAL
i V I. QUALITY ASSURANCE A. QA-Projects  Activities Detailed Assessments Actions to    be  completed by the contractors, as a              result of the detailed assessments,        are scheduled for completion            by  the  first quarter of 1985.
Surveillance The  review of In-Place safety related items, materials, components, etc., that    had been accepted by the Contractors QC organizations has been completed by NMPC QA Projects.                  The data collected from this reveiw is summarized                  by    commodity,    contractor,    and generalization of deficiencies on Attachment 81.
Per  NMPC  direction,    SWEC    has  completed      their evaluation of      ITT Grinnell installed Large Bore Pipe Supports.                The  results of  SWEC's findings are contained in Attachment t2.
The  results of the      NMPC  surveillance      and SWEC's evaluation of ITT Large Bore Pipe Supports        have  been  forwarded    to Project Engineering to determine      if-  any  reinspection      is  required  and  if  so, what inspection attributes are applicable.
In addition to the above, 100 instrumentation supports previously accepted by JCI Quality Control are to be evaluated by SWEC.
Further Actions are pending          an  Engineering evaluation of the data gathered.
Another 112 surveillances        were performed by NMPC QA-Projects from November  20  to    December    19, 1984, i'nvolvi ng approximately 1200 attributes    from approved checklists.                From these      surveillance activities  the following number of deficiencies/discrepancies were identified:
HARDWARE          SOFTWARE SWEC                                            17 ITT Grinnel 1                                    6 JCI                                              2 RCI                                              0 All of the      above    deficiencies/discrepancies          have been properly identified  and are being      resolved. In addition to the above, Eight Corrective Action Requests (CARs) were issued as follows:
HARDWARE          SOFTWARE SWEC ITT Grinnell JCI RCI 42
l}uality Trendin Of the two remaining Suspected        Trend Investigation Reports (STIRS),
one has been closed, and no          corrective    action was required. The other STIR is      still  being    investigated.      The next quality trend report will be issued    in  January    1985.
NRC RELATED  ACTIVITIES NMPC  8  SWEC  have  completed the review of ITT Grinnell 's plan for performing the film compari sons to determine the extent of the "Duplication of Radiographs" problem. Comments that were generated have been resolved and ITT Grinnell is to revise the plans and resubmit  it for approval.
Mr. R. A. Gramm introduced        a  new  Resident Inspector on  site - Mr.
R. M. Wheeler.
Mr. Gramm  and  Mr. Wheeler      are    in the process of performing inspection period 84-19.      To  date,  6  inspector follow-up items have been identified. These 6 items are presently being pursued by NMPC and SWEC for closure, prior to the NRC exit.
NRC  Resident Inspector held        a  formal  exit  meeting on  11/7 for inspection period 84-15.
* Results:        5 Unresolved  Items 3 Open Items
* All results are unofficial. Inspection Report 84-15              has not yet been  formally issued.
43
NRC  Open    Items,  Unresolved    Items and Notices of Violations, that remained open as      of  September 20, are statused below:
Additional Action          Final            On          NRC Item                Required        Review        Hold        ~Reviewin    Total Open:                                    6            2            5          16 Unresolved:            13              27          12            10          62 Violations:                            15                          4          30 TOTAL    108 1-    NRC  Open  Item, Unresolved Item, or Notice of Violation
                        ~
2-    Additional action required within            NMPC    or contractor prior to final review    and    verification    by  QA  (i.e. more documentation required, additional calculations to            be  performed, etc.)
3-    The  package for the item is completed and is being reviewed for  adequacy and completeness prior to submittal to the NRC.
4-    Items    which  parallel or are identical to items presently identified      in the CAT inspection and require further resolution prior to submittal.
5-    Items which have been completed and have been forwarded to the NRC  for review and approval for closure of the item.
Audits Special Audit SP-VR-NZ-84009 to comply with the commitment made to the NRC in G.K. Rhode's letter dated June 30, 1983, which was in response to an NRC Notice of Violation. In summary, NMPC committed to assure that only certified QC personnel (ANSI N45.2.6) would be "Final Accepting" items and not personnel in training. The audit revealed that the inspection activities being performed by SWEC and their Contractors (ITT-G, RCI and JCI) are being performed only by Certified Personnel.
Audit    RG-VR-N2-84010 was performed        at  SWEC    in Boston for activities in support of the        NMP-2  Project. The  audit specifically addressed the conformance        of QA,    FQC, PQC,      NDT and      QACA Divisions  for compliance to the SWEC NMP2 QA Program and the commitments in the Regulatory Licensing document (SAR).                  The audit was conducted during    the  week  of  9  December,    1984,  and    resulted in the issuance of three (3) AFR for minor deficiencies.
Audit RG-VR-N2-84011 presently in process (Dec. 17-21, 1984). The Audit Scope includes those activities being performed by ITT Gri nnell and Stone 8 Webster on a pre-selected large bore piping and hanger installation effort (Hardware Audit) to verify that all work effort is in compliance with the applicable requirements and the  QA  programs.
                                                                  ~eh~      1  ~
NO. OF ITEMS PIPE HANGERS/      50        LOOSE LOCKING    NNPC HAS DIRECTED SWEC TO PERFORM SUPPORTS                      DEVICES          A RE INSPECT ION OF  125 ADD I T I ONAL WELDING          HANGERS/SUPPORTS.
INSTRUMENT          30        WELDING          NNPC HAS DIRECTED THAT A    RE-TUBING                                        INSPECTION OF 100 SUPPORTS      BE SUPPORTS                                      PERFORMED BY  JCI  AND THAT  20  OF THE  100 SUPPORTS  BE REINSPECTED BY SWEC.
HVAC HANGERS/                CONFIGURATION    NNPC HAS DIRECTED SWEC TO PERFORM A SUPPORTS                      MELDING          REINSPECTION OF 50 HANGERS/SUPPORTS.
FIELD RACENAY      319      LACK OF HARDENED UNDER EVALUATION.
HANGERS/SUPPORTS              WASHERS INADEQUATE STOR-AGE 8, NAINTEN-ANCE
NO, OF ITEMS CABLE TRAY    106        LACK OF    IDENT I-  UNDER EVALUATION.
F I CAT ION.
INADEQUATE STOR-STORAGE 8    MAIN-TENANCE CONDUIT      189        DAMAGED    IDENTI-    UNDER EVALUATION.
FICATION NUMBERS.
INADEQUATE STORAGE AND MAINTENANCE ELECTRICAL    43          DAMAGED 8    MISSING  AS A RESULT OF THE NRC  VIO-EQUIPMENT                PARTS    8 COMPO-    'LATION,  NNPC HAS ALREADY DIRECTED NENTS                SWEC TO'PERFORM A REINSPECTION.
INADEQUATE IDEN-      A SAMPLE REINSPECTION  IS IN TIFICATION    OF      PROCESS.
COMPONENTS INADEQUATE TORQUE OF  BOlTED HARD-WARE INADEQUATE STOR-AGE 8    MAINTENANCE M M M M M M M M M M M M M M M M M M
NO. OF ITEMS STRUCTURAL STEEL  80 .MEMBERS MELDING                        UNDER EVALUATION.
120 CONNEC-  IMPROPER COPES TIONS  LOOSE BOLTS INADEQUATE IDEN-TIFICATION  OF BOI TING HARDWARE UNAPPROVED COAT-ING IN FRICTION CONNECT IONS CONCRETE EXPANSION 00          VIOLATION  OF                UNDER EVALUATION.
ANCHORS                        DISTANCES FROM C OF  ANCHOR TO EDGE OF CONCRETE OF  DIS-'IOLATION TANCES FROM    C  TO C OF  ANCHORS.
/0330Y
Attachment 2
==SUMMARY==
Approximately 1000 field welds and 1250 inspection attributes were in-cluded in 125 supports sampled by SWEC. The following is a summary of the 125 supports inspected and concerns identified:
FOR ATTACHMENT "B" SUPPTS/WELDS      SUPPTS AFFECTED        TOTAL WELDS INSPECTED    WELD CONCERN 125/1000 approx.          32  ~ ~ ~
383                  61 FOR ATTACHMENT "C" NO. OF ATTRI. ASSOCIATED SUP PTS/ATTRI      SUPPTS AFFECTED        TOTAL ATTRI    WITH HARDWARE CONCERNS 125/1250 approx.          454                565                    45
* Six (6) supports included in total of 45 are also li'sted on Attachment B due "to welding concerns.
48
V II . CONTRACT ADMINISTRATION A. Major Contract Issues
: 1. GE  Spare Parts Excess    Inventory Sale -    NSSS Every    effort is    being  made  to ensure that    maximum advantage      is taken of  a 35    -'0K    discount. offer on an inventory of start-up, test, and operational      spare parts.      This proposal from GE remains valid until December 31, 1984.
: 2. PBOOA    - GE NSSS  Contract - Cost Allocation The    research initiated in November to characterize the technical nature of PGCC FDDRs as well as to determine the respective cost responsi bil i ti es was compl eted duri ng December.              The i nf ormati on gained from thi s study was used as the                  foundation      for a final settlement meeting with General          Electric  during    the  week  of December 10, 1984. Deductions        from  GE's  monthly  PGCC    invoices  continue  to be made.
B. Materials    Management
: l. Valve    List  Review In conjunction with engineering," materials management is conducting a review of the valve shortage and excess list. The primary objective of this effort is to identify potential substitute materials and thus reduce the need to place additional valve orders.
: 2. Inventory Trackin Data    is currently being entered into the computerized inventory tracking/materials management system. A major feature of this system is,its ability to reserve material and identify shortages by BIP or work package.        This system is cur rently being used to track spare parts and standard stock items. It is anticipated that the system will    be fully operational      by January  7, 1985.
: 3. Productivity    Im rovement After careful        review of its operations, materi als management has
          'dentified        several activities which can be made more productive.
Listed below are the areas of concern in which materials management has  initiated constructive      change.
Combine small bore      inventory under SWEC control Realign laydown areas      for greater effective control Improve tool control process Improve measurement and test equipment control Improve material control response time and enhance inventory management Materials      Management    will monitor      the    effectiveness      of these changes.      The results    of the effort which      began    during December will be        seen        and      reported        in        subsequent        months.
49
C. ~ECh
: 1. BALANCE OF PLANT  (BOP):
The  total number  of active CHOC purchase orders for permanent. plant equipment  is  now  si xty-nine (69) with del i veri es projected through August 30, 1985. The material on these orders represent a total of 1,845 items which are not delivered (not including hanger material, cable, or equipment procured under P800A/NSSS spare parts) that are required fo'r completion of the plant.
50
VI I I. STARTUP AND TEST A. General The  procedures    which set policy for the Startup 5 Test Program are the Startup Administrative Procedures (SAP). These procedures have been approved by the Joint Test Group (JTG), and their implementation will streamline the program.
B. Release  for Testin Status Of the 106 subBIP 'A'eleases scheduled as of December 17, 1984, 94 have been accepted for Preliminary Testing.                    There are    ll  additional subBIP 'A'eleases            which have been accepted as early releases.
There are 12 subBIP 'A'eleases overdue per the Project Schedule issued October 15, 1984 with Revision gl. (See Attachments 1 and 2)
C. Preliminary Test Status Preliminary testing continues with emphasis on systems supporting Integrated Flush. Other systems in testing at this time are Service Water, Instrument Air, Turbine Building Closed Loop Cooling, Makeup Water, Control Rod Drive Hydraulics, Turbine Generator Lube Oil System, and permanent plant electrical unit heaters.                            Electrical Systems    and  the  Annunciator      8  Computer      testing    is  being  prioritized to support the Star tup schedule.                The suppression. pool is in the process of bei ng filled to support ECCS pump runs and integrated flush.
D. Turnover 'Status P
Project Records      Management    has    the schedul e of system turnovers to support    devel opment of a        required      records    li st and inclusion of outstanding    documentation    on  the    Installation      Completion    Report (ICR) to suppor t the turnover process.
E. Preop/Acce tance Testin          Status Startup and Test is preparing to begin an Acceptance Test for System 15 - Makeup Water Treating by January, 1985.                      The system turnover plan is shown on Attachment 3.
F. Major Problems
: 1.  =Materials and        S  are Parts:        An evaluation          of the present Matena s an          pare    arts      rogram    is  in  process.      The initial problems identified are being addressed and resolutions are in progress (i.e. completing an inventory of the warehouse and feedback      is being provided to user organizations).                            The Controlling    Procedure    (PG-35)    has    been  revised  to  streamline    the efforts.
: 2. Release    of    Systems    From    Construction:        Startup    and  Test    is wor i ng  w~ t    urnover o accept            re eases    which are designated priori ty  for  testing.      The    releases    are  behind  schedule due to incomplete construction,        procedural      and  programmatic    problems.
51
: 3. Systemic    Sof tware:  Current Permanent      Pl ant    File contents in icate a nee to increase        the  emphasi s  and  activities  for software processing to be      completed  to  support    system  turnover.
A major effort remains underway by Records Management to define the records required for turnover. (See Section X).
: 4. Project Schedule Integration: =An Integrated Startup/Project Plan has been      eve oped and i ssued to the Project for information.
Meetings  are    being held to coordinate and bring the various Project    schedules    and  contractors    into line with the Startup/Project Schedule.      The Project is shi fting to a System Completion mode to support plant completion and Startup.          Startup has started a Plan of the Meek to coordinate the testing to support the Startup/Project Schedule.
G. Fuel Status
: 1. Enriched uranium has been delivered to G.E.
: 2. G. E. currently fabricating the bundles; scheduled to complete          by May, 1985.
: 3. NMPC  currently evaluating storage requirements prior to shipment to Site. 1 52
Attachment    81 SubBIP 'A', Releases Released                      Early        Total Scheduled    IAW  Schedule                  Release  Releases    Accepted
  , 106            94                                          105 Late Per Schedule:      12 Flush Path Releases Released                      Early        Total Scheduled    IAW  Scheduled                  Release Releases    Accepted 65                                                        60 Late Per Schedule:      12
                            'B'omponent Releases Early Releases            % Completed Schedule                  Accepted                  Testing N/A                      234                          85%
53
PLAN VS ACTUAL CONSTRUCTION A RELEASE TO STARTUP
  '400 350 300 2SO 200 150 0
100 50 SEPT 84 DEC 84    MAR  85    JUN 85      SEPT 85 DEC 85
                                  +  ACTUAL 54
HTAGARA NOHATTK PO'HER CORPORAT10H H1HE'ILE P01HT UHl T 2 HUNBER OF SYSTEN TURHOVERS PER NOHTH TOTAL                                    TOTAL 144                                              144 o
128                                              128 X:                                                      K I
Ch 112                                              112 96                                              96 80                                              80 64                                              64 48                                              48 16                                              16 SYSTEH TVRHOVERS                                STSTEH TVRROVERS TOTAL r    STARTS ORTC SCH STARTS ES  CVH                          I STARTS CVRR SCH STARTS ES  CVH 55
IX. COST A. Cash Flow Summary Approximately $ 2,656 million* has been charged on the total Project to date. (See Attachment 1)
See  Attachment 2 for the cost commitment status        report with expended cost through November.
As  of December 16, approximately $ 674.7 million had been expended in 1984 versus $ 675.0 million forecasted for an underrun of .3 million.
Approximately    $ 48.1  million  was  expended    in  December  versus  $ 41.6 million planned.
B. December Cash Flow Variance    Analysis Variance              Remarks SWEC  (Manual 8              $ 3.0 million over    SWEC  Labor Forces have taken over Non-Manual) & Walsh                                the forecasted Painting effort, (Manual 8 Non-Manual)                              the remaining Temporary Electric Including:    Painting                            effort  (SMS), and a    portion of Temp. Electric                      Walsh's  effort. The  overall Wal sh Takeover                      effect of this takeover      has been an  approximate 100,000    MH  overrun in  Manual Manhours, and an    over-run in Non-Manual manhours      of approximately 11,000    MH.
Grinnel 1                    $ 2.4 million over    Non-Manual  staffing higher than Plan.
Manual overtime higher than forecast by approximately 24,000 hours (120% over plan).
Comstock                      $ 1.4 million over    Manual and Non-Manual overtime over the forecast. (Manual overtime being 152% over and Non-Manual overtime being 74% over)
Johnson Controls              $. 5  million over    Manual and Non-Manual overtime forecast. (Manual overtime being 106% over and Non-Manual overtime being  177%  over) 56
Other Misc.              $ 2.6  million under
    +Total Construction $ 4.7  million over Headquarter Labor        $ 8.8  million over  manpower requirements greater than forecast, and October's Bill paid on schedule.
HQ NSSS/PGCC            $ 1.6  million under Realization of negotiated credits Headquarter P.O.'s      $ 2.6  million under
    *Total Headqrtrs.  $ 4.6  million over
    *Client Cost        $  .6 million over
    *Contingency        $ 3.4  million under TOTAL PROJECT      $ 6.5  million over 57
PROJECT FORECAST 3.5 3.2 INC CONT-3.0                                  -PLAN LESS CONT z0I 2.9 2.8 2,7 g  2.6 2.5
: p. 2.4 Q
2.3 2.2 2.1 2.0 1.9 1.8 DEC 83 JUN 84  DEC 84    JUN 85  DEC 85  JUN 86 DEC 86
                                +  ACT
  <s)3-Dec-84 ss                                                    )sCOST CONIITtlEHT STATUS REPORT-HOV.84ss I                                                                                                                                                          l ESTI)fATED I PROJECTED I                                            ,8/15/80      EST INATE                                      4/84      I        11/84      I      11/84
                                                    ----"  -I 1
DESCRIPTIOH                I- -                                        I/I/83              REVISED      I CONTRACT          a  EXPENDED      a  COST TO        I    FINAL      I I                                    I OR16IHAL        )REFORHATED I ESTIHATE                  I ESTIHATE          ICOkNITHEHT          a                I COHPLETE        I    COST I                                    I                I                    I                  I                  I                                      I                I                I I                                                                                              I                                        I                I I A.      CONSTRUCTION                I I                                    I I                                                                                                                                                                            I I                                                                              I                                                      I I.CONTRACTS                    I                                                                                                                                      I s        i.NALSH                    I    $ 176,261    I    $ 179,915      I    $ 192)455    I    $ 243,837            $ 243)837 I        $ 237,127    s      $ 6,710  l  $ 240,832
: b. ITT 6RINNELL            I    $ 126)732    I      $ 144,391 e. 5223)574            I      $ 252,538    s      5240,347    s    $ 242) 136  a    $ 10,402    e  $ 256>758 a        c.L  K CGNSTOCK                  $ 58)619            561,281 I            575)990    I    t152,432      s      $ 152,432    a    $ 121>241    I    $ 31>191    I  $ 147)405 I        d.JOHNSON COH'IROLS                5)3)136    I        $ 14)818    a        $ 21,423  I        $ 32,052            532)051 I          $ 21)251  I    $ 10) 795 .I      Q6,940 e.SCHNEIDER PNR                      $ 9>028            $ 9>028 I          5f1,041    I      $ 31) 982 I          $ 28,357    e      t25,788    I      $ 6,194  I    $ 31)543 I          I.OTHER                    s    $ 284)152    I    5292)068 I Q15,671                I    Q40,898      I      5304>016          5277,333    s    $ 63>565    I  $ 338,034 I                                    I                  I                  I                  I                  I                    I                I                I I                                    I                  I                  I                  I                  I                    I                I                I I      2.SMEC LABOR                  s    $ 182,715          t203)576      )    5213,322    I      t402s571            $ 292,098    a    5292)098    I  5110,413      s  $ 395)199    s I                                    I                  I                  I                  I                  I                    I                I                I I                                    I                  I                    I                  I                  I                    I                I                I I      3.NORK.CONP.      Ic IHSUR. I      $ 35)650    I        $ 35,650    I      t37)612    )        $ 23,992            522> 511    s      $ 22)511  s      $ 1,481  s    529,636    )
I                                    I                  I                    I                  I                  I                                      I                I I                                    I                  I                    I                  I                                        I                I                I 4.FIELD P.O.'s 6 UTIL.              $ 113)215          $ 121>757    s      t142s413    )      $ 238,430          $ 198)468          $ 194,254    s    $ 44s 176    '  $ 232,186    a I                  I                    I                  I                                                          ar I                  I                                        I                I SUBTOTAL          I    $ 999,508      I $ 1 > 062)  544  I 5 1) 233)  501    5 I ) 718) 732  stf)514)117 ISI)433)745                a  $ 284)987      )Sf)709)133      I I                                    I                  I                                      I                  I                    I                I                                  I I                                    I                                                                                                    I                I                I                I I                  I                  I                  I                    I                    I                                  I                I I    B.          HEADQUARTERS        I                  I                    I                  I                    I                  I                I                  I              I I                                    I                  I                    I                  I                  I                    I                                  I                I I                                    I                  I  ~                I                  I                  I                    I                I                I                I s      i.      HQ  SERVICES        I    $ 382,891            $ 388,231    I      $ 415,184  s      t571,305    I      $ 519)  231  I    $ 519)231  s    $ 52) 074 I      $ 571) 018  a I                                    I                  I                    I                  I                                        I                I                I                I I                                    I                  I                  I                  I                    I                                      I                I              I I      2o      PQA SERVICES        a        t25)002    I    '25> 002        I        $ 33) 361 I        Q6) 349  I        t32>20&    a      $ 32>206  s        $ 4)143  e      536>644 I I                                    I                  I                                      I                  I                    I                I                I                I I                                    I                  I                  I                  I                  I                    I                I                  I              I I                                    I                  I                    I                  I                  I                    I                I                I                I I                CHOC  P,O,'S.                          I                    I                  I                  I                    I                I                I                I I
I          a.NSSS    fs P6CC          s    $  145,934          $ 145)934    I      $ 120)0f8  s      $ 222)747    I      t504) 609    I    Sf&3) 051 I      $ 59)  6'96 I    $ 219)  147 a I
I          b.T.G.                    I        $ 36,306  I        Q6,308      I        t36)308  I        $ 36,315  I INC ABOVE I                $ 36)308  I            $7 I      $ 36)315  s I
I          c.OTHER                    I    $ 230,470    I    $ 235)806      I      5254)650    I      $ 289)054  I INC ABOVE I              $ 251)092  I    53)>9K2      I  $ 288,254  I I                                                          I                    I                I                I                I I                    I                                                                                                                I SUBTOTAL              $ 820)603            $ 831)281    I      $ 859>52f  1$ 1)    155)770  1  51) 056) 046    1  51) 001) 888 I    t153) 882 151) 151) 318        I I                  I                    I                  I                  I                    I                I                I                I I                  I      ~            I                  I                  I                                      I                I                I I C.            CLIEHT COST      (I) s    $ 234>    889      $ 234)889      I      $ 222)978  e      $ 2'90)498  I      t180) 229    I    $ 180)  229 I  $ 110)  269 I    $ 290) 498  s I                                                        I                    I                  I                  I                    I                I                I                I I                                    I                  I                  I                  I                  I                    I                I                I                I s    D.          CONTIH6EHCY        I    QI5)000      I      $ 271)286    a      5334~000 I        $ 205)000                    50 I              $0 I  $ 205>000    I    $ 218)991  I I                  I                                      I                  I                                      I                I I
I I                                                        I                    I                  I                  I                    I                I                                  I I                    I                  I                  I                    I                I                I                I I                                  I 6RAND TOTAL        I 52,400,000        I '52> 400>    000 I $ 2> 650)    000 I Q> 370> 000 l52,750,392                l$ 2,615,862 I        $ 154,138    I t3,370,000    I I
(I)  CLIENT COST IHCLUDES UHIT            tf ADHIH B).DS        COST    fs  AFUDC COST($ 2>58)>49)              I>  $ 5,290,799      RESP.)
5< NOTE: ALL DOLLARS ARE IH THOUSANDS 55
        *** NOTE:              This report is an extraction of various Stone                                                            &    Webster reports 59
IX. COST  (Continued)
C. Common  Facilities A  proposed plan for allocating tHe costs of common facilities between Units 1 and 2 has been developed.          the plan'as been provided to the Cotenants.
Contin enc    Mana ement  Pro ram The    Project    is currently reviewing the cash requirement to complete. As a part of this evaluation,    the contingency will be assessed. The results will    be provided in this section at the conclusion of this  assessment.
60
RECORDS/INFORMATION MANAGEMENT A. Progress made during the        last  month:
: 1. The review has been completed on 1850 ITT CAT II Hanger Packages and approximately 1400 have been turned over to the NMP2 Record Acceptance Center.
: 2. Record status activities have been completed per the current component      lists for the following BIPs'5.001, 15.002, 14.001, 14.002, 72.001 - 72.0010, 72.B01 - 72.B16, 10B01, 22.801, 22.A01, 10.COl, 4.004 and 4.003. Anticipated changes will be required as component lists are redefined by Startup and Test.
: 3. Program Implementation          - Status
: 1.      Site  Document    Control - procedures        have been reviewed by Records Management and comments are being incorporated.
: 2.      FQC  -  QAD  17.1 has been approved on          site    and  is currently awaiting approval by        SWEC-QA    Boston.
: 3.      ITT Grinnell    - All five (5)        Records Management Procedures have    been    approved      and    48    Documentation        Turnover Transmittals have been prepared to              initiate turnover of backl ogged documentation.          Indexing conventions        have been approved to support the review activities.
4;      JCI  - Procedure      QAS  18.01 has been approved and          QAS 18.02 and    18.03    are    in    final      review    stages,      Indexing conventions      have    been    approved      to support review activities.
: 5.      RCI  - Procedures      QAI 17.1    and 17.2 are in final approval cycle and are scheduled for issue            on 12/21/84.
: 6.      NMPC-QA    Projects - Program has                been    assessed    and procedure revisions are bei ng drafted.
: 7.      Startup and Test - Procedure            SAP 104A and 104B have been approved. SAP  104E  has  been  drafted  and is scheduled for review by Records Management and Star tup,and Test.
: 4. Project Procedures        PP  103, 104, 105, 106, 107, 108, 110, and 112    covering    Records    Management      activities were issued on ll/20/84.
: 5. Records Management Personnel have been relocated to the Record Acceptance Center (RCA).              The RAC is currently set up to process      Category      II    8    III    documentation.        Category    I p'rocessing will commence when construction activities are complete.
: 6. The    Preliminary Required Records List has been completed and di stributed      for revi ew by Engi neer i ng, Licensi ng, Qual ity Assurance and Startup and Test.
61
: 7. The      NMP2                    Records Management Organi zation has successful ly completed                        the activities in support of the 400,000 records milestone on the NMP2 Records Database.
B. Major Acti vities                        in Progress:
: 1. Methodology                          being    developed      for statusing        procurement documentation in support of Startup and Test.                                    Statusing in support of initial system turnovers began on 12/12/84.
: 2. Completion of the Record                                Acceptance    Center    and    related equipment which include:
          'a ~    Roof on Vault
: b.      fire Protection C.      Key Card Access
: d.      Vault Doors
: e.      HVAC These    activities                    are scheduled    for completion  by  1/18/85.
: 3. Review    activities                    by the  NMP2  Record Users Group in support      of the issuance of the                        NMP2  Required Records List by 1/15/85.
C. Record Turnover The  following are estimated percents complete of                                SWEC  turnover of documentation to the NMPC Permanent Plant file.
  *Total Turnover of                          CHOC  Documents                          88%    Complete
  +Total Turnover of                          SWEC  Site  Documents                    14%    Complete Total Turnover of                        ALL  SWEC Documents                        26%  Complete The    f  oil owi ng are estimated percents compl ete o f NMPC Syracuse Turnover of documentation to the Permanent Plant file.
Total Turnover of                          NMPC  Syracuse Documents                  87%    Complete The  total estimated percent complete of turnover documentation to the.PPF      33%
Complete.'Estimates adjusted                      for  CHOC  and  Site  due  to reallocation      of record's source from Site to                          CHOC.
62
Note    1  Fuel Load NMP2 PERMANENT PLANT FILE                                    Note    2  Commercial  Operation COMPUTER INDEXED ENTRIES                                                                    yv PLANNED VS. ACTUAL (IN TNoooANoos Note 2 Note  1 OPO 0
Anticipated X-Recovery Program
: c. g  g  cC  os    z  c. g  'g t ~ os  z  c K g c.c os  Z z z q        NS 0      g  z            SN              m    CS g      as ~  s  ts  e:                c 1984                    1985            1986 The      following tables              summarize          the production levels of record receipt, preparation,                    filming          and indexing into the Permanent Plant File.
Total to          Percent December              November        Date        ~Com  lete
~Ac t i v i t Record Receipt            and              68,824              152, 458    2,665,405          33%
Preparation (Includes                    Pages                    Pages      Pages Aperture Cards Records      Microfilming                59,835              136 953      2, 271, 614        28$
And    Verification                    Pages                    Pages      Pages (Includes Aperture Cards)
Computer Indexed                          23,283                10,530        409,523          63$
Entries                                  Entries'7,              Entries    Entries Records      Indexing        and                  714          10,872        623,872          26$
Document Entry                          Documents                Documents  Documents Percent complete is based on an estimated 2,400,000 documents comprising 8,000,000 pages and 650,000 computer index entries required for Permanent Plant File entry by fuel load.
63
NMP2 PERMANENT PLANT FILE                                            Note  1  Fuel Load DOCUMENTS INDEXED                                                    Note  2  Commercial      Operation PLANNED VS. ACTUAL UN TNOUSANOSI                                  ACTUAL T ~ 00 Note    2 T 000 SCOO                                                      Note  1 0
0  0000 C
0000 II I coo N
Ieoo S
I  COO I  TOO I
IOOO 0
    ~ oo X
X
    ~ oo Anticipated 0                                          p@pQ                                                  X-Recovery F 00 Program Too r r ~g  c C
x ~  r r    c comp x I      r r    c    UI Z c  r r    c- CO  Z III O
                              <<                    <<C            C    m  O
                                                                              %  Te  TN  C  m 1983                1984                  1985                1986 NMP2 PERMANENT PLANT FILE PAGES ENTERED PLANNED VS. ACTUAL CIN TNOUSANOSI                                ACTUAL    P
    ~ 000 Note  2
    ~ 000                                                      Note    1 TOOO A
0 oooo S
oooo N
T sooo                                                  X 8                                                      II S
TOOO pp pQ                                                  Anticipated p pp                                                        X-Recovery 1000 Program r r                r ~'r LC coIII O2
                                                    <<g r r Cr                  r r
                        ~    g                                                        cc co'x x  sT  <<r  C 0
m p  O c
TA z )y, g    <<r  p c          c  co III p
x O
c m
1983              ~ 1984                  1985                1986 64
XI. LICENSING A. FSAR  Status A  total of    850 questions    relative to the    FSAR and  ER-OLS have  been received      from    the NRC.      For  'his    period,  840  responses    are complete,    and the remaining ten open questions            are  confirmatory.
Amendment 15 was sent to the NRC November 21, 1984.
B. Safety Evaluation Report        (SER)  Status There are 233      SER open items and an      additional 80 Power Systems    SER items    for a  total of  313. Me  believe that 305 SER items are        NHPC action complete.
C. 50.55(e) Reports Twelve 50.55(e) Reports were sent to the            NRC;
: l.      Velan Valves    - PWHT  (55(e)-84-22), Final Report.
: 2.      Cable Separation    in Free Air (55(e)-84-48), Interim Report.
: 3.      Defective Wiring (55(e)-84-31), Final Report.
: 4.      RCIC  Turbine Steam Admission Line (55(e)-84-33), Final Report.
: 5.      Hin. Wall Violation-ITT Grinnell (55(e)-84-49), Interim Report.
: 6.      Hin. Mall Violation-JCI-Tubing (55(e)-84-50), Interim Report.
: 7.      Rosemont Master    Trip Units (55(e)-84-34), Final Report.
: 8.      Non-blunt Stencils (55(e)-84-51), Interim Report.
: 9.      Topaz  inverters-(55(e)-84-52),        Interim Report
: 10. Traceabi  lity of  Spare  Parts, (55(e)-84-53), Interim Report.
ll.    ()A Witness Cable Terminations,        (55(e)-84-45), Final Report.
: 12. Voltage    Profile  on  Diesel  Generator    (55(e)-84-54),    Interim Report.
D. 50.55(e)'s Identified Two    items were reported to the        NRC  as potential deficiencies under 10CFR50. 55e.
: l. Diesel Generator Voltage Profile (55(e)-84-54)
: 2. Undersized Melds on Hul ti function Support System (55(e)-84-55)
                                                    '5
E. Ins ection    Re  orts No  Responses    were required since no violations have been  identified.
F. Advisory Committee on Reactor Safety    (ACRS) -(Meeting Preparation)
The  first  ACRS mock meeting was held November 5 and 6.      The second mock meeting originally scheduled for November 28 and 29 has been cancelled due to a conflict with the Hope Creek ACRS subcommittee meeting.      Several of the NMP2 presenters will be requested to attend the Hope Creek meeting.          Another mock meeting will be scheduled at    a  later date..
66
G.
STATUS OF RESPONSES TO BRANCH TECHNICAL QUESTIONS                I NUMBER OF RESPONSES                  SCHEDULE FOR RESPONSE COMPLETION Technical Question          Questions                                                1985 Areas            Received  Completed  Outstanding INSTRUMENT AND CONTROLS*            85          85 421 5 DISCREPANCIES RADIOLOGIC 470, 471              62          59 EFFLUENT 460, 451, 810 PIPING 210          168        166 STRUCTURE/220 SEISMIC-230 GEOLOGY-231 HYDROLOGY-240 GEOTECH-241 STRUCTURAL AUDIT EQUIPMENT            13          10 QUAL.
270 271 QA  260              51          51 FIRE                  33        33 PROTECTION 280 POWER                118        117 SYSTEM 430 CONTAINMENT            67          67 REACTOR PHYSICS CORE PERFORM 480, 491, 492 REACTOR SYSTEM 440 AUXILIARY              51          51 SYSTEM 410 67
STATUS OF RESPONSES TO BRANCH TECHNICAL QUESTIONS NUMBER OF RESPONSES                  SCHEDULE FOR RESPONSE COMPLETION Technical Question Areas Questions
                            ~C1        ~di                                1985 STARTUP 5            41          40 TEST 640 OTHER                61          60 100, 250, 251 252, 281, 311 450, 620, 630 730 TOTALS              850        840            10                            10 68
I I
I}}

Latest revision as of 16:28, 3 February 2020

Project Rept for Dec 1984.
ML18037A113
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/31/1984
From:
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML18037A112 List:
References
NUDOCS 8501250085
Download: ML18037A113 (80)


Text

V

~1 4pv',

es f P

g;o Hive Mille Point U~B 2 DEC 1984 850ii7 850i250085 05000410 PDR ADOGK eOR R

, I DECEMBER 1984 PROJECT REPORT TABLE OF CONTENTS PAGE I EXECUTIVE

SUMMARY

II MILESTONE STATUS 6-7 III CONSTRUCTION 8-23 IV ENGINEERING 24-'33 V HORKFORCE LEVELS 34-41 V I QUALITY ASSURANCE 42-48 V II CONTRACT ADMINISTRATION 49-50 VIII STARTUP 8 TEST 51-55 IX COST 56-60 X RECORDS MANAGEMENT 61-64 XI LICENSING 65-68

1 A. Project Director 1l The Project this period earned 0.8% to- end 1984 at a cumulative 83.49 percent complete. The earning of 0.8%, for thi s month against a planned percent complete of progress of 1.19% was disappointing. It should be recognized that this reporting period included Thanksgiving week and even though the Project anticipated some loss of production, the loss was more sever e than expected. Anticipated construction turnovers to Preliminary Test did not materialize, and lack of testing progress contributed to .this month's shortfall. The Project has established a "War Room" to be used as a focal point for rapid elimination of restraints which are holding up system completion and release.

The Project i s estimating that the Integrated Flush/RPV Hydro Milestone is currently 2 - 3 weeks behind schedule. Due to the close coordination and cooperation between Construction and Startup and Test, required work activities are proceeding at a rate which provides encouragement that the start of the Integrated Systems Flush can still be accom lished on schedule.

Johnson Control s producti on impro ved si gni fi cantly during December while L. K. Comstock's positive conduit and conduit support production continued. In general, SWEC force account work continues to support Project pri ori ties. ITT Grinnel 1 pl armed production fell bel ow expectation. The shift from bulk construction to that work required to support the Startup and Test schedule intensified this month.

The Project awaits the INPO final report to be released in January 1985. The Project will be in position to respond to the INPO audit evaluation in a rapid and positive manner.

The NRC completed its Construction Team Inspection (CTI) on December 14th. Initial indications give cause to appraise the inspection as a positive indication of Project improvements since the CAT. The Project is currently awaiting the issuance by the NRC of the final inspection report.

Engineering demonstrated good progress in the Equipment gualification, Design Verification and Licensing efforts. Continued engineering schedule adherence is anticipated.

The Project expended $ 674.7 million of the $ 675.0 million forecasted for 1984. A reevaluation of the required cash flow for 1985 i s underway.

In general 1984 was a year of tremendous Project challenges: the Project moved from bulk construction to near term intensified support of the turnover process; the assignment of a new management team; and the development of corrective actions required by the CAT audit. It is satisfying that the actions taken in the area of quality including establishment of new programs such as the gPMP and equality First Program appear to have been successful.

The Project realizes that the plan of 1985 is achievable but difficult. The Project Director believes the management team has the capability to drive the Project to this schedule as all Project resources are organized to support and sustain the Startup and Test p'o gram.

EXECUTIVE

SUMMARY

B. Mana er Quali Assurance - Projects The review of In-Place safety related items, materials, components, etc., that have been accepted by the contractor's QC organization has been completed. The results are presently being evaluated by Engineering and QA.

The Independent Assessment Team has completed its review of completed CAT Action Plans, NRC deficiencies identified in the SALP Report, and NMPC/Contractor identified deficiencies. The final Report is expected to be issued in early 1985.

The NRC Construction Team Inspection was concluded on December 16, 1984. The Team Leader presented the preliminary finding at the exit meeting. Thirteen open items were identified with two preliminarily classified as violations. The potential violations relate to storage and maintenance and a welding deficiency in an instrument tube support. The final report is due in January or early February .

PROJECT PERCENT COMPLETE SUNNARY TABLE DEC 84 tACTUAL PERCENT ss PLANNED PERCENTs ATE 16-Der-84 sPERCENT t ITEN CONPLETE COMPLETE I

sQF TOTALsPERCENT I (PROJECT tCONPLETEs CUMN INC s t CUMM INC I I I

1 ENERGI ZAT ION 4160 V a ~ 49/ 98. 37/e I 2. 45% 0.00/' ~ 45/t 00/I

0. 46/ 0.00/ 0. 53/t 0.00/

i 2 DIESEL GENXREL. TEST 0 63/ 73 56%t

~ t I t

~

INT. FLUSHXRPV HYDRO 17. 09% 88. 19/t 15.07/ 0. 12/s 15. 32/t t 0. 39% s 4 T GLINT VAC PULL 50/ 82 ~ 41/I 2.88/ .00/st 2 89/s ~ 0. Oi / t 5 VENTILATION 3s 95/ 74. 56/s 2. 95/ 0.02/tt 2. 95/t 0. 00%

i 97/t 0.00/st 0. 14%>> 00/

6 INTEGRATED LEAK RATE 0. 24/ 56 ~ 0. 14/ I 7 RADWASTE SYSTEN l. 34/ 70. 29/s 0. 94/ 0.01% t s 0. 93%s 0.00/t 8 FUEL RECEIPT 0 75/

~ 58. 25%t 0. 44/ .00/t t 0 ~ 44%t 0.00/s 01/ 71 16/t 2. 14/ 0.01/ 2 ~ 15/s 0.00%s t LOSS QF POWER/ECCS ~ t s 10 FUEL LOAD 50/ 66 68/t

~ 1. 67/ 0.01/I t 1 ~ 64/s 0. 01% t 11 FUEL LOAD TO C.O. 0. 50/ 0. 00%t 0. OOX 0 00/t' 0. 00/. ' 0.00/t iII.

I SUBTOTAL 00/t 80. 94/t 29. 14/ t 0.17%t s 29 ~ 44/ I I

0.41/ t I

I I I I I I I I I I I I I I I I CONSTRUCTION CONM. I I I I I I

I I I I I I I I I I I I L 1 PIPING 10 ~ 45/ 79/s 9 ~ BOI t 0.11/t t 9~ 80/ t,. 0. 10/ t 2 ELECTRICAL 7. 63% 86. 1 1/ t 6.57/ t 0. 12Xt t 6. 59/s 0. 14/,t I 5 C 0 ~ 99/ 71. 36/t 0. 71Xt, 0.05/s t 0 70/s 0.04/ t 4 HVAC 0. 83/ 90. 68%s 0. 75% s 0.01/s s 0. 75'/ s 0.01/t 5 CIVIL 13. 10/ 100. 00/t 13. 10/ t 0.00/s s 13. 10/s 0.00/',

i SUBTOTAL III.STARTUP

~ u~. TEST COMN.

00/t 00%t I

I I

93. 73/

12.00%t t

I I

I 30 '3/s 0.60/t I

I I

0 ~ 29/t 0.03/t I I I I I I s

t 30.

F 94,%

00/s I

I t

I 0.29/t 0.17%t I

I I

I I I I I I I I I I I I I I V. ENGINEERING

~ I I I I

I I I I I

I I

I I I I I I I I I I 1 DESIGN VERIFICATION 0. 54/t 53. 33/ 0. 29/', 0.03/ t 0.33/t 0.03/t t

s s 2 EQUIP. QUAL IF I CAT ION 0 25/t 86. 80% 0.22%t 0.01/s 0.23/t 0. 01/ I

'7/s

~ s s LICENSING 0. 56%>> 84.11/t 0 0.01/ t t 0.48/s 0.01/ t 4 SUPPORT OF STARTUP 38%s 0. 29/ t .00/ t t 0.31/s 0. 01/ s 5 BAL QF ENGINEERING 18. 27%t 96.39/t 17.61/ t 0. 11/ << 17.83/s 0.12%t SUBTOTAL 20.00%t I

94.40/,' '8.88/ 0.16/t I I t 19. 18/ t I

0 '8/s I I I I I I I 5.00/ t 72. 28/ s 3. 61/ 0.13/t I t

I

3. 41/ s I
0. 12/ t I

I I I I I I I I

21. RECORDS TURNOVER 1.00/ t 33. 00/ 0. 33/ 0.01/t t 0.40/t 0.02/t I I TQ PPF I I I I I I TOTAL 100.00/t 83.49/s 0.80%tt 84. 37/ t 1.19/s I I I I

PROJECT PERCENT COMPLETE N.M.P.$ 2 1 00%

98%

96%

94%

hl 92%

I-90%

0 88%

O 86%

. 84%

-ACTU 82%

80%

78%

Aug.84 Dec.84 Apr.85 Aug.85 Dec.85 Apr.86 Aug.86 Dec.86

1984 1985 1986 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT'OV DEC JAN FEB MAR OCT STARTUP SCHEDULED TESTING MILESTONE COMPLETION 4 I60

1) 4160 V 21 AUG 84 I I ENERGIZA TION
2) DIESEL GENERATORS 6 APR 85 I

I I 3) INTEGRATED FLUSH/'1 MAR 85 STARTUP TESTING-TURBINE GENERATOR hTJLESTONE RPV HYDRO 1 APR 85 I

') 4) TURBINE GENERATOR 12 SEP 85 I

I VACUUM PULL CONSTRUCTION COMPLETE TURBINE I 5) .VENTILATION 14 NOV 85 I

STARTUPI TESTING-DIESEL I GENERATOR MILESTONE COMP 6) INTEGRATED LEAK 6 DEC 85 TESTING I RATE TEST

'l FOR ECCS/'OP CONST COMPL I 7) RADWASTE SYSTEM 20 OCT 85 DIESEL CREATOR I J I I I 9 6 IO 11

8) FUEL RECEIPT 7 NOV 85 POWER AND TRANSFER I COLD STARTUP TESTING- FUNCTIONAL ASCENSION INTEGRATED FLUSH COMPLETE NSSS STARTUP TESTING TESTNG TESTING 9) LOSS OF 8 NOV 85 POWER/'CCS I C~

CONST COMPL FLUSH PATH SYS'IEMS CONSTRUCTION COMPLETE TEST NG 10) FUEL LOAD 24 FEB 86 FCR CRT

11) FUFL LOAD TO C.O. 1 OCT 86 I STARTUP TESTING-RADWASTE hhILESTON LEGEND I.

CONST COhTR. RADWASTE SYSTEMS I

0 PRELIMINARY TESTING Q CONSTRUCTION STARTUP TESTING-FUEL RECEiPT W.ESTONE CRITICAL PATH CONST COMPL FUEL HANDLING STATUS AS OF DEC 17, 1984 5 MILESTONE

SUMMARY

SCHEDULE l STARTUP TESTING-VENTILATION MILESTONE NIAGARA MOHAWK POWER CORPORATION I

STONE 84 WEBSTER ENGINEERING CORP.

CONST COMPI. HVAC STSTEMS J.O. 12187 REVISIONS JUL AUG SEP OCT NOV DEC JAN F B MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR OCT ORIGINAL 1984 1985 1986 I5 OCT 84

II. MILESTONE SCHEDULE STATUS Project Controls is currently developing a computerized (Project/2) Project Schedule consisting of all the Project Milestone Schedules, and it will depict their interrelationships. This will enable the Project to assess more easily a potential impact on the overall project caused by any current deviation from the schedule.

A. Energization 4160V The 4160V milestone is essentially complete with the exception of the High Pressure Core Spray (HPCS) related switchgear.

This switchgear is scheduled to be energized the first week in January 1985. Testing of other electrical di stribution i s being prioritized and energized to support the Startup & Test program.

B. Diesel Generators Release of the Standby Diesel Generator ¹1 and associated systems in the West Bay is well under way. HVAC, fire detection and protection have been released to Startup &

Test. The breaker portion and air start systems are in the turnover signoff process. The fuel portion has minimal instrumentation and electrical remaining and is estimated to turnover on 12/26. The Middle Bay (Standby Diesel ¹3) has approximately 3 weeks of work remaining. The completion of the air gap setting restrains Large Bore Pipe and instrumentation completion and has a estimated completion date of 1/2/85. With respect to the High Pressure Core Spray Diesel Generator, the primary emphasis has been placed on Diesel Generators 1 & 3, where outstanding electrical modifications are being completed. There are approximately eight weeks of work remaining with an estimated completion date of February 28th.

C. Integrated Flush/RPV Hydro Startup & Test is prioritizing work with Construction to expedite the rel ease of systems to support the Integrated Flush/RPV Hydro effort. The work scope of RPV Hydro has been identified to Construction and an integrated Project Plan has been developed and distributed for use. The integrated Flush milestone is 2-3 weeks behind schedule due to late Construction releases although the February 25, 1985, date for the start of the Integrated Systems Flush is still achievable.

Fourteen (14) additional flush paths ("B" releases) were turned over in December.

1.001A Main Steam System This flush path currently is showing 8 weeks negative. A work around plan is being studied, source documents are being verified, and a walkdown is being done.

31.001A Residual Heat Removal System Projected completion for the entire flush path is currently 1/20/85; however, the compl eti on of work required for the suppressi on pool fill wi1 1 support the schedule. The completion of this flush path will support integrated flush.

Turbine Generator The completion of the General Electric Turbine Generator work has been integrated into the Startup Plan and is being closely monitored by General Electric, Construction, and Startup Test. The Turbine Generator Milestone remains on schedule.

All of the 7 releases scheduled to date have been accomplished. The lube oil flush was completed during December, and G.E. is restoring the system to enable centerline completion.

III. CONSTRUCTION A. General During December, efforts 'focused upon completion of construction work for the suppression pool fill along with work required to release the Emergency Core Cooling Systems for initial testing.

craft manpower continued to be directed toward near

'ignificant term system releases. In a number of areas, non-manual support became a limiting factor in work completion. The "War Room" was established to provide a focal point for identification and elimination of restrai nts which are holding up system completion and release. Integration of contractor and SWEC engineering was initiated to provide better support to field 'efforts.

SWEC PLAN VS ACT S EI PIPE 90 818 7 80 70

-ACT 60 Oc 50

<U 40 I-30 MONTH TO DATE 20 TY UR TY lan 3,900 4.95 64,966 4.95 10 ctual 3,859 6.71 64,308 5.28 0

26 52 26 1984 1985

SWEC PLAN VS ACT

.S 8 PIPE SPTS (4x)(POS) 140 5 14 13 R PLAN

'12 10 N~m -ACT(TO 4x) 0c 8

~m Z3 7 Oo MONTH. TO DATE TY UR TY UR lan 913 40.41 8,458 40.41 casual 967 46.38 8 378 42 26 52 13 26 1984 1985 10

ITT PLAN VS ACT L B PIPE SPTS (4x)(POS) 18 17 -ACT(TO 4x) 16 gUl 15 0

14 lan tual l

268 184 MONTH 179.93 441.6 9

16,848 16,912 TO DATE 179.93 226.42 12 13 26 13 26 1984 1985

ITT PLAN VS, ACT L B WELDS 26 25 R PLAN-

-ACT 23

0) 22 gC
00) 21 2O 19 MONTH TO DATE TY UR lan 330 25.86 23,475 25.'86 ctual 196 53.80 23,275 27.62 17 16 26 52 13 26 1984 1985 12

ITT PLAN VS ACT S EI PIPE SPTS (4x)(POS) 17 16345 16 R PlAN-

-ACT (TO 4x) 14 gC Og 13 12 MONTH TO DATE QTY UR TY UR lan 213 53.89 15,224 53.89 tual 157 58.37 15,098 52.90 10 26 39 52 26 1984 1985 13

LKC PLAN VS ACT cowoutT 942230 950 900 850 800 750 BCKLG-0~~o 700 650 MONTH TO DATE 600 9 lan.'tual 26,000 1.10 819,532 1.10 20,889 1.27 812,676 1.07 500 TTT]

52 13 26 1984 1985 14

LKC PLAN VS ACT CONDUIT SPTS 45640 46 40

-ACT Z~ 32 gO

~o BCKLG-28 26 MONTH TO DATE 22 lan 1,400 17.18 36;686 17.18 20 1,617 18.99 36,901 16.57 ctua1 18 16 13 26 52 26 1984 1985

LKC PLAN VS ACT SCHEDULED CABLE PULLING 7065660 R PLAN-

-ACT BCKLG MONTH TO DATE TY UR TY UR lan 172,000 0.12 5,565,799 0.12 ctual 1 5 120 0.1 5 592 679 0.12 26 26 39 1984 1985 16

LKC. PLAN VS ACT UNSCHEDULED CABLE PULLlNG 2.7 2.6 MONTH TO DATE 2473198 2.5 TY UR TY UR 2.4 lan 100,000 0.07 1,435,220 0.07 ct:tI&l 52 957 0.07 1 404 342 2.3 2.2 2.1 2

1.9 o 18 1.7 1.6 1.5 1.4 -ACT 1.3 1.2 0.9 26 52 26 39 1984 1985.

LKC PLAN V.S ACT CABLE TERM 300 277401 280 260 240 220 R PLAN 200 180 z~ 160 Og

<4O BCKLG-120 100 80 MONTH TO DATE 60 TY UR 40 lan 12,000 0.96 163,895 0.96 ctual 9 946 0.96 160 226 1.01 20 13 26 52 26 1984 1985 18

JCI PLAN VS ACT SEISMlc SPTS.

5.5 4.5 R PLA

-ACT 3.5 I-2.5 MONTH ~ TO DATE TY UR TY UR lhn 240 67.78 3,733 67.78 1.5 ctusl 267 69.61 3,750 65.26 13 26 39 26 1984 1985 19

JCI PLAN VS ACT INST. TUBING 250 240 234360 230 220 210 200 R PLA 190 180 170 -ACT

<o I- m 160 Ov 150 QO

3OOO 2500 2000 1679 ~ 1967 1862 1472 1500 0 1000 859 864 7an O 500 A S 0 N 0 J F M A M J J A S 0 N D J F M A M J J A S 0 1984 't985 1986 ACN STATUS ATTACHMENT 6 8000 7500 CONSTRUCTION 7000 WORK ITEMS 6500 CAT I ACNS ~- -o AWAITING OC VERIFICATION 6000 5721 5500 5390 5000 < 4500 4722 ~ 4000 W 3500 E) 3000 2500 2000 ie>9 >949 154O 1500 1384 1000 500 0 A S 0 N 0 J F M A M J J A S 0 N D J F M A M J J A . S 0 w 8 m m 1QQP I I I a MONTHLY STATUS OF 1985 ENGINEERING WORK PLAN 1984 1985 1986 JUN WL AUG SEP OCT NOV DEC 'AN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A Noe OO Otstf ~ I '1 c I TSA(c 5155)(04 5 r) (5) DIT DIOS, TFSIIK) 'cvfvl'1 'To Tsa LC II '1LLOCD SSCIL XSLVLD CDHVILSIDA IHCI'aSOV CS)IC SIC(TT ANALV5 1\ (I)octo S) Ital 1SSVC DCS IS)TICO 1talvf TD scs l FS)ltlaO XSSVC TCS (S)tcl5 l(ttokT lla "(CKS eas ~, (Lese'll plat ea ~ laavL Io IV ~ saa vv M via 5ÃC(ccucAL To CDN) CSOL TIDOH .L Lalaaa\ Lo ov ~ F)(45 )ADDS. ~a Isavv ~ aaaaa val ~IJ I'acvvvLI avs LvesvATL ~I as sa 14 flat Ial ~ l\a Ct) IVT (f) eeaest Iae fess (Nant classis (41 oei4 ('llllas aaavahsavu Deals ~ astf aspv Avs Dlaveshf Ial ~ ls ~ l Iu fes Ivsal ~ I ~ I(e4k acaeaf fevac Iusaels cttattes ~ COLO((DC '1CCCOL ot Al aaavl at vvaases RI fo lahasv tfsssvc cpasvlt Fcl(C )AOSL ~ II~ I ~ 1 aeu M'Ile~ Ilssol ~ 4 'I Saavf ~ Dfa Cl thill Iaaaaa cllallt I~ leleIL Irma Delf (I) sett ~ 1st f I l ~ vetoes s4 L CN ~ ef vl Isof ~ loess Cupel aeVC CVT>> csaesaal 'sasf Dttaaatpvs rcel ash aattea lveaaf Sea Aaaaalal Auavf I O((A'1'LON I Iassaesal AID svvoaTvv aeeata>> ~ ava TS LACKOLCT STUDY vvavasvlppv 'ksvssfa (Llse ~ (al scca Dlslc aa Ivaoaalaoal Lv falaef tsllLL 1 Lvsasavaas cuva p'T isla ~ (valet 'NN>>a awava uaefltela vae Tt(N0CIL I N sls ~ eea a alas ~ lola slat caaaa as so assv1 ~ CSTTDI(T Cts(TCCC covg I~ seaeaea~p ~ MCI vacassl aa M casova aaa faasva Iaaaaoal aa S(vcsstsr TCCVISCS Ill(th la \I ssaIc '10 s(otc thoolrcc(LTIDN I\I II'lI ~ essa soa AL(tvv (Nasa cvpell us ant CSI vt Ivasaef Daeasavc vsaavsfvv ~ es Ca)ILA 4ssvel Iwsavf Daaassvs svaaasva taalaaalatva(4)I ~ vawf havsapv I I ls Vau. SVAVISII Iaa'at jl'las Tel lisps salsa, svesasavs caauhaalovl '4 ~ t tu as I It I I (4 'fftv 4 , C)CO((0 ( ~ spe ~ asatavlsov Dt ovva ca I eol ~ I A IT tate La DLTCDIIATF (L)4 tvao I tsCCCCS Toll)'T SCCUO 155 SO(OLDS)LS "'7 , Cela l tt (l)11 (s) I ~ (LNI Is') aa Cl) ID Cgao 4 NOO Os'Ht (AU I 0440 (41LCD I 114 CD cn4to INLCD naLID Isle to I ~ )I So cs)vso ' I Cll cs'5 l ~ 4114'Ll (Q Lste os LSL ao Ie' I JV Lsl OC L SS avv I e~ I (a)OII ( I~ 1 1 Destt I oastea ofeap sl ~ Italo vsoatt4 51 ~ ct 5'I'I 4 fell IVLCS cssst coTLS choco 44'TDI ~ 1000 Co'111 Dt D(D ~ .COTCI ~ aaoafoaf, Ifatf1 as at ot jot(DC ~ vf oon clef aaaaaao cvafaecaa ~A vl ataa foeavesoat aoaafof opec (ale) CAlcetf j(4 'Sall 01500 LS 400 Altos oecos rc TIT cv54 5 loses Ctfoh LITTD dc OCT DIDCS ~ Co.hes oaha' gales c(JIODD 'ao ~ sv) ft Us fo TIIA ~ OIDO 40>> 'rtt (A'100 (CID 1 Weto Ctrts r)DT ct At Cvas ~nt CDPL Csvg Colas rttp' 4 ~ CSIN CDIto heoc 0'IT reaa ol ~ cvt f1 OIC11 ct 111 Dct 10 als Sa htIDC ( SL) OC, (A') siss ~ sa ) atf ~ 4 ATIS raas ro sa ol ~ I is) ss Inta Wl ~ ' I illa CQTI Isl tilts (vseta Diva o)IL CA)st Ca)' ' CN a ~ toes Io) (a) so(sos (4 IS (441 I 'oot CALLS OAT CON (1) 1511 (s') cssoht) Il)LTSS 4155L5 (L)LITI INLS)S CAV i(stot(($ (Scot) (hl)401j hsst ' 4 ~ (5) 051 ~ (I) vsse SHILL 5)OD(( tlTNLC. )lltssc)S Illoh Scott INQICASC (St IDDrf, 4OCCOC() Z)CSCOD (el 1 htf (A110$ (1) CST ts tt 0'IIIDT S)TILL Cpaooa (to(ICITSD CA)SI) TUDINL 'cvTDULC'tvelfD evoo Dvr 14 tcotr evchfoc/ (A') Csl (A ISST I I SOUDDNS 141( S (5) CS (S H (5) IS (Sue (LlS5 (list raapvt It/N ar 'TDK DDTa CNST ~ pe 4 o woaveeo Aaataeos TSSUC (A)N L {A)II( (A)11 (A)51 caa hf" (II Dh ~ CalS (I) 0 CI)ss calls (n 1 1 (nso cs)hv Is) 5r llacef INTI (S)01 DS 100 ltsh 'T LFSKO SCTLDIILT TILTISLD ~ TD Dhrrort (a) 5 (tl O)C P) I NSTT TAL'or Lceasousc LDH 4 Iss 0 Cnlb caltv cuhc (lish ulth cllho Isll lts <<L1151 Isl los (I) tao cs115$ Csl 1 ss 'TOSKL ~r (A)1 IT> OcnI(IT) ~GE N LATCK Lstatass Lsao ~ Cvlt414 DD, DO'La La 4DCL (L)sh OSC ~ DS0 Svess t It C IDCICL (T osc(STANDIIC) CA'I uses. LCTDAL DID CIC ~ ot Kasssvass 'lofAL . ILLNL ADSINC KNI LAI'LIL b) I/4 Cl) Stet TVCD 0 I TIT CA 5 I DA, DDSL CVLNCC CONLTOL DCACS 5)CSICN ICL'ISCW Dr ISWCC ( J, (LC. C Cut Da e DSS ~ O'5 4 ~ ATCCCC C CNCA 111VC DCN 10 D.C. Cl)nns ~ (OS r DX ~ ') P SHEET NO.'I OF 3 '0 Lvvv av vtc csvsvLTANTTNIATC vcvscw 5 Tsctoct 1()SS ENGINEERING VIORK PLAN ro4 Too ~ ~ tverap Uacsvcfcsalte TOIC IICCLIICCD IADDS tscc Lvfolsashsv) taa Daeecsecv ~ 4 lvcwols 'To saaaLL Docs csecavvan 0 STATUS AS OF 30 NOV'84 NMP2 CHOC PLANt(ING DEPT. aa ~ ~ I sg sN Ml ~ ~ ~ ~ ~ ~ ~ ~ ~~ RM tg C~ 'A"t t ~,p wh$ ,y, c INK'% fib' ~u tti"'4> ~ li >. 'p h.q p l. g;e Pl 4 V C MONTHLY STATUS OF 1985 ENGINEERING WORK PLAN 1984 1965 1986 bSSC IUOT)() N JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR I' Alss CL)sl (L)CO (Qc'1 (1)t5 IQCO (Qlr Als ~ Il)at (Lla>> CLSTO CL'itl <Sit>> ($ 151 (\'iLL SQS 1 ($1>>1 T.DS 'I CAI sl It<it /A)sa wsl (sol (Alto (cll (A)ts (c)I AS T)L)LLT 01 ZD ~ CAT CA. ST EELS A)0 ()) C . ($ 15 (SII ($ ) 1~ (Slgo LC<<loi/LC IICV<lc' ll/Oa )I(cga<cali)co) (~ lit Sl (ICLS DATA Tsgat) 'I VCO Og)OILITTAL CI) ) (%) tl A)SD /O) AS AICO (%171 (L) gt (Q logo (1) It( (S') Itt dl SOS (Ql'SI (S 1$ 1 f)s <$ 0 O(t<CSDLC '10 7gCELCCT alt/ rtt CA)M A7) IN<1 ($ 1) CLVSSCTS ~ C SIOC DP SC<<CDOLC' (QA Cil 7 Alll (S) SO (TIES (LICD (1'I')7 CQSC IQIO>> Ia)ltt A)g'S't (S)ltl ()'sns ($)i'$1 A'II ) 0 CLLSC tlgat. CCCVICII) (A)I (sv) ff)s) ($ 71 TCSO(a Ca</OISQ) DIO P)si flats OILS rrococctscggr asvc oao qTTE ~ re Ovtcvacl (I<DO tt 5 SSIIC 0 I (LOLCC( osg 'Sli 1 a%hi ) <%aevi ( ~ 'l I/st v/ I sees% A u>>aso>>s/ anc wl4assas<V IIELOLVE ~ actl tac aloac gas ~ TA<vi1 awso ss ~ . aves>>at<oh% wlc<cnaosa gpss<Tata ~ 'To <<ate'1) 5/I VALVCS />>two I fsaVls . (Ill/i I gtlssg 2 UIC))ocaoc la'lt/la I<<tao<a/E<vpo s<<s a'<< ~ iu Isa<a Dion ca<its <WS ~ <14'I ~ I'os/n Shut  %<>>AT ~ Ca) Lh OCSSA)OCS u Lat %<A/so Ca<La~I I\)'I/la ns VAL u Vt s/1 ta>>A attila%a Vise% O>>il. Stot ~ aitwol SSSALSLW hei C)QCIC nso/1 soph Ivhv<<os Mw<<os svn Cail/sl IKLI<<gals><<tl aaa/s A'ihs ~ %% tsaitu% <<<<sass ov'1 %a >>L toa i<as%%a 1<<ta<T AL\te>>L< st%essa Io<<<<as<T ~ VALVCS r so) 11 lieve su<L'1 'aia ~ lass%/ p toss%op I\I I/aa I'ai )%%VI gtlol/V 0/I7/ 55 at<a ADA. 1st CD<<I<sac SLDC. '7/0 CC <CO($ VALVE s\ v uw'sha ss'I s/st ~ ~ SA ~ aaa asti< ~ /1 1\< A aa ' I>>a<A tulsa>> Aaa vavsvat oe<aatocs hl ~ ss ~ tsvt,aat,pvc,avc,4<co aoL Lls Tvato<<r 'OLOA T/0 Et u Of tk4TO CS ' AO ~ saa ta>>sAE'I Co>>sat>>tits<I 1/0 K I'oils I <tl ~ ts'1 ~ Stt <to<a AOS ~ I %ego A aacv egal Awe%La 7 Tt 0 ~ n< ~ M <>> 1<1% ~ I' IS S<a I ~ I ~ / Scion ~ TSO(s C %4>>O oaoaa Oh'tie>>a LVK a s ~ C)LCT OAT QQ Pouts >>AI\.east%A cu va ola/<1 sua<<stt list uta<< 7CASX SUL 7<ETC)L ~ h)la'1 fl) 1/IO 'oh aha. ~~ sstI ~ . O~O'1 0)CID (t)447 ~ s>>sotav go<as<< I '1I I le)sot) AS) t (S)st ~ sl I SCAL 7VATCO V/lail I Iso~ 'lliL <AWT. sot'Ll A<I 5 CSSV(ATC(C ~ %ass<< 'll'il(11 I/ao Tl(lr Qaa <<t s(h fel ~ sh Tog(DIQC ~ Aa \ ou (ai ~ sit ~ a<<loss TKvr (l<>><<aotse I gol sl/ ~ T '%/I ~ a 111 Tr(AS)tllQT Mal SWC CLODS. s 'i 'ati ~ M eaa ot 14 T SC CVICC tAME ~ <aoasgail <<va sais'<LA (altc/ ~ st<<<%<aha/atua aaeltoaslsa at>>a (ca saa <a>>la ava Casu%LIE <u<O/C ~ VEATCK 0(L IQV<<SeS ~ Cn>> CC>>%) (1)a/A I<I<I%V<< %Peso 0 S<aa<<%(vaeataoaVuht< ~ SI A<%<ICCL ~ CODS. taocvar.tao(rota caoiv vlsvl ALT>>a<VOL ( ~ 'll/IC 7 T' I I'l /s'C aavs'4/I\wc LVS ei ~ I ~ L Leos I (o) s/guar (11 IL/~ >>t/ I ov us o ~ uvsa ~ su<tao>>ac N 'ID a<<go>>cvoassavi/ Its<a o<settsu<r cv< ~ 4 OT. (f)7 ~ >>saa 0/ass<, Last Io vva ~ VSV I ~ ~ ~ ii a/co I \ I'A a<I Cl TW< IASV ~ oaoste eis ss Tia'Louis O'Sh/I ~ osu.awe<%sot< aoaae wva>>>>LP)st/so 1>> VALVC 'DODV Cog(C 05)0 IL <sight tsl <<ate sau>>A ~ usa ~ <<%A< plast< g>> Aa'Wl <<%<L<<4L Ctl ss/ ~ uveoaE ~ <4w\%4/ jsaaaasao ts>>w <I I /' 5 I I CCTCEIC (Allo<~ waa os<<A<Os<< 1<14< <<auSSSS >LTKS. ao Tusta' Sa I%i u/I I /e. ~ C TV<<l0 C 1 s f1l a/s ~ ACT))ATOE CAI ~ Iu avalgslsl/1 0) I/I~ los% os<<'h (%1<< /n ~aDS. I ass aa e<<A As<< ss usa n s/I u<<uh I Dsw'll 0 l </I ~ 1 gaaao Aa sva<<as avv uae I' CCO AI li fsiao A)no C'Qno CQ CAT ($)tss I117%0 a P< ~ gu CT fa)71 Io)AT (a)at 'f$ 05 Cal sit CPS IQO fQtl CS)AT (SICC CS)05 A'I<05 It)<1$ CQI$ 5 tQC'15 gagi 5 <%1515 <QSSO (~ I ~ ff) Cs fa s A<sf)()E)0 0(((S (110 (1 II (c) s. (C) C ($ 1'5 (Clt f L'lI< (11<5 (Qto Q 0 Sita 0<CO (Df S'(STCIE) lo fA'I 15 Sgtf 0 CT AID A) tOO C)l 100 ($ )it40 SKSC4CWET Qsg CS) AOO A)ECO (\)SODO A)IAOO (DSCOO (S)SSOO CS)COOO (S)C(40 (S)ttoo I, (ICCS LLLO() o, rtoaCSL) IAI<15 cu nt ~ I ~ I r()STOAT los( (S 0 (Q I A)S (S)5 A) 0 OQ<1 Alla (Q<7 At tD Altt /Og /CT SLS I girt To)TTIICLC (7) 0 (L') ES (Slat l (STEAa)T SIOCL CLVO fo) 7 (S)1>> ('S)50 (QI 0 (S)01 CSI IOO fQ ISO ftl<') ~ fal<5< (O'I Il 7 (S) <70 ($1 1oa V AS VCAOIU(01) LEGEND gal 0/ls (a) v/)0 I~ so/t ~ <<M last.unu 1 I I I/ 1<CCIECC Isfg(T <Asi ~ >>s s<<s<<ai sow aoo/av 4- C ~ tsuwaas<<T ( ~ I es ~ ~ Oslo ia10 y 'EAL))atioa ~ 4 111 ~ ~ *1 <<st ~ ash>> qua<to A'ILA (a<O CQ<>> ffi Cssu.<ava ~ CML ~ CILIAL ~ >> co<ac<Ala I OI tsi. CAT Jt OVCO CAT 1 LA(( IC %<AC)CD 4 5) Q <ao svs au <<su us>>a/lsgv> ~ ~ <~ I ~ Co aus>>a I s )CODD%4(e ~ <<tsw ssv>> I su <<ps I C>>u~~( 'w oa SHEET NQ2 OF 3 tv ))i Al 7 TS Q ~ ~ ~ ~ >>K <<<<S AOW s ss eo <<oa ~ u ' i ~ CCSOU)7 QQS I 0 19SS ENGINEERING WORK PLAN P CI d o>>AA. Lha I ~ aust IA ~ sw I>> I t<<wss ~ c STATUS AS OF 3D NDV'84 NMP2 CHOC PLANNING DEPT. I; QQ Q ~I aw ~ ~ ~ ~ ~ ms am I~ r~~, E ~ k , Ih <<8 la v~ ~ % 4 \tv ma m m &w sa m m m aa .m m m m aa m tc Lt s MONTHLY STATUS QF 1985 ENGINEERING WORK PLAN 5984 1985 1986 JUN JUL AUG SEP OCT NOV OEC JAN FEB MAR APR MAY JUN JUL AUG SEP OC NOV DEC JAN FE B MAR DTSCR')rl)ON w ~ svss Isa ~ s ~ ~s ~,s so, 4 I ~ ~ N r sear rs ~ sails Trsssrt Ll Isvws swat Nstv ~ Lea It av ILL Is gsn sti ~ AF'sooA I Ia\ te II ~ otclii f'4 evrla ~ sos 4 ~ ~ I~ oe erosive LNVHLra 0 4(551 A sisgla Arsltpas wwvv ~ stAI g 4t oavna ooo Plot,c \I. gast ~ ss I CO Sri f1>T LIC 4~ ~ ~~ v ~ v ~ 1st \ vs er ~ wp ~ \ ~ ~ 4 ~4 ea c (al s~ t ~ I Doeeoa ASNVA <<Svo ~ W I~ I Mat I f ~ s vl 4 VNL oarlvaac 41 tasvi ~ svaeovla leis aoo 4 ~ vooov's'n I sgs ~ saic eeoc I'ss sir CV ail ~ ~ 'vr ML m (s I 1st f I hst ~ e gas 4 s I ~ aisata 0 s oeveaeav 'I ~ Nisacl Livitel Naos,rh 1 Vol(l 5>>esse({<<svc, ID clatR(rilit scoots)ICA)isic rasss DSCITAL a ~ s D s i sir as Nos'ls ~ ~ ~ ~ i I 4 soon\ Aoovvonaas1ORLLOIVI ()pcu Dsscsincessasaisi tg ~ et lvv gas aiot I wl ooslti '10 onsf Tsss svsltw, RA 5l ATIOsl ~ I st sat rsracvsan tva tevl erat css cngavsa'Hi ~ I IAOLATosllu4 4 I DOT cs)sss (s)stv (s)ss'5 (Slits (5) l54 (5's lao 0 sl1' Lg o luis (A>I'51 CAII44 {assai Caa)5(sal) {IVSLS(roD CAaoifcsot> 4 CONTROL g)s 5 ~ C.illa cs) 5$ (1) 5 ~ (S) 5t (S) 51 (1'I VS (Sl CS ~ Auel DLLI'Ve 4 th PL)I P 111 I AILI (A151 {AI)o (55) (4)'55 ($ 51 (als1 cst) (tl 1S Ol st (Sltf (11'IS {014 ~ {1155 (Silo 5 (f)55 (Slat (f)LI (Ill (1'l 1I 0 IS)tp (fl)S (g)T) CONTROL rauci. ) I N(tssf I(AC IONS Call ~ I*'IfLs (4'It'I CA))0 (alas (41 5'I (as(SS SIRC DLTC{710eg Clsto ( ~ I I) (4 1 to (f )tl r AL>CL De 1.'s'V '4 Tile'5 IV1 ga'I so calli 4)st (as 10 CLO so (4)l t) I t NILC IVS(04(o Iuto,aoo (Sitllpo (S)teoop (5 tie)00 s TCoufluc (ACT IVC'I Lasto ~ Ol Co(ROD {Al (0154 (4) tlt50 (A),tl+TS 4 CATLCL rulL IS) IOstt I Il0~ ('0 (Dtr.t{O (11'll(00 CS)leooo ($ )41100 'T)CKCTS (AC'tlVS) IA)(0 Dos (Ai(0,144 {alto 1) ~ (ARL loo tatsj 555 Ig f R)so 'lo sls')ST ())IT(v lsltoso (')its)5 ls) l)00 LossooO (1) tos.o (1) tso (1) 400 sr Lou DIAT5 a)s))I Ca>sligo (Al Ioal <Allo)t (41 IIOO CA'I t150 {4~ ttOO cas saa LOS tD ~ aesvav ~ cava rvna COWll t CAT. 5 t uct4c DLLT 'tAACD4(o SII4AL IOA)S (51 sa (1141 I1'ill fii11 fists (5)LS (S)TI (S>OS (S)T ~ ())IOS (S)ssl (5)ut (1) St) (5 I 5 0 VLICLT)(A)LOtg IA III I A 1 s sr I"1(D IAI>s {4>)aou (4)ot (44) (A)LT (41) lti tis coasts LLLO ~ Ilsv 0~ ssgse 4\L tvaasa svs wv LL~ I Iss lrDMoar oe ~ vus gu en ~ Nssv alL vsta Ivor ~ Lutose ~ I tvsv 't ILOCSsaa sgl Aea Lssvvi 14os . SLATS ( ~ 'I si ~ aaN Lssaa wsa 441 wasLsa\v bat I11 ~ i'lo ~ VCRtS(A)5114 Ia'I Stir VP I)R Dtlltguc) ~ Lgoaroaae cgvsaa\Nsvt ~ 11 gosvis I Nassvevsovs oa gas.l rsasroaeol asst 'Lvss ~ sva! n (Cg 0 (5) 0 (ss 0 (s)ID Alto (seto cs'I)to gsl4to cis ~ 10 Is'ssco (ssssD I DC I v 4 Ice I== =Alta stofo,s.c>>.ulv (Alo 'tcr.so to (A)so (OO I (LIogt h)140 hlo40 hl ~ 1P Iaatlp (14 sa gsvao CuttO DODD. tavasv Avotstlfals ~ sow sasaas)T ~ ao cv<<~4 ¹ owv/s csl\sslso ~ risers test Io ( ~ Issi ~ la I Issi saswv at Cas 50 cwvs t rc 4550(ILS) (Alltl {ttO) u tl'DA 1{Ala OAS{00') ~ 14 Lis I>> S Ntu ~ eovol ~ St/ia a ttoLuauls O laoueoRD4c asI ass f~ st Lvaewv gen av tsNI Cal Sli ~ S l TVOST.RS (S>{R(gg 'Llue CARLING ~ 4 ail al ~ t \svaot oat 0 1sii IVIAL'I4 IS hs vs r aoassoa - Dva ~ vs Ctl aiil avaoas{ ~isas ILSonr Ll.AK Matc ctaiva ovs oo la{les ~ Ivs Lsa.to 4 ac\p ovst II e L 4 Vosv DettCT) 0 1) N CI) Lgrf (1) i ~ 1144 I swvaa' IILTou ' el ia4 CASLVI (Llaitr {1)SOie (1 ~ i saiaa aNtc LLL caoi Data eaaa var stavvslavvoH I

2) 0 0 ses (isla n rico ssov Nos vsse ~s vvivsvaw evT A

I I calais (1st Deva eecaaac Acvsssv 'T I 2 Nels\silos aat tasVIL ge lan (Lloilr I\)S'1 el J 4 1 I%II Lpssv a I ~ Lc giloiro (DILLIAtslsvs ALL east soot, Lest easoigo ooowcs ~ LLLT plslisf NS'5'5 Iisois ~ 44 Avvl I\I~ I ~ s ratsNLHH Lsasa. 1)stir (euott tst A) ( ~ 'lai ~ vs ~ scs s Ltasosae Decisis ploroaaa (t)tis ~ loe ~ vasvll Loot ~ ItaL ~ Lsa gassaov 51\Vv ei'll ~ air 4a1 vi IAP 'I oisila (Viols ~ ~ \ls ~ Lt IHa Noa ~ Aa 4(eros 1II ~ i1s 'Dot 104, (llsfl (llss') (1)1 55 ISlel,o (S)(O'5 (4) (1)tao (1)l'>S Il')504 CLI SIP (Sl Sff llfARDussau) Ll AtlN IT ILS (ass tv ( ~ I sos ( ~ >Is) lassos (oivl Iia5) cavu (I'1$) (astca ((151 40 45 ~ rts (11 11 (5) IS I Lit I (51( I (1) tt (5) (1)54 (5) 5 ~ (5) 5 5 CS)SD (Sl SS h) 51 (4>V (Ai1 0 ) 15 calls Ias rl (41 I'I (A)I 45 sa SWCC h)5 (1'll (5'so colls (5)st'sits (s) t. CS) 5 I ls) ' co'154 (s) 54 h)ss cslso {Sl 1 rase W g setto RT 5 (AI5 (ia 4 Cal 4 (41 so (As 15 (A) It (A) 10 e E J>tvcces ~ . hits -(s)to 4 fi'lta cssTS'(o)s'7 '(s'115 (5)l S~ (S) '54 IS'1545 (SISS'1 CSlttS IS)C 'll C)etta gi'I 1 ~ 0 CVAllt(LD Lttasva Live Dc Atr)R)5 (AI~ I ~ I IS IA))~ cas St (A') 50 (41 agecoost01 g)s)T cssaS IS)54 fL)'I~ gssot huv DfCC s ~ {SVICLI 4 VODATC Sara I CAILS (41 os (e,lao J as ca'I (41 41 (Al {aS tCaa cvn Acsvsa cvn Aglvai ts CS) t'5 (1) ts (O'I Ss os Lciaorssa 4 I Ol 4'1 Tla(4ussL s I 4 utfoRA)avC A) ll (altS CAS I~ CA'Itt I I) 2 VCNDOII, SLS(a CSS51>> {51504 CSV I ~ Ia)s ' ~ IS)L1\ (SIS 00 0 DOCO PLS)IT R i 1(LV1%'Ill (4)'Sfl (A154C (4'I S15 LA)554 fal V)t 0) 051 (AI ts'E. SQRT rf{¹RA)IL(ACT)VITTL'\CES)DT ~ I ~ 144 lsSVI fio Pie) ~ LOOTL Siss ig ~ neogeaaevagevno rvor sLOuso TSD I'li ~ atl)A lo eel ever uctus loao D'tfsuslsou ~ 5 oi>I rsR(T J r I Ioo, A(ssvslt Dtsctspssou Qs AI H I~ ssi/I (s oe via so aapane ~ illais ~ hlagt svaN 0 is+ astir aaa lovts ~ sf J Qt CL>A)I(I(atlou Rttw)uo)R)u LI ~ SHEET NO.3 OF 3 f n n <0 2)ICSCL uS) lr sctNT ~ s ~ lo ive ge eve ~ ao,toswos ~ Otssteot saasl ~ SSSSS Lsvstoal 14'sa LL~ rla Dias ctvvas D vrn ss ~ I ~, lgai lao rNVVSVr S L.etaaag avsseow Assets Ha ~ eaton I pi ~ ( 4 4LD'1) >o QS Qa DI4kft Docusstutallou A504>LLIOL(LT)os PLANS )985 ENG)NEERING WOR>I PLAN v CSNCRRSIC (LS Vr ~ I ~S Vis gas I~ I it Dotuvseul LTLON 57(fe 5 fg(55)(t UC%5DRC (Dtr(OS(DR 4 cr caor rosa opcoatsova ccvtf ~ I I STATUS AS OF 3O NOV'84 NMP2 CHOC PLANNING DEPT. CQ r m m m m m m m m m m w am &m m m w m aw I1 O'- I g g I

  • I-

/ )t ~I rg WORKFORCE LEVELS The Site Staffing is shown on the following table and presented on a weekly basi s on addi tional tabl es. The SWEC non-manual staf fi ng, regardless of location, is also presented. 34 DECEMBER SITE AVERAGE STAFFING (PAYROLL) t 1ANUAL NON-MANUAL TOTAL COST REIMBURSABLE P A P A P A SWEC 1516 2161 1020 1053 2536 3214 Walsn 382 129 37 15 419 144 LKComstock 731 740 100 99 831 839 ITT Grinnell 949 990 307 439 1256 1429 SMS 83 0 5 0 88 0 JCI 306 . 312 110 126 '416 438 Schneider 150 151 19 19 169 170 Painting 120 0 10 0 130 0 Subtotal 4237 4483 1608 1751 5845 6234 Hard Money Al 1 186 46 232 GE/NSSS 72 72 NMPC 633 633 TOTAL 4669 2502 7171 Note: (1) Excludes CHOC paid site assigned personnel. (2) NMPC includes MAC, NYSEG, RG5E and Central Hudson. 35 )Mn f cv'r ManuaL Manpaner I Po I'a I'ral (rung'Ja ~e>>r'arAH>> O<<NOL1 fr fg 8'$5% F >$ roll onB u sr t>> g j,oo 2A 2ooo Lloo So@ o Ct OO ~+ MOO I L5OO L'ILL I'I L%o iL'A L s l'fOO P q Lo I'Lafa I 800 VJl 7OO Pl QCO 5'OO CYCLO 'ILC Boo I 2CLO $ L%L I.CO Nl. l~ BT I 25 IPPW ll00 Loaf IPPP IPB4 IOOO IP55 lo5$ P2o BOO ~ ~ TOO S2I I" Pol BP3 S 528 8H ?45 2%'3$ + 1+ ~'L1 300 PCLO E IPB I oo llo IIO IOO IPO BB PB loo IS IPT IPB III log Ill [OIL 0 O 0 9OO C4L fN IH A9 t42 gyp ~ ianna $5) Ioo 0 I55 IS~ lfl ey I55 I5B I52 I55 I55 I55 I55 I I54 I33 IBX I4g I+2 I42 I@ ~ LNo I E'1 Lg I '5aLCP LSI. I'5 zo2 UL L'Lg L'L1 LaLt, L'L't ajaoo 15I XBP A7 '244 XN glg clP~jIOO saaavnaa >>satanas oa 47f3 473'5IO 44 4434 44~ L

> Var>>oatra Jdl/ 36 Nonrnanual Man Outer JC Null ) may jUn8 JU g QLfg, 98 'ace. dec. 4/so v/sr o ef </v Ql IO P/17 g I O/g$ C S 7 7+ 4/o 0/I7 f550 I SOP II55 n50 f200 ~u 1193 IC3$ ICW II5 117 11+ 1L II <5( ll50 Ilk'~f4 Ifn t~ IICO IIPO IO50 1011 l~ l09t f000 050 l50 IOO 50 4l 41 It ~ Ao ~ 40 40 I Co I 0 40 4o 'LG '4 HOP 850 500 - 475 4CI 455 45I I 444 451 45l 450 44I ~ W 1 4'": . >50 41 300 ~ A NO NO I50 IO IOT IOO toe foi IH IO5 IP5 l07 IPS OP IPO 50 5< too IOI fg IP5 55 III IOO cf 50 0 5 5 5 5 5 8 s 5 555 59'5 855 44 In RO O' f50 IOI fPI f04 17.3 L7C IPX IPI gg 4l 5I 94 ~Q IOO 35 32. OC IOg lol IOX, LL) 5P to I50 IOO 50 Xl CO

17. 15 l5 n IG <I 14 11 Ib 0 2I Al l50 II4 II5 IIX 117 I OP III IIV Ia ~to ~

IIS a 50 I kf 43 5500 5000 NOO 5XO 2ooz f993 <d37 N +5 W5 nu'4XS 'L5$ f500 gg IAI5 l555 8'I7 l9l9 IO r f595 e I~~ IOOO 7/C5~ 1/SO OVI%&hfArlAYA'07 AVAICASCO' +'Pig/jVSt/g 'Fdt I)/CCCIPEu (DAMN'4 7/S/Sg)~ N WWW @~gym ~ gg. gr g OaCy (sr~zP 6-a Py) O CXCCCIPC$ BC4 CIIIOC 37 December 16, 1984 SWEC STAFF I NG REPORT Page 1 of 2 CHOC LOCATED SITE LOCATED TOTAL Department ~Oen F i I I ed Tota I Open Fi I I ed Total Open Filled Total MANAGEMENT 0 15 15 17 17 PROJECT CONTROLS 16 16 56 64 72 80 Planning 10 10 37 43 47 53 Hanagement Systems 4 4 4 4 Cost 15 17 21 CO Pl SITE ENGINEERING 32 485 517 32 485 517 ADVISORY OPERATIONS 34 35 10 136 146 170 181 PGCC Startup 6 Test 34 35 8>>4 2 22 24 122 22 148 24 157 PROJECT ENGINEERING 24 464 488 24 464 488 CONSTRUCTION 32 218 250 32 218 250 CCCP 0 7 7 0 7 7 Safety 0 10 10 0 10 10 System Turnover 6 40 46 6 40 46 Construction Groups 26 161 187 26 161 187 December 16, 1984 SWEC STAFFING REPORT Page 2 of 2 CHOC LOCATED SITE LOCATED TOTAL Department Open Filled Total Open Filled Total Open F i I I ed Tota I ADMINISTRATIVE SERVICES 55 57 16 252 268 18 307 325 Project Administration 0 1 1 Office Services 0 7 7 0 7 7 Project Records Admin. 1 3 2 14 16 4 15 19 Document Control 32 32 10 153 163 10 185 195 Information Systems 21 21 3 23 26 3 44 47 Accounting 0 25 25 0 25 25 Time Office 1 15 16 1 15 16 First Aid o 8 8 o 8 8 Training 0 7 7 0 7 7 CONTRACTS 8 MATERIALS 6O 63 65 68 Contracts 9 10 9 10 Materials 23 23 23 23 Purchasing 12 12 16 16 Expediting 16 18 17 19 QA/QC 0 25 282 307 25 286 311 QA 3 24 27 3 28 31 QC 22 258 28O 22 258 28O LABOR RELATIONS/PERSONNEL GRAND TOTAL 27 580 6O7 127 1511 1638 154 2091 2245 SWEC ENGINEERING AND DESIGN PERSONNEL (SEG + CHOC) PLANNED ACTUAL VARIANCE DECEMBER 876 8/6 1500 1400 1300 +1200 zw 1100 ~1000 zO 900 ~ 800 o 700 ~ 600 I ~ 500 + 400 300 200 100 JFMAM J JASOND J F MAM J JASOND JFMAM J JASO 1984 1985 1986 ~ o- -m KEY PLANNED 0 ACTIIAL C,G, MODEL: NMBFGRPH06 40 SWEC ENGINEERING AND DESIGN MANHOURS (SEG + CHOC) PLANNED ACTUAL VARIANCE DECEMBER 146,909 146,709 (x1,000,000) CUMULATIVE 12,507,302 12,493,253 t14,049) 14.0 13.8 13.6 13.4

13. 2 4J

'3.0 12,8 12.6 D 12 4~ O

12. 2 M

12.0 Q 11.8 11.6 11.4 11.2

11. 0 10.8 10 '

10.4 JFMAMJ JASONO JFMAMJ JASONOJFMAMJ JASO 1984 1985 1986 NOTE: 4 DECEMBER ACTUALS PROJECTED. C.G. MODEL: NMBFGRPH12 ~ o-- ~ KEY PLANNED s ACTUAL i V I. QUALITY ASSURANCE A. QA-Projects Activities Detailed Assessments Actions to be completed by the contractors, as a result of the detailed assessments, are scheduled for completion by the first quarter of 1985. Surveillance The review of In-Place safety related items, materials, components, etc., that had been accepted by the Contractors QC organizations has been completed by NMPC QA Projects. The data collected from this reveiw is summarized by commodity, contractor, and generalization of deficiencies on Attachment 81. Per NMPC direction, SWEC has completed their evaluation of ITT Grinnell installed Large Bore Pipe Supports. The results of SWEC's findings are contained in Attachment t2. The results of the NMPC surveillance and SWEC's evaluation of ITT Large Bore Pipe Supports have been forwarded to Project Engineering to determine if- any reinspection is required and if so, what inspection attributes are applicable. In addition to the above, 100 instrumentation supports previously accepted by JCI Quality Control are to be evaluated by SWEC. Further Actions are pending an Engineering evaluation of the data gathered. Another 112 surveillances were performed by NMPC QA-Projects from November 20 to December 19, 1984, i'nvolvi ng approximately 1200 attributes from approved checklists. From these surveillance activities the following number of deficiencies/discrepancies were identified: HARDWARE SOFTWARE SWEC 17 ITT Grinnel 1 6 JCI 2 RCI 0 All of the above deficiencies/discrepancies have been properly identified and are being resolved. In addition to the above, Eight Corrective Action Requests (CARs) were issued as follows: HARDWARE SOFTWARE SWEC ITT Grinnell JCI RCI 42 l}uality Trendin Of the two remaining Suspected Trend Investigation Reports (STIRS), one has been closed, and no corrective action was required. The other STIR is still being investigated. The next quality trend report will be issued in January 1985. NRC RELATED ACTIVITIES NMPC 8 SWEC have completed the review of ITT Grinnell 's plan for performing the film compari sons to determine the extent of the "Duplication of Radiographs" problem. Comments that were generated have been resolved and ITT Grinnell is to revise the plans and resubmit it for approval. Mr. R. A. Gramm introduced a new Resident Inspector on site - Mr. R. M. Wheeler. Mr. Gramm and Mr. Wheeler are in the process of performing inspection period 84-19. To date, 6 inspector follow-up items have been identified. These 6 items are presently being pursued by NMPC and SWEC for closure, prior to the NRC exit. NRC Resident Inspector held a formal exit meeting on 11/7 for inspection period 84-15.

  • Results: 5 Unresolved Items 3 Open Items
  • All results are unofficial. Inspection Report 84-15 has not yet been formally issued.

43 NRC Open Items, Unresolved Items and Notices of Violations, that remained open as of September 20, are statused below: Additional Action Final On NRC Item Required Review Hold ~Reviewin Total Open: 6 2 5 16 Unresolved: 13 27 12 10 62 Violations: 15 4 30 TOTAL 108 1- NRC Open Item, Unresolved Item, or Notice of Violation ~ 2- Additional action required within NMPC or contractor prior to final review and verification by QA (i.e. more documentation required, additional calculations to be performed, etc.) 3- The package for the item is completed and is being reviewed for adequacy and completeness prior to submittal to the NRC. 4- Items which parallel or are identical to items presently identified in the CAT inspection and require further resolution prior to submittal. 5- Items which have been completed and have been forwarded to the NRC for review and approval for closure of the item. Audits Special Audit SP-VR-NZ-84009 to comply with the commitment made to the NRC in G.K. Rhode's letter dated June 30, 1983, which was in response to an NRC Notice of Violation. In summary, NMPC committed to assure that only certified QC personnel (ANSI N45.2.6) would be "Final Accepting" items and not personnel in training. The audit revealed that the inspection activities being performed by SWEC and their Contractors (ITT-G, RCI and JCI) are being performed only by Certified Personnel. Audit RG-VR-N2-84010 was performed at SWEC in Boston for activities in support of the NMP-2 Project. The audit specifically addressed the conformance of QA, FQC, PQC, NDT and QACA Divisions for compliance to the SWEC NMP2 QA Program and the commitments in the Regulatory Licensing document (SAR). The audit was conducted during the week of 9 December, 1984, and resulted in the issuance of three (3) AFR for minor deficiencies. Audit RG-VR-N2-84011 presently in process (Dec. 17-21, 1984). The Audit Scope includes those activities being performed by ITT Gri nnell and Stone 8 Webster on a pre-selected large bore piping and hanger installation effort (Hardware Audit) to verify that all work effort is in compliance with the applicable requirements and the QA programs. ~eh~ 1 ~ NO. OF ITEMS PIPE HANGERS/ 50 LOOSE LOCKING NNPC HAS DIRECTED SWEC TO PERFORM SUPPORTS DEVICES A RE INSPECT ION OF 125 ADD I T I ONAL WELDING HANGERS/SUPPORTS. INSTRUMENT 30 WELDING NNPC HAS DIRECTED THAT A RE-TUBING INSPECTION OF 100 SUPPORTS BE SUPPORTS PERFORMED BY JCI AND THAT 20 OF THE 100 SUPPORTS BE REINSPECTED BY SWEC. HVAC HANGERS/ CONFIGURATION NNPC HAS DIRECTED SWEC TO PERFORM A SUPPORTS MELDING REINSPECTION OF 50 HANGERS/SUPPORTS. FIELD RACENAY 319 LACK OF HARDENED UNDER EVALUATION. HANGERS/SUPPORTS WASHERS INADEQUATE STOR-AGE 8, NAINTEN-ANCE NO, OF ITEMS CABLE TRAY 106 LACK OF IDENT I- UNDER EVALUATION. F I CAT ION. INADEQUATE STOR-STORAGE 8 MAIN-TENANCE CONDUIT 189 DAMAGED IDENTI- UNDER EVALUATION. FICATION NUMBERS. INADEQUATE STORAGE AND MAINTENANCE ELECTRICAL 43 DAMAGED 8 MISSING AS A RESULT OF THE NRC VIO-EQUIPMENT PARTS 8 COMPO- 'LATION, NNPC HAS ALREADY DIRECTED NENTS SWEC TO'PERFORM A REINSPECTION. INADEQUATE IDEN- A SAMPLE REINSPECTION IS IN TIFICATION OF PROCESS. COMPONENTS INADEQUATE TORQUE OF BOlTED HARD-WARE INADEQUATE STOR-AGE 8 MAINTENANCE M M M M M M M M M M M M M M M M M M NO. OF ITEMS STRUCTURAL STEEL 80 .MEMBERS MELDING UNDER EVALUATION. 120 CONNEC- IMPROPER COPES TIONS LOOSE BOLTS INADEQUATE IDEN-TIFICATION OF BOI TING HARDWARE UNAPPROVED COAT-ING IN FRICTION CONNECT IONS CONCRETE EXPANSION 00 VIOLATION OF UNDER EVALUATION. ANCHORS DISTANCES FROM C OF ANCHOR TO EDGE OF CONCRETE OF DIS-'IOLATION TANCES FROM C TO C OF ANCHORS. /0330Y Attachment 2

SUMMARY

Approximately 1000 field welds and 1250 inspection attributes were in-cluded in 125 supports sampled by SWEC. The following is a summary of the 125 supports inspected and concerns identified:

FOR ATTACHMENT "B" SUPPTS/WELDS SUPPTS AFFECTED TOTAL WELDS INSPECTED WELD CONCERN 125/1000 approx. 32 ~ ~ ~

383 61 FOR ATTACHMENT "C" NO. OF ATTRI. ASSOCIATED SUP PTS/ATTRI SUPPTS AFFECTED TOTAL ATTRI WITH HARDWARE CONCERNS 125/1250 approx. 454 565 45

  • Six (6) supports included in total of 45 are also li'sted on Attachment B due "to welding concerns.

48

V II . CONTRACT ADMINISTRATION A. Major Contract Issues

1. GE Spare Parts Excess Inventory Sale - NSSS Every effort is being made to ensure that maximum advantage is taken of a 35 -'0K discount. offer on an inventory of start-up, test, and operational spare parts. This proposal from GE remains valid until December 31, 1984.
2. PBOOA - GE NSSS Contract - Cost Allocation The research initiated in November to characterize the technical nature of PGCC FDDRs as well as to determine the respective cost responsi bil i ti es was compl eted duri ng December. The i nf ormati on gained from thi s study was used as the foundation for a final settlement meeting with General Electric during the week of December 10, 1984. Deductions from GE's monthly PGCC invoices continue to be made.

B. Materials Management

l. Valve List Review In conjunction with engineering," materials management is conducting a review of the valve shortage and excess list. The primary objective of this effort is to identify potential substitute materials and thus reduce the need to place additional valve orders.
2. Inventory Trackin Data is currently being entered into the computerized inventory tracking/materials management system. A major feature of this system is,its ability to reserve material and identify shortages by BIP or work package. This system is cur rently being used to track spare parts and standard stock items. It is anticipated that the system will be fully operational by January 7, 1985.
3. Productivity Im rovement After careful review of its operations, materi als management has

'dentified several activities which can be made more productive.

Listed below are the areas of concern in which materials management has initiated constructive change.

Combine small bore inventory under SWEC control Realign laydown areas for greater effective control Improve tool control process Improve measurement and test equipment control Improve material control response time and enhance inventory management Materials Management will monitor the effectiveness of these changes. The results of the effort which began during December will be seen and reported in subsequent months.

49

C. ~ECh

1. BALANCE OF PLANT (BOP):

The total number of active CHOC purchase orders for permanent. plant equipment is now si xty-nine (69) with del i veri es projected through August 30, 1985. The material on these orders represent a total of 1,845 items which are not delivered (not including hanger material, cable, or equipment procured under P800A/NSSS spare parts) that are required fo'r completion of the plant.

50

VI I I. STARTUP AND TEST A. General The procedures which set policy for the Startup 5 Test Program are the Startup Administrative Procedures (SAP). These procedures have been approved by the Joint Test Group (JTG), and their implementation will streamline the program.

B. Release for Testin Status Of the 106 subBIP 'A'eleases scheduled as of December 17, 1984, 94 have been accepted for Preliminary Testing. There are ll additional subBIP 'A'eleases which have been accepted as early releases.

There are 12 subBIP 'A'eleases overdue per the Project Schedule issued October 15, 1984 with Revision gl. (See Attachments 1 and 2)

C. Preliminary Test Status Preliminary testing continues with emphasis on systems supporting Integrated Flush. Other systems in testing at this time are Service Water, Instrument Air, Turbine Building Closed Loop Cooling, Makeup Water, Control Rod Drive Hydraulics, Turbine Generator Lube Oil System, and permanent plant electrical unit heaters. Electrical Systems and the Annunciator 8 Computer testing is being prioritized to support the Star tup schedule. The suppression. pool is in the process of bei ng filled to support ECCS pump runs and integrated flush.

D. Turnover 'Status P

Project Records Management has the schedul e of system turnovers to support devel opment of a required records li st and inclusion of outstanding documentation on the Installation Completion Report (ICR) to suppor t the turnover process.

E. Preop/Acce tance Testin Status Startup and Test is preparing to begin an Acceptance Test for System 15 - Makeup Water Treating by January, 1985. The system turnover plan is shown on Attachment 3.

F. Major Problems

1. =Materials and S are Parts: An evaluation of the present Matena s an pare arts rogram is in process. The initial problems identified are being addressed and resolutions are in progress (i.e. completing an inventory of the warehouse and feedback is being provided to user organizations). The Controlling Procedure (PG-35) has been revised to streamline the efforts.
2. Release of Systems From Construction: Startup and Test is wor i ng w~ t urnover o accept re eases which are designated priori ty for testing. The releases are behind schedule due to incomplete construction, procedural and programmatic problems.

51

3. Systemic Sof tware: Current Permanent Pl ant File contents in icate a nee to increase the emphasi s and activities for software processing to be completed to support system turnover.

A major effort remains underway by Records Management to define the records required for turnover. (See Section X).

4. Project Schedule Integration: =An Integrated Startup/Project Plan has been eve oped and i ssued to the Project for information.

Meetings are being held to coordinate and bring the various Project schedules and contractors into line with the Startup/Project Schedule. The Project is shi fting to a System Completion mode to support plant completion and Startup. Startup has started a Plan of the Meek to coordinate the testing to support the Startup/Project Schedule.

G. Fuel Status

1. Enriched uranium has been delivered to G.E.
2. G. E. currently fabricating the bundles; scheduled to complete by May, 1985.
3. NMPC currently evaluating storage requirements prior to shipment to Site. 1 52

Attachment 81 SubBIP 'A', Releases Released Early Total Scheduled IAW Schedule Release Releases Accepted

, 106 94 105 Late Per Schedule: 12 Flush Path Releases Released Early Total Scheduled IAW Scheduled Release Releases Accepted 65 60 Late Per Schedule: 12

'B'omponent Releases Early Releases  % Completed Schedule Accepted Testing N/A 234 85%

53

PLAN VS ACTUAL CONSTRUCTION A RELEASE TO STARTUP

'400 350 300 2SO 200 150 0

100 50 SEPT 84 DEC 84 MAR 85 JUN 85 SEPT 85 DEC 85

+ ACTUAL 54

HTAGARA NOHATTK PO'HER CORPORAT10H H1HE'ILE P01HT UHl T 2 HUNBER OF SYSTEN TURHOVERS PER NOHTH TOTAL TOTAL 144 144 o

128 128 X: K I

Ch 112 112 96 96 80 80 64 64 48 48 16 16 SYSTEH TVRHOVERS STSTEH TVRROVERS TOTAL r STARTS ORTC SCH STARTS ES CVH I STARTS CVRR SCH STARTS ES CVH 55

IX. COST A. Cash Flow Summary Approximately $ 2,656 million* has been charged on the total Project to date. (See Attachment 1)

See Attachment 2 for the cost commitment status report with expended cost through November.

As of December 16, approximately $ 674.7 million had been expended in 1984 versus $ 675.0 million forecasted for an underrun of .3 million.

Approximately $ 48.1 million was expended in December versus $ 41.6 million planned.

B. December Cash Flow Variance Analysis Variance Remarks SWEC (Manual 8 $ 3.0 million over SWEC Labor Forces have taken over Non-Manual) & Walsh the forecasted Painting effort, (Manual 8 Non-Manual) the remaining Temporary Electric Including: Painting effort (SMS), and a portion of Temp. Electric Walsh's effort. The overall Wal sh Takeover effect of this takeover has been an approximate 100,000 MH overrun in Manual Manhours, and an over-run in Non-Manual manhours of approximately 11,000 MH.

Grinnel 1 $ 2.4 million over Non-Manual staffing higher than Plan.

Manual overtime higher than forecast by approximately 24,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> (120% over plan).

Comstock $ 1.4 million over Manual and Non-Manual overtime over the forecast. (Manual overtime being 152% over and Non-Manual overtime being 74% over)

Johnson Controls $. 5 million over Manual and Non-Manual overtime forecast. (Manual overtime being 106% over and Non-Manual overtime being 177% over) 56

Other Misc. $ 2.6 million under

+Total Construction $ 4.7 million over Headquarter Labor $ 8.8 million over manpower requirements greater than forecast, and October's Bill paid on schedule.

HQ NSSS/PGCC $ 1.6 million under Realization of negotiated credits Headquarter P.O.'s $ 2.6 million under

  • Total Headqrtrs. $ 4.6 million over
  • Client Cost $ .6 million over
  • Contingency $ 3.4 million under TOTAL PROJECT $ 6.5 million over 57

PROJECT FORECAST 3.5 3.2 INC CONT-3.0 -PLAN LESS CONT z0I 2.9 2.8 2,7 g 2.6 2.5

p. 2.4 Q

2.3 2.2 2.1 2.0 1.9 1.8 DEC 83 JUN 84 DEC 84 JUN 85 DEC 85 JUN 86 DEC 86

+ ACT

<s)3-Dec-84 ss )sCOST CONIITtlEHT STATUS REPORT-HOV.84ss I l ESTI)fATED I PROJECTED I ,8/15/80 EST INATE 4/84 I 11/84 I 11/84


" -I 1

DESCRIPTIOH I- - I/I/83 REVISED I CONTRACT a EXPENDED a COST TO I FINAL I I I OR16IHAL )REFORHATED I ESTIHATE I ESTIHATE ICOkNITHEHT a I COHPLETE I COST I I I I I I I I I I I I I I A. CONSTRUCTION I I I I I I I I I.CONTRACTS I I s i.NALSH I $ 176,261 I $ 179,915 I $ 192)455 I $ 243,837 $ 243)837 I $ 237,127 s $ 6,710 l $ 240,832

b. ITT 6RINNELL I $ 126)732 I $ 144,391 e. 5223)574 I $ 252,538 s 5240,347 s $ 242) 136 a $ 10,402 e $ 256>758 a c.L K CGNSTOCK $ 58)619 561,281 I 575)990 I t152,432 s $ 152,432 a $ 121>241 I $ 31>191 I $ 147)405 I d.JOHNSON COH'IROLS 5)3)136 I $ 14)818 a $ 21,423 I $ 32,052 532)051 I $ 21)251 I $ 10) 795 .I Q6,940 e.SCHNEIDER PNR $ 9>028 $ 9>028 I 5f1,041 I $ 31) 982 I $ 28,357 e t25,788 I $ 6,194 I $ 31)543 I I.OTHER s $ 284)152 I 5292)068 I Q15,671 I Q40,898 I 5304>016 5277,333 s $ 63>565 I $ 338,034 I I I I I I I I I I I I I I I I I I I 2.SMEC LABOR s $ 182,715 t203)576 ) 5213,322 I t402s571 $ 292,098 a 5292)098 I 5110,413 s $ 395)199 s I I I I I I I I I I I I I I I I I I I 3.NORK.CONP. Ic IHSUR. I $ 35)650 I $ 35,650 I t37)612 ) $ 23,992 522> 511 s $ 22)511 s $ 1,481 s 529,636 )

I I I I I I I I I I I I I I I I 4.FIELD P.O.'s 6 UTIL. $ 113)215 $ 121>757 s t142s413 ) $ 238,430 $ 198)468 $ 194,254 s $ 44s 176 ' $ 232,186 a I I I I ar I I I I SUBTOTAL I $ 999,508 I $ 1 > 062) 544 I 5 1) 233) 501 5 I ) 718) 732 stf)514)117 ISI)433)745 a $ 284)987 )Sf)709)133 I I I I I I I I I I I I I I I I I I I I I I I I B. HEADQUARTERS I I I I I I I I I I I I I I I I I I I I I ~ I I I I I I I s i. HQ SERVICES I $ 382,891 $ 388,231 I $ 415,184 s t571,305 I $ 519) 231 I $ 519)231 s $ 52) 074 I $ 571) 018 a I I I I I I I I I I I I I I I I I I I 2o PQA SERVICES a t25)002 I '25> 002 I $ 33) 361 I Q6) 349 I t32>20& a $ 32>206 s $ 4)143 e 536>644 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I CHOC P,O,'S. I I I I I I I I I

I a.NSSS fs P6CC s $ 145,934 $ 145)934 I $ 120)0f8 s $ 222)747 I t504) 609 I Sf&3) 051 I $ 59) 6'96 I $ 219) 147 a I

I b.T.G. I $ 36,306 I Q6,308 I t36)308 I $ 36,315 I INC ABOVE I $ 36)308 I $7 I $ 36)315 s I

I c.OTHER I $ 230,470 I $ 235)806 I 5254)650 I $ 289)054 I INC ABOVE I $ 251)092 I 53)>9K2 I $ 288,254 I I I I I I I I I I SUBTOTAL $ 820)603 $ 831)281 I $ 859>52f 1$ 1) 155)770 1 51) 056) 046 1 51) 001) 888 I t153) 882 151) 151) 318 I I I I I I I I I I I I ~ I I I I I I I C. CLIEHT COST (I) s $ 234> 889 $ 234)889 I $ 222)978 e $ 2'90)498 I t180) 229 I $ 180) 229 I $ 110) 269 I $ 290) 498 s I I I I I I I I I I I I I I I I I I I s D. CONTIH6EHCY I QI5)000 I $ 271)286 a 5334~000 I $ 205)000 50 I $0 I $ 205>000 I $ 218)991 I I I I I I I I

I I I I I I I I I I I I I I I I I I I 6RAND TOTAL I 52,400,000 I '52> 400> 000 I $ 2> 650) 000 I Q> 370> 000 l52,750,392 l$ 2,615,862 I $ 154,138 I t3,370,000 I I

(I) CLIENT COST IHCLUDES UHIT tf ADHIH B).DS COST fs AFUDC COST($ 2>58)>49) I> $ 5,290,799 RESP.)

5< NOTE: ALL DOLLARS ARE IH THOUSANDS 55

      • NOTE: This report is an extraction of various Stone & Webster reports 59

IX. COST (Continued)

C. Common Facilities A proposed plan for allocating tHe costs of common facilities between Units 1 and 2 has been developed. the plan'as been provided to the Cotenants.

Contin enc Mana ement Pro ram The Project is currently reviewing the cash requirement to complete. As a part of this evaluation, the contingency will be assessed. The results will be provided in this section at the conclusion of this assessment.

60

RECORDS/INFORMATION MANAGEMENT A. Progress made during the last month:

1. The review has been completed on 1850 ITT CAT II Hanger Packages and approximately 1400 have been turned over to the NMP2 Record Acceptance Center.
2. Record status activities have been completed per the current component lists for the following BIPs'5.001, 15.002, 14.001, 14.002, 72.001 - 72.0010, 72.B01 - 72.B16, 10B01, 22.801, 22.A01, 10.COl, 4.004 and 4.003. Anticipated changes will be required as component lists are redefined by Startup and Test.
3. Program Implementation - Status
1. Site Document Control - procedures have been reviewed by Records Management and comments are being incorporated.
2. FQC - QAD 17.1 has been approved on site and is currently awaiting approval by SWEC-QA Boston.
3. ITT Grinnell - All five (5) Records Management Procedures have been approved and 48 Documentation Turnover Transmittals have been prepared to initiate turnover of backl ogged documentation. Indexing conventions have been approved to support the review activities.

4; JCI - Procedure QAS 18.01 has been approved and QAS 18.02 and 18.03 are in final review stages, Indexing conventions have been approved to support review activities.

5. RCI - Procedures QAI 17.1 and 17.2 are in final approval cycle and are scheduled for issue on 12/21/84.
6. NMPC-QA Projects - Program has been assessed and procedure revisions are bei ng drafted.
7. Startup and Test - Procedure SAP 104A and 104B have been approved. SAP 104E has been drafted and is scheduled for review by Records Management and Star tup,and Test.
4. Project Procedures PP 103, 104, 105, 106, 107, 108, 110, and 112 covering Records Management activities were issued on ll/20/84.
5. Records Management Personnel have been relocated to the Record Acceptance Center (RCA). The RAC is currently set up to process Category II 8 III documentation. Category I p'rocessing will commence when construction activities are complete.
6. The Preliminary Required Records List has been completed and di stributed for revi ew by Engi neer i ng, Licensi ng, Qual ity Assurance and Startup and Test.

61

7. The NMP2 Records Management Organi zation has successful ly completed the activities in support of the 400,000 records milestone on the NMP2 Records Database.

B. Major Acti vities in Progress:

1. Methodology being developed for statusing procurement documentation in support of Startup and Test. Statusing in support of initial system turnovers began on 12/12/84.
2. Completion of the Record Acceptance Center and related equipment which include:

'a ~ Roof on Vault

b. fire Protection C. Key Card Access
d. Vault Doors
e. HVAC These activities are scheduled for completion by 1/18/85.
3. Review activities by the NMP2 Record Users Group in support of the issuance of the NMP2 Required Records List by 1/15/85.

C. Record Turnover The following are estimated percents complete of SWEC turnover of documentation to the NMPC Permanent Plant file.

  • Total Turnover of CHOC Documents 88% Complete

+Total Turnover of SWEC Site Documents 14% Complete Total Turnover of ALL SWEC Documents 26% Complete The f oil owi ng are estimated percents compl ete o f NMPC Syracuse Turnover of documentation to the Permanent Plant file.

Total Turnover of NMPC Syracuse Documents 87% Complete The total estimated percent complete of turnover documentation to the.PPF 33%

Complete.'Estimates adjusted for CHOC and Site due to reallocation of record's source from Site to CHOC.

62

Note 1 Fuel Load NMP2 PERMANENT PLANT FILE Note 2 Commercial Operation COMPUTER INDEXED ENTRIES yv PLANNED VS. ACTUAL (IN TNoooANoos Note 2 Note 1 OPO 0

Anticipated X-Recovery Program

c. g g cC os z c. g 'g t ~ os z c K g c.c os Z z z q NS 0 g z SN m CS g as ~ s ts e: c 1984 1985 1986 The following tables summarize the production levels of record receipt, preparation, filming and indexing into the Permanent Plant File.

Total to Percent December November Date ~Com lete

~Ac t i v i t Record Receipt and 68,824 152, 458 2,665,405 33%

Preparation (Includes Pages Pages Pages Aperture Cards Records Microfilming 59,835 136 953 2, 271, 614 28$

And Verification Pages Pages Pages (Includes Aperture Cards)

Computer Indexed 23,283 10,530 409,523 63$

Entries Entries'7, Entries Entries Records Indexing and 714 10,872 623,872 26$

Document Entry Documents Documents Documents Percent complete is based on an estimated 2,400,000 documents comprising 8,000,000 pages and 650,000 computer index entries required for Permanent Plant File entry by fuel load.

63

NMP2 PERMANENT PLANT FILE Note 1 Fuel Load DOCUMENTS INDEXED Note 2 Commercial Operation PLANNED VS. ACTUAL UN TNOUSANOSI ACTUAL T ~ 00 Note 2 T 000 SCOO Note 1 0

0 0000 C

0000 II I coo N

Ieoo S

I COO I TOO I

IOOO 0

~ oo X

X

~ oo Anticipated 0 p@pQ X-Recovery F 00 Program Too r r ~g c C

x ~ r r c comp x I r r c UI Z c r r c- CO Z III O

<< <<C C m O

% Te TN C m 1983 1984 1985 1986 NMP2 PERMANENT PLANT FILE PAGES ENTERED PLANNED VS. ACTUAL CIN TNOUSANOSI ACTUAL P

~ 000 Note 2

~ 000 Note 1 TOOO A

0 oooo S

oooo N

T sooo X 8 II S

TOOO pp pQ Anticipated p pp X-Recovery 1000 Program r r r ~'r LC coIII O2

<<g r r Cr r r

~ g cc co'x x sT <<r C 0

m p O c

TA z )y, g <<r p c c co III p

x O

c m

1983 ~ 1984 1985 1986 64

XI. LICENSING A. FSAR Status A total of 850 questions relative to the FSAR and ER-OLS have been received from the NRC. For 'his period, 840 responses are complete, and the remaining ten open questions are confirmatory.

Amendment 15 was sent to the NRC November 21, 1984.

B. Safety Evaluation Report (SER) Status There are 233 SER open items and an additional 80 Power Systems SER items for a total of 313. Me believe that 305 SER items are NHPC action complete.

C. 50.55(e) Reports Twelve 50.55(e) Reports were sent to the NRC;

l. Velan Valves - PWHT (55(e)-84-22), Final Report.
2. Cable Separation in Free Air (55(e)-84-48), Interim Report.
3. Defective Wiring (55(e)-84-31), Final Report.
4. RCIC Turbine Steam Admission Line (55(e)-84-33), Final Report.
5. Hin. Wall Violation-ITT Grinnell (55(e)-84-49), Interim Report.
6. Hin. Mall Violation-JCI-Tubing (55(e)-84-50), Interim Report.
7. Rosemont Master Trip Units (55(e)-84-34), Final Report.
8. Non-blunt Stencils (55(e)-84-51), Interim Report.
9. Topaz inverters-(55(e)-84-52), Interim Report
10. Traceabi lity of Spare Parts, (55(e)-84-53), Interim Report.

ll. ()A Witness Cable Terminations, (55(e)-84-45), Final Report.

12. Voltage Profile on Diesel Generator (55(e)-84-54), Interim Report.

D. 50.55(e)'s Identified Two items were reported to the NRC as potential deficiencies under 10CFR50. 55e.

l. Diesel Generator Voltage Profile (55(e)-84-54)
2. Undersized Melds on Hul ti function Support System (55(e)-84-55)

'5

E. Ins ection Re orts No Responses were required since no violations have been identified.

F. Advisory Committee on Reactor Safety (ACRS) -(Meeting Preparation)

The first ACRS mock meeting was held November 5 and 6. The second mock meeting originally scheduled for November 28 and 29 has been cancelled due to a conflict with the Hope Creek ACRS subcommittee meeting. Several of the NMP2 presenters will be requested to attend the Hope Creek meeting. Another mock meeting will be scheduled at a later date..

66

G.

STATUS OF RESPONSES TO BRANCH TECHNICAL QUESTIONS I NUMBER OF RESPONSES SCHEDULE FOR RESPONSE COMPLETION Technical Question Questions 1985 Areas Received Completed Outstanding INSTRUMENT AND CONTROLS* 85 85 421 5 DISCREPANCIES RADIOLOGIC 470, 471 62 59 EFFLUENT 460, 451, 810 PIPING 210 168 166 STRUCTURE/220 SEISMIC-230 GEOLOGY-231 HYDROLOGY-240 GEOTECH-241 STRUCTURAL AUDIT EQUIPMENT 13 10 QUAL.

270 271 QA 260 51 51 FIRE 33 33 PROTECTION 280 POWER 118 117 SYSTEM 430 CONTAINMENT 67 67 REACTOR PHYSICS CORE PERFORM 480, 491, 492 REACTOR SYSTEM 440 AUXILIARY 51 51 SYSTEM 410 67

STATUS OF RESPONSES TO BRANCH TECHNICAL QUESTIONS NUMBER OF RESPONSES SCHEDULE FOR RESPONSE COMPLETION Technical Question Areas Questions

~C1 ~di 1985 STARTUP 5 41 40 TEST 640 OTHER 61 60 100, 250, 251 252, 281, 311 450, 620, 630 730 TOTALS 850 840 10 10 68

I I

I