ML18092A300: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/25/1984
| issue date = 09/25/1984
| title = Forwards NPDES Discharge Monitoring Rept for Aug 1984. Discharge Reporting of Data & Accuracy of Results Reflect Working Environ,Design Capabilities & Reliability of Instrumentation.Exclusion Explanations Encl
| title = Forwards NPDES Discharge Monitoring Rept for Aug 1984. Discharge Reporting of Data & Accuracy of Results Reflect Working Environ,Design Capabilities & Reliability of Instrumentation.Exclusion Explanations Encl
| author name = RONAFALVY J P
| author name = Ronafalvy J
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name = RADOW E
| addressee name = Radow E
| addressee affiliation = NEW JERSEY, STATE OF
| addressee affiliation = NEW JERSEY, STATE OF
| docket = 05000272, 05000311
| docket = 05000272, 05000311
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station Ellen Radow -Chief Bureau of Permits Admin. Division of W2ter Resources CN-029 Trenton, NJ 08625  
{{#Wiki_filter:..
Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station September 25, 1984 Ellen Radow - Chief Bureau of Permits Admin.
Division of W2ter Resources CN-029 Trenton, NJ 08625


==Dear Ms:==
==Dear Ms:==
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM DISCHARGE MONITORING REPORTS SALEM NUCLEAR GENERATING STATION PERMIT NO. NJ0005622 September 25, 1984 .. Attached are Lhe Discharge Monitoring Report forms for Salem Nuclear Station containing the information as . quired in Permit No *. NJ0005622 for the month of August 1984. . . The information contained in this report the observed results required by the Environmental Protection Agency and the. New Jersey Department of Environmental Protection, obtained in accordance with approved methods with respect to sampling, analy-sis, monitoring and methods of reporting.
 
* The reporting of .the data and the accuracy of the reflect the working design capabilities and of the instrumentation.
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM DISCHARGE MONITORING REPORTS SALEM NUCLEAR GENERATING STATION PERMIT NO. NJ0005622 Attached are Lhe Discharge Monitoring Report forms for Salem Nuclear Gener~ting Station containing the information as re-
Discharge sampling locations 482 and 485 are set up and used for ongoing entrainment studies. This precludes any sampling activities  
    . quired in Permit No *. NJ0005622 for the month of August 1984.
.. Since all chemical treatments of or discharges to the circulating water system common with at least one other discharge, those values are assumed to be identical.
The information contained in this report present~ the observed results required by the Environmental Protection Agency and the.
This assumption is made for all identifieQ.
New Jersey Department of Environmental Protection, obtained in accordance with approved methods with respect to sampling, analy-sis, monitoring and methods of reporting.
parameters.  
* The reporting of .the data and the accuracy of the re~ults reflect the working ~nvironment, design capabilities and rel~ability of the instrumentation.
* --. 940925 . (  
Discharge sampling locations 482 and 485 are set up and used for ongoing entrainment studies. This precludes any sampling activities ..
\. AD . . The Energy People 95-2189 (20M) 11-81
Since all chemical treatments of or discharges to the circulating water system ~re common with at least one other discharge, those values are assumed to be identical. This assumption is made for all identifieQ. parameters.                                           *
'" .. I NP DES .... Discharge Moni tori9 Reports 9/25/84 The columns labeled, "No,.Ex.", in the enclosed Discharge Monitoring Report forms tabulate the number of observed results that were above or below, as appropriate, the limits contained in the permit; the limits are reflected on the enclosed forms. Pursuant to Consent Order EPA-CWA-II-82-77 (May 27, 1983), entered by EPA and NJDEP, the following limits apply to the discharge from DSN 48C until July 1, 1985. * '' Discharge Limitation  
  -- .                 940925
....; Gross
.(
* Effluent Characteristics TSS Total Iron Total Copper Anunonia as NH 4 . Average Monthly Maximum Daily mg/l 40 1. 5 0.2 35 . mg/l 100 1.5 0.2 70 Exclusion explanations are included on an additional sheet. PDB:slg Attachment CC: Executive Director, DRBC Very truly yours, J. P. Ronafalvy . Technical Manager -Salem Operations Director, USNRC Office of Nuclear Reactor Regulation Dr. Richard Baker Vice President  
\.   ~OR AD 0
-Nuclear NPDES Report **Explanation of exc93ions August, 1984 9/25/84 The following exclusions are included in U.e attached report and explained below. Exclusions have not endangered nor significantly impacted health or the environment.
9410120 ~~0 o50002P7D~
DMR NO. 481 48C EXPLANATION TSS -Cause of high value undetermined.
The Energy People 95-2189 (20M) 11-81
TSS -Investiqation has indicated adequacy of facility to support two unit operation  
 
-construction of new facility is in progress.}}
NP DES                                                        9/25/84
'"   .... Discharge Moni tori9 Reports The columns labeled, "No,.Ex.", in the enclosed Discharge Monitoring Report forms tabulate the number of observed results that were above or below, as appropriate, the limits contained in the permit; the limits are reflected on the enclosed forms.
Pursuant to Consent Order EPA-CWA-II-82-77 (May 27, 1983), entered by EPA and NJDEP, the following limits apply to the discharge from DSN 48C until July 1, 1985.
* Discharge Limitation ....; Gross
* Average Monthly   Maximum Daily Effluent Characteristics              mg/l           . mg/l TSS                                    40                100 Total Iron                            1. 5              1.5 Total Copper                          0.2               0.2 Anunonia as NH                        35                70 4
Exclusion explanations are included on an additional sheet.
Very truly yours, QJ._'?.~~
J. P. Ronafalvy     .
Technical Manager -
Salem Operations PDB:slg Attachment CC:    Executive Director, DRBC Director, USNRC Office of Nuclear Reactor Regulation Dr. Richard Baker Vice President - Nuclear
 
NPDES Report                                         9/25/84
**Explanation of exc93ions August, 1984 The following exclusions are included in U.e attached report and explained below. Exclusions have not endangered nor significantly impacted health or the environment.
DMR NO.                     EXPLANATION 481                         TSS - Cause of high value undetermined.
48C                        TSS - Investiqation has indicated in-adequacy of facility to support two unit operation - construction of new facility is in progress.}}

Latest revision as of 07:18, 3 February 2020

Forwards NPDES Discharge Monitoring Rept for Aug 1984. Discharge Reporting of Data & Accuracy of Results Reflect Working Environ,Design Capabilities & Reliability of Instrumentation.Exclusion Explanations Encl
ML18092A300
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/25/1984
From: Ronafalvy J
Public Service Enterprise Group
To: Radow E
NEW JERSEY, STATE OF
Shared Package
ML18092A301 List:
References
NUDOCS 8410120340
Download: ML18092A300 (3)


Text

..

Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station September 25, 1984 Ellen Radow - Chief Bureau of Permits Admin.

Division of W2ter Resources CN-029 Trenton, NJ 08625

Dear Ms:

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM DISCHARGE MONITORING REPORTS SALEM NUCLEAR GENERATING STATION PERMIT NO. NJ0005622 Attached are Lhe Discharge Monitoring Report forms for Salem Nuclear Gener~ting Station containing the information as re-

. quired in Permit No *. NJ0005622 for the month of August 1984.

The information contained in this report present~ the observed results required by the Environmental Protection Agency and the.

New Jersey Department of Environmental Protection, obtained in accordance with approved methods with respect to sampling, analy-sis, monitoring and methods of reporting.

  • The reporting of .the data and the accuracy of the re~ults reflect the working ~nvironment, design capabilities and rel~ability of the instrumentation.

Discharge sampling locations 482 and 485 are set up and used for ongoing entrainment studies. This precludes any sampling activities ..

Since all chemical treatments of or discharges to the circulating water system ~re common with at least one other discharge, those values are assumed to be identical. This assumption is made for all identifieQ. parameters. *

-- . 940925

.(

\. ~OR AD 0

9410120 ~~0 o50002P7D~

The Energy People 95-2189 (20M) 11-81

NP DES 9/25/84

'" .... Discharge Moni tori9 Reports The columns labeled, "No,.Ex.", in the enclosed Discharge Monitoring Report forms tabulate the number of observed results that were above or below, as appropriate, the limits contained in the permit; the limits are reflected on the enclosed forms.

Pursuant to Consent Order EPA-CWA-II-82-77 (May 27, 1983), entered by EPA and NJDEP, the following limits apply to the discharge from DSN 48C until July 1, 1985.

  • Discharge Limitation ....; Gross
  • Average Monthly Maximum Daily Effluent Characteristics mg/l . mg/l TSS 40 100 Total Iron 1. 5 1.5 Total Copper 0.2 0.2 Anunonia as NH 35 70 4

Exclusion explanations are included on an additional sheet.

Very truly yours, QJ._'?.~~

J. P. Ronafalvy .

Technical Manager -

Salem Operations PDB:slg Attachment CC: Executive Director, DRBC Director, USNRC Office of Nuclear Reactor Regulation Dr. Richard Baker Vice President - Nuclear

NPDES Report 9/25/84

    • Explanation of exc93ions August, 1984 The following exclusions are included in U.e attached report and explained below. Exclusions have not endangered nor significantly impacted health or the environment.

DMR NO. EXPLANATION 481 TSS - Cause of high value undetermined.

48C TSS - Investiqation has indicated in-adequacy of facility to support two unit operation - construction of new facility is in progress.