{{#Wiki_filter:}} | {{#Wiki_filter:e UNIf Oconu Unit 2 (U') DATE 6-10-77 DOCKET NO. 50-270 PREPARED BY J. A. Reavis OPERATIhG STATUS | ||
: 1. REPORTING PERIOD: May 1 THROUGH May 31, 1977 GROSS HOURS IN REPORTING PERIOD: 744.00 | |||
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net): 860 | |||
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) | |||
: 4. REASONS FOR RESTRICTION (IF ANY) | |||
This Month Year to Date Cumulative | |||
: 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 671.91 __3548.67 17775.70 | |||
: 6. REACTOR RESERVE SHUTDOWN HOURS - - - | |||
: 7. HOURS GENERATOR ON-LINE 667.74 3539.47 17305.01 | |||
: 8. UNIT RESERVE SHUTDOWN HOURS - - - | |||
: 9. GROSS THERMAL ENERGY GENERATED (MWH) 1686648 8864517 41625779 | |||
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 569520 3007570 14163176 | |||
: 11. NET ELECTRICAL ENERGY GENERATED (MWH) , | |||
543551 2879108 13463231 | |||
: 12. REACTOR SERVICE FACTOR 90.31 97.95 74.36 | |||
: 13. REACTOR AVAILABILITY FACTOR 89.75 97.90 72.87 | |||
: 14. UNIT SERVICE FACTOR 89.75 97.69 72.39 | |||
: 15. UNIT AVAILABILITY FACTOR 89.75 97.69 72.39 | |||
: 16. UNIT CAPACITY FACTOR (Using Net 84.95 92.40 65.49 Capability) | |||
: 17. UNIT CAPACITY FACTOR (Using Design Mwe) 82.37 89.59 63.50 | |||
: 18. UNIT FORCED OUTAGE RATE 10.25 2.31 21.59 | |||
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:) | |||
: 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
July 10, 1977 REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT. | |||
I!OURS IN REPORTING PERIOD REACTOR AVAIL \ BILI 1Y FACTOR = HOURS REACTOR ' Q AgILGl.E TO OPERATE X 100 110URS IN RIF,G V Pdt100 UNIT SERVICE TACTOR = jiOITS CCf.ER@ i( A E-HOURS IN Ri.; :'t w q10D "T 100 UNIT AVAIL \BILITY FACTOR = U0t RS UNTT WAS AVATI.\nG TO r.EhERATE X 100 HOURS IN REPok!1NG PER10D UNIT CAPACITT FACTOR = NET ELECTRICAL PohER GENT.RATFD s. | |||
(N..t C.ip.ibility or Design (We-het).1 X HOURS IN !!EPor. flu. 0 PERIOD UNIT FORCED OUTACE RATE < TORCED OUTAGE HOURS -- -V 100 HOURS GENERATOR ON 1.INE + gCgA . | |||
DOCKET NO. 50-270 UNIT oconee Unit 2 DATE 6-10-77 AVERAGE DAILY UNIT POWER LEVEL MONTH May, 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) 1 827 17 816 827 816 2 18 828 816 3 39 4 832 20 829 812 5 2 788 811 6 22 819 812 7 23 8 821 24 823 809 9 25 821 813 10 26 11 27 810 12 28 609 819 13 29 - | |||
14 30 15 817 31 16 817 DAILY UNTT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe net for each day in the reporting month. | |||
Compute to the nearest whole megawatt. | |||
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical ratin; of the unit. there may be ..t easions when the daily average power level exceeds the 100'6 line (or the restricted power lesel line). In such c.ises, the average daily unit power output sheet should be footnoted to explain the apparent anomaly. | |||
DdCKET NO. 50-270 UNIT SHUTDOWNS UNIT NAMii Oconee Unit 2 DATli 6-10-77 REPORT MONTil May, 1977 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) RE ASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS s | |||
2 77-05-28 S 76.26 C 1 Refueling 4 | |||
(1) REASON (2) METHOD A--EQUIPMENT F ALLURE (EXPLAIN) 1-MANUAL B- MAINT. OR TEST. 2-MANUAL C- REl'ULLING SCRAM D-REGULATORY RESTRICHON 3- AUTOM ATIC 7 | |||
E-OPERATOR TRAINING AND SCRAM , | |||
LICENSE EXAMINATION 4-Other F- ADMINISTRATIVE G-OPERATIONAL ERROR (LXPLAIN) li-0TilLR (EXPLAIN) | |||
==SUMMARY== | |||
Reactor shutdown for refueling. | |||
__. . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ -}} |
Latest revision as of 07:09, 1 February 2020
ML19317E669 | |
Person / Time | |
---|---|
Site: | Oconee |
Issue date: | 06/10/1977 |
From: | Reavis J DUKE POWER CO. |
To: | |
Shared Package | |
ML19317E649 | List: |
References | |
NUDOCS 7912180835 | |
Download: ML19317E669 (3) | |
Text
e UNIf Oconu Unit 2 (U') DATE 6-10-77 DOCKET NO. 50-270 PREPARED BY J. A. Reavis OPERATIhG STATUS
- 1. REPORTING PERIOD: May 1 THROUGH May 31, 1977 GROSS HOURS IN REPORTING PERIOD: 744.00
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net): 860
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
- 4. REASONS FOR RESTRICTION (IF ANY)
This Month Year to Date Cumulative
- 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 671.91 __3548.67 17775.70
- 6. REACTOR RESERVE SHUTDOWN HOURS - - -
- 7. HOURS GENERATOR ON-LINE 667.74 3539.47 17305.01
- 8. UNIT RESERVE SHUTDOWN HOURS - - -
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 1686648 8864517 41625779
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 569520 3007570 14163176
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) ,
543551 2879108 13463231
- 12. REACTOR SERVICE FACTOR 90.31 97.95 74.36
- 13. REACTOR AVAILABILITY FACTOR 89.75 97.90 72.87
- 14. UNIT SERVICE FACTOR 89.75 97.69 72.39
- 15. UNIT AVAILABILITY FACTOR 89.75 97.69 72.39
- 16. UNIT CAPACITY FACTOR (Using Net 84.95 92.40 65.49 Capability)
- 17. UNIT CAPACITY FACTOR (Using Design Mwe) 82.37 89.59 63.50
- 18. UNIT FORCED OUTAGE RATE 10.25 2.31 21.59
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
July 10, 1977 REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT.
I!OURS IN REPORTING PERIOD REACTOR AVAIL \ BILI 1Y FACTOR = HOURS REACTOR ' Q AgILGl.E TO OPERATE X 100 110URS IN RIF,G V Pdt100 UNIT SERVICE TACTOR = jiOITS CCf.ER@ i( A E-HOURS IN Ri.; :'t w q10D "T 100 UNIT AVAIL \BILITY FACTOR = U0t RS UNTT WAS AVATI.\nG TO r.EhERATE X 100 HOURS IN REPok!1NG PER10D UNIT CAPACITT FACTOR = NET ELECTRICAL PohER GENT.RATFD s.
(N..t C.ip.ibility or Design (We-het).1 X HOURS IN !!EPor. flu. 0 PERIOD UNIT FORCED OUTACE RATE < TORCED OUTAGE HOURS -- -V 100 HOURS GENERATOR ON 1.INE + gCgA .
DOCKET NO. 50-270 UNIT oconee Unit 2 DATE 6-10-77 AVERAGE DAILY UNIT POWER LEVEL MONTH May, 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) 1 827 17 816 827 816 2 18 828 816 3 39 4 832 20 829 812 5 2 788 811 6 22 819 812 7 23 8 821 24 823 809 9 25 821 813 10 26 11 27 810 12 28 609 819 13 29 -
14 30 15 817 31 16 817 DAILY UNTT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical ratin; of the unit. there may be ..t easions when the daily average power level exceeds the 100'6 line (or the restricted power lesel line). In such c.ises, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
DdCKET NO. 50-270 UNIT SHUTDOWNS UNIT NAMii Oconee Unit 2 DATli 6-10-77 REPORT MONTil May, 1977 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) RE ASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS s
2 77-05-28 S 76.26 C 1 Refueling 4
(1) REASON (2) METHOD A--EQUIPMENT F ALLURE (EXPLAIN) 1-MANUAL B- MAINT. OR TEST. 2-MANUAL C- REl'ULLING SCRAM D-REGULATORY RESTRICHON 3- AUTOM ATIC 7
E-OPERATOR TRAINING AND SCRAM ,
LICENSE EXAMINATION 4-Other F- ADMINISTRATIVE G-OPERATIONAL ERROR (LXPLAIN) li-0TilLR (EXPLAIN)
SUMMARY
Reactor shutdown for refueling.
__. . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ -